Key benefits are fuel flexibility, reduced emission and
lower bed temperature.
Different Versions
 Industrial boilers ore developing with gradual change in their design of different
parts and to optimize the thermal efficiency, fuel multiplicity and to sustain with
environmental norms, with cost effectiveness for installation operation and
maintenance.
 In our country early fifties and sixties small multi fuel boilers were used for process
industries and high pressure coal based boilers were used for power generation.
 With decreasing trend of coal heat value boiler was constantly modified to reach the
present status of CFBC boiler from previous version of stationary furnaces type
chain grate type, spreader stoker type, PF type, AFBC type and CFBC type. CFBC
is a new generation coal fired fluidized bed boiler developed since 1950 has the
advantage of high efficiency low Sox and Nox. emission and higher turn down ratio.
CFBC BOILER
 Assume a container with an air supply plenum at the bottom , A distributer plate
that promotes even air flow through the bed and an upper chamber filled with
sand. If a small quantity of air flow through the distributer plate in to the bed , If
it will pass through the voids of an immobile mass of sand. For low velocity the
air does not exert much force on sand and they remain in place. This condition
is called fixed bed or static bed. By increasing a flow rate ,the air exert greater
force on the sand and thereby reduces the contact force between the sand
particle caused by gravity. By increasing the air flow further ,a point is reached
where the drag force on particle counter balance the gravity force and sand
particle become suspended in up flowing air steam. The point where the bed
start to behave as a fluid is called the minimum fluidization condition.
CFBC BOILER
As the air increased further , the bed become less uniform bubbles of air start
to form and the bed becomes violent . At this condition bed is in expanded
condition, This is called bubbling fluidized bed and this occurs at
atmospheric condition. Hence, It is called as Atmospheric Fluidized Bed. As
the velocity of air further increased (around 10 m/sec.) a condition is
reached where in whole of bed material is in circulation from furnace to a
collection chamber (U beam hopper) and back to furnace. Thus resulting in
uniform temperature profile throughout the furnace. Because the whole bed
is in continuous circulation internally, This type of boiler is called IR-
CFBC. (Internal Re-circulating fluidized bed combustion).
CFBC BOILER TECHNOLOGY OFFERS
 High combustion efficiency
 Compact and economical
design.
 Higher reliability and
availability.
 Lower maintenance cost.
 Reduced erosion.
 Fuel flexibility.
Gas Velocities
 CFBC - 4 - 6 m/sec.
 AFBC - 2 - 3 mtr./sec.
 PF - 8 - 10 mtr./sec.
IMPROVED PERFORMANCE AT
REDUCED COST
 CFBC boiler design as – Two stage particle separation
system.
 First - U beam impact separators.
 Second – Mechanical dust collector or multi-cyclone
dust collector.
DESCRIPTION OF CFBC BOILER
 CFBC boilers are compact natural circulation ,Top
supported ,Single drum unit. The primary and
secondary particle separator is an integral part of
boiler / furnace and connected to the particle return
system.
THE BOILER IS COMPRISED OF-
 CFB Furnace
 U-Beam (Particle separator)
 Particle Return System
 Convection pass and back end equipment.
Internal Recirculation - Circulating Fluidized
Bed Boilers
CFBC FURNACE
 The CFBC furnace construction is of all welded
membrane tube panels. Functionally the furnace is
divided into three distinct zone .
A -Primary zones
B - Secondary zone
C - Free board zone
PRIMARY ZONE
 In the primary zone the fuel,sand,recycled material
and 50% to 60% of the air for combustion are
introduced.
 SECONDARY AND FREE BOARD ZONE
 In secondary zone the balance of combustion air is
introduced.
 Combustion is completed in free board zone
CFBC BOILER
• The combustion air split correspond to the furnace zones . i.e. Primary , lower secondary
and upper secondary air flow zone.
lower secondary zone – Burner
upper secondary zone – OF (Over Fired)
• Primary air effects the actual fluidization of bed material and is supplied through a
distributor plate at the bottom of the furnace. lower secondary and upper secondary air are
supplied through nozzle located on both the front or rear furnace walls at two separate
elevations.
• The air distribution patterns in the furnace can be adjusted to provide for the best control
of Nox (Nitrous Oxide) formation.
• In addition to the enclosure walls , water cooled division walls for the entire height of the
furnace provides additional heating surface.
U-BEAM
 Flue gas and solids leaving the furnace passes through a high temperature
primary particle collector where nearly all of the solids are separated from
the flue gas. A unique feature of boiler is a particle separator made of
labyrinth type array of beam having a shape similar to the letter “U”. The U-
beam made from stainless steel alloy. Or fiber material for less weight &
cost and less erosion. The collector is designed to remove solids from dense
gas–solids mixture .the solids impacting the first two rows of beams fall by
gravity back down the rear of the furnace .Solids impacting the remaining
beams fall by gravity in two particle collector hopper located directly
beneath the array of beams and enters the rear furnace through particle
return system especially designed for this application.
Hot Cyclone CFBC
BOILER CONVECTION PASS
 The flue gas leaving the particle separator flows in to the
boiler convection pass which includes the superheated and
economizer banks . The gas velocity in these tube banks is
designed specifically to minimize the erosion . Gases
enters the air pre heater and then to the secondary particle
separator . Gas leaving air heater enters the ESP and then
to the stack through ID Fans.
U-Beam separators
© 2003 The Babcock & Wilcox Company, all rights reserved
U-Beam separators
41
2
3Flue
Gas
&
Solid
Flow
Flue
Gas
1. Sidewall
membrane panel
2. U-beam - SS309H/
SS310H/RA253MA
3. Seal baffle
4. Refractory
U-Beams
Internal Recirculation - Circulating
Fluidized Bed Boilers
Internal Recirculation Circulating
Fluidized Bed Boilers
 A simplified approach to improved flexibility and reliability
 Design Features
 High combustion efficiency
 Compact, economical design
 Higher reliability and availability
 Lower maintenance costs
 Reduced erosion
 Fuel flexibility
 Low emissions
Why CFBC Boiler ?
 CFBC is a Fuel Flexible Technology
 Accepts wide range of fuels
 Volatile matter - >15 %
 Ash - UP TO 60%
 Heating value - > 2150 Kcal/kg
 Moisture - < 10%
 Use of lower rank fuels reduces fuel costs
 Fuel flexibility - minimizes fuel supply uncertainties
 Ability to burn low cost and waste fuels
Steam Flow Circuit
 Riser tubes are used to direct the steam water mixture from the outlet headers of each
water circuit to the steam drum.
 The water steam mixture in drum is separated by cyclone separators and the primary and
secondary scrubber arrangement.
 The saturated steam leaves the steam drum and enters primary super heater in let header
through supply pipes.Steam passes through the primary super heater coils and exits the
outlet header.Then steam enters the attemperator header for desuperheating.
 The attemperator uses water from the high pressure feed water heater discharge to
control the secondary super heater outlet temperature.
 From the attemperator the steam flow to the secondary super heater inlet header and to
the counter flow secondary super heater bank. Steam leaves the coils and exits from the
secondary super heater outlet header. Steam enters the turbine through main steam stop
valve and NRV.
Flue Gas Path
 CFBC boilers are balanced draft combustors. The pressure balance point is at the top
of the furnace, ahead of the front row of U beams, The flue gas flow path through is
as follows :
 Gas carrying with large quantity of bed solids, flow into the in bed U beams, above
hopper U beams hot particle collector. The U beams removes most of the solids
entrained in gas. The flue gas leaves the U beams and flows through the secondary
super heater zone, primary super heater zone, Economizer, primary & secondary air
heaters. At the bottom of the air heaters gas enters secondary particle U beams
separators which collects the majorities of the remaining solids entrained in gas.
 The cleaned gas then passes through ESP for final gas cleaning and stack through ID
fans. One stands by ID fanes is provided. Dampers are provided before and after the
ID fans for maintenance of fans. With the exception of the U beam and secondary
particle collection system below APH, The flue path is identical to what is found
conventional Unit.
CFBC BOILER
1st Pass
Fuel
2nd Pass
SH - 1
U Beam Section
SH - 2
Bed Ash
3rd Pass
Economizer
APH
ESP
Fans
Ash
Recycle
Particle Transfer Hopper
PA air
IR-CFBC Boiler Reheat
IR-CFBC Advantages
 High Upper Furnace Heat Transfer Rate and Precise
furnace temperature control Result of high efficiency
solids collection and solids recycle control from the MDC
(Mechanical Dust Collection)
 Extended turndown ratio (no oil/gas)
100% to 20% MCR (Maximum Continuous Rating)
 Low auxiliary power requirements
Due to Low Flue Gas ΔP and no fluidizing blower
IR-CFBC Advantages
 Fast shut down / cool down
80%+ of Bed material is drained during cooldown. Can
shutdown / cool / enter / re-start within a 24 hour period
compared to 2 to 3 times longer for competitor CFB designs.
 Low Maintenance Costs
Less refractory or hot expansion joints, ‘RDZ’ at lower furnace
refractory interface, no fluidized sealing system, low furnace exit
velocity, low gas velocity in convective heating surfaces,...
The B&W IR-CFBC Two-Staged Solids Separation
System
 Benefits
 High overall solid collection efficiency ~ More than
99.7%
 Precise furnace temperature control ~ By controlling
solid recycle rate from the secondary collector
 Extended turndown ratio without use of auxiliary fuel
(oil/gas) ~ 100% to 20% MCR
 Low auxiliary power requirements compared to
competitor cyclone-based CFB technologies ~ 50-100
mm w.c.
Thin Cooled Refractory
75% less refractory in IR-
CFB compared to hot
cyclone CFB
Difference Between CFBC &
AFBC
 CFBC boiler
 Flue gas velocity-3.7 to 4.3 m/sec
 Over bed feeding
 U beam Technology
 No bed coil
 UBC-Less than 2%
 Efficiency high (88%)
 Clinker formation chances low
 Tube erosion high as compared
to AFBC
 Ash recycle (unburned heavy
particle) system.
 Fuel consumption is less as
compared to AFBC
 AFBC boiler
 Flue gas velocity-1.5 to 2.0 m/sec
 Under bed feeding
 No U beam
 bed coil
 UBC-Less than 3 to 4%
 Efficiency low (84%)
 Clinker formation chances high
 Tube erosion low as compared to
CFBC
 No Ash recycle (unburned heavy
particle) system.
 Fuel consumption is more as
compared to CFBC
Conclusion
 With the changing environmental condition of Raw material
availability cost and sustainability of boilers are still under
modification stage with the effort of optimizing their efficiency and
reducing troubles.
 Presently different versions of boiler are being installed by various
venders like IJT Foster Wheeler (USA) design with compact separator
model, Thyssen Krupp AG Germany Design for cold cyclone model.
CVL with water cooled “hot loop” cyclone. Songhai electric Alstom
design for cyclone & V type seal, Greensol Hungzhon, Wuxi etc with
steam cooled cyclone. In view of operation troubles all boiler designers’
are on the way to compete each other, with best possible designs and
constant innovation to become the leader of the market.
Presentation on CFBC Boilers

Contenu connexe

Tendances

Thermax IR CFBC BOILER U BEAM TYPE
Thermax IR CFBC BOILER                U BEAM TYPEThermax IR CFBC BOILER                U BEAM TYPE
Thermax IR CFBC BOILER U BEAM TYPEAshish Kumar Jain
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesBoben Anto Chemmannoor
 
Boiler Drum And Its Internals
Boiler Drum And Its InternalsBoiler Drum And Its Internals
Boiler Drum And Its InternalsAshrant Dass
 
660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boilerAshvani Shukla
 
Air Heater and PF Boiler Performance Indices
Air Heater and PF Boiler Performance IndicesAir Heater and PF Boiler Performance Indices
Air Heater and PF Boiler Performance IndicesManohar Tatwawadi
 
Combustion in a CFBC Boiler
Combustion in a CFBC BoilerCombustion in a CFBC Boiler
Combustion in a CFBC BoilerTapash Nag
 
Boiler Reheater protection
Boiler Reheater  protectionBoiler Reheater  protection
Boiler Reheater protectionanujkumarsingh79
 
Cfb boiler basic design, operation and maintenance
Cfb boiler basic design, operation and maintenanceCfb boiler basic design, operation and maintenance
Cfb boiler basic design, operation and maintenancePichai Chaibamrung
 
The Coal mill performance monitoring
The Coal mill performance monitoringThe Coal mill performance monitoring
The Coal mill performance monitoringManohar Tatwawadi
 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingTahoor Alam Khan
 
Effect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsEffect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsManohar Tatwawadi
 
Coal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsCoal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsSHIVAJI CHOUDHURY
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesVaibhav Paydelwar
 
SOOT BLOWERS - Copy.pptx
SOOT BLOWERS - Copy.pptxSOOT BLOWERS - Copy.pptx
SOOT BLOWERS - Copy.pptxanujgupta862927
 
A Brief Introduction to Boilers
A Brief Introduction to BoilersA Brief Introduction to Boilers
A Brief Introduction to BoilersSATYAKAM MOHAPATRA
 

Tendances (20)

CFBC Boiler vs Pulverized Fired Boiler
CFBC Boiler vs Pulverized Fired BoilerCFBC Boiler vs Pulverized Fired Boiler
CFBC Boiler vs Pulverized Fired Boiler
 
Thermax IR CFBC BOILER U BEAM TYPE
Thermax IR CFBC BOILER                U BEAM TYPEThermax IR CFBC BOILER                U BEAM TYPE
Thermax IR CFBC BOILER U BEAM TYPE
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbines
 
Boiler Drum And Its Internals
Boiler Drum And Its InternalsBoiler Drum And Its Internals
Boiler Drum And Its Internals
 
660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boiler
 
Air Heater and PF Boiler Performance Indices
Air Heater and PF Boiler Performance IndicesAir Heater and PF Boiler Performance Indices
Air Heater and PF Boiler Performance Indices
 
Combustion in a CFBC Boiler
Combustion in a CFBC BoilerCombustion in a CFBC Boiler
Combustion in a CFBC Boiler
 
Boiler Reheater protection
Boiler Reheater  protectionBoiler Reheater  protection
Boiler Reheater protection
 
Boiler safety protection
Boiler  safety protectionBoiler  safety protection
Boiler safety protection
 
Cfb boiler basic design, operation and maintenance
Cfb boiler basic design, operation and maintenanceCfb boiler basic design, operation and maintenance
Cfb boiler basic design, operation and maintenance
 
Case Studies on CFBC Boilers
Case Studies on CFBC BoilersCase Studies on CFBC Boilers
Case Studies on CFBC Boilers
 
The Coal mill performance monitoring
The Coal mill performance monitoringThe Coal mill performance monitoring
The Coal mill performance monitoring
 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & Working
 
Effect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsEffect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / Mills
 
Coal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsCoal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plants
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its Auxillaries
 
SOOT BLOWERS - Copy.pptx
SOOT BLOWERS - Copy.pptxSOOT BLOWERS - Copy.pptx
SOOT BLOWERS - Copy.pptx
 
200 mw FSSS
200 mw FSSS200 mw FSSS
200 mw FSSS
 
Air heater
Air heaterAir heater
Air heater
 
A Brief Introduction to Boilers
A Brief Introduction to BoilersA Brief Introduction to Boilers
A Brief Introduction to Boilers
 

En vedette

Circulating fluidized bed boiler (cfb boiler) how does it work and its principle
Circulating fluidized bed boiler (cfb boiler) how does it work and its principleCirculating fluidized bed boiler (cfb boiler) how does it work and its principle
Circulating fluidized bed boiler (cfb boiler) how does it work and its principlePichai Chaibamrung
 
06 procedure of start up boiler ok
06 procedure of start up boiler ok06 procedure of start up boiler ok
06 procedure of start up boiler okBunk Bonk
 
Water and fire tube boilers
Water and fire tube boilersWater and fire tube boilers
Water and fire tube boilersTariq Jamshaid
 
Ash Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power PlantAsh Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power PlantAmay Jain
 
Foreign part separator-FPS
Foreign part separator-FPSForeign part separator-FPS
Foreign part separator-FPSHardik Pujara
 

En vedette (20)

Circulating fluidized bed boiler (cfb boiler) how does it work and its principle
Circulating fluidized bed boiler (cfb boiler) how does it work and its principleCirculating fluidized bed boiler (cfb boiler) how does it work and its principle
Circulating fluidized bed boiler (cfb boiler) how does it work and its principle
 
Boiler Presentation
Boiler PresentationBoiler Presentation
Boiler Presentation
 
Boiler Introduction
Boiler IntroductionBoiler Introduction
Boiler Introduction
 
Boiler Maintenance & Safety
Boiler Maintenance & SafetyBoiler Maintenance & Safety
Boiler Maintenance & Safety
 
Boiler Operation and Maintenance Experiences
Boiler Operation and Maintenance ExperiencesBoiler Operation and Maintenance Experiences
Boiler Operation and Maintenance Experiences
 
06 procedure of start up boiler ok
06 procedure of start up boiler ok06 procedure of start up boiler ok
06 procedure of start up boiler ok
 
Boiler operation
Boiler operationBoiler operation
Boiler operation
 
Safe Operation and Explosions in Boilers
Safe Operation and Explosions in BoilersSafe Operation and Explosions in Boilers
Safe Operation and Explosions in Boilers
 
Minimum Energy Performance Standards for Boilers in India
Minimum Energy Performance Standards for Boilers in IndiaMinimum Energy Performance Standards for Boilers in India
Minimum Energy Performance Standards for Boilers in India
 
Online Efficiency Monitoring and Diagnostics in Coal Fired Boiler
Online Efficiency Monitoring and Diagnostics in Coal Fired BoilerOnline Efficiency Monitoring and Diagnostics in Coal Fired Boiler
Online Efficiency Monitoring and Diagnostics in Coal Fired Boiler
 
New Technologies in Process Heating
New Technologies in Process HeatingNew Technologies in Process Heating
New Technologies in Process Heating
 
Developments in Industrial Boilers, WHR and Power Boilers
Developments in Industrial Boilers, WHR and Power BoilersDevelopments in Industrial Boilers, WHR and Power Boilers
Developments in Industrial Boilers, WHR and Power Boilers
 
Boiler Water Treatment for LP,MP and HP Boiler
Boiler Water Treatment for LP,MP and HP BoilerBoiler Water Treatment for LP,MP and HP Boiler
Boiler Water Treatment for LP,MP and HP Boiler
 
Boiler Superheater Design Modification
Boiler Superheater Design ModificationBoiler Superheater Design Modification
Boiler Superheater Design Modification
 
Efficient steam systems - Generation to WHR
Efficient steam systems - Generation to WHREfficient steam systems - Generation to WHR
Efficient steam systems - Generation to WHR
 
Efficient Steam Systems -
Efficient Steam Systems -Efficient Steam Systems -
Efficient Steam Systems -
 
Boiler Water Treatment -
Boiler Water Treatment - Boiler Water Treatment -
Boiler Water Treatment -
 
Water and fire tube boilers
Water and fire tube boilersWater and fire tube boilers
Water and fire tube boilers
 
Ash Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power PlantAsh Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power Plant
 
Foreign part separator-FPS
Foreign part separator-FPSForeign part separator-FPS
Foreign part separator-FPS
 

Similaire à Presentation on CFBC Boilers

Boilers ps mrng sessn
Boilers ps mrng sessnBoilers ps mrng sessn
Boilers ps mrng sessnInes Kkumar
 
Boilers ps mrng sessn
Boilers ps mrng sessnBoilers ps mrng sessn
Boilers ps mrng sessnInes Kkumar
 
Costumer focus12 06-2010
Costumer focus12 06-2010Costumer focus12 06-2010
Costumer focus12 06-201013thidiot
 
Steam Power Plant and Boiler power plant.pptx
Steam Power Plant and Boiler power plant.pptxSteam Power Plant and Boiler power plant.pptx
Steam Power Plant and Boiler power plant.pptxsanzy2
 
Coalfiredelectricpowerplants23 131208122612-phpapp01
Coalfiredelectricpowerplants23 131208122612-phpapp01Coalfiredelectricpowerplants23 131208122612-phpapp01
Coalfiredelectricpowerplants23 131208122612-phpapp01arvind singh rathore
 
BOILER PRESENTATION ON 21.10.14 1.pdf
BOILER PRESENTATION ON 21.10.14 1.pdfBOILER PRESENTATION ON 21.10.14 1.pdf
BOILER PRESENTATION ON 21.10.14 1.pdfPrasadKandukuri4
 
Coal fired electric power plants23
Coal fired electric power plants23Coal fired electric power plants23
Coal fired electric power plants23Munna Sagar
 
Power plant engineering micro project
Power plant engineering micro projectPower plant engineering micro project
Power plant engineering micro projectSumitSutar6
 
Combustion chambers-and-performance
Combustion chambers-and-performanceCombustion chambers-and-performance
Combustion chambers-and-performancemanojg1990
 
Boiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetBoiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetRohit Meena
 
Boiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetBoiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetdrazil
 
Boiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetBoiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetRohit Meena
 
Combustion chamber
Combustion chamberCombustion chamber
Combustion chambermanojg1990
 

Similaire à Presentation on CFBC Boilers (20)

Boilers ps mrng sessn
Boilers ps mrng sessnBoilers ps mrng sessn
Boilers ps mrng sessn
 
Boilers ps mrng sessn
Boilers ps mrng sessnBoilers ps mrng sessn
Boilers ps mrng sessn
 
Costumer focus12 06-2010
Costumer focus12 06-2010Costumer focus12 06-2010
Costumer focus12 06-2010
 
Steam Power Plant and Boiler power plant.pptx
Steam Power Plant and Boiler power plant.pptxSteam Power Plant and Boiler power plant.pptx
Steam Power Plant and Boiler power plant.pptx
 
Coalfiredelectricpowerplants23 131208122612-phpapp01
Coalfiredelectricpowerplants23 131208122612-phpapp01Coalfiredelectricpowerplants23 131208122612-phpapp01
Coalfiredelectricpowerplants23 131208122612-phpapp01
 
Fbc boilers
Fbc boilersFbc boilers
Fbc boilers
 
BOILER PRESENTATION ON 21.10.14 1.pdf
BOILER PRESENTATION ON 21.10.14 1.pdfBOILER PRESENTATION ON 21.10.14 1.pdf
BOILER PRESENTATION ON 21.10.14 1.pdf
 
Coal fired electric power plants23
Coal fired electric power plants23Coal fired electric power plants23
Coal fired electric power plants23
 
Power plant engineering micro project
Power plant engineering micro projectPower plant engineering micro project
Power plant engineering micro project
 
Combustion chambers-and-performance
Combustion chambers-and-performanceCombustion chambers-and-performance
Combustion chambers-and-performance
 
Boiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetBoiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yet
 
Boiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetBoiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yet
 
Boiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetBoiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yet
 
Cfbc
CfbcCfbc
Cfbc
 
fbc boilers
 fbc boilers fbc boilers
fbc boilers
 
boilers
boilersboilers
boilers
 
Combustion chamber
Combustion chamberCombustion chamber
Combustion chamber
 
Steam turbine deaerating condenser perforamace improvement
Steam turbine deaerating condenser perforamace improvementSteam turbine deaerating condenser perforamace improvement
Steam turbine deaerating condenser perforamace improvement
 
Studies on boiler
Studies on boilerStudies on boiler
Studies on boiler
 
THERMAL
THERMALTHERMAL
THERMAL
 

Dernier

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 

Dernier (20)

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 

Presentation on CFBC Boilers

  • 1.
  • 2. Key benefits are fuel flexibility, reduced emission and lower bed temperature.
  • 3. Different Versions  Industrial boilers ore developing with gradual change in their design of different parts and to optimize the thermal efficiency, fuel multiplicity and to sustain with environmental norms, with cost effectiveness for installation operation and maintenance.  In our country early fifties and sixties small multi fuel boilers were used for process industries and high pressure coal based boilers were used for power generation.  With decreasing trend of coal heat value boiler was constantly modified to reach the present status of CFBC boiler from previous version of stationary furnaces type chain grate type, spreader stoker type, PF type, AFBC type and CFBC type. CFBC is a new generation coal fired fluidized bed boiler developed since 1950 has the advantage of high efficiency low Sox and Nox. emission and higher turn down ratio.
  • 4. CFBC BOILER  Assume a container with an air supply plenum at the bottom , A distributer plate that promotes even air flow through the bed and an upper chamber filled with sand. If a small quantity of air flow through the distributer plate in to the bed , If it will pass through the voids of an immobile mass of sand. For low velocity the air does not exert much force on sand and they remain in place. This condition is called fixed bed or static bed. By increasing a flow rate ,the air exert greater force on the sand and thereby reduces the contact force between the sand particle caused by gravity. By increasing the air flow further ,a point is reached where the drag force on particle counter balance the gravity force and sand particle become suspended in up flowing air steam. The point where the bed start to behave as a fluid is called the minimum fluidization condition.
  • 5. CFBC BOILER As the air increased further , the bed become less uniform bubbles of air start to form and the bed becomes violent . At this condition bed is in expanded condition, This is called bubbling fluidized bed and this occurs at atmospheric condition. Hence, It is called as Atmospheric Fluidized Bed. As the velocity of air further increased (around 10 m/sec.) a condition is reached where in whole of bed material is in circulation from furnace to a collection chamber (U beam hopper) and back to furnace. Thus resulting in uniform temperature profile throughout the furnace. Because the whole bed is in continuous circulation internally, This type of boiler is called IR- CFBC. (Internal Re-circulating fluidized bed combustion).
  • 6. CFBC BOILER TECHNOLOGY OFFERS  High combustion efficiency  Compact and economical design.  Higher reliability and availability.  Lower maintenance cost.  Reduced erosion.  Fuel flexibility. Gas Velocities  CFBC - 4 - 6 m/sec.  AFBC - 2 - 3 mtr./sec.  PF - 8 - 10 mtr./sec.
  • 7. IMPROVED PERFORMANCE AT REDUCED COST  CFBC boiler design as – Two stage particle separation system.  First - U beam impact separators.  Second – Mechanical dust collector or multi-cyclone dust collector.
  • 8. DESCRIPTION OF CFBC BOILER  CFBC boilers are compact natural circulation ,Top supported ,Single drum unit. The primary and secondary particle separator is an integral part of boiler / furnace and connected to the particle return system.
  • 9. THE BOILER IS COMPRISED OF-  CFB Furnace  U-Beam (Particle separator)  Particle Return System  Convection pass and back end equipment.
  • 10. Internal Recirculation - Circulating Fluidized Bed Boilers
  • 11. CFBC FURNACE  The CFBC furnace construction is of all welded membrane tube panels. Functionally the furnace is divided into three distinct zone . A -Primary zones B - Secondary zone C - Free board zone
  • 12. PRIMARY ZONE  In the primary zone the fuel,sand,recycled material and 50% to 60% of the air for combustion are introduced.  SECONDARY AND FREE BOARD ZONE  In secondary zone the balance of combustion air is introduced.  Combustion is completed in free board zone
  • 13. CFBC BOILER • The combustion air split correspond to the furnace zones . i.e. Primary , lower secondary and upper secondary air flow zone. lower secondary zone – Burner upper secondary zone – OF (Over Fired) • Primary air effects the actual fluidization of bed material and is supplied through a distributor plate at the bottom of the furnace. lower secondary and upper secondary air are supplied through nozzle located on both the front or rear furnace walls at two separate elevations. • The air distribution patterns in the furnace can be adjusted to provide for the best control of Nox (Nitrous Oxide) formation. • In addition to the enclosure walls , water cooled division walls for the entire height of the furnace provides additional heating surface.
  • 14. U-BEAM  Flue gas and solids leaving the furnace passes through a high temperature primary particle collector where nearly all of the solids are separated from the flue gas. A unique feature of boiler is a particle separator made of labyrinth type array of beam having a shape similar to the letter “U”. The U- beam made from stainless steel alloy. Or fiber material for less weight & cost and less erosion. The collector is designed to remove solids from dense gas–solids mixture .the solids impacting the first two rows of beams fall by gravity back down the rear of the furnace .Solids impacting the remaining beams fall by gravity in two particle collector hopper located directly beneath the array of beams and enters the rear furnace through particle return system especially designed for this application.
  • 16. BOILER CONVECTION PASS  The flue gas leaving the particle separator flows in to the boiler convection pass which includes the superheated and economizer banks . The gas velocity in these tube banks is designed specifically to minimize the erosion . Gases enters the air pre heater and then to the secondary particle separator . Gas leaving air heater enters the ESP and then to the stack through ID Fans.
  • 17. U-Beam separators © 2003 The Babcock & Wilcox Company, all rights reserved U-Beam separators 41 2 3Flue Gas & Solid Flow Flue Gas 1. Sidewall membrane panel 2. U-beam - SS309H/ SS310H/RA253MA 3. Seal baffle 4. Refractory
  • 19. Internal Recirculation - Circulating Fluidized Bed Boilers
  • 20. Internal Recirculation Circulating Fluidized Bed Boilers  A simplified approach to improved flexibility and reliability  Design Features  High combustion efficiency  Compact, economical design  Higher reliability and availability  Lower maintenance costs  Reduced erosion  Fuel flexibility  Low emissions
  • 21. Why CFBC Boiler ?  CFBC is a Fuel Flexible Technology  Accepts wide range of fuels  Volatile matter - >15 %  Ash - UP TO 60%  Heating value - > 2150 Kcal/kg  Moisture - < 10%  Use of lower rank fuels reduces fuel costs  Fuel flexibility - minimizes fuel supply uncertainties  Ability to burn low cost and waste fuels
  • 22. Steam Flow Circuit  Riser tubes are used to direct the steam water mixture from the outlet headers of each water circuit to the steam drum.  The water steam mixture in drum is separated by cyclone separators and the primary and secondary scrubber arrangement.  The saturated steam leaves the steam drum and enters primary super heater in let header through supply pipes.Steam passes through the primary super heater coils and exits the outlet header.Then steam enters the attemperator header for desuperheating.  The attemperator uses water from the high pressure feed water heater discharge to control the secondary super heater outlet temperature.  From the attemperator the steam flow to the secondary super heater inlet header and to the counter flow secondary super heater bank. Steam leaves the coils and exits from the secondary super heater outlet header. Steam enters the turbine through main steam stop valve and NRV.
  • 23. Flue Gas Path  CFBC boilers are balanced draft combustors. The pressure balance point is at the top of the furnace, ahead of the front row of U beams, The flue gas flow path through is as follows :  Gas carrying with large quantity of bed solids, flow into the in bed U beams, above hopper U beams hot particle collector. The U beams removes most of the solids entrained in gas. The flue gas leaves the U beams and flows through the secondary super heater zone, primary super heater zone, Economizer, primary & secondary air heaters. At the bottom of the air heaters gas enters secondary particle U beams separators which collects the majorities of the remaining solids entrained in gas.  The cleaned gas then passes through ESP for final gas cleaning and stack through ID fans. One stands by ID fanes is provided. Dampers are provided before and after the ID fans for maintenance of fans. With the exception of the U beam and secondary particle collection system below APH, The flue path is identical to what is found conventional Unit.
  • 24. CFBC BOILER 1st Pass Fuel 2nd Pass SH - 1 U Beam Section SH - 2 Bed Ash 3rd Pass Economizer APH ESP Fans Ash Recycle Particle Transfer Hopper PA air
  • 26. IR-CFBC Advantages  High Upper Furnace Heat Transfer Rate and Precise furnace temperature control Result of high efficiency solids collection and solids recycle control from the MDC (Mechanical Dust Collection)  Extended turndown ratio (no oil/gas) 100% to 20% MCR (Maximum Continuous Rating)  Low auxiliary power requirements Due to Low Flue Gas ΔP and no fluidizing blower
  • 27. IR-CFBC Advantages  Fast shut down / cool down 80%+ of Bed material is drained during cooldown. Can shutdown / cool / enter / re-start within a 24 hour period compared to 2 to 3 times longer for competitor CFB designs.  Low Maintenance Costs Less refractory or hot expansion joints, ‘RDZ’ at lower furnace refractory interface, no fluidized sealing system, low furnace exit velocity, low gas velocity in convective heating surfaces,...
  • 28. The B&W IR-CFBC Two-Staged Solids Separation System  Benefits  High overall solid collection efficiency ~ More than 99.7%  Precise furnace temperature control ~ By controlling solid recycle rate from the secondary collector  Extended turndown ratio without use of auxiliary fuel (oil/gas) ~ 100% to 20% MCR  Low auxiliary power requirements compared to competitor cyclone-based CFB technologies ~ 50-100 mm w.c.
  • 29. Thin Cooled Refractory 75% less refractory in IR- CFB compared to hot cyclone CFB
  • 30. Difference Between CFBC & AFBC  CFBC boiler  Flue gas velocity-3.7 to 4.3 m/sec  Over bed feeding  U beam Technology  No bed coil  UBC-Less than 2%  Efficiency high (88%)  Clinker formation chances low  Tube erosion high as compared to AFBC  Ash recycle (unburned heavy particle) system.  Fuel consumption is less as compared to AFBC  AFBC boiler  Flue gas velocity-1.5 to 2.0 m/sec  Under bed feeding  No U beam  bed coil  UBC-Less than 3 to 4%  Efficiency low (84%)  Clinker formation chances high  Tube erosion low as compared to CFBC  No Ash recycle (unburned heavy particle) system.  Fuel consumption is more as compared to CFBC
  • 31. Conclusion  With the changing environmental condition of Raw material availability cost and sustainability of boilers are still under modification stage with the effort of optimizing their efficiency and reducing troubles.  Presently different versions of boiler are being installed by various venders like IJT Foster Wheeler (USA) design with compact separator model, Thyssen Krupp AG Germany Design for cold cyclone model. CVL with water cooled “hot loop” cyclone. Songhai electric Alstom design for cyclone & V type seal, Greensol Hungzhon, Wuxi etc with steam cooled cyclone. In view of operation troubles all boiler designers’ are on the way to compete each other, with best possible designs and constant innovation to become the leader of the market.