Sample Evaluation Criteria
ERP Package Vendors

     Area           Evaluation Parameter              Area Points   Weightage in
                         & Criteria                                 OVERALL
                                                                    Evaluation
ERP Package                                           120           40%
        Functiona
        lity
Production                                            20
Application(s)
Materials                                             20
Sales                                                 10
Finance                                               20
Human Resource                                        10
Workflow                                              05
Business                                              10
Intelligence
General                                               25
ERP Package                                           27            10%
Market
Acceptance
Client Base         Total Number of Clients           4
                    <4 = 0 points
                    5 - 10 = 2
                    10-20 = 3
                    20+ = 4


Clients -             1 client = 0 points             4
Govt/Semi-govt        2-4        =2
                      4+         =4
Multinational       # MNC Clients                     1
Co’s                1- 5      = 0 point
                      5+      = 1 points
Package used        Yes = 2 points                    2
internationally
GOP Projects        # ERP projects completed for      8
                    govt./ semi-govt. organizations
                    1     = 0 points
                    2- 3 = 2
                    4.5 = 4
                    6-7 = 6
                    7+ = 8
Project Types       Project Type (add * points)       8
                    * Multiple Application projects
                    < 2 projects = 0 points
                    2-5          =2
                    5+           =4
                    * Multiple Location Projects
                    < 2 projects = 0 points
                    2-5            =2
                    5+             =4


Proposed Team       Team Assigned to MYCO for         90            30%
                    Implementation Phase I and II
Company IT          Total number of IT staff in Co.   6
Team strength       <5     = 0 points
                    5–8 =2
                    9 – 15 = 4
                    15+ = 6
Senior Team        Includes Senior staff only such   6
Members            as: Team Leaders, Senior / Lead
                   Consultants, Managers, System
                   Administrator / DBA
                   < 2 = 0 points
                   2-3 = 2
                   3-4 = 4
                   4+ = 6
Team               Team Academic Level (add          8
Qualifications     points)
                   * PhD/ MCS/MBA/BE/BCS
                    1 point each max 4 points
                   * MSc / BSc (non CS)
                    ½ point each max 4 points

Certifications     Certified staff in Team           6
                   <2 = 0 points
                   2 = 2
                   3 = 4
                   3+ = 6
Technical Team     Total Man -Years of IT Team       6
Experience (IT)    < 5 = 0 points
                   6-10 = 2
                   11-30 = 4
                   30+ = 6

Team BA/ SA        Number of Business or System      5
strength           Analysts / Consultants
                   <3 = 0 points
                   3-4 = 2
                   4.6 =4
                    6+ = 5
Experience of      Average Experience (Years)        5
Business or        1-3 years = 0 points
Systems Analysts   3-5        = 2
/ Consultants      6-8        = 4
                   8+         = 5

Team Leaders       Team Leaders    (add * points)    8
                   * Number        1 = 0 points
                                2-3 = 1
                                  3+= 2
                   * Average Experience (Years)
                   1-3 years = 0 points
                   4-8       = 2
                   9-12      = 4
                   12+       = 6

Number of Full     # Team                            4
Time Team          < 5 = 0 points
Members            5-6 = 1
                   7-10 = 2
                   10+ = 4
Total Person       Full Time Man-Months:             6
Months of Full     < 50 MM =0 points
Time Team          51 – 100 = 2
                   101 – 150 = 4
                   150+      =6
Number of Part     # Team                            4
Time Team          < 4 = 0 points
                   4–8=2
                   8+ = 4
Total Person       Part Time Man-Months:             6
Months of Part     < 30 MM =0 points
Time Team          31 – 60 = 2
                   61 – 100 = 4
                   100+     =6
Total number of    # ERP Projects                    6
ERP Projects        <8     = 0 points
completed by the    8 – 12 = 2
Team               13 – 18 = 4
                      18+ = 6
Current            # ERP Projects by company            4
Experience on      during last 3 years
similar projects     < 3 = 0 points
                   3–5=2
                   6–8=4
Programming        Add points (Max 2 points)            2
Skill Sets         Dot Net = 1 point
Available with     Oracle Dev = 1
Team               ABAP         =1
                   Java         =1
                   C++         =1
Programming        Certified Developers                 2
Certifications         1 = 0 points
                     2-3 = 1
                    4-8 = 2
                     8+ = 4
Team Synergy       Team continuity: 50% of team         6
                   assigned to MYCO has
                   previously done:
                     One other project = 2 points
                     Two other projects = 4
                     Three or more “ = 6


Implementation                                          73   20%
Services Quality
Project Plan       Total number of Tasks                4
                   < 10 = 0
                   10 – 20 = 1 points
                   21 – 30 = 2
                   31-40 = 3
                   40+     =4

Gap Analysis       # Gaps identified (to be filled by   4
(Less Gaps         Add-on or Customization)
identified)        10+ = 0 points
                   6 – 10 = 2
                   2–5 = 3
                   0–1 =4
Gap Analysis       # Pages in this Chapter 3            3
(Depth of study)   < 5 = 0 points
                   6-8 = 1
                   9 - 10 = 2
                   10+ = 3

Testing & QA       # Tasks specified                    4
Tasks              < 3 = 0 points
                   3-8 = 2
                   8+ = 4
Non-ERP i.e.       # Tasks specified                    4
MYCO Business      < 3 = 0 points
Transformation     3-8 = 2
tasks              8+ = 4
Risks Identified   # Risks specified                    4
                   < 2 = 0 points
                   2-5 = 2
                   5+ = 4
Project            # Pages in this section              4
Management         < 3 = 0 points
Reporting          3-5 = 2
                   5+ = 4
Training Courses   Total number of Courses to be        8
                   conducted for MYCO
                   < 3 = 0 points
                   3-8 = 4
                   8+ = 8
Training Days        Total number of Class Days to    8
                     be conducted for MYCO
                     < 20 = 0
                     20 – 50 = 2 points
                     51 – 80 = 4
                     81-120 = 6
                     120+       =8
Student Days         Total number of Student Days     8
offered              offered to MYCO
                     < 100 = 0
                     100 – 200 = 2 points
                     201 – 300 = 4
                     301-400 = 6
                     400+       =8
Certified Trainers   # Trainers offered               6
                     2 points each
                     Maximum 6 points
Data Conversion      # Activities Proposed            6
(Activities /        < 3 = 0 points
Tasks)               3-8 = 4
                     8+ = 6
Data Conversion      # Data Elements identified for   6
(Data Elements)      conversion
                     < 5 = 0 points
                     6-10 = 2
                     10-20 = 4
                     20+ = 6
Documentation        Available on CD                  2
                     Yes = 2 points
Maintenance          Type of Support available (add   2
Support              points – max 2)
Availability         Web Based service = 1 point
                     Int’l Call Center   =1
                     Video Conferencing = 1
                                                                  100%


Notes:
1. The information not available will be treated as 0 points
2. The Evaluation summary prepared by Technical Committee will be presented in the
Steering Committee.
3. The Evaluation Summary can be crosschecked by an audit team before submission to
Steering Committee
4. Any assumptions necessary should be made and recorded, and then applied
UNIFORMLY in the same manner to all the Firms
5. The Technical Committee may raise or lower the evaluation criteria for a selection
parameter if all vendors fall above or below the limits specified


                                                      *********

Contenu connexe

Similaire à Restricted ERP Package Evaluation

Metrics on employee management
Metrics on employee managementMetrics on employee management
Metrics on employee managementHR Spot
 
ЄРМЕК КАДИРБАЄВ & АЛЕКС РИБКІН «How we train QAEs to join automation» Online ...
ЄРМЕК КАДИРБАЄВ & АЛЕКС РИБКІН «How we train QAEs to join automation» Online ...ЄРМЕК КАДИРБАЄВ & АЛЕКС РИБКІН «How we train QAEs to join automation» Online ...
ЄРМЕК КАДИРБАЄВ & АЛЕКС РИБКІН «How we train QAEs to join automation» Online ...GoQA
 
A study on employee morale in multinational
A study on employee morale in multinationalA study on employee morale in multinational
A study on employee morale in multinationalprjpublications
 
A study on employee morale in multinational
A study on employee morale in multinationalA study on employee morale in multinational
A study on employee morale in multinationalIAEME Publication
 
Quantitative tools for HR managers
Quantitative tools for HR managersQuantitative tools for HR managers
Quantitative tools for HR managersraza kamal
 
Performance Management
Performance ManagementPerformance Management
Performance ManagementPeter Anyebe
 
Agile planning and monitoring
Agile planning and monitoringAgile planning and monitoring
Agile planning and monitoringNhan Nguyen
 
PPM Intelligence Capability Survey 2012 - Summary Findings
PPM Intelligence Capability Survey 2012 - Summary FindingsPPM Intelligence Capability Survey 2012 - Summary Findings
PPM Intelligence Capability Survey 2012 - Summary FindingsBryan Fenech
 
Steering Cmte - Employability Toolkit, Dundalk Institute of Technology
Steering Cmte - Employability Toolkit, Dundalk Institute of TechnologySteering Cmte - Employability Toolkit, Dundalk Institute of Technology
Steering Cmte - Employability Toolkit, Dundalk Institute of TechnologyEmbedding Employability
 
Machine learning in action at Pipedrive
Machine learning in action at PipedriveMachine learning in action at Pipedrive
Machine learning in action at PipedriveAndré Karpištšenko
 
Why do projects fail - the project execution maturity model - basic collabor...
Why do projects fail  - the project execution maturity model - basic collabor...Why do projects fail  - the project execution maturity model - basic collabor...
Why do projects fail - the project execution maturity model - basic collabor...Pinnacle Strategies
 
Nurturing improvement with Ravensdown
Nurturing improvement with RavensdownNurturing improvement with Ravensdown
Nurturing improvement with RavensdownPromapp Solutions
 
Incentive plan
Incentive planIncentive plan
Incentive planConnect2HR
 
HR Analytics Project EEB
HR Analytics Project EEBHR Analytics Project EEB
HR Analytics Project EEBErik Bebernes
 
Саша Гаврилюк "Проблеми зростають разом із бізнесом. Чого чекати на наступном...
Саша Гаврилюк "Проблеми зростають разом із бізнесом. Чого чекати на наступном...Саша Гаврилюк "Проблеми зростають разом із бізнесом. Чого чекати на наступном...
Саша Гаврилюк "Проблеми зростають разом із бізнесом. Чого чекати на наступном...Lviv Startup Club
 
chapter FP Analysis .pptx
chapter FP Analysis .pptxchapter FP Analysis .pptx
chapter FP Analysis .pptxtowexib993
 
Getting Some Respect - How to Measure and Communicate Your EA Success
Getting Some Respect - How to Measure and Communicate Your EA SuccessGetting Some Respect - How to Measure and Communicate Your EA Success
Getting Some Respect - How to Measure and Communicate Your EA SuccessDavid Baker
 

Similaire à Restricted ERP Package Evaluation (20)

Metrics on employee management
Metrics on employee managementMetrics on employee management
Metrics on employee management
 
ЄРМЕК КАДИРБАЄВ & АЛЕКС РИБКІН «How we train QAEs to join automation» Online ...
ЄРМЕК КАДИРБАЄВ & АЛЕКС РИБКІН «How we train QAEs to join automation» Online ...ЄРМЕК КАДИРБАЄВ & АЛЕКС РИБКІН «How we train QAEs to join automation» Online ...
ЄРМЕК КАДИРБАЄВ & АЛЕКС РИБКІН «How we train QAEs to join automation» Online ...
 
A study on employee morale in multinational
A study on employee morale in multinationalA study on employee morale in multinational
A study on employee morale in multinational
 
A study on employee morale in multinational
A study on employee morale in multinationalA study on employee morale in multinational
A study on employee morale in multinational
 
Quantitative tools for HR managers
Quantitative tools for HR managersQuantitative tools for HR managers
Quantitative tools for HR managers
 
Performance Management
Performance ManagementPerformance Management
Performance Management
 
Agile planning and monitoring
Agile planning and monitoringAgile planning and monitoring
Agile planning and monitoring
 
PPM Intelligence Capability Survey 2012 - Summary Findings
PPM Intelligence Capability Survey 2012 - Summary FindingsPPM Intelligence Capability Survey 2012 - Summary Findings
PPM Intelligence Capability Survey 2012 - Summary Findings
 
Steering Cmte - Employability Toolkit, Dundalk Institute of Technology
Steering Cmte - Employability Toolkit, Dundalk Institute of TechnologySteering Cmte - Employability Toolkit, Dundalk Institute of Technology
Steering Cmte - Employability Toolkit, Dundalk Institute of Technology
 
Machine learning in action at Pipedrive
Machine learning in action at PipedriveMachine learning in action at Pipedrive
Machine learning in action at Pipedrive
 
Why do projects fail - the project execution maturity model - basic collabor...
Why do projects fail  - the project execution maturity model - basic collabor...Why do projects fail  - the project execution maturity model - basic collabor...
Why do projects fail - the project execution maturity model - basic collabor...
 
Nurturing improvement with Ravensdown
Nurturing improvement with RavensdownNurturing improvement with Ravensdown
Nurturing improvement with Ravensdown
 
Recruiting&HR Analytics
Recruiting&HR AnalyticsRecruiting&HR Analytics
Recruiting&HR Analytics
 
Incentive plan
Incentive planIncentive plan
Incentive plan
 
HR Analytics Project EEB
HR Analytics Project EEBHR Analytics Project EEB
HR Analytics Project EEB
 
Саша Гаврилюк "Проблеми зростають разом із бізнесом. Чого чекати на наступном...
Саша Гаврилюк "Проблеми зростають разом із бізнесом. Чого чекати на наступном...Саша Гаврилюк "Проблеми зростають разом із бізнесом. Чого чекати на наступном...
Саша Гаврилюк "Проблеми зростають разом із бізнесом. Чого чекати на наступном...
 
chapter FP Analysis .pptx
chapter FP Analysis .pptxchapter FP Analysis .pptx
chapter FP Analysis .pptx
 
Pmp exam changes march 2021) webinar
Pmp exam changes march 2021) webinarPmp exam changes march 2021) webinar
Pmp exam changes march 2021) webinar
 
Getting Some Respect - How to Measure and Communicate Your EA Success
Getting Some Respect - How to Measure and Communicate Your EA SuccessGetting Some Respect - How to Measure and Communicate Your EA Success
Getting Some Respect - How to Measure and Communicate Your EA Success
 
Presentation eSofLabs
Presentation  eSofLabsPresentation  eSofLabs
Presentation eSofLabs
 

Restricted ERP Package Evaluation

  • 1. Restricted Confidential – Restricted Copying Sample Evaluation Criteria ERP Package Vendors Area Evaluation Parameter Area Points Weightage in & Criteria OVERALL Evaluation ERP Package 120 40% Functiona lity Production 20 Application(s) Materials 20 Sales 10 Finance 20 Human Resource 10 Workflow 05 Business 10 Intelligence General 25 ERP Package 27 10% Market Acceptance Client Base Total Number of Clients 4 <4 = 0 points 5 - 10 = 2 10-20 = 3 20+ = 4 Clients - 1 client = 0 points 4 Govt/Semi-govt 2-4 =2 4+ =4 Multinational # MNC Clients 1 Co’s 1- 5 = 0 point 5+ = 1 points Package used Yes = 2 points 2 internationally GOP Projects # ERP projects completed for 8 govt./ semi-govt. organizations 1 = 0 points 2- 3 = 2 4.5 = 4 6-7 = 6 7+ = 8 Project Types Project Type (add * points) 8 * Multiple Application projects < 2 projects = 0 points 2-5 =2 5+ =4 * Multiple Location Projects < 2 projects = 0 points 2-5 =2 5+ =4 Proposed Team Team Assigned to MYCO for 90 30% Implementation Phase I and II Company IT Total number of IT staff in Co. 6 Team strength <5 = 0 points 5–8 =2 9 – 15 = 4 15+ = 6
  • 2. Senior Team Includes Senior staff only such 6 Members as: Team Leaders, Senior / Lead Consultants, Managers, System Administrator / DBA < 2 = 0 points 2-3 = 2 3-4 = 4 4+ = 6 Team Team Academic Level (add 8 Qualifications points) * PhD/ MCS/MBA/BE/BCS 1 point each max 4 points * MSc / BSc (non CS) ½ point each max 4 points Certifications Certified staff in Team 6 <2 = 0 points 2 = 2 3 = 4 3+ = 6 Technical Team Total Man -Years of IT Team 6 Experience (IT) < 5 = 0 points 6-10 = 2 11-30 = 4 30+ = 6 Team BA/ SA Number of Business or System 5 strength Analysts / Consultants <3 = 0 points 3-4 = 2 4.6 =4 6+ = 5 Experience of Average Experience (Years) 5 Business or 1-3 years = 0 points Systems Analysts 3-5 = 2 / Consultants 6-8 = 4 8+ = 5 Team Leaders Team Leaders (add * points) 8 * Number 1 = 0 points 2-3 = 1 3+= 2 * Average Experience (Years) 1-3 years = 0 points 4-8 = 2 9-12 = 4 12+ = 6 Number of Full # Team 4 Time Team < 5 = 0 points Members 5-6 = 1 7-10 = 2 10+ = 4 Total Person Full Time Man-Months: 6 Months of Full < 50 MM =0 points Time Team 51 – 100 = 2 101 – 150 = 4 150+ =6 Number of Part # Team 4 Time Team < 4 = 0 points 4–8=2 8+ = 4 Total Person Part Time Man-Months: 6 Months of Part < 30 MM =0 points Time Team 31 – 60 = 2 61 – 100 = 4 100+ =6 Total number of # ERP Projects 6 ERP Projects <8 = 0 points
  • 3. completed by the 8 – 12 = 2 Team 13 – 18 = 4 18+ = 6 Current # ERP Projects by company 4 Experience on during last 3 years similar projects < 3 = 0 points 3–5=2 6–8=4 Programming Add points (Max 2 points) 2 Skill Sets Dot Net = 1 point Available with Oracle Dev = 1 Team ABAP =1 Java =1 C++ =1 Programming Certified Developers 2 Certifications 1 = 0 points 2-3 = 1 4-8 = 2 8+ = 4 Team Synergy Team continuity: 50% of team 6 assigned to MYCO has previously done: One other project = 2 points Two other projects = 4 Three or more “ = 6 Implementation 73 20% Services Quality Project Plan Total number of Tasks 4 < 10 = 0 10 – 20 = 1 points 21 – 30 = 2 31-40 = 3 40+ =4 Gap Analysis # Gaps identified (to be filled by 4 (Less Gaps Add-on or Customization) identified) 10+ = 0 points 6 – 10 = 2 2–5 = 3 0–1 =4 Gap Analysis # Pages in this Chapter 3 3 (Depth of study) < 5 = 0 points 6-8 = 1 9 - 10 = 2 10+ = 3 Testing & QA # Tasks specified 4 Tasks < 3 = 0 points 3-8 = 2 8+ = 4 Non-ERP i.e. # Tasks specified 4 MYCO Business < 3 = 0 points Transformation 3-8 = 2 tasks 8+ = 4 Risks Identified # Risks specified 4 < 2 = 0 points 2-5 = 2 5+ = 4 Project # Pages in this section 4 Management < 3 = 0 points Reporting 3-5 = 2 5+ = 4 Training Courses Total number of Courses to be 8 conducted for MYCO < 3 = 0 points 3-8 = 4 8+ = 8
  • 4. Training Days Total number of Class Days to 8 be conducted for MYCO < 20 = 0 20 – 50 = 2 points 51 – 80 = 4 81-120 = 6 120+ =8 Student Days Total number of Student Days 8 offered offered to MYCO < 100 = 0 100 – 200 = 2 points 201 – 300 = 4 301-400 = 6 400+ =8 Certified Trainers # Trainers offered 6 2 points each Maximum 6 points Data Conversion # Activities Proposed 6 (Activities / < 3 = 0 points Tasks) 3-8 = 4 8+ = 6 Data Conversion # Data Elements identified for 6 (Data Elements) conversion < 5 = 0 points 6-10 = 2 10-20 = 4 20+ = 6 Documentation Available on CD 2 Yes = 2 points Maintenance Type of Support available (add 2 Support points – max 2) Availability Web Based service = 1 point Int’l Call Center =1 Video Conferencing = 1 100% Notes: 1. The information not available will be treated as 0 points 2. The Evaluation summary prepared by Technical Committee will be presented in the Steering Committee. 3. The Evaluation Summary can be crosschecked by an audit team before submission to Steering Committee 4. Any assumptions necessary should be made and recorded, and then applied UNIFORMLY in the same manner to all the Firms 5. The Technical Committee may raise or lower the evaluation criteria for a selection parameter if all vendors fall above or below the limits specified *********