Prepared by:
Chiam Jia Ern
Hii Pai Ling
Lee Chun Yee
Lim Chern Yie
Yong Boon Xiong
SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
BACHELOR OF QUANTITY SURVEYING (HONOURS)
MANAGEMENT SCIENCE (MGT 60203)
Company Background
• Founder:
Lee Chun Yee, Yong Boon Xiong,
Lim Chern Yie, Hii Pai Ling, Chiam Jia Ern
• Started in November,2015
• Construction Company
• Specialize in residential projects.
Vision and Mission
Vision
• Calculus Sdn Bhd is committed to
be recognized as the contractor of
choice. We strive to be the
customer’s first choice and stand
out from our competition.
Mission
• To be an innovative, passionate
company that fully utilizes the latest
technology.
• To provide our customers the best quality
construction services at reasonable and
market competitive prices.
• To provide the highest level of
professionalism to our clients.
• To ensure our personnel are aligned with
our company’s core values, which are
“excellence, reliability and passion”.
Short term goals
• Attract and retain talented employees.
• Ensure all the employees understand and fulfill their own
roles.
• Advertise to let people know the existence of our
company, then develop a good impression by providing
good customer services to attract customers.
• Choose projects wisely. Only accepts projects that are
within our capability.
Mid-term goals
• Create a comfortable working environment for
our employees.
• Create an effective employee development
program.
• Establishing a positive reputation by constructing
superb quality projects which meet budget and
schedule goals.
Long term goals
• Establish a strong and efficient internal structure.
• Building a long term relationship with clients by offering reasonable price
and superb quality products.
• Always accept, listen and prioritize customers’ feedbacks.
• Acknowledge the contribution of employees and show appreciations by
rewarding them consistent.
• Diversify our construction businesses. Accept different genre of projects to
provide alternative services to different customers.
• Be the leading construction company in Malaysia.
Managing
Director
Vice Managing
Director
Quality Assurance
Administration
Manager
Human
Resource Officer
Accountant
Project Manager
Quantity
Surveyor
Engineer
Site Surpervisor
Project Manager
Quantity
Surveyor
Engineer
Site surpervisor
Project Manager
Quantity
Surveyor
Engineer
Site surpervisor
Job Scope
• Managing Director
i. Direct and control the work and resources.
ii. Establish and maintain effective formal and informal
links.
iii. Represent the Company in negotiations.
iv. Provide strategic advice and guidance to the staffs
• Vice Managing Director
i. Develop new business for the company.
ii. Bringing new clients for the company by acting as a high-level
sales person.
iii. Overseeing the process of recruiting and retaining of the
employees.
iv. Reporting of vital information on the company's overall
performance to the company's Managing Director.
Project Manager
• Progress
• Cost
• Quality
• Performance
(Value)
• Cash flow
• SHE
• Regulatory
• Reporting
• Engineer
i. Responsible for preparing the site.
ii. Controls machines, plants, and organizations
providing power, transportation, and communication
for the site.
iii. Selects methods, specifies materials, and
determines shapes to satisfy technical requirements
and to meet performance specification
• Quantity Surveyor
i. Managing the cost of construction project.
ii. Working to keep the project on time and
within budget.
iii. Preparing insurance replacement estimates
for all kind of buildings.
• Site Supervisor
i. Maintains safe, secure, and healthy work
environment.
ii. Prevents fines and interruptions.
iii. Meets construction budget.
• Quality Assurance
i. Assessing customer requirements and ensuring that these are
met.
ii. Specifying quality requirements of raw materials
iii. Working with operating staff to establish procedures,
standards, systems and procedures
iv. Ensuring that manufacturing processes comply with standards
• Administration Manager
i. Ensure effective information flow and resources are employed
efficiently.
ii. Add value to an organisation.
iii. Develop budgets for company and perform cost reduction research.
iv. Handling accounts.
v. Recruits and training employees.
vi. Provide report on employees’ performance for managing director.
• Accountant
i. Prepares asset, liability, and capital account entries.
ii. Understand how well or badly the organisation is
performing.
iii. Form a view on how the organisation, in whole or in
part, is likely to perform in the future.
• Human Resource Officer
i. Recruiting staff.
ii. Advising on pay and other remuneration
issues, including promotion and benefits.
iii. Undertaking regular salary reviews.
Interview activity
Phase 1
• Advertise job vacancies
a) Attract the right one
b) Focus on management
c) List of requirements
• Online Jobsites
• Social Networking
Hiring of applicants
• Estimate of 50-100 applicants
• Further proceed to basic interview Q & A
• Mostly based on leadership and
management questions
• The best remaining 20 applicants
Phase 2
• Event planning
a) Build reputation and interact
b) Planning of this event will take 3-4months
Organizing Teams
• Form 5 groups, each group consist of 4 people
• Each consists of 1 expirenced leader guiding them
• Team roles include:-
-Budget Planning
-Venue Selection
-Program Scheduling
-Marketing
-Event Safety Management
Budget Planning
• Develop an accurate and comprehensive budget
• Sponsorship
• Test negotiation and communication skills
Venue Selection
• Best venue to suit the event
• Various considerations:-
-Indoor/outside prerequisites
-Location and rough travel time to arrive
-Cost of utilizing the venue
-Services supplied
Program Scheduling
• Building up a running sheet
• Set-up of hardware, entry of VIPs, set-up
of tables
• Fine dining session
• Good Performance
• Management, communication and critical
thinking
Marketing
• Promote event
• Through banner, direct mail, social media,
newsapaper
• Design a suitable signage
• Boost advertising and planning skill
Event Safety Management
• To recognize danger then minimize any possible
accidents happen before, during or after the event
• Emergency services, traffic management, road closures,
alcohol management, food hygiene and fire
management
• Manage crowd control issues, the serving of alcohol and
the safe storage of money
Post-event evaluation
• Leader of group evaluate each
performance of the applicants
• Possess with all those technical and soft
skills
• Remain the best 5 applicants
Phase 3
• Final Interview
• Exchange situation: Applicants ask questions to the
Head of the Managing Director
• Its purpose is to test whether the candidates have the
ability to take the initiative to ask questions, understand
to take this opportunity to learn about the company's
background and cultural issues
• I would like to ask about applying this position is it facing
what kind of problems and challenges? In addition, how
is your company's expectations of the duties?
• This question can be eager to show the applicant is
serious about the job, and know how to take this
opportunity to learn about the most vital issues of the
post.
• Such action can show their loyalty to the company and
ready to contribute to the company
Management Trainee
• designed for particularly ambitious candidates.
• provide an opportunity to demonstrate the
abilities
• may lead to internal promotion within the
company.
• For the company, it provides a good succession
planning and improves morale of the company.
Introduction
Criteria
1. Good command of English speaks and written
2. Active in sports and extracurricular activities
3. Completion of a degree graduate qualification and the result
must achieve at least a CGPA score of 3.50 out of 4.00
4. Well-developed interpersonal and communication skills
5. Able to work independently and work with people of all levels
6. Have self-discipline and time management
7. Possess positive attitudes, hardworking, have strong analytical
and problem solving skills
Training and Development Plan
Duration : 2 Years
Months of First:
• Understand and familiar of overall company
(vision, mission, short term, midterm, long term
goals, organization chart and job scope of each
position)
• Experience manager will lead and coach them to job
duty assign
Months of two to eight:
• Apprenticeships (send to training center)
 Project Planning
 Project Control and Monitoring
 Managing the Quality of Site Work
 Developing and Managing People
 Improving Managerial Skills
 Contractual and Legal Responsibilities
 Managing Technology of Modern Construction
• Task:
Weekly need to submit reports for the things
learn and how to apply in our company
system
Months of nine to twenty-four:
Rotation in department of company
• Months of 9-15
Project Management Department
• Months of 16-19
Quality Assurance Department
• Months of 18-24
Administration Management Department
Final project
Prepare a presentation, need
• The overall they learn in this 2 years
• The things company needs to improve
• The department they most interested and
why they suitable for it
Information Technology
and
Information Management Skills
Microsoft Office 365 Home -RM 299.99
Microsoft Office 365 Home -RM 299.99
• It can be applied for five users.
• The contractor uses it for internet banking.
• The contractor can track the billing such as client’s
payment.
Microsoft Office 365 Home -RM 299.99
• All employees can access to all the emails, calendars,
contacts, photos, videos and documents through
Outlook cloud storage.
• Document- client’s projects, contracts, timesheets,
drawings, Bill Of Quantities and tenders.
• Every employee can use Skype for communicating,
online meetings, and audio or video call.
Building Design Suite Premium-RM 12179.60
CAD x BIM
Computer aided design (CAD)
• This software is widely used by architects,
engineers or designers.
• Used for creating two dimensional (2D) or
three dimensional (3D) models.
Building Design Suite Premium-RM 12179.60
Computer Aided Design (CAD)
• A civil engineers use it to produce preliminary
drawings.
• The drawings are used to visualize their ideas more
clearly to the project managers and the clients.
• They can view the 3D models from any angle by
rotating them and including all the details mentioned
in the design.
Building Design Suite Premium-RM 12179.60
Computer Aided Design (CAD)
• They can also link the drawings to the online for the
contractors and clients to view.
• The drawings are saved in the computer for the
engineers to edit it next time without redrawing all
components again.
Building Design Suite Premium-RM 12179.60
Building Information Modelling
(BIM)
A process of designing,
simulating, analyzing, managing
and document a 3D building
model that including the building
details.
Building Design Suite Premium-RM 12179.60
• The project teams can utilize a 3D BIM system for
structural design simulation.
• They can view every single section of the actual building
components through the virtual building models such as
columns, wall, staircase, beams, etc.
• The engineers can communicate with the contractor
before the real project commences to reduce the risk of
mistakes.
• Our clients, the owner of the building and the operator
can direct use the mobile devices or tablets to view the
building models without installing a BIM software.
Building Design Suite Premium-RM 12179.60
• The contractors can utilize a 4D schedule system for analysis and time scheduling.
• The contractors can use it to track the quantity take off, location-based quantities,
productivity rates, resources needed and labor costs through the project life cycles.
• They can provide the 4D animation of building combination which includes a
logical construction sequence to the owners.
• Besides, the authority can use this system to verify the building.
• The analysis includes structural analysis, thermal analysis, acoustic analysis,
mechanical analysis, lighting analysis and others.
Building Design Suite Premium-RM 12179.60
• The contractors can use a 5D estimate system for quantity takeoff and cost
estimating.
• They can estimate the price of the components used in the actual building
and the quantities and quality of materials used.
• Besides, they can use this system to show the material cost schedules to the
stakeholders and the clients.
• The contractors finance and accounting department can estimate the required
amount of funds to be prepared.
• The clients can prepare the funds for the contractor’s progress payments.
THANK YOU

Contenu connexe

Tendances

Leadership Hiring Senior Consultant-Bishan Chakraborty
Leadership Hiring Senior Consultant-Bishan ChakrabortyLeadership Hiring Senior Consultant-Bishan Chakraborty
Leadership Hiring Senior Consultant-Bishan Chakraborty
Bishan Chakraborty
 
Jaya's Resume-2015
Jaya's Resume-2015Jaya's Resume-2015
Jaya's Resume-2015
Jaya Katare
 
CV Somendra Nov 2016 external
CV Somendra Nov 2016 externalCV Somendra Nov 2016 external
CV Somendra Nov 2016 external
SOMENDRA06
 
Presentation mgt 210
Presentation mgt 210Presentation mgt 210
Presentation mgt 210
Wahid Riffat
 
The_Importance_Of_Job_Appraisal_in_Organ.pptx
The_Importance_Of_Job_Appraisal_in_Organ.pptxThe_Importance_Of_Job_Appraisal_in_Organ.pptx
The_Importance_Of_Job_Appraisal_in_Organ.pptx
zaldymendoza1
 
Joseph Pitts Resume 2016.
Joseph Pitts Resume 2016.Joseph Pitts Resume 2016.
Joseph Pitts Resume 2016.
Joe Pitt
 

Tendances (20)

Priya Anil
Priya AnilPriya Anil
Priya Anil
 
Leadership Hiring Senior Consultant-Bishan Chakraborty
Leadership Hiring Senior Consultant-Bishan ChakrabortyLeadership Hiring Senior Consultant-Bishan Chakraborty
Leadership Hiring Senior Consultant-Bishan Chakraborty
 
Jaya's Resume-2015
Jaya's Resume-2015Jaya's Resume-2015
Jaya's Resume-2015
 
CA Meenakshi arora
CA Meenakshi aroraCA Meenakshi arora
CA Meenakshi arora
 
Orientation of employee by MOHSIN MUMTAZ
Orientation of employee by MOHSIN MUMTAZ Orientation of employee by MOHSIN MUMTAZ
Orientation of employee by MOHSIN MUMTAZ
 
CV Somendra Nov 2016 external
CV Somendra Nov 2016 externalCV Somendra Nov 2016 external
CV Somendra Nov 2016 external
 
Presentation mgt 210
Presentation mgt 210Presentation mgt 210
Presentation mgt 210
 
Niyaz_MBA_HR
Niyaz_MBA_HRNiyaz_MBA_HR
Niyaz_MBA_HR
 
Samuel Christopher Gibson_Resume
Samuel Christopher Gibson_ResumeSamuel Christopher Gibson_Resume
Samuel Christopher Gibson_Resume
 
The_Importance_Of_Job_Appraisal_in_Organ.pptx
The_Importance_Of_Job_Appraisal_in_Organ.pptxThe_Importance_Of_Job_Appraisal_in_Organ.pptx
The_Importance_Of_Job_Appraisal_in_Organ.pptx
 
PPT-for-report-march-19.pptx
PPT-for-report-march-19.pptxPPT-for-report-march-19.pptx
PPT-for-report-march-19.pptx
 
Madan_Profile9866650675
Madan_Profile9866650675Madan_Profile9866650675
Madan_Profile9866650675
 
Corporate Accelerator
Corporate AcceleratorCorporate Accelerator
Corporate Accelerator
 
new CV BLP
new CV BLPnew CV BLP
new CV BLP
 
Bharat Pahuja
Bharat PahujaBharat Pahuja
Bharat Pahuja
 
IERF - I Train Corporate Onboarding
IERF - I Train Corporate OnboardingIERF - I Train Corporate Onboarding
IERF - I Train Corporate Onboarding
 
Joseph Pitts Resume 2016.
Joseph Pitts Resume 2016.Joseph Pitts Resume 2016.
Joseph Pitts Resume 2016.
 
BuildHr company profile - June 2020
BuildHr   company profile - June 2020BuildHr   company profile - June 2020
BuildHr company profile - June 2020
 
SIEGER CORPORATE TRAINING
SIEGER CORPORATE TRAININGSIEGER CORPORATE TRAINING
SIEGER CORPORATE TRAINING
 
Retention strategies presentation laurence yap_ march 24-252015
Retention strategies presentation laurence yap_ march 24-252015Retention strategies presentation laurence yap_ march 24-252015
Retention strategies presentation laurence yap_ march 24-252015
 

Similaire à Management science

kode-bala-gopal
kode-bala-gopalkode-bala-gopal
kode-bala-gopal
bala gopal
 
David_Curruculum_Vitae
David_Curruculum_VitaeDavid_Curruculum_Vitae
David_Curruculum_Vitae
David Prakash
 
Internship Presentation 2020 Template (1).pptx
Internship Presentation 2020 Template (1).pptxInternship Presentation 2020 Template (1).pptx
Internship Presentation 2020 Template (1).pptx
KalyanGowdaS1
 
ProAction Case Studies - Diligence through Exit Q3 2015
ProAction Case Studies - Diligence through Exit Q3 2015ProAction Case Studies - Diligence through Exit Q3 2015
ProAction Case Studies - Diligence through Exit Q3 2015
Tim Van Mieghem
 
Employeeengagement wifimodel-091127145047-phpapp02
Employeeengagement wifimodel-091127145047-phpapp02Employeeengagement wifimodel-091127145047-phpapp02
Employeeengagement wifimodel-091127145047-phpapp02
Laurence Yap M.A. (UM) CHRM
 
Lainey Bonser CV 2014
Lainey Bonser CV 2014Lainey Bonser CV 2014
Lainey Bonser CV 2014
Lainey Bonser
 
Ibm mentorship program analysis
Ibm mentorship program analysisIbm mentorship program analysis
Ibm mentorship program analysis
Meghna Verma
 
Hany Hassan - C V
Hany Hassan - C VHany Hassan - C V
Hany Hassan - C V
Hany Hassan
 

Similaire à Management science (20)

Management Science - Krimzen Tech
Management Science - Krimzen TechManagement Science - Krimzen Tech
Management Science - Krimzen Tech
 
kode-bala-gopal
kode-bala-gopalkode-bala-gopal
kode-bala-gopal
 
David_Curruculum_Vitae
David_Curruculum_VitaeDavid_Curruculum_Vitae
David_Curruculum_Vitae
 
L&D Roadmap.pptx
L&D Roadmap.pptxL&D Roadmap.pptx
L&D Roadmap.pptx
 
New resume
New resume New resume
New resume
 
Next
NextNext
Next
 
Internship Presentation 2020 Template (1).pptx
Internship Presentation 2020 Template (1).pptxInternship Presentation 2020 Template (1).pptx
Internship Presentation 2020 Template (1).pptx
 
Resume_Ashis
Resume_AshisResume_Ashis
Resume_Ashis
 
Management Science - Krimzen Tech
Management Science - Krimzen TechManagement Science - Krimzen Tech
Management Science - Krimzen Tech
 
Project Management Centre of Excellence
Project Management Centre of ExcellenceProject Management Centre of Excellence
Project Management Centre of Excellence
 
Mohamed mongy resume
Mohamed mongy  resumeMohamed mongy  resume
Mohamed mongy resume
 
ProAction Case Studies - Diligence through Exit Q3 2015
ProAction Case Studies - Diligence through Exit Q3 2015ProAction Case Studies - Diligence through Exit Q3 2015
ProAction Case Studies - Diligence through Exit Q3 2015
 
www.missionindiaconsultancy.com
www.missionindiaconsultancy.comwww.missionindiaconsultancy.com
www.missionindiaconsultancy.com
 
Mission India consultancy slide 2
Mission India consultancy slide 2 Mission India consultancy slide 2
Mission India consultancy slide 2
 
Employeeengagement wifimodel-091127145047-phpapp02
Employeeengagement wifimodel-091127145047-phpapp02Employeeengagement wifimodel-091127145047-phpapp02
Employeeengagement wifimodel-091127145047-phpapp02
 
Lainey Bonser CV 2014
Lainey Bonser CV 2014Lainey Bonser CV 2014
Lainey Bonser CV 2014
 
Project WeLike
Project WeLikeProject WeLike
Project WeLike
 
OVERALL UNIT2.ppt
OVERALL UNIT2.pptOVERALL UNIT2.ppt
OVERALL UNIT2.ppt
 
Ibm mentorship program analysis
Ibm mentorship program analysisIbm mentorship program analysis
Ibm mentorship program analysis
 
Hany Hassan - C V
Hany Hassan - C VHany Hassan - C V
Hany Hassan - C V
 

Dernier

Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
alinstan901
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
Nimot Muili
 

Dernier (15)

Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysis
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 

Management science

  • 1. Prepared by: Chiam Jia Ern Hii Pai Ling Lee Chun Yee Lim Chern Yie Yong Boon Xiong SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) MANAGEMENT SCIENCE (MGT 60203)
  • 2. Company Background • Founder: Lee Chun Yee, Yong Boon Xiong, Lim Chern Yie, Hii Pai Ling, Chiam Jia Ern • Started in November,2015 • Construction Company • Specialize in residential projects.
  • 3. Vision and Mission Vision • Calculus Sdn Bhd is committed to be recognized as the contractor of choice. We strive to be the customer’s first choice and stand out from our competition. Mission • To be an innovative, passionate company that fully utilizes the latest technology. • To provide our customers the best quality construction services at reasonable and market competitive prices. • To provide the highest level of professionalism to our clients. • To ensure our personnel are aligned with our company’s core values, which are “excellence, reliability and passion”.
  • 4. Short term goals • Attract and retain talented employees. • Ensure all the employees understand and fulfill their own roles. • Advertise to let people know the existence of our company, then develop a good impression by providing good customer services to attract customers. • Choose projects wisely. Only accepts projects that are within our capability.
  • 5. Mid-term goals • Create a comfortable working environment for our employees. • Create an effective employee development program. • Establishing a positive reputation by constructing superb quality projects which meet budget and schedule goals.
  • 6. Long term goals • Establish a strong and efficient internal structure. • Building a long term relationship with clients by offering reasonable price and superb quality products. • Always accept, listen and prioritize customers’ feedbacks. • Acknowledge the contribution of employees and show appreciations by rewarding them consistent. • Diversify our construction businesses. Accept different genre of projects to provide alternative services to different customers. • Be the leading construction company in Malaysia.
  • 7.
  • 8. Managing Director Vice Managing Director Quality Assurance Administration Manager Human Resource Officer Accountant Project Manager Quantity Surveyor Engineer Site Surpervisor Project Manager Quantity Surveyor Engineer Site surpervisor Project Manager Quantity Surveyor Engineer Site surpervisor
  • 9. Job Scope • Managing Director i. Direct and control the work and resources. ii. Establish and maintain effective formal and informal links. iii. Represent the Company in negotiations. iv. Provide strategic advice and guidance to the staffs
  • 10. • Vice Managing Director i. Develop new business for the company. ii. Bringing new clients for the company by acting as a high-level sales person. iii. Overseeing the process of recruiting and retaining of the employees. iv. Reporting of vital information on the company's overall performance to the company's Managing Director.
  • 11. Project Manager • Progress • Cost • Quality • Performance (Value) • Cash flow • SHE • Regulatory • Reporting
  • 12. • Engineer i. Responsible for preparing the site. ii. Controls machines, plants, and organizations providing power, transportation, and communication for the site. iii. Selects methods, specifies materials, and determines shapes to satisfy technical requirements and to meet performance specification
  • 13. • Quantity Surveyor i. Managing the cost of construction project. ii. Working to keep the project on time and within budget. iii. Preparing insurance replacement estimates for all kind of buildings.
  • 14. • Site Supervisor i. Maintains safe, secure, and healthy work environment. ii. Prevents fines and interruptions. iii. Meets construction budget.
  • 15. • Quality Assurance i. Assessing customer requirements and ensuring that these are met. ii. Specifying quality requirements of raw materials iii. Working with operating staff to establish procedures, standards, systems and procedures iv. Ensuring that manufacturing processes comply with standards
  • 16. • Administration Manager i. Ensure effective information flow and resources are employed efficiently. ii. Add value to an organisation. iii. Develop budgets for company and perform cost reduction research. iv. Handling accounts. v. Recruits and training employees. vi. Provide report on employees’ performance for managing director.
  • 17. • Accountant i. Prepares asset, liability, and capital account entries. ii. Understand how well or badly the organisation is performing. iii. Form a view on how the organisation, in whole or in part, is likely to perform in the future.
  • 18. • Human Resource Officer i. Recruiting staff. ii. Advising on pay and other remuneration issues, including promotion and benefits. iii. Undertaking regular salary reviews.
  • 20. Phase 1 • Advertise job vacancies a) Attract the right one b) Focus on management c) List of requirements • Online Jobsites • Social Networking
  • 21. Hiring of applicants • Estimate of 50-100 applicants • Further proceed to basic interview Q & A • Mostly based on leadership and management questions • The best remaining 20 applicants
  • 22. Phase 2 • Event planning a) Build reputation and interact b) Planning of this event will take 3-4months
  • 23. Organizing Teams • Form 5 groups, each group consist of 4 people • Each consists of 1 expirenced leader guiding them • Team roles include:- -Budget Planning -Venue Selection -Program Scheduling -Marketing -Event Safety Management
  • 24. Budget Planning • Develop an accurate and comprehensive budget • Sponsorship • Test negotiation and communication skills
  • 25. Venue Selection • Best venue to suit the event • Various considerations:- -Indoor/outside prerequisites -Location and rough travel time to arrive -Cost of utilizing the venue -Services supplied
  • 26. Program Scheduling • Building up a running sheet • Set-up of hardware, entry of VIPs, set-up of tables • Fine dining session • Good Performance • Management, communication and critical thinking
  • 27. Marketing • Promote event • Through banner, direct mail, social media, newsapaper • Design a suitable signage • Boost advertising and planning skill
  • 28. Event Safety Management • To recognize danger then minimize any possible accidents happen before, during or after the event • Emergency services, traffic management, road closures, alcohol management, food hygiene and fire management • Manage crowd control issues, the serving of alcohol and the safe storage of money
  • 29. Post-event evaluation • Leader of group evaluate each performance of the applicants • Possess with all those technical and soft skills • Remain the best 5 applicants
  • 30. Phase 3 • Final Interview • Exchange situation: Applicants ask questions to the Head of the Managing Director • Its purpose is to test whether the candidates have the ability to take the initiative to ask questions, understand to take this opportunity to learn about the company's background and cultural issues
  • 31. • I would like to ask about applying this position is it facing what kind of problems and challenges? In addition, how is your company's expectations of the duties? • This question can be eager to show the applicant is serious about the job, and know how to take this opportunity to learn about the most vital issues of the post. • Such action can show their loyalty to the company and ready to contribute to the company
  • 33. • designed for particularly ambitious candidates. • provide an opportunity to demonstrate the abilities • may lead to internal promotion within the company. • For the company, it provides a good succession planning and improves morale of the company. Introduction
  • 34. Criteria 1. Good command of English speaks and written 2. Active in sports and extracurricular activities 3. Completion of a degree graduate qualification and the result must achieve at least a CGPA score of 3.50 out of 4.00 4. Well-developed interpersonal and communication skills 5. Able to work independently and work with people of all levels 6. Have self-discipline and time management 7. Possess positive attitudes, hardworking, have strong analytical and problem solving skills
  • 35. Training and Development Plan Duration : 2 Years
  • 36. Months of First: • Understand and familiar of overall company (vision, mission, short term, midterm, long term goals, organization chart and job scope of each position) • Experience manager will lead and coach them to job duty assign
  • 37. Months of two to eight: • Apprenticeships (send to training center)  Project Planning  Project Control and Monitoring  Managing the Quality of Site Work  Developing and Managing People  Improving Managerial Skills  Contractual and Legal Responsibilities  Managing Technology of Modern Construction • Task: Weekly need to submit reports for the things learn and how to apply in our company system
  • 38. Months of nine to twenty-four: Rotation in department of company • Months of 9-15 Project Management Department • Months of 16-19 Quality Assurance Department • Months of 18-24 Administration Management Department
  • 39. Final project Prepare a presentation, need • The overall they learn in this 2 years • The things company needs to improve • The department they most interested and why they suitable for it
  • 41.
  • 42. Microsoft Office 365 Home -RM 299.99
  • 43. Microsoft Office 365 Home -RM 299.99 • It can be applied for five users. • The contractor uses it for internet banking. • The contractor can track the billing such as client’s payment.
  • 44. Microsoft Office 365 Home -RM 299.99 • All employees can access to all the emails, calendars, contacts, photos, videos and documents through Outlook cloud storage. • Document- client’s projects, contracts, timesheets, drawings, Bill Of Quantities and tenders. • Every employee can use Skype for communicating, online meetings, and audio or video call.
  • 45. Building Design Suite Premium-RM 12179.60 CAD x BIM
  • 46. Computer aided design (CAD) • This software is widely used by architects, engineers or designers. • Used for creating two dimensional (2D) or three dimensional (3D) models.
  • 47. Building Design Suite Premium-RM 12179.60 Computer Aided Design (CAD) • A civil engineers use it to produce preliminary drawings. • The drawings are used to visualize their ideas more clearly to the project managers and the clients. • They can view the 3D models from any angle by rotating them and including all the details mentioned in the design.
  • 48. Building Design Suite Premium-RM 12179.60 Computer Aided Design (CAD) • They can also link the drawings to the online for the contractors and clients to view. • The drawings are saved in the computer for the engineers to edit it next time without redrawing all components again.
  • 49. Building Design Suite Premium-RM 12179.60 Building Information Modelling (BIM) A process of designing, simulating, analyzing, managing and document a 3D building model that including the building details.
  • 50. Building Design Suite Premium-RM 12179.60 • The project teams can utilize a 3D BIM system for structural design simulation. • They can view every single section of the actual building components through the virtual building models such as columns, wall, staircase, beams, etc. • The engineers can communicate with the contractor before the real project commences to reduce the risk of mistakes. • Our clients, the owner of the building and the operator can direct use the mobile devices or tablets to view the building models without installing a BIM software.
  • 51. Building Design Suite Premium-RM 12179.60 • The contractors can utilize a 4D schedule system for analysis and time scheduling. • The contractors can use it to track the quantity take off, location-based quantities, productivity rates, resources needed and labor costs through the project life cycles. • They can provide the 4D animation of building combination which includes a logical construction sequence to the owners. • Besides, the authority can use this system to verify the building. • The analysis includes structural analysis, thermal analysis, acoustic analysis, mechanical analysis, lighting analysis and others.
  • 52. Building Design Suite Premium-RM 12179.60 • The contractors can use a 5D estimate system for quantity takeoff and cost estimating. • They can estimate the price of the components used in the actual building and the quantities and quality of materials used. • Besides, they can use this system to show the material cost schedules to the stakeholders and the clients. • The contractors finance and accounting department can estimate the required amount of funds to be prepared. • The clients can prepare the funds for the contractor’s progress payments.