LAUREL INTERMEDIATE / MIDDLE SCHOOL
CONDITIONAL ASSESSMENT
PRESENTED BY: JIM BAKER, P.E.
MACINTOSH ENGINEERING
APRIL 9, 2014
CONDITIONAL ASSESSMENT
(1921 BUILDING ASSESSMENT)
•ROOF & FLOOR CONSTRUCTION
•ROOF CONSTRUCTION
•1ST & 2ND FLOOR FRAMING CONSTRUCTION
•INTERIOR & EXTERIOR BRICK WALLS
•INTERIOR BEARING WALLS
•EXTERIOR BEARING WALLS
•EXISTING STEEL LINTELS SUPPORTING BEARING WALLS
•EXISTING CONCRETE KNEEWALL
•ARCHITECTURAL FEATURES
•LIMESTONE COPING / ARCHITECTURAL FEATURES
•MISCELLANEOUS ITEMS
•ITEMS REQUIRING REMEDIATION
1921 ORIGINAL STRUCTURE
OVERALL BUILDING LAYOUT PLAN
ROOF & FLOOR CONSTRUCTION
EXISTING ROOF CONSTRUCTION
- SIGNS OF WATER INFILTRATION IN 2ND FLOOR CEILING
ROOF & FLOOR CONSTRUCTION
EXISTING ROOF CONSTRUCTION
- ANTICIPATE ROOF REINFORCING FOR NEW MECHANICAL
UNITS & PLUMBING
ROOF & FLOOR CONSTRUCTION
- ANTICIPATE NEW FLOOR OPENINGS
- REQUIRES REINFORCING OF EXISTING FLOOR FOR NEW
OPENINGS & FLOOR INFILL
- NEW MECHANICAL PIPING LOCATED IN
CORRIDORS
- WILL REQUIRE REINFORCING / STEEL PLUMBING SUPPORT
FRAME TO SUPPORT NEW PIPING
- CONCRETE REPAIR OF EXISTING FIRST FLOOR
- REPAIR OF EXISTING SPALLING CONCRETE SUPPORT
MEMBERS
- POTENTIAL REINFORCING OF EXISTING FLOOR
LOCATED UNDER CURRENT LIBRARY
- DEPENDENT ON FUTURE USAGE & EXISTING FRAMING
CAPACITY
1ST & 2ND FLOOR CONSTRUCTION
INTERIOR & EXTERIOR BRICK WALLS
- EXISTING AREAS OF HORIZONTAL & STEP CRACKING
- ANTICIPATE NEW OPENINGS IN EXISTING WALLS
- FOR ADA ACCESSIBILITY & MECHANICAL OPENINGS
INTERIOR BEARING WALLS
INTERIOR BEARING WALLS
INTERIOR & EXTERIOR BRICK WALLS
EXISTING HORIZONTAL CRACKING CONDITION
INTERIOR & EXTERIOR BRICK WALLS
EXTERIOR BRICK WALLS
- CRACKING AT EXTERIOR BRICK CHIMNEY LOCATION
INTERIOR & EXTERIOR BRICK WALLS
EXTERIOR BRICK WALLS
- EVIDENCE OF WATER INFILTRATION ON WALLS &
WINDOWS
INTERIOR & EXTERIOR BRICK WALLS
EXISTING STEEL LINTELS
- CORROSION OF EXISTING EXTERIOR STEEL LINTELS
INTERIOR & EXTERIOR BRICK WALLS
EXISTING STEEL LINTELS
STEEL LINTEL CORROSION CONDITION
INTERIOR & EXTERIOR BRICK WALLS
STEEL LINTEL CORROSION CONDITION
EXISTING STEEL LINTEL
INTERIOR & EXTERIOR BRICK WALLS
EXISTING CONCRETE KNEEWALL
- VERITICAL & OPEN CRACKS IN CONCRETE KNEEWALL
INTERIOR & EXTERIOR BRICK WALLS
VERTICAL CRACKS AT CONCRETE KNEEWALL
ARCHITECTURAL FEATURES
LIMESTONE FEATURES
- REQUIRES EXTENSIVE STRUCTURAL ASSESSMENT TO
BE PERFORMED TO DETERMINE CONDITION
- VERIFY FASTNERS OF LIMESTONE SECTIONS TO
EXISTING SUBSTRATE
- PERFORM SOUNDING TEST TO DETERMINE CONDITION
ARCHITECTURAL FEATURES
LIMESTONE FEATURES
- DETERIORATION OF LIMESTONE HEADER BLOCKS
ABOVE WINDOWS
ARCHITECTURAL FEATURES
LIMESTONE FEATURES
- VERTICAL CRACKING IN LIMESTONE & DETERIORATED
JOINTS
ARCHITECTURAL FEATURES
LIMESTONE FEATURES
- SPALLING AT LIMESTONE ARCHITECTURAL COLUMNS
ARCHITECTURAL FEATURES
LIMESTONE FEATURES
- SPALLING / CRACKING OF LIMESTONE COPING &
DETERIORATED JOINTS
MISCELLANEOUS ITEMS
MISCELLANEOUS ITEMS REQUIRING REMEDIATION
- EXISTING PARAPET WALL REMEDIATION
- EXISTING STAIRS AT EAST AND WEST SIDES OF
BUILDING REMEDIATION
- EXISTING CONCRETE STAIRS ACCESSING BASEMENT
- EXISTING FRONT ENTRANCE STAIRS
SUMMARY
REQUIRED REMEDIATION ITEMS
- CONCRETE SPALLING AT FIRST FLOOR FRAMING
- BRICK WALL CRACKING
- WATER INFILTRATION AT WINDOWS & ROOF
- EXTERIOR CHIMNEY REMOVAL
- EXTERIOR STEEL LINTEL REPLACEMENT
- CONCRETE KNEEWALL CRACK REPAIR AT BUILDING
BASE
- REPAIR OF DELAMINATED LIMESTONE FEATURES
- AMOUNT OF REPAIRS DEPENDENT ON RESULTS OF AN
EXTENSIVE STRUCTURAL SURVEY
- REINFORCING OF PARAPET WALL
- EXISTING FRONT ENTRANCE AND BASEMENT STAIR
SUMMARY
ANTICIPATED STRUCTURAL RENOVATION ITEMS
- ROOF STRUCTURE REINFORCING FOR NEW MEP
SYSTEMS
- FLOOR STRUCTURE REINFORCING FOR NEW MEP
SYSTEMS
- NEW LINTELS SUPPORTING LARGER WALL OPENINGS
- NEW EXTERIOR RAMPS / STAIRS
- NEW ELEVATOR
- TOILET ROOM RENOVATIONS AND OTHER
MISCELLANEOUS CODE REQUIRED ROOM UPGRADES
QUESTIONS

Contenu connexe

Tendances

Commercial wallsystems (green)
Commercial wallsystems (green)Commercial wallsystems (green)
Commercial wallsystems (green)
mikedicks
 
Ce 1204 construction_techniques_equipments___practise
Ce 1204 construction_techniques_equipments___practiseCe 1204 construction_techniques_equipments___practise
Ce 1204 construction_techniques_equipments___practise
lotuseye
 
Scs – A World Of Possibilities R New
Scs – A World Of Possibilities R NewScs – A World Of Possibilities R New
Scs – A World Of Possibilities R New
neerajtri
 
REINFORCED CONCRETE PRECAST TWIN WALLS
REINFORCED CONCRETE PRECAST TWIN WALLSREINFORCED CONCRETE PRECAST TWIN WALLS
REINFORCED CONCRETE PRECAST TWIN WALLS
Guy Pomphrey
 
building materials
building materialsbuilding materials
building materials
nicocarlos
 
Building methods and construction technology 1
Building methods and construction technology 1Building methods and construction technology 1
Building methods and construction technology 1
hpinn
 

Tendances (20)

Commercial wallsystems (green)
Commercial wallsystems (green)Commercial wallsystems (green)
Commercial wallsystems (green)
 
Precast concrete - coen precast pty ltd
Precast concrete - coen precast pty ltdPrecast concrete - coen precast pty ltd
Precast concrete - coen precast pty ltd
 
Building Materials & Construction Module - 3
Building Materials & Construction Module - 3Building Materials & Construction Module - 3
Building Materials & Construction Module - 3
 
Curtain walls - As construction material
Curtain walls - As construction materialCurtain walls - As construction material
Curtain walls - As construction material
 
PREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMPREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEM
 
Site report
Site reportSite report
Site report
 
Ce 1204 construction_techniques_equipments___practise
Ce 1204 construction_techniques_equipments___practiseCe 1204 construction_techniques_equipments___practise
Ce 1204 construction_techniques_equipments___practise
 
Scs – A World Of Possibilities R New
Scs – A World Of Possibilities R NewScs – A World Of Possibilities R New
Scs – A World Of Possibilities R New
 
Dry wall profile
Dry wall profileDry wall profile
Dry wall profile
 
REINFORCED CONCRETE PRECAST TWIN WALLS
REINFORCED CONCRETE PRECAST TWIN WALLSREINFORCED CONCRETE PRECAST TWIN WALLS
REINFORCED CONCRETE PRECAST TWIN WALLS
 
Stick framing system with glazing
Stick framing system with glazingStick framing system with glazing
Stick framing system with glazing
 
Types of modern construction formwork
Types of modern construction formwork Types of modern construction formwork
Types of modern construction formwork
 
CURTAIN WALL
CURTAIN WALLCURTAIN WALL
CURTAIN WALL
 
building materials
building materialsbuilding materials
building materials
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction technique
 
Superstructure design
Superstructure designSuperstructure design
Superstructure design
 
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEMODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
 
Building methods and construction technology 1
Building methods and construction technology 1Building methods and construction technology 1
Building methods and construction technology 1
 
advanced construction
advanced constructionadvanced construction
advanced construction
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
 

Similaire à LIMS Conditional Assessment Presentation; 4-9-14

Big Water Visitor Center
Big Water Visitor CenterBig Water Visitor Center
Big Water Visitor Center
Ray Rankin
 
The Home Construction Process
The Home Construction ProcessThe Home Construction Process
The Home Construction Process
jillainedawn
 

Similaire à LIMS Conditional Assessment Presentation; 4-9-14 (20)

Structural Engineering | STEEL and REINFORCED CONCRETE STRUCTURES
Structural Engineering | STEEL  and  REINFORCED CONCRETE STRUCTURESStructural Engineering | STEEL  and  REINFORCED CONCRETE STRUCTURES
Structural Engineering | STEEL and REINFORCED CONCRETE STRUCTURES
 
Design of Retaining Wall
Design of Retaining WallDesign of Retaining Wall
Design of Retaining Wall
 
WALLS.pptx
WALLS.pptxWALLS.pptx
WALLS.pptx
 
Building Materials & Construction Module-2
Building Materials & Construction Module-2Building Materials & Construction Module-2
Building Materials & Construction Module-2
 
High rise
High rise High rise
High rise
 
Lecture 1 and 2 - Earth Retaining Structure (Introduction)
Lecture 1 and 2 - Earth Retaining Structure (Introduction)Lecture 1 and 2 - Earth Retaining Structure (Introduction)
Lecture 1 and 2 - Earth Retaining Structure (Introduction)
 
Turning torso
Turning torsoTurning torso
Turning torso
 
Telecommunication Tower
Telecommunication TowerTelecommunication Tower
Telecommunication Tower
 
Big Water Visitor Center
Big Water Visitor CenterBig Water Visitor Center
Big Water Visitor Center
 
Structural glazing final
Structural glazing finalStructural glazing final
Structural glazing final
 
The Home Construction Process
The Home Construction ProcessThe Home Construction Process
The Home Construction Process
 
Presentation MSc Thesis Federico Chinnici
Presentation MSc Thesis Federico ChinniciPresentation MSc Thesis Federico Chinnici
Presentation MSc Thesis Federico Chinnici
 
arcauated structure
arcauated structure arcauated structure
arcauated structure
 
High rise
High riseHigh rise
High rise
 
Retrofitting
RetrofittingRetrofitting
Retrofitting
 
Foundations. noel villas and apartments Builders in Kerala
Foundations. noel villas and apartments Builders in KeralaFoundations. noel villas and apartments Builders in Kerala
Foundations. noel villas and apartments Builders in Kerala
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
 
High rise construction
High rise constructionHigh rise construction
High rise construction
 
How to identify building defects
How to identify building defectsHow to identify building defects
How to identify building defects
 
Diaphragm wall construction
Diaphragm wall constructionDiaphragm wall construction
Diaphragm wall construction
 

Plus de laurelschooldistrict (7)

FY15 District Kickoff
FY15 District KickoffFY15 District Kickoff
FY15 District Kickoff
 
Superintendent's Report 4-16-14
Superintendent's Report 4-16-14Superintendent's Report 4-16-14
Superintendent's Report 4-16-14
 
Superintendent's Report to BOE 3-19-14
Superintendent's Report to BOE 3-19-14Superintendent's Report to BOE 3-19-14
Superintendent's Report to BOE 3-19-14
 
LSDS Capital Projects Community Forum 4-9-2014
LSDS Capital Projects Community Forum 4-9-2014LSDS Capital Projects Community Forum 4-9-2014
LSDS Capital Projects Community Forum 4-9-2014
 
Superintendent's Report; 2-19-14
Superintendent's Report; 2-19-14Superintendent's Report; 2-19-14
Superintendent's Report; 2-19-14
 
Laurel School District State of the District Report 11 20-13
Laurel School District State of the District Report 11 20-13Laurel School District State of the District Report 11 20-13
Laurel School District State of the District Report 11 20-13
 
Superintendent's Entry Plan Report
Superintendent's Entry Plan ReportSuperintendent's Entry Plan Report
Superintendent's Entry Plan Report
 

Dernier

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 

Dernier (20)

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 

LIMS Conditional Assessment Presentation; 4-9-14

  • 1. LAUREL INTERMEDIATE / MIDDLE SCHOOL CONDITIONAL ASSESSMENT PRESENTED BY: JIM BAKER, P.E. MACINTOSH ENGINEERING APRIL 9, 2014
  • 2. CONDITIONAL ASSESSMENT (1921 BUILDING ASSESSMENT) •ROOF & FLOOR CONSTRUCTION •ROOF CONSTRUCTION •1ST & 2ND FLOOR FRAMING CONSTRUCTION •INTERIOR & EXTERIOR BRICK WALLS •INTERIOR BEARING WALLS •EXTERIOR BEARING WALLS •EXISTING STEEL LINTELS SUPPORTING BEARING WALLS •EXISTING CONCRETE KNEEWALL •ARCHITECTURAL FEATURES •LIMESTONE COPING / ARCHITECTURAL FEATURES •MISCELLANEOUS ITEMS •ITEMS REQUIRING REMEDIATION
  • 3. 1921 ORIGINAL STRUCTURE OVERALL BUILDING LAYOUT PLAN
  • 4. ROOF & FLOOR CONSTRUCTION EXISTING ROOF CONSTRUCTION - SIGNS OF WATER INFILTRATION IN 2ND FLOOR CEILING
  • 5. ROOF & FLOOR CONSTRUCTION EXISTING ROOF CONSTRUCTION - ANTICIPATE ROOF REINFORCING FOR NEW MECHANICAL UNITS & PLUMBING
  • 6. ROOF & FLOOR CONSTRUCTION - ANTICIPATE NEW FLOOR OPENINGS - REQUIRES REINFORCING OF EXISTING FLOOR FOR NEW OPENINGS & FLOOR INFILL - NEW MECHANICAL PIPING LOCATED IN CORRIDORS - WILL REQUIRE REINFORCING / STEEL PLUMBING SUPPORT FRAME TO SUPPORT NEW PIPING - CONCRETE REPAIR OF EXISTING FIRST FLOOR - REPAIR OF EXISTING SPALLING CONCRETE SUPPORT MEMBERS - POTENTIAL REINFORCING OF EXISTING FLOOR LOCATED UNDER CURRENT LIBRARY - DEPENDENT ON FUTURE USAGE & EXISTING FRAMING CAPACITY 1ST & 2ND FLOOR CONSTRUCTION
  • 7. INTERIOR & EXTERIOR BRICK WALLS - EXISTING AREAS OF HORIZONTAL & STEP CRACKING - ANTICIPATE NEW OPENINGS IN EXISTING WALLS - FOR ADA ACCESSIBILITY & MECHANICAL OPENINGS INTERIOR BEARING WALLS
  • 8. INTERIOR BEARING WALLS INTERIOR & EXTERIOR BRICK WALLS EXISTING HORIZONTAL CRACKING CONDITION
  • 9. INTERIOR & EXTERIOR BRICK WALLS EXTERIOR BRICK WALLS - CRACKING AT EXTERIOR BRICK CHIMNEY LOCATION
  • 10. INTERIOR & EXTERIOR BRICK WALLS EXTERIOR BRICK WALLS - EVIDENCE OF WATER INFILTRATION ON WALLS & WINDOWS
  • 11. INTERIOR & EXTERIOR BRICK WALLS EXISTING STEEL LINTELS - CORROSION OF EXISTING EXTERIOR STEEL LINTELS
  • 12. INTERIOR & EXTERIOR BRICK WALLS EXISTING STEEL LINTELS STEEL LINTEL CORROSION CONDITION
  • 13. INTERIOR & EXTERIOR BRICK WALLS STEEL LINTEL CORROSION CONDITION EXISTING STEEL LINTEL
  • 14. INTERIOR & EXTERIOR BRICK WALLS EXISTING CONCRETE KNEEWALL - VERITICAL & OPEN CRACKS IN CONCRETE KNEEWALL
  • 15. INTERIOR & EXTERIOR BRICK WALLS VERTICAL CRACKS AT CONCRETE KNEEWALL
  • 16. ARCHITECTURAL FEATURES LIMESTONE FEATURES - REQUIRES EXTENSIVE STRUCTURAL ASSESSMENT TO BE PERFORMED TO DETERMINE CONDITION - VERIFY FASTNERS OF LIMESTONE SECTIONS TO EXISTING SUBSTRATE - PERFORM SOUNDING TEST TO DETERMINE CONDITION
  • 17. ARCHITECTURAL FEATURES LIMESTONE FEATURES - DETERIORATION OF LIMESTONE HEADER BLOCKS ABOVE WINDOWS
  • 18. ARCHITECTURAL FEATURES LIMESTONE FEATURES - VERTICAL CRACKING IN LIMESTONE & DETERIORATED JOINTS
  • 19. ARCHITECTURAL FEATURES LIMESTONE FEATURES - SPALLING AT LIMESTONE ARCHITECTURAL COLUMNS
  • 20. ARCHITECTURAL FEATURES LIMESTONE FEATURES - SPALLING / CRACKING OF LIMESTONE COPING & DETERIORATED JOINTS
  • 21. MISCELLANEOUS ITEMS MISCELLANEOUS ITEMS REQUIRING REMEDIATION - EXISTING PARAPET WALL REMEDIATION - EXISTING STAIRS AT EAST AND WEST SIDES OF BUILDING REMEDIATION - EXISTING CONCRETE STAIRS ACCESSING BASEMENT - EXISTING FRONT ENTRANCE STAIRS
  • 22. SUMMARY REQUIRED REMEDIATION ITEMS - CONCRETE SPALLING AT FIRST FLOOR FRAMING - BRICK WALL CRACKING - WATER INFILTRATION AT WINDOWS & ROOF - EXTERIOR CHIMNEY REMOVAL - EXTERIOR STEEL LINTEL REPLACEMENT - CONCRETE KNEEWALL CRACK REPAIR AT BUILDING BASE - REPAIR OF DELAMINATED LIMESTONE FEATURES - AMOUNT OF REPAIRS DEPENDENT ON RESULTS OF AN EXTENSIVE STRUCTURAL SURVEY - REINFORCING OF PARAPET WALL - EXISTING FRONT ENTRANCE AND BASEMENT STAIR
  • 23. SUMMARY ANTICIPATED STRUCTURAL RENOVATION ITEMS - ROOF STRUCTURE REINFORCING FOR NEW MEP SYSTEMS - FLOOR STRUCTURE REINFORCING FOR NEW MEP SYSTEMS - NEW LINTELS SUPPORTING LARGER WALL OPENINGS - NEW EXTERIOR RAMPS / STAIRS - NEW ELEVATOR - TOILET ROOM RENOVATIONS AND OTHER MISCELLANEOUS CODE REQUIRED ROOM UPGRADES