SlideShare une entreprise Scribd logo
1  sur  24
Télécharger pour lire hors ligne
www.newpacificmetals.com
Expansion of the camp from 25 to 50 persons has been completed with 
the installation of services, including power, water, and communications.   
Refurbishment of the 6,000 square feet geological office and core logging 
facility is also complete




                                                                           2
Front and inside of the camp 




                                3
Celebration of Solstice Day with Carcross/Tagish Lake First Nation 




                                                                      4
2011 Exploration and priority drilling targets




                                Camp 
       5.Chieftain Hill North               2. Goddell

   4. Chieftain Hill

                 1. Raca
3. Skukum Creek 
                                                         5
Road Building from Raca to Chieftain Hill (Photo Taken from 
Skukum Creek 1300 m Level Tunnel) has been completed




                                                               6
Surface mapping and sampling at the Roca and Cheiftain Hill Area




                                                                   7
Re‐interpretation of Geology at the Roca and Chieftain Hill




                                                              8
Surface Drilling at the Raca to test the extension of the historical discovery and four 
new parallel mineralized structures mapped by New Pacific




                                                     Raca



                   Skukum Creek 
                                                                                           9
Drill Cross Section showing 
                       historical drill holes and 
                       proposed drill hole for 
                       Section E1950 at the Raca
                       (dashed blue lines are 
                       planned drill holes) 

3.61 m @ 2.66 g/t Au
         561 g/t Ag




                                                10
Surface Drilling from at the Raca has commenced on 
June 28, 2011




                                                      11
Access Road to the Chieftain Hill is completed and drilling is scheduled at mid‐August 
to test the soil gold anomalies that extend over 2 km long northeast of Raca




                                                  Chieftain Hill 




                            Raca
Skukum Creek 
                                                                                      12
Surface Mapping and sampling at the Chieftain Hill




                                                     13
Geological model and drill cross section showing planned drill hole to test the soil gold‐
lead‐zinc anomalies (discovered in 1986 and confirmed by NUX in June 2011) for the 
first time at the Chieftain Hill area




                                                                                       14
Surface and Underground drilling for Skukum Creek Project
Surface Facility at the Skukum Creek 1300m Level Adit Entrance:  Access for 
underground drilling and bulk sampling program and future mining


                   new Generator


                                                                  settling pond




                                                                           Scoop
                                     First Aid trailer 




                                                                                  15
Inside Skukum Creek 1300m Level: De‐icing  is completed and the Adit is at 
very stable conditions and is currently being prepared for underground in‐fill 
and step‐out drilling




                                                                                  16
Jumbo underground drill rig is on site the Skukum Creek 1300 Adit. 
Underground drilling is scheduled to commence on July 15, 2011 




                                                                      17
Drilling will be 
                carried out at the 
                Skukum Creek 
                both from 
                underground and 
                surface (blue 
                lines are planned 
                drill hole 
                projections) 
Skukum Creek 




                               18
Surface and underground  
Drilling Section plan at Cross 
Section 1400 for the Skukum
Creek project.   


Drilling will test the depth 
extension of known high 
grade gold‐silver 
mineralization and test those 
sections of the veins along 
strike that have not been 
drilled before 




                                  19
Surface and Underground Drilling for Goddell
 Underground drilling from the existing Goddell Decline will substantially 
 reduce the amount of drilling than from surface, and can been carried out 
 year round. Accordingly, emphasis has been placed on de‐watering the 
 decline to take advantage of the underground drilling strategy



                                                        water settling ponds


       Goddell Decline

                                                 First Air Trailer

new generator and 
underground mining 
equipment                                                                      20
However, de‐watering Goddell decline has 
experienced delay and difficulty as gouge filled 
faults with widths of 2 to 3 metres have caused 
difficult ground conditions that have required 
extensive support steel frame work to be 
installed.




                                             21
As a contingency plan, the old Goddell
                                   Gully road has been repaired and 
                                   advanced.  A surface drill rig will carry 
               Goddell Decline
                                   out some of the drilling that was 
IP Anomalies                       initially planned for the decline

                                 Goddell Gully road




                                                                                22
A second Surface drill rig will 
arrive at the Goddell site July 
6, 2011 and will carry out 
some of the drilling that was 
initially planned for the 
decline from the old Goddell
Gully road.


Once de‐watering is 
successfully completed at the 
Goddell decline by the mid‐
August, a second underground  
rig will be brought to the site 
for drilling.



                                   23
Surface drilling from the west 
of the Goddell Decline will be 
carried out later in the 
program to test the west 
extension of the Goddell zone, 
where IP geophysical 
anomalies have been 
identified by the previous 
owner  




                                  24

Contenu connexe

Tendances

Final fall senior design presentation
Final fall senior design presentationFinal fall senior design presentation
Final fall senior design presentation
Julianne Crawford
 
Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...
Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...
Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...
Michael Hewitt, GISP
 
N11 Gorey By Pass Scheme
N11 Gorey By Pass SchemeN11 Gorey By Pass Scheme
N11 Gorey By Pass Scheme
Tony O Neill
 
STAVRIDISJGISC9231D3 (1)
STAVRIDISJGISC9231D3 (1)STAVRIDISJGISC9231D3 (1)
STAVRIDISJGISC9231D3 (1)
James Stavridis
 
Presentation_051013_Greer_ScottishOilClub
Presentation_051013_Greer_ScottishOilClubPresentation_051013_Greer_ScottishOilClub
Presentation_051013_Greer_ScottishOilClub
David Greer
 
BCPC LOADING JETTY AND STOCK PILE Presentation
BCPC  LOADING JETTY AND STOCK PILE  PresentationBCPC  LOADING JETTY AND STOCK PILE  Presentation
BCPC LOADING JETTY AND STOCK PILE Presentation
Adi Sumanto
 
Crescent Power Point
Crescent Power PointCrescent Power Point
Crescent Power Point
Kurt Hoffman
 
Presentation fot Coal Loading Operation
Presentation fot Coal Loading OperationPresentation fot Coal Loading Operation
Presentation fot Coal Loading Operation
Adi Sumanto
 
Utah_AMR Award Nomination2015_Knight-Ideal-Loadout
Utah_AMR Award Nomination2015_Knight-Ideal-LoadoutUtah_AMR Award Nomination2015_Knight-Ideal-Loadout
Utah_AMR Award Nomination2015_Knight-Ideal-Loadout
Chris Rohrer
 
Feb. 14 Waste Management Daily Progress Report
Feb. 14 Waste Management Daily Progress ReportFeb. 14 Waste Management Daily Progress Report
Feb. 14 Waste Management Daily Progress Report
Honolulu Civil Beat
 
2016.11.01 Atlantic Irl (1)
2016.11.01 Atlantic Irl (1)2016.11.01 Atlantic Irl (1)
2016.11.01 Atlantic Irl (1)
Lewis Whiting
 

Tendances (19)

OTC14038
OTC14038OTC14038
OTC14038
 
Final fall senior design presentation
Final fall senior design presentationFinal fall senior design presentation
Final fall senior design presentation
 
Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...
Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...
Matt MacConnell, Lehigh River Stocking Association, “Lausanne Tunnel Remediat...
 
2000_Charleston_cement
2000_Charleston_cement2000_Charleston_cement
2000_Charleston_cement
 
Widening of the Huey P. Long Bridge
Widening of the Huey P. Long BridgeWidening of the Huey P. Long Bridge
Widening of the Huey P. Long Bridge
 
N11 Gorey By Pass Scheme
N11 Gorey By Pass SchemeN11 Gorey By Pass Scheme
N11 Gorey By Pass Scheme
 
STAVRIDISJGISC9231D3 (1)
STAVRIDISJGISC9231D3 (1)STAVRIDISJGISC9231D3 (1)
STAVRIDISJGISC9231D3 (1)
 
Presentation_051013_Greer_ScottishOilClub
Presentation_051013_Greer_ScottishOilClubPresentation_051013_Greer_ScottishOilClub
Presentation_051013_Greer_ScottishOilClub
 
Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...
Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...
Hank Zielinski, Northhampton Generating Company, “Excellence in Surface Coal ...
 
BCPC LOADING JETTY AND STOCK PILE Presentation
BCPC  LOADING JETTY AND STOCK PILE  PresentationBCPC  LOADING JETTY AND STOCK PILE  Presentation
BCPC LOADING JETTY AND STOCK PILE Presentation
 
Backlick Run Gravity Sewer Abandonment Project June 2020
Backlick Run Gravity Sewer Abandonment Project June 2020Backlick Run Gravity Sewer Abandonment Project June 2020
Backlick Run Gravity Sewer Abandonment Project June 2020
 
Pecker aci2003
Pecker aci2003Pecker aci2003
Pecker aci2003
 
Crescent Power Point
Crescent Power PointCrescent Power Point
Crescent Power Point
 
Presentation fot Coal Loading Operation
Presentation fot Coal Loading OperationPresentation fot Coal Loading Operation
Presentation fot Coal Loading Operation
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
 
Utah_AMR Award Nomination2015_Knight-Ideal-Loadout
Utah_AMR Award Nomination2015_Knight-Ideal-LoadoutUtah_AMR Award Nomination2015_Knight-Ideal-Loadout
Utah_AMR Award Nomination2015_Knight-Ideal-Loadout
 
Feb. 14 Waste Management Daily Progress Report
Feb. 14 Waste Management Daily Progress ReportFeb. 14 Waste Management Daily Progress Report
Feb. 14 Waste Management Daily Progress Report
 
2016.11.01 Atlantic Irl (1)
2016.11.01 Atlantic Irl (1)2016.11.01 Atlantic Irl (1)
2016.11.01 Atlantic Irl (1)
 
Robert Hughes and Michael Hewitt, EPCAMR, “3D Modeling of Eastern Pennsylvani...
Robert Hughes and Michael Hewitt, EPCAMR, “3D Modeling of Eastern Pennsylvani...Robert Hughes and Michael Hewitt, EPCAMR, “3D Modeling of Eastern Pennsylvani...
Robert Hughes and Michael Hewitt, EPCAMR, “3D Modeling of Eastern Pennsylvani...
 

En vedette

11 july-5 nux-update
11 july-5 nux-update11 july-5 nux-update
11 july-5 nux-update
newpacific
 
A vavoularis final_presentation
A vavoularis final_presentationA vavoularis final_presentation
A vavoularis final_presentation
angelavav
 
Lauren's ireland clothing section
Lauren's ireland clothing sectionLauren's ireland clothing section
Lauren's ireland clothing section
lheikes
 
Jamia Al-Karam & Al-Azhar Islamic Centre
Jamia Al-Karam & Al-Azhar Islamic CentreJamia Al-Karam & Al-Azhar Islamic Centre
Jamia Al-Karam & Al-Azhar Islamic Centre
Musafireelmoishq Mei
 

En vedette (11)

11 july-5 nux-update
11 july-5 nux-update11 july-5 nux-update
11 july-5 nux-update
 
Licencia CC
Licencia CCLicencia CC
Licencia CC
 
A vavoularis final_presentation
A vavoularis final_presentationA vavoularis final_presentation
A vavoularis final_presentation
 
Lauren's ireland clothing section
Lauren's ireland clothing sectionLauren's ireland clothing section
Lauren's ireland clothing section
 
Jamia Al-Karam & Al-Azhar Islamic Centre
Jamia Al-Karam & Al-Azhar Islamic CentreJamia Al-Karam & Al-Azhar Islamic Centre
Jamia Al-Karam & Al-Azhar Islamic Centre
 
Ireland Culture Communication Presentation!
Ireland Culture Communication Presentation!Ireland Culture Communication Presentation!
Ireland Culture Communication Presentation!
 
Ireland Culture Communication Presentation
Ireland Culture Communication PresentationIreland Culture Communication Presentation
Ireland Culture Communication Presentation
 
Cassandra at Morningstar (Feb 2011)
Cassandra at Morningstar (Feb 2011)Cassandra at Morningstar (Feb 2011)
Cassandra at Morningstar (Feb 2011)
 
Pycon 2012 Apache Cassandra
Pycon 2012 Apache CassandraPycon 2012 Apache Cassandra
Pycon 2012 Apache Cassandra
 
Active Object Design Pattern
Active Object Design PatternActive Object Design Pattern
Active Object Design Pattern
 
Using Apache Cassandra: What is this thing, and how do I use it?
Using Apache Cassandra: What is this thing, and how do I use it?Using Apache Cassandra: What is this thing, and how do I use it?
Using Apache Cassandra: What is this thing, and how do I use it?
 

Similaire à New Pacific Metals Corporate Presentation

20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx
AmirShafiq25
 
Projects_Oku_Resume
Projects_Oku_ResumeProjects_Oku_Resume
Projects_Oku_Resume
Eyo Oku
 
Chartership_Interview. LinkedIn
Chartership_Interview. LinkedInChartership_Interview. LinkedIn
Chartership_Interview. LinkedIn
Ram Ben-david
 
First Narrows Sept 07
First Narrows Sept 07First Narrows Sept 07
First Narrows Sept 07
guest7338b5
 
Tight Reservoir Technology IUGF 20 1 2012
Tight Reservoir Technology IUGF 20 1 2012Tight Reservoir Technology IUGF 20 1 2012
Tight Reservoir Technology IUGF 20 1 2012
Dev Dutt Sharma
 
News Release: Lakeland Resources Commences Field Program at Riou Lake (Octob...
News Release:  Lakeland Resources Commences Field Program at Riou Lake (Octob...News Release:  Lakeland Resources Commences Field Program at Riou Lake (Octob...
News Release: Lakeland Resources Commences Field Program at Riou Lake (Octob...
Lakeland Resources Inc. (TSXv: LK)
 
Lekcin property fact sheet 20150702
Lekcin property fact sheet 20150702Lekcin property fact sheet 20150702
Lekcin property fact sheet 20150702
John Chapman
 

Similaire à New Pacific Metals Corporate Presentation (20)

DP0901.pdf
DP0901.pdfDP0901.pdf
DP0901.pdf
 
EL2558 Project Update DECEMBER 2022.pptx
EL2558 Project Update DECEMBER 2022.pptxEL2558 Project Update DECEMBER 2022.pptx
EL2558 Project Update DECEMBER 2022.pptx
 
Bridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara SetuBridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara Setu
 
Advancing Discovery New Craigmont Project’s High-grade Copper Potential
Advancing Discovery New Craigmont Project’s High-grade Copper PotentialAdvancing Discovery New Craigmont Project’s High-grade Copper Potential
Advancing Discovery New Craigmont Project’s High-grade Copper Potential
 
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx
 
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...News Release:  Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
News Release: Lakeland Resources Inc. Updates Drilling at Gibbons Creek Prop...
 
NMR Investor Presentation - August 2022
NMR Investor Presentation - August 2022NMR Investor Presentation - August 2022
NMR Investor Presentation - August 2022
 
Projects_Oku_Resume
Projects_Oku_ResumeProjects_Oku_Resume
Projects_Oku_Resume
 
Chartership_Interview. LinkedIn
Chartership_Interview. LinkedInChartership_Interview. LinkedIn
Chartership_Interview. LinkedIn
 
Kaigah Hydropower Project
Kaigah Hydropower ProjectKaigah Hydropower Project
Kaigah Hydropower Project
 
Tunnel Project
Tunnel ProjectTunnel Project
Tunnel Project
 
Objective Capital Precious Metals, Diamonds and Gemstones Investment Summit: ...
Objective Capital Precious Metals, Diamonds and Gemstones Investment Summit: ...Objective Capital Precious Metals, Diamonds and Gemstones Investment Summit: ...
Objective Capital Precious Metals, Diamonds and Gemstones Investment Summit: ...
 
First Narrows Sept 07
First Narrows Sept 07First Narrows Sept 07
First Narrows Sept 07
 
Project Analysis - PPT
Project Analysis - PPTProject Analysis - PPT
Project Analysis - PPT
 
Ailments of the First Concrete Dam in Sri Lanka
Ailments of the First Concrete Dam in Sri LankaAilments of the First Concrete Dam in Sri Lanka
Ailments of the First Concrete Dam in Sri Lanka
 
Tight Reservoir Technology IUGF 20 1 2012
Tight Reservoir Technology IUGF 20 1 2012Tight Reservoir Technology IUGF 20 1 2012
Tight Reservoir Technology IUGF 20 1 2012
 
News Release: Lakeland Resources Commences Field Program at Riou Lake (Octob...
News Release:  Lakeland Resources Commences Field Program at Riou Lake (Octob...News Release:  Lakeland Resources Commences Field Program at Riou Lake (Octob...
News Release: Lakeland Resources Commences Field Program at Riou Lake (Octob...
 
John Hart TAC Paper
John Hart TAC PaperJohn Hart TAC Paper
John Hart TAC Paper
 
Lekcin property fact sheet 20150702
Lekcin property fact sheet 20150702Lekcin property fact sheet 20150702
Lekcin property fact sheet 20150702
 
RHowell_project summaries
RHowell_project summariesRHowell_project summaries
RHowell_project summaries
 

Dernier

Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdf
Probe Gold
 
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Klinik kandungan
 
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
xzxvi5zp
 
Terna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results Presentation
Terna SpA
 
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
sovco
 

Dernier (20)

Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdf
 
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
 
Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024
 
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
 
The Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationThe Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results Presentation
 
Terna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results Presentation
 
SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 Presentation
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdf
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdf
 
Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024
 
Premium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call Girls
Premium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call GirlsPremium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call Girls
Premium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call Girls
 
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
 
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024
 
AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024
 
Osisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 ResultsOsisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 Results
 
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdfITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
 
Teekay Corporation Q1-24 Earnings Results
Teekay Corporation Q1-24 Earnings ResultsTeekay Corporation Q1-24 Earnings Results
Teekay Corporation Q1-24 Earnings Results
 
Dubai Call Girls/// Hot Afternoon O525547819 Call Girls In Dubai
Dubai Call Girls/// Hot Afternoon O525547819 Call Girls In DubaiDubai Call Girls/// Hot Afternoon O525547819 Call Girls In Dubai
Dubai Call Girls/// Hot Afternoon O525547819 Call Girls In Dubai
 

New Pacific Metals Corporate Presentation