Prismatic compass
Compass traversing:
Important Definition
 True meridian: Line or plane passing
through geographical north pole and
geographical south pole
 Magnetic meridian: When the magnetic
needle is suspended freely and balanced
properly, unaffected by magnetic
substances, it indicates a direction. This
direction is known as magnetic meridian.
The angle between the magnetic meridian
and a line is known as magnetic bearing or
simple bearing of the line.
North
pole
True meridian
Magnetic meridian
True bearing
Magnetic bearing
 Arbitrary meridian: Convenient direction is assumed as a meridian.
 Grid meridian: Sometimes for preparing a map some state agencies
assume several lines parallel to the true meridian for a particular
zone these lines are termed as grid meridian.
 Designation of magnetic bearing
 Whole circle bearing (WCB)
 Quadrantal bearing (QB)
 WCB: The magnetic bearing of a line measured clockwise from the North
Pole towards the line is known as WCB. Varies 0-360°
 Quadrantal Bearing: The magnetic bearing of a line measured
clockwise or anticlockwise from NP or SP (whichever is nearer to the
line) towards the east or west is known as QB. This system consists of 4-
quadrants NE, SE, NW, SW. The values lie between 0-90°
 QB of OA = N a E
 Reduced Bearing: When the whole circle bearing of a line is
converted to quadrantal bearing it is termed as reduced bearing.
 Fore and Back Bearing:
 In WCB the difference between FB and BB should be exactly 180°
 BB=FB+/-180°
 Use the +ve sign when FB<180°
 Use the –ve sign when FB> 180°
 Magnetic declination: The horizontal angle between the magnetic meridian and
true meridian is known as magnetic declination.
 Dip of the magnetic needle: If the needle is perfectly balanced before
magnetisation, it does not remain in the balanced position after it is magnetised. This
is due to the magnetic influence of the earth. The needle is found to be inclined
towards the pole. This inclination of the needle with the horizontal is known
as dip of the magnetic needle.
 Local Attraction
 Method of correction for traverse:
 First method: Sum of the interior angle should be equal to (2n-4) x 90. if not
than distribute the total error equally to all interior angles of the traverse. Then
starting from unaffected line the bearings of all the lines are corrected using
corrected interior angles.
 Second method: Unaffected line is first detected. Then, commencing from the
unaffected line, the bearing of other affected lines are corrected by finding the
amount of correction at each station.
Methods of traversing
 Chain traversing:
 Compass traversing: Fore bearings and back bearings between the traverse
leg are measured
 Theodolite traversing: Horizontal angles between the traverse legs are
measured. The length of the traverse legs are measured by chain/tape or by
stadia method
 Plane table traversing: Plane table is set at every traverse station in
clockwise and anticlockwise direction and the circuit is finally closed. During
traversing the sides of the traverse are plotted according to any suitable scale.
15 m
15 m
Checks on traverse: Closed traverse
 Check on closed traverse:
 Sum of the measured interior angles (2n-4) x 90°
 Sum of the measured exterior angles (2n+4) x 90 °
 The algebric sum of the deflection angles should be equal to 360°.
Right hand deflection is considered +ve, left hand deflection –ve
 Check on linear measurement
 The lines should be measured once each on two different days
(along opposite directions). Both measurement should tally.
 Linear measurement should also be taken by the stadia method.
The measurement by chaining and stadia method should tally.
Checks on traverse: Open traverse
 Taking cut-off lines: measured the
bearings and lengths of cut off
lines after plotting and tally with
actual values.
 Taking an auxiliary point: Take P
permanent point as auxiliary point
measured bearings and lengths of
P from each traverse point. If
survey is accurate, while plotting
all the measured bearing of P
should meet at P.
Problems:
 Convert the following WCBs to QBs
 (a) WCB of AB = 45°30’
(Ans 45°30’)
 (b) WCB of BC = 125°45’
(Ans 180- 125°45’ = 54° 15’)
 Fore bearing of the following lines are given. Find back bearing
 AB=S 30°30’ E
 BC=N 40°30’ W
 The magnetic bearing of a line AB is 135°30’ what will be the true
bearing, if the declination is 5°15’ W.
Problems
Contd…
Problems
Included angle at A= 280-180-40=60
=FB of DA-180-FB of AB
Included angle at B= 40+180-70= 150
=FB of AB+180-FB of BC
Included angle at C= 70+180-210
=FB of BC+180-FB of CD
Formula: FB of previous line+/-180-
FB of next line
Compass surveying

Contenu connexe

Tendances

Chain Surveying 2020.ppt
 Chain Surveying 2020.ppt Chain Surveying 2020.ppt
Chain Surveying 2020.pptAsadKhan606012
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingDolat Ram
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying neharajpl
 
Chain surveying
Chain surveyingChain surveying
Chain surveyingJNTUK
 
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTUVATSAL PATEL
 
Tacheometric surveying ppt
Tacheometric surveying pptTacheometric surveying ppt
Tacheometric surveying pptNaufil Sayyad
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2Muhammad Zubair
 
types of bearing
types of bearingtypes of bearing
types of bearingankit5597
 
Theodolite ppt in 7
Theodolite ppt in 7Theodolite ppt in 7
Theodolite ppt in 7Arun Kama
 
Theodolite angle measurement
Theodolite angle measurementTheodolite angle measurement
Theodolite angle measurementMujeeb Muji
 
Surveying by using Digital Theodolite
Surveying by using Digital TheodoliteSurveying by using Digital Theodolite
Surveying by using Digital TheodoliteEhab AL-Timimi
 

Tendances (20)

Levelling
LevellingLevelling
Levelling
 
Chain Surveying 2020.ppt
 Chain Surveying 2020.ppt Chain Surveying 2020.ppt
Chain Surveying 2020.ppt
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversing
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 
Module 1 tacheometry
Module 1 tacheometryModule 1 tacheometry
Module 1 tacheometry
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
 
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU
6. TACHOMETRIC SURVEYING (SUR) 3140601 GTU
 
Surveying and Leveling
Surveying and LevelingSurveying and Leveling
Surveying and Leveling
 
Tacheometric surveying ppt
Tacheometric surveying pptTacheometric surveying ppt
Tacheometric surveying ppt
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
 
Module-I SURVEYING-I [BTCVC304]
Module-I SURVEYING-I [BTCVC304]Module-I SURVEYING-I [BTCVC304]
Module-I SURVEYING-I [BTCVC304]
 
Triangulation survey
Triangulation surveyTriangulation survey
Triangulation survey
 
Theodolite survey
Theodolite surveyTheodolite survey
Theodolite survey
 
Curves
CurvesCurves
Curves
 
types of bearing
types of bearingtypes of bearing
types of bearing
 
Theodolite ppt in 7
Theodolite ppt in 7Theodolite ppt in 7
Theodolite ppt in 7
 
Theodolite angle measurement
Theodolite angle measurementTheodolite angle measurement
Theodolite angle measurement
 
Levelling
LevellingLevelling
Levelling
 
Surveying by using Digital Theodolite
Surveying by using Digital TheodoliteSurveying by using Digital Theodolite
Surveying by using Digital Theodolite
 

Similaire à Compass surveying

Compass surveying (1).ppt
Compass surveying (1).pptCompass surveying (1).ppt
Compass surveying (1).pptSrini Vasan
 
Compasssurveying 160050106053
Compasssurveying 160050106053Compasssurveying 160050106053
Compasssurveying 160050106053Sumit Nayani
 
1392741020 traverse survey
1392741020 traverse survey1392741020 traverse survey
1392741020 traverse surveyanjali adabala
 
Compass surveying
Compass surveyingCompass surveying
Compass surveyingAhmed Eid
 
traversing survey principles.docx
traversing survey principles.docxtraversing survey principles.docx
traversing survey principles.docxalexandermwaura
 
COMPASS AND PLANE TABLE SURVEYING
COMPASS AND PLANE TABLE SURVEYINGCOMPASS AND PLANE TABLE SURVEYING
COMPASS AND PLANE TABLE SURVEYINGLavanya Singh
 
Traverse Computations
Traverse ComputationsTraverse Computations
Traverse ComputationsBahzad5
 
Compass surveying
Compass surveyingCompass surveying
Compass surveyingRAHUL SINHA
 
Angular measurement
Angular measurementAngular measurement
Angular measurementKarnav Rana
 
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptxUnit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptxOKOKILOUISmefgi
 
CE(PC)403 Surveying & Geomatics
CE(PC)403 Surveying & GeomaticsCE(PC)403 Surveying & Geomatics
CE(PC)403 Surveying & GeomaticsBIKIMALLIK1
 
COMPASS SURVEYING btech civil ...-I.pptx
COMPASS SURVEYING btech civil ...-I.pptxCOMPASS SURVEYING btech civil ...-I.pptx
COMPASS SURVEYING btech civil ...-I.pptxAyushsharma131736
 

Similaire à Compass surveying (20)

Compass surveying.ppt
Compass surveying.pptCompass surveying.ppt
Compass surveying.ppt
 
Compass surveying (1).ppt
Compass surveying (1).pptCompass surveying (1).ppt
Compass surveying (1).ppt
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Compass Survaying
Compass SurvayingCompass Survaying
Compass Survaying
 
Compasssurveying 160050106053
Compasssurveying 160050106053Compasssurveying 160050106053
Compasssurveying 160050106053
 
1392741020 traverse survey
1392741020 traverse survey1392741020 traverse survey
1392741020 traverse survey
 
Traverse surveiying
Traverse surveiyingTraverse surveiying
Traverse surveiying
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
3.compass surveying
3.compass surveying3.compass surveying
3.compass surveying
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
traversing survey principles.docx
traversing survey principles.docxtraversing survey principles.docx
traversing survey principles.docx
 
COMPASS AND PLANE TABLE SURVEYING
COMPASS AND PLANE TABLE SURVEYINGCOMPASS AND PLANE TABLE SURVEYING
COMPASS AND PLANE TABLE SURVEYING
 
Traverse Computations
Traverse ComputationsTraverse Computations
Traverse Computations
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Angular measurement for surveying
Angular measurement for surveyingAngular measurement for surveying
Angular measurement for surveying
 
Angular measurement
Angular measurementAngular measurement
Angular measurement
 
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptxUnit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
 
CE(PC)403 Surveying & Geomatics
CE(PC)403 Surveying & GeomaticsCE(PC)403 Surveying & Geomatics
CE(PC)403 Surveying & Geomatics
 
Variations in Magnetic Declination
Variations in Magnetic DeclinationVariations in Magnetic Declination
Variations in Magnetic Declination
 
COMPASS SURVEYING btech civil ...-I.pptx
COMPASS SURVEYING btech civil ...-I.pptxCOMPASS SURVEYING btech civil ...-I.pptx
COMPASS SURVEYING btech civil ...-I.pptx
 

Plus de Land Surveyors United Community

Plus de Land Surveyors United Community (20)

Introduction to Land Surveying
Introduction to Land SurveyingIntroduction to Land Surveying
Introduction to Land Surveying
 
Survey instruments
Survey instrumentsSurvey instruments
Survey instruments
 
Sokkia spectrum survey field reference manual
Sokkia spectrum survey field reference manualSokkia spectrum survey field reference manual
Sokkia spectrum survey field reference manual
 
Sokkia set20 k
Sokkia set20 kSokkia set20 k
Sokkia set20 k
 
Sokkia set6 manual
Sokkia set6 manualSokkia set6 manual
Sokkia set6 manual
 
Sokkia setx10 instruction_manual
Sokkia setx10 instruction_manualSokkia setx10 instruction_manual
Sokkia setx10 instruction_manual
 
Sokkia sdr-8100 operations manual
Sokkia sdr-8100 operations manualSokkia sdr-8100 operations manual
Sokkia sdr-8100 operations manual
 
216 surveying traverse explained
216 surveying traverse explained216 surveying traverse explained
216 surveying traverse explained
 
nikon nivo m-series instruction manual
nikon nivo m-series instruction manualnikon nivo m-series instruction manual
nikon nivo m-series instruction manual
 
Land Surveying Resources Handbook
Land Surveying Resources HandbookLand Surveying Resources Handbook
Land Surveying Resources Handbook
 
Fundamentals hp33s exam-review
Fundamentals hp33s exam-reviewFundamentals hp33s exam-review
Fundamentals hp33s exam-review
 
Using the scientific calculator
Using the scientific calculatorUsing the scientific calculator
Using the scientific calculator
 
Complex numbers & vectors hp35s overview
Complex numbers & vectors hp35s overviewComplex numbers & vectors hp35s overview
Complex numbers & vectors hp35s overview
 
Using the hp35s Calculator
Using the hp35s CalculatorUsing the hp35s Calculator
Using the hp35s Calculator
 
Programming 33s simple
Programming 33s simpleProgramming 33s simple
Programming 33s simple
 
Summing up 33_s
Summing up 33_sSumming up 33_s
Summing up 33_s
 
Hp33s calculator user_guide
Hp33s calculator user_guideHp33s calculator user_guide
Hp33s calculator user_guide
 
Programming Hp33s talk v3
Programming Hp33s talk v3Programming Hp33s talk v3
Programming Hp33s talk v3
 
Trimble R8 gnss r6-5800-364_userguide
Trimble R8 gnss r6-5800-364_userguideTrimble R8 gnss r6-5800-364_userguide
Trimble R8 gnss r6-5800-364_userguide
 
Nikon DTN502 instruction-manual-english
Nikon DTN502 instruction-manual-englishNikon DTN502 instruction-manual-english
Nikon DTN502 instruction-manual-english
 

Dernier

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 

Dernier (20)

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 

Compass surveying

  • 3. Compass traversing: Important Definition  True meridian: Line or plane passing through geographical north pole and geographical south pole  Magnetic meridian: When the magnetic needle is suspended freely and balanced properly, unaffected by magnetic substances, it indicates a direction. This direction is known as magnetic meridian. The angle between the magnetic meridian and a line is known as magnetic bearing or simple bearing of the line. North pole True meridian Magnetic meridian True bearing Magnetic bearing
  • 4.  Arbitrary meridian: Convenient direction is assumed as a meridian.  Grid meridian: Sometimes for preparing a map some state agencies assume several lines parallel to the true meridian for a particular zone these lines are termed as grid meridian.  Designation of magnetic bearing  Whole circle bearing (WCB)  Quadrantal bearing (QB)  WCB: The magnetic bearing of a line measured clockwise from the North Pole towards the line is known as WCB. Varies 0-360°
  • 5.  Quadrantal Bearing: The magnetic bearing of a line measured clockwise or anticlockwise from NP or SP (whichever is nearer to the line) towards the east or west is known as QB. This system consists of 4- quadrants NE, SE, NW, SW. The values lie between 0-90°  QB of OA = N a E  Reduced Bearing: When the whole circle bearing of a line is converted to quadrantal bearing it is termed as reduced bearing.  Fore and Back Bearing:  In WCB the difference between FB and BB should be exactly 180°  BB=FB+/-180°  Use the +ve sign when FB<180°  Use the –ve sign when FB> 180°
  • 6.  Magnetic declination: The horizontal angle between the magnetic meridian and true meridian is known as magnetic declination.  Dip of the magnetic needle: If the needle is perfectly balanced before magnetisation, it does not remain in the balanced position after it is magnetised. This is due to the magnetic influence of the earth. The needle is found to be inclined towards the pole. This inclination of the needle with the horizontal is known as dip of the magnetic needle.  Local Attraction  Method of correction for traverse:  First method: Sum of the interior angle should be equal to (2n-4) x 90. if not than distribute the total error equally to all interior angles of the traverse. Then starting from unaffected line the bearings of all the lines are corrected using corrected interior angles.  Second method: Unaffected line is first detected. Then, commencing from the unaffected line, the bearing of other affected lines are corrected by finding the amount of correction at each station.
  • 7.
  • 8.
  • 9. Methods of traversing  Chain traversing:  Compass traversing: Fore bearings and back bearings between the traverse leg are measured  Theodolite traversing: Horizontal angles between the traverse legs are measured. The length of the traverse legs are measured by chain/tape or by stadia method  Plane table traversing: Plane table is set at every traverse station in clockwise and anticlockwise direction and the circuit is finally closed. During traversing the sides of the traverse are plotted according to any suitable scale. 15 m 15 m
  • 10. Checks on traverse: Closed traverse  Check on closed traverse:  Sum of the measured interior angles (2n-4) x 90°  Sum of the measured exterior angles (2n+4) x 90 °  The algebric sum of the deflection angles should be equal to 360°. Right hand deflection is considered +ve, left hand deflection –ve  Check on linear measurement  The lines should be measured once each on two different days (along opposite directions). Both measurement should tally.  Linear measurement should also be taken by the stadia method. The measurement by chaining and stadia method should tally.
  • 11. Checks on traverse: Open traverse  Taking cut-off lines: measured the bearings and lengths of cut off lines after plotting and tally with actual values.  Taking an auxiliary point: Take P permanent point as auxiliary point measured bearings and lengths of P from each traverse point. If survey is accurate, while plotting all the measured bearing of P should meet at P.
  • 12. Problems:  Convert the following WCBs to QBs  (a) WCB of AB = 45°30’ (Ans 45°30’)  (b) WCB of BC = 125°45’ (Ans 180- 125°45’ = 54° 15’)  Fore bearing of the following lines are given. Find back bearing  AB=S 30°30’ E  BC=N 40°30’ W  The magnetic bearing of a line AB is 135°30’ what will be the true bearing, if the declination is 5°15’ W.
  • 14.
  • 16. Problems Included angle at A= 280-180-40=60 =FB of DA-180-FB of AB Included angle at B= 40+180-70= 150 =FB of AB+180-FB of BC Included angle at C= 70+180-210 =FB of BC+180-FB of CD Formula: FB of previous line+/-180- FB of next line