Presented by: Ngo Anh Hien
                                              Deputy General Manager
                                              Gas Division of PetroVienam



PETROVIETNAM
Energy for National Sustainable Development
Content
 OVERVIEW OF PIPELINE SYSTEM

 CURRENT GAS PIPELINE SYSTEMS

 DIRECTION TO DEVELOPMENT

 ON-GOING GAS PIPELINE PROJECTS

 UP-COMING GAS PIPELINE PROJECTS



 PETROVIETNAM
 Energy for National Sustainable Development
Overview of Gas Pipeline System
 In 1981, the first developed gas field from Tien Hai – Song
  Hong basin with flowrate of 20 – 23 MMCM/year supplied
  to local industry.
 In 1995, the first associated gas from Bach Ho field – Cuu
  Long basin – with flowrate 1 MMCM/day supplied to Ba
  Ria Power Plant.
 In 2003, a first natural gas from Lan Tay field – Nam Con
  Son basin with flowrate of 2 MMCM/day supplied to Phu
  My Power Complex. By October 2008, the flowrate was
  increased to 20 MMCM/day.
 In 2007, a first associated gas from PM3-CAA overlapping
  area supplied to Ca Mau Power Complex.

PETROVIETNAM
Energy for National Sustainable Development
Current Gas Pipeline Systems

 • Northern area – Thai Binh Pipeline
 • Rang Dong – Bach Ho – Phu My Pipeline
 • Nam Con Son Pipeline
 • PM3 – Ca Mau Pipeline
 • Low Pressure Pipeline



 PETROVIETNAM
 Energy for National Sustainable Development
Current Gas Pipeline Systems
                                               Northern area – Thai Binh
                                               Fields:          Tien Hai C (07/1981)
                                                                D14_STL (5/2004)
                                                                Dong Quan D (2005)
                                               Specification:   Length: ~20 km
                                                                Diameter: Small (~6”)
                                               Description:     Limited gas resources
                                                                Supply gas to Tien Hai
                                                                industrial zone, Thai
                                                                Binh.




 PETROVIETNAM
 Energy for National Sustainable Development
Current Gas Pipeline Systems
                                                                          Bach Ho –Phu My PL:
                                                                          •Capacity: 2 bcmpa
                                                                          •Length: 117 km
                                                                          •Diameter: 16”
             CAMBODIA
                                         Hiep      Phu My
                                         Phuoc     Complex


                                          Dinh Co
                               O Mon      GPP


                              Ca Mau
Block B,                                         Cuu Long
                              Comple
48 &52                                           Basin
                              x


   Ma Lay
   Tho Chu                 PM3-Ca Mau PL:                                 Nam Con Son 1 PL:
                                                            Nam Con Son
   Basin                   •Capacity: 2 bcmpa                             •Capacity: 7 bcmpa
                                                            Basin
             PM3-CAA       •Length: 330 km                                •Length: 400 km
                           •Diameter: 18”                                 •Diameter: 26”



  PETROVIETNAM
  Energy for National Sustainable Development
Current Gas Pipeline Systems
                               Southeast Region                                              NHON TRACH 1

                                                                                             NHON TRACH 2
               BLOCK 11.2
                 LOÂ 11.2                                                  PHU MY - HCM
                             DINH CO AREA
                                                                                              HIEP PHUOC

                                  DINH CO Y
                                  NHAØ MAÙ
   LOÂ 06.1
BLOCK 06.1                       TERMINALKHÍ
                                  XÖ Û LYÙ
  LAÂ NTAÂ-Y
 LAN TAY                        NAM COÂ N SÔ N
   LANÑ OÛ
 & LAN DO                      NAM CON SON
                                                                                             PHU MY 3 3
                                                                                              PHU MY
                                                                     NAM CON SON
                                                                       TRUNG TAÂ M           PHU MY 4
                                                                   GAS DISTRIBUTION
                                        Max. capacity: 7 BCM/y          CENTER
                                                                         PHUÙ MYÕ
                                                                                             PHU MY 2.2
                                                                     PHU MY GDC
                 STD/STV                                                 GDC                  PHU MY 1
                                DINH CO Y
                                NHAØ MAÙ
                                XÖ GPP KHÍ
                                   Û LYÙ
                                 DINH COÁ
           PHUONG DONG
                                BACH HO                                                   PHU MY FERTILIZER
            RANG DONG
                                                                       BACH HO
                                                                                             PHU MY 2.1
 Rong                                   Max. capacity: 2.0 BCM/y         GAS
                      MOÛ
                 BACH HO
Doi Moi                                                             DISTRIBUTION
                                                                                            PHU MY 2.1 EXT.
                                                                       CENTER
                                                                     PHU MY GDS             LOW PRESSURE
                                    BA RIA POWER PLANT                                       PM – MX - GD
               CA NGU VANG



     OFFSHORE                        BA RIA AREA                          PHU MY INDUSTRIAL ZONE



  PETROVIETNAM
  Energy for National Sustainable Development
Current Gas Pipeline Systems
          Rang Dong – Bach Ho – Phu My Pipeline
  PM1                                                                  547 MMCM/y
                                                           Ba Ria
                                                                       22.5 - 24 bar
                                                         Power Plant
 PM 2.2
                           LBV                  Ba Ria
          Phu My                      SDV-805
 PM 2.1                                          GDS
           GDS

 PM 3     Phu My
           GDC
                                                           Dinh Co
 PM 4
                                                            GPP                                      STD/STV
 UREA
                   Thi Vai Terminal
                                                             LBV-804
                                                                                                            Ca Ngu Vang


                                                                                       Rang Dong

                                                                                       1.5 Bcm/y, 125 bar

                                                                                                               Bach Ho

                                                                                   Rong Doi Moi


 PETROVIETNAM
 Energy for National Sustainable Development
Current Gas Pipeline Systems
                          Nam Con Son Pipeline
PM 1


PM 2.1
                            LBV
           Phu My
PM 2.2      GDC
           Phu My
PM 3
            GDS                                  Dinh Co
                                                Terminal
PM 4



                Thi Vai Terminal   Dinh Co      LBV
                                    GPP
                                                           Hai Thach
                                                                       Lan Tay




                                                            Rong Doi
  PETROVIETNAM
  Energy for National Sustainable Development
Current Gas Pipeline Systems
                       Low Pressure Gas Pipeline

                                               Design           1 BCMY
                                               Capacity:
                                               Specification:   Length: 15 km
                                               Description:     Supply gas to the
                                                                industrial   zones
                                                                along the trunk-
                                                                pipeline to Ba Ria,
                                                                Phu My area.




 PETROVIETNAM
 Energy for National Sustainable Development
Direction to Development
    • Maximize the utilization of existing pipeline system.
    • Expand gas pipeline system in Southeast and Southwest
       region.
    • Utilize gas reserves in the Central and Northern of
       Vietnam.
    • Interconnect regional/national gas pipeline systems.
    • Expand gas usage in other sectors such as resident,
       transportation, industry etc through low pressure and city
       gas pipeline system.
PETROVIETNAM
Energy for National Sustainable Development
Master Plan For Pipeline System




 PETROVIETNAM
 Energy for National Sustainable Development
On-going Gas Pipeline Projects
                   Rong-Doi Moi – Bach Ho Pipeline

                                               Design Capacity:   6.4 BCMY
                                               Location:          Southeast region
                                               Description:       To gather gas and then
                                                                  compress associated gas
                                                                  in Rong – Doi Moi gas
                                                                  fields through Bach Ho –
                                                                  Dinh Co pipeline.
                                               Specification:     RC1-RP2: 9,5km, 10”
                                                                  RP3-RP2: 8.5km, 12”
                                                                  RP3-RC4: 16km, 10”
                                                                  RC4-RC5: 5.5km, 8”
                                                                  RC4-RCDM: 3.5km, 8”
                                               First gas:         12/2010




 PETROVIETNAM
 Energy for National Sustainable Development
On-going Gas Pipeline Projects




 PETROVIETNAM
 Energy for National Sustainable Development
On-going Gas Pipeline Projects
                           Block B – O Mon Pipeline

                                                     CARIGA
                                                     LI


                                   PHU My                        Design Capacity:   6.4 BCMY
                   O MON


                                                   CARI
                                                   G
                                                                 Location:          Southwest region

                                            PETR
                                                                 Specification:     Length: 406 km
                                            O
                                                                                     Onshore: 160 km, 30”
                                                                                     Offshore: 246 km, 28”
                                                                 First gas:         2014
                                                                 Customers:         - O Mon Power Complex
                                                                                    (O Mon Power Plant
                                                                                    2,3,4,5)
                                                          06-2


                                                                                    - Gas-Power-Fertilizer
                                                                                    Industry Zone in Ca Mau
                                                                                    Province.




 PETROVIETNAM
 Energy for National Sustainable Development
Up-coming Gas Pipeline Projects
                       Nam Con Son II Gas Pipeline
   Design Capacity:                    7 BCMY
   Location:                          Southeast region
   Description:                       The 400 km line will be built in parallel
                                      with the 1st pipeline to transport gas
                                      from Block 05-2, 05-3 and 04-3 with
                                      consideration of re-serving for other
                                      potential gas fields in Nam Con Son
                                      basin and importing gas later.
   First gas:                         2014




 PETROVIETNAM
 Energy for National Sustainable Development
Up-coming Gas Pipeline Projects
           Block 102/106 & 103/107 – Thai Binh Pipeline
                                               Distances
                                               Hong Long - Landfall:     ~55km

                                               Hac Long - Hong Long:     10,3km

                                               Bach Long - Hong Long:    17,4km

                                               Dia Long - Hong Long:     ~20km

                                               Hong Long - Thai Binh:    ~40km

                                               Thai Binh – Landfall:    19,54km




 PETROVIETNAM
 Energy for National Sustainable Development
THANK YOU!

Contenu connexe

Tendances

WMSP Diverter, WMSP Diverter Oilfield Equipment - WOM Group
WMSP Diverter, WMSP Diverter Oilfield Equipment - WOM GroupWMSP Diverter, WMSP Diverter Oilfield Equipment - WOM Group
WMSP Diverter, WMSP Diverter Oilfield Equipment - WOM Groupwomgroup
 
Basic technology & solutions of LNG
Basic technology & solutions of LNGBasic technology & solutions of LNG
Basic technology & solutions of LNGAbu Bakar Siddiqui
 
Title: Workover and Production Practices. A Case Study Of Acid Job Workover,...
Title: Workover and Production Practices.  A Case Study Of Acid Job Workover,...Title: Workover and Production Practices.  A Case Study Of Acid Job Workover,...
Title: Workover and Production Practices. A Case Study Of Acid Job Workover,...Karan Maniar
 
C3.2.2. Topside Gas Compression_2020
 C3.2.2. Topside Gas Compression_2020 C3.2.2. Topside Gas Compression_2020
C3.2.2. Topside Gas Compression_2020David Seow
 
Oil industry in Kurdistan
Oil industry in KurdistanOil industry in Kurdistan
Oil industry in KurdistanMuhammad Faisal
 
Natural gas processing technology lng process
Natural gas processing technology   lng processNatural gas processing technology   lng process
Natural gas processing technology lng processMohamad Abdelraof
 
LPG TANK INSTALLATION
LPG TANK INSTALLATION LPG TANK INSTALLATION
LPG TANK INSTALLATION lpgbnhgastank
 
Guidelines for design construction and testing of lpg sphere
Guidelines for design construction and testing of lpg sphereGuidelines for design construction and testing of lpg sphere
Guidelines for design construction and testing of lpg spherelpgbnhgastank
 
Internship Report By M Younus
Internship Report By M YounusInternship Report By M Younus
Internship Report By M YounusMuhammad Younus
 
Cfbc burner startup sequence
Cfbc burner startup sequenceCfbc burner startup sequence
Cfbc burner startup sequenceAshvani Shukla
 
Year Testing of LPG Spherical Tank
Year Testing of LPG Spherical TankYear Testing of LPG Spherical Tank
Year Testing of LPG Spherical Tanklpgbnhgastank
 
6- storage tank except design.pdf
6- storage tank except design.pdf6- storage tank except design.pdf
6- storage tank except design.pdfelsayedAmer7
 
syn.gas compressor fir&foaming in catacarb system
syn.gas compressor fir&foaming in catacarb systemsyn.gas compressor fir&foaming in catacarb system
syn.gas compressor fir&foaming in catacarb systemEjaz Ahmed Latki
 
uhde_brochures_pdf_en_12
uhde_brochures_pdf_en_12uhde_brochures_pdf_en_12
uhde_brochures_pdf_en_12Ahmed Omran
 
Well Test Analysis in Horizontal Wells
Well Test Analysis in Horizontal WellsWell Test Analysis in Horizontal Wells
Well Test Analysis in Horizontal WellsSohil Shah
 

Tendances (20)

WMSP Diverter, WMSP Diverter Oilfield Equipment - WOM Group
WMSP Diverter, WMSP Diverter Oilfield Equipment - WOM GroupWMSP Diverter, WMSP Diverter Oilfield Equipment - WOM Group
WMSP Diverter, WMSP Diverter Oilfield Equipment - WOM Group
 
Liquefied Natural Gas (LNG) Life Cycle
Liquefied Natural Gas (LNG) Life CycleLiquefied Natural Gas (LNG) Life Cycle
Liquefied Natural Gas (LNG) Life Cycle
 
Basic technology & solutions of LNG
Basic technology & solutions of LNGBasic technology & solutions of LNG
Basic technology & solutions of LNG
 
Title: Workover and Production Practices. A Case Study Of Acid Job Workover,...
Title: Workover and Production Practices.  A Case Study Of Acid Job Workover,...Title: Workover and Production Practices.  A Case Study Of Acid Job Workover,...
Title: Workover and Production Practices. A Case Study Of Acid Job Workover,...
 
C3.2.2. Topside Gas Compression_2020
 C3.2.2. Topside Gas Compression_2020 C3.2.2. Topside Gas Compression_2020
C3.2.2. Topside Gas Compression_2020
 
Oil industry in Kurdistan
Oil industry in KurdistanOil industry in Kurdistan
Oil industry in Kurdistan
 
Natural gas processing technology lng process
Natural gas processing technology   lng processNatural gas processing technology   lng process
Natural gas processing technology lng process
 
Thượng lý
Thượng lýThượng lý
Thượng lý
 
Lecture 9 natural gas processes
Lecture 9 natural gas processesLecture 9 natural gas processes
Lecture 9 natural gas processes
 
LPG TANK INSTALLATION
LPG TANK INSTALLATION LPG TANK INSTALLATION
LPG TANK INSTALLATION
 
Guidelines for design construction and testing of lpg sphere
Guidelines for design construction and testing of lpg sphereGuidelines for design construction and testing of lpg sphere
Guidelines for design construction and testing of lpg sphere
 
Internship Report By M Younus
Internship Report By M YounusInternship Report By M Younus
Internship Report By M Younus
 
LNG
LNGLNG
LNG
 
Engineering design guideline LPG
Engineering design guideline LPGEngineering design guideline LPG
Engineering design guideline LPG
 
Cfbc burner startup sequence
Cfbc burner startup sequenceCfbc burner startup sequence
Cfbc burner startup sequence
 
Year Testing of LPG Spherical Tank
Year Testing of LPG Spherical TankYear Testing of LPG Spherical Tank
Year Testing of LPG Spherical Tank
 
6- storage tank except design.pdf
6- storage tank except design.pdf6- storage tank except design.pdf
6- storage tank except design.pdf
 
syn.gas compressor fir&foaming in catacarb system
syn.gas compressor fir&foaming in catacarb systemsyn.gas compressor fir&foaming in catacarb system
syn.gas compressor fir&foaming in catacarb system
 
uhde_brochures_pdf_en_12
uhde_brochures_pdf_en_12uhde_brochures_pdf_en_12
uhde_brochures_pdf_en_12
 
Well Test Analysis in Horizontal Wells
Well Test Analysis in Horizontal WellsWell Test Analysis in Horizontal Wells
Well Test Analysis in Horizontal Wells
 

Plus de luuguxd

Huong dan Setup SACS 5.7
Huong dan Setup SACS 5.7Huong dan Setup SACS 5.7
Huong dan Setup SACS 5.7luuguxd
 
Hướng dẫn sử dụng SACS 5.6
Hướng dẫn sử dụng SACS 5.6Hướng dẫn sử dụng SACS 5.6
Hướng dẫn sử dụng SACS 5.6luuguxd
 
KHU NEO ĐẬU TÀU CÁ
KHU NEO ĐẬU TÀU CÁKHU NEO ĐẬU TÀU CÁ
KHU NEO ĐẬU TÀU CÁluuguxd
 
Trien tau
Trien tau Trien tau
Trien tau luuguxd
 
Thuyet minh ke bao ve bo
Thuyet minh ke bao ve boThuyet minh ke bao ve bo
Thuyet minh ke bao ve boluuguxd
 
Hướng dẫn sử dụng sacs 5.6 (phần modelling)
Hướng dẫn sử dụng sacs 5.6 (phần modelling)Hướng dẫn sử dụng sacs 5.6 (phần modelling)
Hướng dẫn sử dụng sacs 5.6 (phần modelling)luuguxd
 
Huong dan tekla 15 (ptsc mc)
Huong dan tekla 15 (ptsc mc)Huong dan tekla 15 (ptsc mc)
Huong dan tekla 15 (ptsc mc)luuguxd
 
THIẾT KẾ KỸ THUẬT CÔNG TRÌNH ĐÊ CHẮN SÓNG CẢNG NEO ĐẬU VÀ CỬA BIỂN MỸ Á – GIA...
THIẾT KẾ KỸ THUẬT CÔNG TRÌNH ĐÊ CHẮN SÓNG CẢNG NEO ĐẬU VÀ CỬA BIỂN MỸ Á – GIA...THIẾT KẾ KỸ THUẬT CÔNG TRÌNH ĐÊ CHẮN SÓNG CẢNG NEO ĐẬU VÀ CỬA BIỂN MỸ Á – GIA...
THIẾT KẾ KỸ THUẬT CÔNG TRÌNH ĐÊ CHẮN SÓNG CẢNG NEO ĐẬU VÀ CỬA BIỂN MỸ Á – GIA...luuguxd
 
Thuyet minh
Thuyet minhThuyet minh
Thuyet minhluuguxd
 
Da Tau Drawing
Da Tau DrawingDa Tau Drawing
Da Tau Drawingluuguxd
 
Thuyet minh DATN đà tàu Cà Mau 15000 DWT
Thuyet minh DATN đà tàu Cà Mau 15000 DWTThuyet minh DATN đà tàu Cà Mau 15000 DWT
Thuyet minh DATN đà tàu Cà Mau 15000 DWTluuguxd
 
De thi mon ctkt dv vb
De thi mon ctkt dv vbDe thi mon ctkt dv vb
De thi mon ctkt dv vbluuguxd
 
Thuyết minh
Thuyết minh Thuyết minh
Thuyết minh luuguxd
 
Tn k53-1 merged
Tn k53-1 mergedTn k53-1 merged
Tn k53-1 mergedluuguxd
 
chuyên đề về cừ thép
chuyên đề về cừ thépchuyên đề về cừ thép
chuyên đề về cừ thépluuguxd
 
chương 4 : thi công , chống ăn mòn
chương 4 : thi công , chống ăn mònchương 4 : thi công , chống ăn mòn
chương 4 : thi công , chống ăn mònluuguxd
 
chương 3 : thiết kế
chương 3 : thiết kếchương 3 : thiết kế
chương 3 : thiết kếluuguxd
 
chuong 1
 chuong 1 chuong 1
chuong 1luuguxd
 
Phuong phap pthh
Phuong phap pthhPhuong phap pthh
Phuong phap pthhluuguxd
 
Giaotrinh pppthh v10
Giaotrinh pppthh v10Giaotrinh pppthh v10
Giaotrinh pppthh v10luuguxd
 

Plus de luuguxd (20)

Huong dan Setup SACS 5.7
Huong dan Setup SACS 5.7Huong dan Setup SACS 5.7
Huong dan Setup SACS 5.7
 
Hướng dẫn sử dụng SACS 5.6
Hướng dẫn sử dụng SACS 5.6Hướng dẫn sử dụng SACS 5.6
Hướng dẫn sử dụng SACS 5.6
 
KHU NEO ĐẬU TÀU CÁ
KHU NEO ĐẬU TÀU CÁKHU NEO ĐẬU TÀU CÁ
KHU NEO ĐẬU TÀU CÁ
 
Trien tau
Trien tau Trien tau
Trien tau
 
Thuyet minh ke bao ve bo
Thuyet minh ke bao ve boThuyet minh ke bao ve bo
Thuyet minh ke bao ve bo
 
Hướng dẫn sử dụng sacs 5.6 (phần modelling)
Hướng dẫn sử dụng sacs 5.6 (phần modelling)Hướng dẫn sử dụng sacs 5.6 (phần modelling)
Hướng dẫn sử dụng sacs 5.6 (phần modelling)
 
Huong dan tekla 15 (ptsc mc)
Huong dan tekla 15 (ptsc mc)Huong dan tekla 15 (ptsc mc)
Huong dan tekla 15 (ptsc mc)
 
THIẾT KẾ KỸ THUẬT CÔNG TRÌNH ĐÊ CHẮN SÓNG CẢNG NEO ĐẬU VÀ CỬA BIỂN MỸ Á – GIA...
THIẾT KẾ KỸ THUẬT CÔNG TRÌNH ĐÊ CHẮN SÓNG CẢNG NEO ĐẬU VÀ CỬA BIỂN MỸ Á – GIA...THIẾT KẾ KỸ THUẬT CÔNG TRÌNH ĐÊ CHẮN SÓNG CẢNG NEO ĐẬU VÀ CỬA BIỂN MỸ Á – GIA...
THIẾT KẾ KỸ THUẬT CÔNG TRÌNH ĐÊ CHẮN SÓNG CẢNG NEO ĐẬU VÀ CỬA BIỂN MỸ Á – GIA...
 
Thuyet minh
Thuyet minhThuyet minh
Thuyet minh
 
Da Tau Drawing
Da Tau DrawingDa Tau Drawing
Da Tau Drawing
 
Thuyet minh DATN đà tàu Cà Mau 15000 DWT
Thuyet minh DATN đà tàu Cà Mau 15000 DWTThuyet minh DATN đà tàu Cà Mau 15000 DWT
Thuyet minh DATN đà tàu Cà Mau 15000 DWT
 
De thi mon ctkt dv vb
De thi mon ctkt dv vbDe thi mon ctkt dv vb
De thi mon ctkt dv vb
 
Thuyết minh
Thuyết minh Thuyết minh
Thuyết minh
 
Tn k53-1 merged
Tn k53-1 mergedTn k53-1 merged
Tn k53-1 merged
 
chuyên đề về cừ thép
chuyên đề về cừ thépchuyên đề về cừ thép
chuyên đề về cừ thép
 
chương 4 : thi công , chống ăn mòn
chương 4 : thi công , chống ăn mònchương 4 : thi công , chống ăn mòn
chương 4 : thi công , chống ăn mòn
 
chương 3 : thiết kế
chương 3 : thiết kếchương 3 : thiết kế
chương 3 : thiết kế
 
chuong 1
 chuong 1 chuong 1
chuong 1
 
Phuong phap pthh
Phuong phap pthhPhuong phap pthh
Phuong phap pthh
 
Giaotrinh pppthh v10
Giaotrinh pppthh v10Giaotrinh pppthh v10
Giaotrinh pppthh v10
 

Tong quan duong ong khi vn

  • 1. Presented by: Ngo Anh Hien Deputy General Manager Gas Division of PetroVienam PETROVIETNAM Energy for National Sustainable Development
  • 2. Content  OVERVIEW OF PIPELINE SYSTEM  CURRENT GAS PIPELINE SYSTEMS  DIRECTION TO DEVELOPMENT  ON-GOING GAS PIPELINE PROJECTS  UP-COMING GAS PIPELINE PROJECTS PETROVIETNAM Energy for National Sustainable Development
  • 3. Overview of Gas Pipeline System  In 1981, the first developed gas field from Tien Hai – Song Hong basin with flowrate of 20 – 23 MMCM/year supplied to local industry.  In 1995, the first associated gas from Bach Ho field – Cuu Long basin – with flowrate 1 MMCM/day supplied to Ba Ria Power Plant.  In 2003, a first natural gas from Lan Tay field – Nam Con Son basin with flowrate of 2 MMCM/day supplied to Phu My Power Complex. By October 2008, the flowrate was increased to 20 MMCM/day.  In 2007, a first associated gas from PM3-CAA overlapping area supplied to Ca Mau Power Complex. PETROVIETNAM Energy for National Sustainable Development
  • 4. Current Gas Pipeline Systems • Northern area – Thai Binh Pipeline • Rang Dong – Bach Ho – Phu My Pipeline • Nam Con Son Pipeline • PM3 – Ca Mau Pipeline • Low Pressure Pipeline PETROVIETNAM Energy for National Sustainable Development
  • 5. Current Gas Pipeline Systems Northern area – Thai Binh Fields: Tien Hai C (07/1981) D14_STL (5/2004) Dong Quan D (2005) Specification: Length: ~20 km Diameter: Small (~6”) Description: Limited gas resources Supply gas to Tien Hai industrial zone, Thai Binh. PETROVIETNAM Energy for National Sustainable Development
  • 6. Current Gas Pipeline Systems Bach Ho –Phu My PL: •Capacity: 2 bcmpa •Length: 117 km •Diameter: 16” CAMBODIA Hiep Phu My Phuoc Complex Dinh Co O Mon GPP Ca Mau Block B, Cuu Long Comple 48 &52 Basin x Ma Lay Tho Chu PM3-Ca Mau PL: Nam Con Son 1 PL: Nam Con Son Basin •Capacity: 2 bcmpa •Capacity: 7 bcmpa Basin PM3-CAA •Length: 330 km •Length: 400 km •Diameter: 18” •Diameter: 26” PETROVIETNAM Energy for National Sustainable Development
  • 7. Current Gas Pipeline Systems Southeast Region NHON TRACH 1 NHON TRACH 2 BLOCK 11.2 LOÂ 11.2 PHU MY - HCM DINH CO AREA HIEP PHUOC DINH CO Y NHAØ MAÙ LOÂ 06.1 BLOCK 06.1 TERMINALKHÍ XÖ Û LYÙ LAÂ NTAÂ-Y LAN TAY NAM COÂ N SÔ N LANÑ OÛ & LAN DO NAM CON SON PHU MY 3 3 PHU MY NAM CON SON TRUNG TAÂ M PHU MY 4 GAS DISTRIBUTION Max. capacity: 7 BCM/y CENTER PHUÙ MYÕ PHU MY 2.2 PHU MY GDC STD/STV GDC PHU MY 1 DINH CO Y NHAØ MAÙ XÖ GPP KHÍ Û LYÙ DINH COÁ PHUONG DONG BACH HO PHU MY FERTILIZER RANG DONG BACH HO PHU MY 2.1 Rong Max. capacity: 2.0 BCM/y GAS MOÛ BACH HO Doi Moi DISTRIBUTION PHU MY 2.1 EXT. CENTER PHU MY GDS LOW PRESSURE BA RIA POWER PLANT PM – MX - GD CA NGU VANG OFFSHORE BA RIA AREA PHU MY INDUSTRIAL ZONE PETROVIETNAM Energy for National Sustainable Development
  • 8. Current Gas Pipeline Systems Rang Dong – Bach Ho – Phu My Pipeline PM1 547 MMCM/y Ba Ria 22.5 - 24 bar Power Plant PM 2.2 LBV Ba Ria Phu My SDV-805 PM 2.1 GDS GDS PM 3 Phu My GDC Dinh Co PM 4 GPP STD/STV UREA Thi Vai Terminal LBV-804 Ca Ngu Vang Rang Dong 1.5 Bcm/y, 125 bar Bach Ho Rong Doi Moi PETROVIETNAM Energy for National Sustainable Development
  • 9. Current Gas Pipeline Systems Nam Con Son Pipeline PM 1 PM 2.1 LBV Phu My PM 2.2 GDC Phu My PM 3 GDS Dinh Co Terminal PM 4 Thi Vai Terminal Dinh Co LBV GPP Hai Thach Lan Tay Rong Doi PETROVIETNAM Energy for National Sustainable Development
  • 10. Current Gas Pipeline Systems Low Pressure Gas Pipeline Design 1 BCMY Capacity: Specification: Length: 15 km Description: Supply gas to the industrial zones along the trunk- pipeline to Ba Ria, Phu My area. PETROVIETNAM Energy for National Sustainable Development
  • 11. Direction to Development • Maximize the utilization of existing pipeline system. • Expand gas pipeline system in Southeast and Southwest region. • Utilize gas reserves in the Central and Northern of Vietnam. • Interconnect regional/national gas pipeline systems. • Expand gas usage in other sectors such as resident, transportation, industry etc through low pressure and city gas pipeline system. PETROVIETNAM Energy for National Sustainable Development
  • 12. Master Plan For Pipeline System PETROVIETNAM Energy for National Sustainable Development
  • 13. On-going Gas Pipeline Projects Rong-Doi Moi – Bach Ho Pipeline Design Capacity: 6.4 BCMY Location: Southeast region Description: To gather gas and then compress associated gas in Rong – Doi Moi gas fields through Bach Ho – Dinh Co pipeline. Specification: RC1-RP2: 9,5km, 10” RP3-RP2: 8.5km, 12” RP3-RC4: 16km, 10” RC4-RC5: 5.5km, 8” RC4-RCDM: 3.5km, 8” First gas: 12/2010 PETROVIETNAM Energy for National Sustainable Development
  • 14. On-going Gas Pipeline Projects PETROVIETNAM Energy for National Sustainable Development
  • 15. On-going Gas Pipeline Projects Block B – O Mon Pipeline CARIGA LI PHU My Design Capacity: 6.4 BCMY O MON CARI G Location: Southwest region PETR Specification: Length: 406 km O Onshore: 160 km, 30” Offshore: 246 km, 28” First gas: 2014 Customers: - O Mon Power Complex (O Mon Power Plant 2,3,4,5) 06-2 - Gas-Power-Fertilizer Industry Zone in Ca Mau Province. PETROVIETNAM Energy for National Sustainable Development
  • 16. Up-coming Gas Pipeline Projects Nam Con Son II Gas Pipeline Design Capacity: 7 BCMY Location: Southeast region Description: The 400 km line will be built in parallel with the 1st pipeline to transport gas from Block 05-2, 05-3 and 04-3 with consideration of re-serving for other potential gas fields in Nam Con Son basin and importing gas later. First gas: 2014 PETROVIETNAM Energy for National Sustainable Development
  • 17. Up-coming Gas Pipeline Projects Block 102/106 & 103/107 – Thai Binh Pipeline Distances Hong Long - Landfall: ~55km Hac Long - Hong Long: 10,3km Bach Long - Hong Long: 17,4km Dia Long - Hong Long: ~20km Hong Long - Thai Binh: ~40km Thai Binh – Landfall: 19,54km PETROVIETNAM Energy for National Sustainable Development