Contents
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
• Assumptions
1. Project, Program, and Portfolio
2. Project & Strategic Management
3. Project Management Office (PMO)
4. Stakeholder Management
5. Organizational Structure
6. Lifecycle
7. Enterprise Environmental Factors
8. Organizational Process Assets
9. PMBOK Structure
Lecture 03: Project Management Framework (2/14)
Assumptions
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
‫المشروعات‬ ‫ادارة‬ ‫معهد‬ ‫لرؤية‬ ‫طبقا‬ ‫المشروعات‬ ‫الدارة‬ ‫العام‬ ‫الفكر‬ ‫افتراضات‬:
•‫سمات‬‫مدير‬‫المشروع‬:
‫يتم‬‫تعيينه‬‫في‬‫بداية‬‫تفعيل‬‫المشروع‬‫و‬‫يهتم‬‫بمصلحة‬‫المشروع‬‫على‬‫حساب‬‫مصلحته‬‫ا‬‫لشخصية‬
‫يكون‬‫مؤهل‬‫اداريا‬‫يعرف‬‫خطوات‬‫االدارة‬‫و‬‫يعرف‬‫اهداف‬‫تنفيذ‬‫المشروع‬‫و‬‫يتماشى‬‫معها‬
‫يقوم‬‫بعمل‬‫الخطط‬‫بناءا‬‫على‬‫البيانات‬‫من‬‫فريق‬‫العمل‬‫و‬‫اصحاب‬‫المصلحة‬
‫يجيد‬‫ادارة‬‫الموارد‬‫البشرية‬,‫و‬‫يهتم‬‫بمنع‬‫المشاكل‬‫بدال‬‫من‬‫حل‬‫المشاكل‬
‫يفهم‬‫العقد‬‫و‬‫يقوم‬‫بتنفيذ‬‫كامل‬‫شروطه‬‫و‬‫ان‬‫بدت‬‫غير‬‫هامه‬‫له‬.
•‫المنظمة‬‫بها‬‫مكتب‬‫ادارة‬‫مشروعات‬PMO‫له‬‫صالحيات‬‫محددة‬‫بوضوح‬,‫و‬‫عندها‬‫بيانات‬‫مسجلة‬‫عن‬‫كل‬
‫المشاريع‬‫السابقة‬,‫و‬‫كل‬‫مشروع‬‫له‬‫خطة‬‫تحتوي‬‫على‬‫خطط‬‫فرعية‬‫لكل‬‫المجاالت‬‫قام‬‫باعدادها‬‫مدير‬
‫المشروع‬‫و‬‫تم‬‫مراعاة‬‫احتياجات‬‫اصحاب‬‫المصلحة‬‫عند‬‫اعداد‬‫الخطط‬,‫و‬‫تكون‬‫الخطة‬‫منطقية‬‫و‬‫يوافق‬
‫عليها‬‫الجميع‬‫و‬‫يتم‬‫ادارة‬‫المشروع‬‫بها‬.
•‫ال‬‫يسمح‬‫بعملية‬‫الـ‬gold plating‫و‬‫التي‬‫تعني‬‫زيادة‬‫خصائص‬‫المشروع‬‫دون‬‫أجر‬‫اضافي‬.
Lecture 03: Project Management Framework (3/14)
1. Project, Program, Portfolio
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Project : A temporary endeavor undertaken to create a unique product,
service, or result.
‫لعمل‬ ‫اجراءه‬ ‫يتم‬ ‫مؤقت‬ ‫نشاط‬‫فريد‬ ‫منتج‬‫او‬ ‫ماكينة‬ ‫او‬ ‫مبنى‬ ‫مثل‬‫فريدة‬ ‫خدمة‬‫او‬ ‫استشارات‬ ‫اعمال‬ ‫مثل‬‫ن‬‫تيجة‬
‫فريدة‬‫بيئي‬ ‫بحث‬ ‫مثل‬.‫المستمرة‬ ‫االعمال‬ ‫بعكس‬ ‫نهاية‬ ‫و‬ ‫بداية‬ ‫له‬ ‫الن‬ ‫مؤقت‬ ‫انه‬ ‫الحظ‬operational‫يكون‬ ‫و‬
‫تتكرر‬ ‫ال‬ ‫المشروع‬ ‫خصائص‬ ‫ألن‬ ‫فريد‬(‫الزمن‬,‫المكان‬,‫التكاليف‬,‫االفراد‬,...‫الخ‬)‫من‬ ‫جزء‬ ‫تكرر‬ ‫ان‬ ‫و‬‫ها‬.
Project Management : Application of knowledge, skills, tools, and techniques to
project activities to meet the project requirements.
Project Management Process Groups :
1.Initiation, 2.Planning, 3.Execution, 4.Monitor & Control, and 5.Closing
PM Knowledge Areas :
1.Integration management, 2.Scope management, 3.Time management, 4.Cost
management, 5.Quality management, 6.HR management, 7.Communication
management, 8.Risk management, 9.Procurement management, 10. Stakeholder
Management.
Lecture 03: Project Management Framework (4/14)
1. Project, Program, Portfolio
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Program : Group of related projects managed in a coordinated way to obtain
benefits and control not available from managing them individually.
‫ذلك‬ ‫من‬ ‫فائدة‬ ‫على‬ ‫للحصول‬ ‫متناسقة‬ ‫بطريقة‬ ‫ادارتها‬ ‫يتم‬ ‫ببعضها‬ ‫المرتبطة‬ ‫المشاريع‬ ‫من‬ ‫مجموعة‬.
‫منهما‬ ‫خليط‬ ‫او‬ ‫فرعية‬ ‫برامج‬ ‫او‬ ‫مشاريع‬ ‫على‬ ‫البرنامج‬ ‫يحتوي‬ ‫ان‬ ‫يمكن‬.
Portfolio : A collection of projects or programs and other work that are
grouped together to facilitate effective management of the work to meet
strategic business objectives.
‫ان‬ ‫يشترط‬ ‫ال‬ ‫و‬ ‫استثمارية‬ ‫حقيبة‬ ‫داخل‬ ‫تجميعها‬ ‫يتم‬ ‫االخري‬ ‫االعمال‬ ‫و‬ ‫المشاريع‬ ‫او‬ ‫البرامج‬ ‫من‬ ‫مجموعة‬‫تكون‬
‫االستراتيجية‬ ‫االهداف‬ ‫تحقيق‬ ‫في‬ ‫يساهم‬ ‫واحدة‬ ‫حقيبة‬ ‫في‬ ‫وضعها‬ ‫لكن‬ ‫و‬ ‫مرتبطة‬.
Operational Work : Ongoing work like manufacturing, production, plant work,
and assembly lines.
‫التجميع‬ ‫خطوط‬ ‫و‬ ‫التصنيع‬ ‫و‬ ‫االنتاج‬ ‫مثل‬ ‫المستمرة‬ ‫األعمال‬,‫مستمرة‬ ‫تكون‬ ‫و‬(‫المشاريع‬ ‫بعكس‬)
Lecture 03: Project Management Framework (5/14)
2. Project & Strategic Management
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
• Organizations need to achieve objectives within their strategic plan.
• Projects are means to achieve these objectives.
• Examples of strategic considerations:
• Market Demand (need for housing, need for certain food, … etc.)
• Opportunity / Business need (university in a new cities, petrochemical
plant in countries that have sources of oil / gas).
• Social Needs (need for electricity, hospital, mosque).
• Environmental Consideration (Producing material for green buildings).
• Customer Request (electrical substation for a private park).
• Technological Advance (utilization of electronics in vehicles).
• Legal Requirements (chemical treatment of industrial waste).
Lecture 03: Project Management Framework (6/14)
3. Project Management Office
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
PMO : An organizational body or entity assigned variable responsibilities
related to the centralized and coordinated management to those projects
under its domain.
‫النقص‬ ‫او‬ ‫بالزيادة‬ ‫عنه‬ ‫يحيد‬ ‫ال‬ ‫بحيث‬ ‫بوضوح‬ ‫محدد‬ ‫المشروعات‬ ‫مكتب‬ ‫دور‬ ‫يكون‬ ‫ان‬ ‫مراعاة‬ ‫يجب‬
PMO Roles : ‫ادوار‬‫مكتب‬‫المشروعات‬
• Managing shared resources across projects ‫المشاريع‬ ‫بين‬ ‫ما‬ ‫الموارد‬ ‫ادارة‬
• Developing methodologies and best practices ‫الجيدة‬ ‫الممارسات‬ ‫و‬ ‫المنهجيات‬ ‫اعداد‬
• Coaching, mentoring, and training ‫التأهيل‬ ‫و‬ ‫التدريب‬
• Monitoring compliance with standards and policies ‫للمشاريع‬ ‫المراقبة‬
• Coordinating communication across projects ‫بعضها‬ ‫و‬ ‫المشاريع‬ ‫بين‬ ‫ما‬ ‫االتصال‬ ‫تنسيق‬
‫و‬‫ايضا‬‫قد‬‫يكون‬‫من‬‫صالحيات‬‫مكتب‬‫المشروعات‬‫الدعم‬‫بالموارد‬‫او‬‫بمدراء‬‫المشاريع‬,‫انهاء‬‫المشاريع‬,
‫المشاركة‬‫في‬‫دراسة‬‫و‬‫البت‬‫في‬‫التغيير‬,‫التوجيه‬,‫االمداد‬‫بالنماذج‬‫و‬‫الدروس‬‫المستفادة‬‫من‬‫مشاري‬‫ع‬‫اخرى‬.
Lecture 03: Project Management Framework (7/14)
3. Project Management Office
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
PMO Types: ‫أنماط‬‫مكتب‬‫المشروعات‬
• Supportive (Low Level of Control)
Providing methodologies such as procedures, templates, best practice, and
lessons learned.
• Controlling (Moderate Level of Control)
In addition to providing such methodologies, this type of PMO requires the
obligation to what has been provided.
• Directive (High Level of Control)
This type of PMO is involved directly in the management of project.
Lecture 03: Project Management Framework (8/14)
4. Stakeholder Management
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Stakeholder : Persons or organizations who are actively involved in the
project or whose interests may be positively or negatively affected by the
performance or completion of the project.
‫المشروع‬ ‫تنفيذ‬ ‫من‬ ‫السلب‬ ‫او‬ ‫بااليجاب‬ ‫سيتأثر‬ ‫من‬ ‫او‬ ‫المشروع‬ ‫داخل‬ ‫المنظمات‬ ‫او‬ ‫االشخاص‬.
‫احتياج‬ ‫و‬ ‫توقعاتهم‬ ‫ترضي‬ ‫و‬ ‫منهم‬ ‫تسمع‬ ‫انك‬ ‫بحيث‬ ‫مساعد‬ ‫عمل‬ ‫فريق‬ ‫انهم‬ ‫على‬ ‫اليهم‬ ‫النظر‬ ‫من‬ ‫بد‬ ‫ال‬‫اتهم‬
Examples for Stakeholders :
- Customer / User ‫الجهة‬‫المستفيدة‬
- Sponsor ‫الممول‬(‫قد‬‫يكون‬‫البنك‬‫او‬‫وزارة‬‫المالية‬‫او‬‫المستفيد‬‫نفسه‬)
- Project Management Office
- Program Manager / Portfolio Manager
- Project Manager / Project Team
- Functional Manager / Operational Manager ‫المدير‬‫الوظيفي‬/‫مدير‬‫العمليات‬
- Sellers / Vendors / contractors / Business Partners
Lecture 03: Project Management Framework (9/14)
5. Organizational Structure
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
1. Functional : Each employee has one superior. Staff members are grouped
by specialty. Each department will do its project work independent of others.
‫للتخصص‬ ‫طبقا‬ ‫وظيفية‬ ‫اقسام‬ ‫عن‬ ‫عبارة‬ ‫الهيكل‬ ‫واحد‬ ‫مدير‬ ‫له‬ ‫الموظف‬
(‫تسويق‬/‫انتاج‬/‫هندسة‬/‫حسابات‬..‫الخ‬),‫احد‬ ‫داخل‬ ‫مشروع‬ ‫وجود‬ ‫وعند‬
‫الوظيفي‬ ‫لعملهم‬ ‫باالضافة‬ ‫المشروع‬ ‫انجاز‬ ‫على‬ ‫بمفرده‬ ‫القسم‬ ‫يقوم‬ ‫االقسام‬,
‫معدومة‬ ‫او‬ ‫قليلة‬ ‫المشروع‬ ‫مدير‬ ‫صالحيات‬,
2. Projectized : Company is organized by project. Project manager has the
authority and control of projects. Team members complete only project work
and when project is over they don’t have a department to go back to.
‫الصالحيات‬ ‫كامل‬ ‫له‬ ‫المشروع‬ ‫مدير‬ ‫و‬ ‫المشاريع‬ ‫من‬ ‫مجموعة‬ ‫عن‬ ‫عبارة‬ ‫المنظمة‬
‫بينهم‬ ‫سهل‬ ‫والتواصل‬ ‫للمشروع‬ ‫والءهم‬ ‫و‬ ‫المشروع‬ ‫لمدير‬ ‫تابع‬ ‫العمل‬ ‫وفريق‬
‫الفريق‬ ‫اعضاء‬ ‫عن‬ ‫االستغناء‬ ‫يتم‬ ‫المشروع‬ ‫نهاية‬ ‫في‬ ‫و‬,‫النظام‬ ‫هذا‬ ‫يعيب‬ ‫و‬
‫التخصص‬ ‫في‬ ‫الفنية‬ ‫الخبرات‬ ‫غياب‬.
‫الشركة‬ ‫مدير‬
‫وظيفي‬ ‫مدير‬
‫العمل‬ ‫فريق‬
‫وظيفي‬ ‫مدير‬
‫عمل‬ ‫فريق‬
‫وظيفي‬ ‫مدير‬
‫العمل‬ ‫فريق‬
1. Functional Organization
‫الشركة‬ ‫مدير‬
‫مشروع‬ ‫مدير‬
3
‫العمل‬ ‫فريق‬
‫مشروع‬3
‫مشروع‬ ‫مدير‬
2
‫العمل‬ ‫فريق‬
‫مشروع‬2
‫مشروع‬ ‫مدير‬
1
‫العمل‬ ‫فريق‬
‫مشروع‬1
2. Projectized Organization
Lecture 03: Project Management Framework (10/14)
5. Organizational Structure
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
3. Matrix : Blend of functional and projectized characteristics. Team members
report to two bosses. ‫خليط‬‫من‬‫النوعين‬‫و‬‫فيها‬‫الموظف‬‫له‬‫رئيسان‬‫بالعمل‬
3. 1 Strong Matrix : Power with project manager ‫المشروع‬ ‫لمدير‬ ‫اعلى‬ ‫صالحيات‬
3.2 Balanced Matrix : Power is shared between project manager and
functional manager. ‫الوظيفي‬ ‫المدير‬ ‫و‬ ‫المشروع‬ ‫مدير‬ ‫بين‬ ‫متساوية‬ ‫صالحيات‬
3.3 Weak matrix : Power with the functional manager and the project
manager will work as coordinator or expediter. ‫الوظيفي‬ ‫للمدير‬ ‫اعلى‬ ‫صالحيات‬
- Expediter :
‫العمل‬ ‫فريق‬ ‫مساعدة‬ ‫و‬ ‫بالمشروع‬ ‫العمل‬ ‫دفع‬ ‫في‬ ‫يساعد‬ ‫و‬ ‫يمكن‬ ‫ما‬ ‫اقل‬ ‫صالحيات‬ ‫له‬ ‫للمشروع‬ ‫مشهل‬.
- Coordinator :
‫ال‬ ‫مثل‬ ‫للمشروع‬ ‫منسق‬expediter‫القرارات‬ ‫بعض‬ ‫الخذ‬ ‫صالحيات‬ ‫له‬ ‫لكن‬ ‫و‬.
Lecture 03: Project Management Framework (11/14)
6. Life Cycle
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Project Life Cycle Structure :
1. Starting the project ‫البدء‬ 2. Organizing and preparing ‫التنظيم‬
3. Carrying out project work ‫التنفيذ‬ 4. Closing the project ‫نهاية‬‫المشروع‬
-‫بسرع‬ ‫يقل‬ ‫ثم‬ ‫التنفيذ‬ ‫في‬ ‫اقصاه‬ ‫يصل‬ ‫ثم‬ ‫البداية‬ ‫في‬ ‫قليال‬ ‫يكون‬ ‫العمل‬ ‫فريق‬ ‫و‬ ‫التكاليف‬‫المشروع‬ ‫نهاية‬ ‫في‬ ‫ة‬
-‫بعد‬ ‫تقل‬ ‫ثم‬ ‫المشروع‬ ‫بداية‬ ‫في‬ ‫يمكن‬ ‫ما‬ ‫اكبر‬ ‫يكون‬ ‫المصلحة‬ ‫اصحاب‬ ‫تأثير‬ ‫و‬ ‫الغموض‬ ‫و‬ ‫المخاطر‬‫ذلك‬
-‫المشروع‬ ‫في‬ ‫العمل‬ ‫تقدم‬ ‫مع‬ ‫تزيد‬ ‫ثم‬ ‫المشروع‬ ‫بداية‬ ‫في‬ ‫يمكن‬ ‫ما‬ ‫اقل‬ ‫تكون‬ ‫التغيير‬ ‫تكاليف‬
Lecture 03: Project Management Framework (12/14)
7. Enterprise Environmental Factors
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Enterprise Environmental Factors : ‫العوامل‬‫البيئية‬‫المؤثرة‬‫في‬‫المشروع‬/‫المنظمة‬ .
It refers to conditions, not under the control of the project team, that
influence, constrain, or direct the project such as:
 Organizational culture, structure, and governance
 Geographic distribution of facilities and resources
 Government or industry standards
 Infrastructure (e.g., existing facilities and capital equipment)
 Existing human resources (e.g., skills, disciplines, and knowledge)
 Company work authorization systems
 Marketplace conditions and political climate
 Commercial databases (e.g., cost estimating data)
Lecture 03: Project Management Framework (13/14)
8. Organizational Process Assets
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Organizational Process Assets : ‫أ‬‫صول‬‫العملية‬‫التنظيمية‬
1. Procedure & Processes :
• Organizational standards, policies, and templates.
• Change management procedures / defect management procedures.
• Guidelines for tailoring processes and procedures
2. Knowledge Base
• Project files and database
• Lessons learned and historical information
• Financial database and configuration management database.
• Issue management database
Lecture 03: Project Management Framework (14/14)
9. PMBOK Structure
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
KnowledgeAreas
4.Integration
5.Scope
6.Time
7.Cost
8.Quality
9.Human Resource
10.Communication
11.Risk
12.Procurement
13. Stakeholders
Process Groups
Initiation Planning Execution
Monitor &
Control
Closing
47 Processes

Contenu connexe

Tendances

1 2. project management
1 2. project management1 2. project management
1 2. project management
akashsaini8
 
Inter national standards for project management - fitsilis
Inter national standards for project management - fitsilisInter national standards for project management - fitsilis
Inter national standards for project management - fitsilis
Panos Fitsilis
 

Tendances (20)

software project management
software project managementsoftware project management
software project management
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
 
Project managemen concept
Project managemen conceptProject managemen concept
Project managemen concept
 
PMP Preparation - 06 Time Management
PMP Preparation - 06 Time ManagementPMP Preparation - 06 Time Management
PMP Preparation - 06 Time Management
 
PMP Preparation - 11 Risk Management
PMP Preparation - 11 Risk ManagementPMP Preparation - 11 Risk Management
PMP Preparation - 11 Risk Management
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Software Project Management (SPM)
Software Project Management (SPM)Software Project Management (SPM)
Software Project Management (SPM)
 
Software Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementSoftware Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project Management
 
Project management frame work part 2
Project management frame work part 2Project management frame work part 2
Project management frame work part 2
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
 
Spm l01
Spm l01Spm l01
Spm l01
 
project Scope management
project Scope management project Scope management
project Scope management
 
PPRPreparationGuide
PPRPreparationGuidePPRPreparationGuide
PPRPreparationGuide
 
Pmi rmp-2020 - v6
Pmi rmp-2020 - v6Pmi rmp-2020 - v6
Pmi rmp-2020 - v6
 
Pmp Final Review - M Maged
Pmp Final Review - M MagedPmp Final Review - M Maged
Pmp Final Review - M Maged
 
Pm Student Ho
Pm Student HoPm Student Ho
Pm Student Ho
 
1 2. project management
1 2. project management1 2. project management
1 2. project management
 
Inter national standards for project management - fitsilis
Inter national standards for project management - fitsilisInter national standards for project management - fitsilis
Inter national standards for project management - fitsilis
 
IT Project Management - Aligning PMBOK Processes and SDLC
IT Project Management  - Aligning PMBOK Processes and SDLCIT Project Management  - Aligning PMBOK Processes and SDLC
IT Project Management - Aligning PMBOK Processes and SDLC
 
Programme management and project evaluation
Programme management and project evaluationProgramme management and project evaluation
Programme management and project evaluation
 

Similaire à PMP Preparation - 03 Framework

Mandarkulkarni 111003065827-phpapp01
Mandarkulkarni 111003065827-phpapp01Mandarkulkarni 111003065827-phpapp01
Mandarkulkarni 111003065827-phpapp01
PMI_IREP_TP
 
Implementation of the pmo proposal
Implementation of the pmo proposalImplementation of the pmo proposal
Implementation of the pmo proposal
Hugh Shults
 
Learn the PRINCE2 Principles ebook
Learn the PRINCE2 Principles ebookLearn the PRINCE2 Principles ebook
Learn the PRINCE2 Principles ebook
Knowledge Train
 
Critical thinking Project Management.docx
Critical thinking Project Management.docxCritical thinking Project Management.docx
Critical thinking Project Management.docx
write31
 
Critical thinking Project Management.docx
Critical thinking Project Management.docxCritical thinking Project Management.docx
Critical thinking Project Management.docx
write22
 
Microsoft Office Enterprise Project Management
Microsoft Office Enterprise Project Management Microsoft Office Enterprise Project Management
Microsoft Office Enterprise Project Management
Arabella Jones
 

Similaire à PMP Preparation - 03 Framework (20)

Mandarkulkarni 111003065827-phpapp01
Mandarkulkarni 111003065827-phpapp01Mandarkulkarni 111003065827-phpapp01
Mandarkulkarni 111003065827-phpapp01
 
7 keys
7 keys7 keys
7 keys
 
Gurtu 2010
Gurtu 2010Gurtu 2010
Gurtu 2010
 
PMP Muzette Charles_Sp2019_Week1_chapter1_2_3
PMP Muzette Charles_Sp2019_Week1_chapter1_2_3PMP Muzette Charles_Sp2019_Week1_chapter1_2_3
PMP Muzette Charles_Sp2019_Week1_chapter1_2_3
 
MCP1
MCP1MCP1
MCP1
 
Implementation of the pmo proposal
Implementation of the pmo proposalImplementation of the pmo proposal
Implementation of the pmo proposal
 
Ben Mkt 347 Week 4
Ben Mkt 347 Week 4Ben Mkt 347 Week 4
Ben Mkt 347 Week 4
 
Advanced concept of project risk management project report
Advanced concept of project risk management project reportAdvanced concept of project risk management project report
Advanced concept of project risk management project report
 
(Fall2016)Lecture2.pptx
(Fall2016)Lecture2.pptx(Fall2016)Lecture2.pptx
(Fall2016)Lecture2.pptx
 
project human resources management
project human resources managementproject human resources management
project human resources management
 
Learn the PRINCE2 Principles ebook
Learn the PRINCE2 Principles ebookLearn the PRINCE2 Principles ebook
Learn the PRINCE2 Principles ebook
 
The role of the project manager based on pmbok6 by mm rahman stm skill that m...
The role of the project manager based on pmbok6 by mm rahman stm skill that m...The role of the project manager based on pmbok6 by mm rahman stm skill that m...
The role of the project manager based on pmbok6 by mm rahman stm skill that m...
 
Critical thinking Project Management.docx
Critical thinking Project Management.docxCritical thinking Project Management.docx
Critical thinking Project Management.docx
 
Critical thinking Project Management.docx
Critical thinking Project Management.docxCritical thinking Project Management.docx
Critical thinking Project Management.docx
 
Project management framework 01
Project management framework 01Project management framework 01
Project management framework 01
 
0. project management framework (fundamentals)
0. project management framework (fundamentals)0. project management framework (fundamentals)
0. project management framework (fundamentals)
 
Project management - Indian Business Academy
Project management - Indian Business AcademyProject management - Indian Business Academy
Project management - Indian Business Academy
 
A Comparative Analysis Of Various Methodologies Of Agile Project Management V...
A Comparative Analysis Of Various Methodologies Of Agile Project Management V...A Comparative Analysis Of Various Methodologies Of Agile Project Management V...
A Comparative Analysis Of Various Methodologies Of Agile Project Management V...
 
Microsoft Office Enterprise Project Management
Microsoft Office Enterprise Project Management Microsoft Office Enterprise Project Management
Microsoft Office Enterprise Project Management
 
PMP Chapter-3_ PMBOK_6(1).pptx
PMP Chapter-3_ PMBOK_6(1).pptxPMP Chapter-3_ PMBOK_6(1).pptx
PMP Chapter-3_ PMBOK_6(1).pptx
 

Plus de Mohamed ElSaadany, PMP, CCP, PMI-RMP, SCE-PE

Plus de Mohamed ElSaadany, PMP, CCP, PMI-RMP, SCE-PE (8)

مكتب إدارة المشاريع. الفرص والتحديات
مكتب إدارة المشاريع. الفرص والتحدياتمكتب إدارة المشاريع. الفرص والتحديات
مكتب إدارة المشاريع. الفرص والتحديات
 
A lecture on CCP Certificate
A lecture on CCP CertificateA lecture on CCP Certificate
A lecture on CCP Certificate
 
Construction KPIs & Dashboards
Construction KPIs & DashboardsConstruction KPIs & Dashboards
Construction KPIs & Dashboards
 
CCP Material
CCP MaterialCCP Material
CCP Material
 
PMP Preparation - 07 Cost Management
PMP Preparation - 07 Cost ManagementPMP Preparation - 07 Cost Management
PMP Preparation - 07 Cost Management
 
PMP Preparation - 02 FAQ
PMP Preparation - 02 FAQPMP Preparation - 02 FAQ
PMP Preparation - 02 FAQ
 
PMP Preparation - 01 Get Ready
PMP Preparation - 01 Get ReadyPMP Preparation - 01 Get Ready
PMP Preparation - 01 Get Ready
 
Project Management Applications Using Google Documents
Project Management Applications Using Google DocumentsProject Management Applications Using Google Documents
Project Management Applications Using Google Documents
 

Dernier

Dernier (20)

Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 

PMP Preparation - 03 Framework

  • 1. Lecture 3 PMP Lectures Prepared By: Eng. Mohamed ElSaadany Project Management Framework
  • 2. Lecture 3: Project Management Framework (1/14) Contents PMP Lectures Prepared By: Eng. Mohamed ElSaadany • Assumptions 1. Project, Program, and Portfolio 2. Project & Strategic Management 3. Project Management Office (PMO) 4. Stakeholder Management 5. Organizational Structure 6. Lifecycle 7. Enterprise Environmental Factors 8. Organizational Process Assets 9. PMBOK Structure
  • 3. Lecture 03: Project Management Framework (2/14) Assumptions PMP Lectures Prepared By: Eng. Mohamed ElSaadany ‫المشروعات‬ ‫ادارة‬ ‫معهد‬ ‫لرؤية‬ ‫طبقا‬ ‫المشروعات‬ ‫الدارة‬ ‫العام‬ ‫الفكر‬ ‫افتراضات‬: •‫سمات‬‫مدير‬‫المشروع‬: ‫يتم‬‫تعيينه‬‫في‬‫بداية‬‫تفعيل‬‫المشروع‬‫و‬‫يهتم‬‫بمصلحة‬‫المشروع‬‫على‬‫حساب‬‫مصلحته‬‫ا‬‫لشخصية‬ ‫يكون‬‫مؤهل‬‫اداريا‬‫يعرف‬‫خطوات‬‫االدارة‬‫و‬‫يعرف‬‫اهداف‬‫تنفيذ‬‫المشروع‬‫و‬‫يتماشى‬‫معها‬ ‫يقوم‬‫بعمل‬‫الخطط‬‫بناءا‬‫على‬‫البيانات‬‫من‬‫فريق‬‫العمل‬‫و‬‫اصحاب‬‫المصلحة‬ ‫يجيد‬‫ادارة‬‫الموارد‬‫البشرية‬,‫و‬‫يهتم‬‫بمنع‬‫المشاكل‬‫بدال‬‫من‬‫حل‬‫المشاكل‬ ‫يفهم‬‫العقد‬‫و‬‫يقوم‬‫بتنفيذ‬‫كامل‬‫شروطه‬‫و‬‫ان‬‫بدت‬‫غير‬‫هامه‬‫له‬. •‫المنظمة‬‫بها‬‫مكتب‬‫ادارة‬‫مشروعات‬PMO‫له‬‫صالحيات‬‫محددة‬‫بوضوح‬,‫و‬‫عندها‬‫بيانات‬‫مسجلة‬‫عن‬‫كل‬ ‫المشاريع‬‫السابقة‬,‫و‬‫كل‬‫مشروع‬‫له‬‫خطة‬‫تحتوي‬‫على‬‫خطط‬‫فرعية‬‫لكل‬‫المجاالت‬‫قام‬‫باعدادها‬‫مدير‬ ‫المشروع‬‫و‬‫تم‬‫مراعاة‬‫احتياجات‬‫اصحاب‬‫المصلحة‬‫عند‬‫اعداد‬‫الخطط‬,‫و‬‫تكون‬‫الخطة‬‫منطقية‬‫و‬‫يوافق‬ ‫عليها‬‫الجميع‬‫و‬‫يتم‬‫ادارة‬‫المشروع‬‫بها‬. •‫ال‬‫يسمح‬‫بعملية‬‫الـ‬gold plating‫و‬‫التي‬‫تعني‬‫زيادة‬‫خصائص‬‫المشروع‬‫دون‬‫أجر‬‫اضافي‬.
  • 4. Lecture 03: Project Management Framework (3/14) 1. Project, Program, Portfolio PMP Lectures Prepared By: Eng. Mohamed ElSaadany Project : A temporary endeavor undertaken to create a unique product, service, or result. ‫لعمل‬ ‫اجراءه‬ ‫يتم‬ ‫مؤقت‬ ‫نشاط‬‫فريد‬ ‫منتج‬‫او‬ ‫ماكينة‬ ‫او‬ ‫مبنى‬ ‫مثل‬‫فريدة‬ ‫خدمة‬‫او‬ ‫استشارات‬ ‫اعمال‬ ‫مثل‬‫ن‬‫تيجة‬ ‫فريدة‬‫بيئي‬ ‫بحث‬ ‫مثل‬.‫المستمرة‬ ‫االعمال‬ ‫بعكس‬ ‫نهاية‬ ‫و‬ ‫بداية‬ ‫له‬ ‫الن‬ ‫مؤقت‬ ‫انه‬ ‫الحظ‬operational‫يكون‬ ‫و‬ ‫تتكرر‬ ‫ال‬ ‫المشروع‬ ‫خصائص‬ ‫ألن‬ ‫فريد‬(‫الزمن‬,‫المكان‬,‫التكاليف‬,‫االفراد‬,...‫الخ‬)‫من‬ ‫جزء‬ ‫تكرر‬ ‫ان‬ ‫و‬‫ها‬. Project Management : Application of knowledge, skills, tools, and techniques to project activities to meet the project requirements. Project Management Process Groups : 1.Initiation, 2.Planning, 3.Execution, 4.Monitor & Control, and 5.Closing PM Knowledge Areas : 1.Integration management, 2.Scope management, 3.Time management, 4.Cost management, 5.Quality management, 6.HR management, 7.Communication management, 8.Risk management, 9.Procurement management, 10. Stakeholder Management.
  • 5. Lecture 03: Project Management Framework (4/14) 1. Project, Program, Portfolio PMP Lectures Prepared By: Eng. Mohamed ElSaadany Program : Group of related projects managed in a coordinated way to obtain benefits and control not available from managing them individually. ‫ذلك‬ ‫من‬ ‫فائدة‬ ‫على‬ ‫للحصول‬ ‫متناسقة‬ ‫بطريقة‬ ‫ادارتها‬ ‫يتم‬ ‫ببعضها‬ ‫المرتبطة‬ ‫المشاريع‬ ‫من‬ ‫مجموعة‬. ‫منهما‬ ‫خليط‬ ‫او‬ ‫فرعية‬ ‫برامج‬ ‫او‬ ‫مشاريع‬ ‫على‬ ‫البرنامج‬ ‫يحتوي‬ ‫ان‬ ‫يمكن‬. Portfolio : A collection of projects or programs and other work that are grouped together to facilitate effective management of the work to meet strategic business objectives. ‫ان‬ ‫يشترط‬ ‫ال‬ ‫و‬ ‫استثمارية‬ ‫حقيبة‬ ‫داخل‬ ‫تجميعها‬ ‫يتم‬ ‫االخري‬ ‫االعمال‬ ‫و‬ ‫المشاريع‬ ‫او‬ ‫البرامج‬ ‫من‬ ‫مجموعة‬‫تكون‬ ‫االستراتيجية‬ ‫االهداف‬ ‫تحقيق‬ ‫في‬ ‫يساهم‬ ‫واحدة‬ ‫حقيبة‬ ‫في‬ ‫وضعها‬ ‫لكن‬ ‫و‬ ‫مرتبطة‬. Operational Work : Ongoing work like manufacturing, production, plant work, and assembly lines. ‫التجميع‬ ‫خطوط‬ ‫و‬ ‫التصنيع‬ ‫و‬ ‫االنتاج‬ ‫مثل‬ ‫المستمرة‬ ‫األعمال‬,‫مستمرة‬ ‫تكون‬ ‫و‬(‫المشاريع‬ ‫بعكس‬)
  • 6. Lecture 03: Project Management Framework (5/14) 2. Project & Strategic Management PMP Lectures Prepared By: Eng. Mohamed ElSaadany • Organizations need to achieve objectives within their strategic plan. • Projects are means to achieve these objectives. • Examples of strategic considerations: • Market Demand (need for housing, need for certain food, … etc.) • Opportunity / Business need (university in a new cities, petrochemical plant in countries that have sources of oil / gas). • Social Needs (need for electricity, hospital, mosque). • Environmental Consideration (Producing material for green buildings). • Customer Request (electrical substation for a private park). • Technological Advance (utilization of electronics in vehicles). • Legal Requirements (chemical treatment of industrial waste).
  • 7. Lecture 03: Project Management Framework (6/14) 3. Project Management Office PMP Lectures Prepared By: Eng. Mohamed ElSaadany PMO : An organizational body or entity assigned variable responsibilities related to the centralized and coordinated management to those projects under its domain. ‫النقص‬ ‫او‬ ‫بالزيادة‬ ‫عنه‬ ‫يحيد‬ ‫ال‬ ‫بحيث‬ ‫بوضوح‬ ‫محدد‬ ‫المشروعات‬ ‫مكتب‬ ‫دور‬ ‫يكون‬ ‫ان‬ ‫مراعاة‬ ‫يجب‬ PMO Roles : ‫ادوار‬‫مكتب‬‫المشروعات‬ • Managing shared resources across projects ‫المشاريع‬ ‫بين‬ ‫ما‬ ‫الموارد‬ ‫ادارة‬ • Developing methodologies and best practices ‫الجيدة‬ ‫الممارسات‬ ‫و‬ ‫المنهجيات‬ ‫اعداد‬ • Coaching, mentoring, and training ‫التأهيل‬ ‫و‬ ‫التدريب‬ • Monitoring compliance with standards and policies ‫للمشاريع‬ ‫المراقبة‬ • Coordinating communication across projects ‫بعضها‬ ‫و‬ ‫المشاريع‬ ‫بين‬ ‫ما‬ ‫االتصال‬ ‫تنسيق‬ ‫و‬‫ايضا‬‫قد‬‫يكون‬‫من‬‫صالحيات‬‫مكتب‬‫المشروعات‬‫الدعم‬‫بالموارد‬‫او‬‫بمدراء‬‫المشاريع‬,‫انهاء‬‫المشاريع‬, ‫المشاركة‬‫في‬‫دراسة‬‫و‬‫البت‬‫في‬‫التغيير‬,‫التوجيه‬,‫االمداد‬‫بالنماذج‬‫و‬‫الدروس‬‫المستفادة‬‫من‬‫مشاري‬‫ع‬‫اخرى‬.
  • 8. Lecture 03: Project Management Framework (7/14) 3. Project Management Office PMP Lectures Prepared By: Eng. Mohamed ElSaadany PMO Types: ‫أنماط‬‫مكتب‬‫المشروعات‬ • Supportive (Low Level of Control) Providing methodologies such as procedures, templates, best practice, and lessons learned. • Controlling (Moderate Level of Control) In addition to providing such methodologies, this type of PMO requires the obligation to what has been provided. • Directive (High Level of Control) This type of PMO is involved directly in the management of project.
  • 9. Lecture 03: Project Management Framework (8/14) 4. Stakeholder Management PMP Lectures Prepared By: Eng. Mohamed ElSaadany Stakeholder : Persons or organizations who are actively involved in the project or whose interests may be positively or negatively affected by the performance or completion of the project. ‫المشروع‬ ‫تنفيذ‬ ‫من‬ ‫السلب‬ ‫او‬ ‫بااليجاب‬ ‫سيتأثر‬ ‫من‬ ‫او‬ ‫المشروع‬ ‫داخل‬ ‫المنظمات‬ ‫او‬ ‫االشخاص‬. ‫احتياج‬ ‫و‬ ‫توقعاتهم‬ ‫ترضي‬ ‫و‬ ‫منهم‬ ‫تسمع‬ ‫انك‬ ‫بحيث‬ ‫مساعد‬ ‫عمل‬ ‫فريق‬ ‫انهم‬ ‫على‬ ‫اليهم‬ ‫النظر‬ ‫من‬ ‫بد‬ ‫ال‬‫اتهم‬ Examples for Stakeholders : - Customer / User ‫الجهة‬‫المستفيدة‬ - Sponsor ‫الممول‬(‫قد‬‫يكون‬‫البنك‬‫او‬‫وزارة‬‫المالية‬‫او‬‫المستفيد‬‫نفسه‬) - Project Management Office - Program Manager / Portfolio Manager - Project Manager / Project Team - Functional Manager / Operational Manager ‫المدير‬‫الوظيفي‬/‫مدير‬‫العمليات‬ - Sellers / Vendors / contractors / Business Partners
  • 10. Lecture 03: Project Management Framework (9/14) 5. Organizational Structure PMP Lectures Prepared By: Eng. Mohamed ElSaadany 1. Functional : Each employee has one superior. Staff members are grouped by specialty. Each department will do its project work independent of others. ‫للتخصص‬ ‫طبقا‬ ‫وظيفية‬ ‫اقسام‬ ‫عن‬ ‫عبارة‬ ‫الهيكل‬ ‫واحد‬ ‫مدير‬ ‫له‬ ‫الموظف‬ (‫تسويق‬/‫انتاج‬/‫هندسة‬/‫حسابات‬..‫الخ‬),‫احد‬ ‫داخل‬ ‫مشروع‬ ‫وجود‬ ‫وعند‬ ‫الوظيفي‬ ‫لعملهم‬ ‫باالضافة‬ ‫المشروع‬ ‫انجاز‬ ‫على‬ ‫بمفرده‬ ‫القسم‬ ‫يقوم‬ ‫االقسام‬, ‫معدومة‬ ‫او‬ ‫قليلة‬ ‫المشروع‬ ‫مدير‬ ‫صالحيات‬, 2. Projectized : Company is organized by project. Project manager has the authority and control of projects. Team members complete only project work and when project is over they don’t have a department to go back to. ‫الصالحيات‬ ‫كامل‬ ‫له‬ ‫المشروع‬ ‫مدير‬ ‫و‬ ‫المشاريع‬ ‫من‬ ‫مجموعة‬ ‫عن‬ ‫عبارة‬ ‫المنظمة‬ ‫بينهم‬ ‫سهل‬ ‫والتواصل‬ ‫للمشروع‬ ‫والءهم‬ ‫و‬ ‫المشروع‬ ‫لمدير‬ ‫تابع‬ ‫العمل‬ ‫وفريق‬ ‫الفريق‬ ‫اعضاء‬ ‫عن‬ ‫االستغناء‬ ‫يتم‬ ‫المشروع‬ ‫نهاية‬ ‫في‬ ‫و‬,‫النظام‬ ‫هذا‬ ‫يعيب‬ ‫و‬ ‫التخصص‬ ‫في‬ ‫الفنية‬ ‫الخبرات‬ ‫غياب‬. ‫الشركة‬ ‫مدير‬ ‫وظيفي‬ ‫مدير‬ ‫العمل‬ ‫فريق‬ ‫وظيفي‬ ‫مدير‬ ‫عمل‬ ‫فريق‬ ‫وظيفي‬ ‫مدير‬ ‫العمل‬ ‫فريق‬ 1. Functional Organization ‫الشركة‬ ‫مدير‬ ‫مشروع‬ ‫مدير‬ 3 ‫العمل‬ ‫فريق‬ ‫مشروع‬3 ‫مشروع‬ ‫مدير‬ 2 ‫العمل‬ ‫فريق‬ ‫مشروع‬2 ‫مشروع‬ ‫مدير‬ 1 ‫العمل‬ ‫فريق‬ ‫مشروع‬1 2. Projectized Organization
  • 11. Lecture 03: Project Management Framework (10/14) 5. Organizational Structure PMP Lectures Prepared By: Eng. Mohamed ElSaadany 3. Matrix : Blend of functional and projectized characteristics. Team members report to two bosses. ‫خليط‬‫من‬‫النوعين‬‫و‬‫فيها‬‫الموظف‬‫له‬‫رئيسان‬‫بالعمل‬ 3. 1 Strong Matrix : Power with project manager ‫المشروع‬ ‫لمدير‬ ‫اعلى‬ ‫صالحيات‬ 3.2 Balanced Matrix : Power is shared between project manager and functional manager. ‫الوظيفي‬ ‫المدير‬ ‫و‬ ‫المشروع‬ ‫مدير‬ ‫بين‬ ‫متساوية‬ ‫صالحيات‬ 3.3 Weak matrix : Power with the functional manager and the project manager will work as coordinator or expediter. ‫الوظيفي‬ ‫للمدير‬ ‫اعلى‬ ‫صالحيات‬ - Expediter : ‫العمل‬ ‫فريق‬ ‫مساعدة‬ ‫و‬ ‫بالمشروع‬ ‫العمل‬ ‫دفع‬ ‫في‬ ‫يساعد‬ ‫و‬ ‫يمكن‬ ‫ما‬ ‫اقل‬ ‫صالحيات‬ ‫له‬ ‫للمشروع‬ ‫مشهل‬. - Coordinator : ‫ال‬ ‫مثل‬ ‫للمشروع‬ ‫منسق‬expediter‫القرارات‬ ‫بعض‬ ‫الخذ‬ ‫صالحيات‬ ‫له‬ ‫لكن‬ ‫و‬.
  • 12. Lecture 03: Project Management Framework (11/14) 6. Life Cycle PMP Lectures Prepared By: Eng. Mohamed ElSaadany Project Life Cycle Structure : 1. Starting the project ‫البدء‬ 2. Organizing and preparing ‫التنظيم‬ 3. Carrying out project work ‫التنفيذ‬ 4. Closing the project ‫نهاية‬‫المشروع‬ -‫بسرع‬ ‫يقل‬ ‫ثم‬ ‫التنفيذ‬ ‫في‬ ‫اقصاه‬ ‫يصل‬ ‫ثم‬ ‫البداية‬ ‫في‬ ‫قليال‬ ‫يكون‬ ‫العمل‬ ‫فريق‬ ‫و‬ ‫التكاليف‬‫المشروع‬ ‫نهاية‬ ‫في‬ ‫ة‬ -‫بعد‬ ‫تقل‬ ‫ثم‬ ‫المشروع‬ ‫بداية‬ ‫في‬ ‫يمكن‬ ‫ما‬ ‫اكبر‬ ‫يكون‬ ‫المصلحة‬ ‫اصحاب‬ ‫تأثير‬ ‫و‬ ‫الغموض‬ ‫و‬ ‫المخاطر‬‫ذلك‬ -‫المشروع‬ ‫في‬ ‫العمل‬ ‫تقدم‬ ‫مع‬ ‫تزيد‬ ‫ثم‬ ‫المشروع‬ ‫بداية‬ ‫في‬ ‫يمكن‬ ‫ما‬ ‫اقل‬ ‫تكون‬ ‫التغيير‬ ‫تكاليف‬
  • 13. Lecture 03: Project Management Framework (12/14) 7. Enterprise Environmental Factors PMP Lectures Prepared By: Eng. Mohamed ElSaadany Enterprise Environmental Factors : ‫العوامل‬‫البيئية‬‫المؤثرة‬‫في‬‫المشروع‬/‫المنظمة‬ . It refers to conditions, not under the control of the project team, that influence, constrain, or direct the project such as:  Organizational culture, structure, and governance  Geographic distribution of facilities and resources  Government or industry standards  Infrastructure (e.g., existing facilities and capital equipment)  Existing human resources (e.g., skills, disciplines, and knowledge)  Company work authorization systems  Marketplace conditions and political climate  Commercial databases (e.g., cost estimating data)
  • 14. Lecture 03: Project Management Framework (13/14) 8. Organizational Process Assets PMP Lectures Prepared By: Eng. Mohamed ElSaadany Organizational Process Assets : ‫أ‬‫صول‬‫العملية‬‫التنظيمية‬ 1. Procedure & Processes : • Organizational standards, policies, and templates. • Change management procedures / defect management procedures. • Guidelines for tailoring processes and procedures 2. Knowledge Base • Project files and database • Lessons learned and historical information • Financial database and configuration management database. • Issue management database
  • 15. Lecture 03: Project Management Framework (14/14) 9. PMBOK Structure PMP Lectures Prepared By: Eng. Mohamed ElSaadany KnowledgeAreas 4.Integration 5.Scope 6.Time 7.Cost 8.Quality 9.Human Resource 10.Communication 11.Risk 12.Procurement 13. Stakeholders Process Groups Initiation Planning Execution Monitor & Control Closing 47 Processes