Table of Contents

• Introduction to Work Breakdown Structure

• 5 steps to define a project

• Process breakdown structure and Communication
  plan

• Key factors to remember

                      GGSB- Project Management    2
Work breakdown structure

• Importance of a clear structure
  – Cope with details
  – Stay focused
  – Satisfy stakeholders


• 5 steps guide provides a well structured guide


                    GGSB- Project Management       3
Step 1: Define the scope

• Brief but specific definition of result or mission

• Focuses on the project purpose throughout its life

• Agreement between costumer and project manager

• To plan and control performance

            The key stone of a project

                       GGSB- Project Management        4
Project Scope Checklist
                                         Overall goal
1/ Project objectives                    what, when, how much

2/ Deliverables                          Major expected outputs
                                         Natural and significant events
3/ Milestones                             time, cost, resources

4/ Technical requirements                To assure performance
5/ Limits and exclusion                  Avoid false expectations
                                         Understanding and agreement of
6/ Reviews with costumers                expectations

       Avoid scope creep : added costs or delays
                            GGSB- Project Management                      5
Step 2: Establishing priorities
• Primary job of the Project Manager




                  GGSB- Project Management   6
• Need to define priorities  priority matrix


                                              • Which criterions
                                                have to be:
                                                 – Constrained
                                                 – Enhanced
                                                 – Accepted


       Creates shared expectations
       Avoids misunderstanding
                   GGSB- Project Management                   7
• Variation of priorities
Microsoft / Event

• Which criteria can be compromised?

• Priorities may change


      Need for vigilance and anticipation

                    GGSB- Project Management   8
Step 3: Create the WBS

                       • Outline of the project
                         with different levels of
                         detail

                       • Evaluation of
                             – Cost
                             – Time
                             – Technical performance
         GGSB- Project Management                 9
• Work package
  – The basic unit of planning, scheduling and
    controlling
  – Maximum 10 days
  – Independent from other work packages
  – No more than 1 sub-deliverable


• Components
  What/ How long/ Cost/ How much/ Who / How well

                    GGSB- Project Management     10
WBS Example




                                                                 GGSB- Project Management   11
Reference: Gray and Larson, Project Management, Irwin/McGraw-Hill, 2000
Step 4: WBS in Organisations
• Result of linking the WBS with the
  organisational units (hereafter OU):

OBS (Organizational Breakdown Structure)

                   Framework to summarize OU work performance


  Purposes         Identify OU responsible for Work Packages

                   Tie the OUs to control cost accounts

                   GGSB- Project Management                    12
Example: Integration of WBS and OBS
          Level
                                                                           Personal computer
            1                                                                  prototype
                                                                                             1.0                                                                             More
                                   1.2                   1.3                      1.1                                                          1.4                           items
            2                Vendor,                 Mouse,                 Disk                                                   Microprocessor
                            software,               keyboard,             storage                                                       unit
                           applications               voice                units
                                                                                                                           1.4.1                                    1.4.2
                                   ~                    ~ 1.1.1                   1.1.2               1.1.3
            3
                                                        Floppy            Optical                  Hard              Internal                          BIOS (basic
                                                                                                                     memory                           input/output
                                                         ~                    ~                                        unit                              system)

                                                                                                                 1.4.1.1           1.4.1.2           1.4.2.1     1.4.2.2       1.4.2.3
            4
                                                                                                              ROM            RAM                I/O            File         Utilities
                                                                                                                 ~                 ~             ~              ~             ~
                         Lowest manageable                     1.1.3.1             1.1.3.2             1.1.3.3              1.1.3.4
            5              subdeliverables               Motor              Circuit                Chassis           Read/write
                                                                            board                   frame              head
                                                                                                                                              Cost account
                                                                              Cost                                    1.1.3.4.1
                                                                                                                                                number
                                          Design
                   Manufacturing                                            account
                                         Production                           Cost                   Cost
                                                                            account                account                                   Work packages
 Organization                                                                 Cost                                      Cost                 WP1.1.3.4.2.1
                                            Test
                                                                            account                                   account                WP1.1.3.4.2.2
                                                               Cost
                                         Purchasing                                                                                          WP1.1.3.4.2.3
                                                             account
                                                                                                                                                 Budget by
                                                                              Cost
                                         Software                                                                                                 period
                                                                            account

                                                                       GGSB- Project Management                                                                                   13
Reference: Gray and Larson, Project Management, Irwin/McGraw-Hill, 2000
Step 5: Coding WBS for IS

• Codes define levels and elements in
   – WBS
   – Work Packages
   – Budget/cost information




• Allows reports to be consolidated at any level in
  the organization structure

                         GGSB- Project Management     14
Example: Integration of WBS and OBS




          3R-237A-P2-33.61
          Facility Area Pipe 2” WP#

                 GGSB- Project Management   15
Process Breakdown Structure
 • PBS vs. WBS

                                  Process-oriented projects
       USE
                                   Intangible projects: phases


• Project organized around phases

                  GGSB- Project Management                 16
Communication Plan

• Project Communication Plan
  – WWWH the information will be transmeted

• 5 Steps
  –   Stakhoder analysis
  –   Information needs
  –   Sources of Information
  –   Disseminiation modes
  –   Responsibility and timing

                       GGSB- Project Management   17
Key factors to remember
• Scope definition                     focuses on end items
• Priorities (PM)                      trade-off decisions
• BS                                   project control



                       Key stones

• Use of WBS, PBS or RM depends on size and nature
• First step of planning / Major reason for failure

                     GGSB- Project Management                  18
Thank you

We would be delighted to answer any question.




                 GGSB- Project Management   19

Contenu connexe

Tendances

Chap 6 Developing A Project Plan
Chap 6 Developing A Project PlanChap 6 Developing A Project Plan
Chap 6 Developing A Project Planproject management
 
Lecture 1. general introduction to project management
Lecture 1. general introduction to project management Lecture 1. general introduction to project management
Lecture 1. general introduction to project management Dania Abdel-aziz
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementMarkos Mulat G
 
The role and responsibilities of the project manager
The role and responsibilities of the project manager The role and responsibilities of the project manager
The role and responsibilities of the project manager ProofHub
 
Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-managementSavaş Şakar
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project ManagementAshish Mittal
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementWaleed Elnaggar
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniquesShivangi Saini
 
Elements of Project Management
Elements of Project ManagementElements of Project Management
Elements of Project ManagementKevin Thomas
 
Project Management PPT
Project Management PPTProject Management PPT
Project Management PPTbletindia
 
Estimating Time & Costs
 Estimating Time & Costs Estimating Time & Costs
Estimating Time & Costsmairemic
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessRuffin Veal and Associates, Inc.
 
10. Project Quality Management
10. Project Quality Management 10. Project Quality Management
10. Project Quality Management BhuWan Khadka
 

Tendances (20)

Chap 6 Developing A Project Plan
Chap 6 Developing A Project PlanChap 6 Developing A Project Plan
Chap 6 Developing A Project Plan
 
Lecture 1. general introduction to project management
Lecture 1. general introduction to project management Lecture 1. general introduction to project management
Lecture 1. general introduction to project management
 
Project initiation
Project initiationProject initiation
Project initiation
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
The role and responsibilities of the project manager
The role and responsibilities of the project manager The role and responsibilities of the project manager
The role and responsibilities of the project manager
 
Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-management
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project Management
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniques
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
Project manager
Project managerProject manager
Project manager
 
Project management structures
Project management structuresProject management structures
Project management structures
 
Elements of Project Management
Elements of Project ManagementElements of Project Management
Elements of Project Management
 
The role of the project manager
The role of the project managerThe role of the project manager
The role of the project manager
 
Project Management
Project ManagementProject Management
Project Management
 
Project Management PPT
Project Management PPTProject Management PPT
Project Management PPT
 
Estimating Time & Costs
 Estimating Time & Costs Estimating Time & Costs
Estimating Time & Costs
 
Chap 2 Organization Strategy
Chap 2 Organization StrategyChap 2 Organization Strategy
Chap 2 Organization Strategy
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition Success
 
10. Project Quality Management
10. Project Quality Management 10. Project Quality Management
10. Project Quality Management
 

Similaire à Project management: defining the project

Oracle R12 Upgrade Lessons Learned
Oracle R12 Upgrade Lessons LearnedOracle R12 Upgrade Lessons Learned
Oracle R12 Upgrade Lessons Learnedbpellot
 
Project mangement chp 1 12
Project mangement chp 1 12Project mangement chp 1 12
Project mangement chp 1 12Dreams Design
 
Sage Project Management
Sage Project Management Sage Project Management
Sage Project Management RKLeSolutions
 
Short Term Planning and Lean
Short Term Planning and LeanShort Term Planning and Lean
Short Term Planning and Leanistarkov
 
Feature Prioritization Rmpdma Public
Feature Prioritization Rmpdma PublicFeature Prioritization Rmpdma Public
Feature Prioritization Rmpdma PublicSignarama Dtc
 
Newhouse capability modeling v2
Newhouse capability modeling v2Newhouse capability modeling v2
Newhouse capability modeling v2NASAPMC
 
7 (+/- 2) Steps to Agility
7 (+/- 2) Steps to Agility7 (+/- 2) Steps to Agility
7 (+/- 2) Steps to AgilityTim Gifford
 
Software proposal sample_project_1-_web_site_development_by_zx_7_of_november_...
Software proposal sample_project_1-_web_site_development_by_zx_7_of_november_...Software proposal sample_project_1-_web_site_development_by_zx_7_of_november_...
Software proposal sample_project_1-_web_site_development_by_zx_7_of_november_...Oleg Zhuravlev
 
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...John Carter
 
Chapter 2
Chapter 2Chapter 2
Chapter 2Mr SMAK
 
Chapter 2 ASE
Chapter 2 ASEChapter 2 ASE
Chapter 2 ASEMr SMAK
 
Source control - what you need to know
Source control - what you need to knowSource control - what you need to know
Source control - what you need to knowdaveymni
 

Similaire à Project management: defining the project (20)

NG BB 11 Power Steering
NG BB 11 Power SteeringNG BB 11 Power Steering
NG BB 11 Power Steering
 
NG BB 11 Power Steering
NG BB 11 Power SteeringNG BB 11 Power Steering
NG BB 11 Power Steering
 
Oracle R12 Upgrade Lessons Learned
Oracle R12 Upgrade Lessons LearnedOracle R12 Upgrade Lessons Learned
Oracle R12 Upgrade Lessons Learned
 
Lean at Yahoo in 2008
Lean at Yahoo in 2008Lean at Yahoo in 2008
Lean at Yahoo in 2008
 
Iss 05
Iss 05Iss 05
Iss 05
 
Rash
RashRash
Rash
 
Project mangement chp 1 12
Project mangement chp 1 12Project mangement chp 1 12
Project mangement chp 1 12
 
Sage Project Management
Sage Project Management Sage Project Management
Sage Project Management
 
P&msp2010 04 wbs-and-estimation
P&msp2010 04 wbs-and-estimationP&msp2010 04 wbs-and-estimation
P&msp2010 04 wbs-and-estimation
 
Short Term Planning and Lean
Short Term Planning and LeanShort Term Planning and Lean
Short Term Planning and Lean
 
Feature Prioritization Rmpdma Public
Feature Prioritization Rmpdma PublicFeature Prioritization Rmpdma Public
Feature Prioritization Rmpdma Public
 
Newhouse capability modeling v2
Newhouse capability modeling v2Newhouse capability modeling v2
Newhouse capability modeling v2
 
7 (+/- 2) Steps to Agility
7 (+/- 2) Steps to Agility7 (+/- 2) Steps to Agility
7 (+/- 2) Steps to Agility
 
Software proposal sample_project_1-_web_site_development_by_zx_7_of_november_...
Software proposal sample_project_1-_web_site_development_by_zx_7_of_november_...Software proposal sample_project_1-_web_site_development_by_zx_7_of_november_...
Software proposal sample_project_1-_web_site_development_by_zx_7_of_november_...
 
Rajesh Paleru
Rajesh PaleruRajesh Paleru
Rajesh Paleru
 
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
Agile Project Management in a Waterfall World: Managing Sprints with Predicti...
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
Chapter 2
Chapter 2Chapter 2
Chapter 2
 
Chapter 2 ASE
Chapter 2 ASEChapter 2 ASE
Chapter 2 ASE
 
Source control - what you need to know
Source control - what you need to knowSource control - what you need to know
Source control - what you need to know
 

Dernier

Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 

Dernier (20)

Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 

Project management: defining the project

  • 1. Project Management: Defining the project By O. Vadillo D. Dimitrov C. Klein F. Bourret GGSB- Project Management 1
  • 2. Table of Contents • Introduction to Work Breakdown Structure • 5 steps to define a project • Process breakdown structure and Communication plan • Key factors to remember GGSB- Project Management 2
  • 3. Work breakdown structure • Importance of a clear structure – Cope with details – Stay focused – Satisfy stakeholders • 5 steps guide provides a well structured guide GGSB- Project Management 3
  • 4. Step 1: Define the scope • Brief but specific definition of result or mission • Focuses on the project purpose throughout its life • Agreement between costumer and project manager • To plan and control performance  The key stone of a project GGSB- Project Management 4
  • 5. Project Scope Checklist Overall goal 1/ Project objectives what, when, how much 2/ Deliverables Major expected outputs Natural and significant events 3/ Milestones  time, cost, resources 4/ Technical requirements To assure performance 5/ Limits and exclusion Avoid false expectations Understanding and agreement of 6/ Reviews with costumers expectations  Avoid scope creep : added costs or delays GGSB- Project Management 5
  • 6. Step 2: Establishing priorities • Primary job of the Project Manager GGSB- Project Management 6
  • 7. • Need to define priorities  priority matrix • Which criterions have to be: – Constrained – Enhanced – Accepted Creates shared expectations Avoids misunderstanding GGSB- Project Management 7
  • 8. • Variation of priorities Microsoft / Event • Which criteria can be compromised? • Priorities may change Need for vigilance and anticipation GGSB- Project Management 8
  • 9. Step 3: Create the WBS • Outline of the project with different levels of detail • Evaluation of – Cost – Time – Technical performance GGSB- Project Management 9
  • 10. • Work package – The basic unit of planning, scheduling and controlling – Maximum 10 days – Independent from other work packages – No more than 1 sub-deliverable • Components What/ How long/ Cost/ How much/ Who / How well GGSB- Project Management 10
  • 11. WBS Example GGSB- Project Management 11 Reference: Gray and Larson, Project Management, Irwin/McGraw-Hill, 2000
  • 12. Step 4: WBS in Organisations • Result of linking the WBS with the organisational units (hereafter OU): OBS (Organizational Breakdown Structure) Framework to summarize OU work performance Purposes Identify OU responsible for Work Packages Tie the OUs to control cost accounts GGSB- Project Management 12
  • 13. Example: Integration of WBS and OBS Level Personal computer 1 prototype 1.0 More 1.2 1.3 1.1 1.4 items 2 Vendor, Mouse, Disk Microprocessor software, keyboard, storage unit applications voice units 1.4.1 1.4.2 ~ ~ 1.1.1 1.1.2 1.1.3 3 Floppy Optical Hard Internal BIOS (basic memory input/output ~ ~ unit system) 1.4.1.1 1.4.1.2 1.4.2.1 1.4.2.2 1.4.2.3 4 ROM RAM I/O File Utilities ~ ~ ~ ~ ~ Lowest manageable 1.1.3.1 1.1.3.2 1.1.3.3 1.1.3.4 5 subdeliverables Motor Circuit Chassis Read/write board frame head Cost account Cost 1.1.3.4.1 number Design Manufacturing account Production Cost Cost account account Work packages Organization Cost Cost WP1.1.3.4.2.1 Test account account WP1.1.3.4.2.2 Cost Purchasing WP1.1.3.4.2.3 account Budget by Cost Software period account GGSB- Project Management 13 Reference: Gray and Larson, Project Management, Irwin/McGraw-Hill, 2000
  • 14. Step 5: Coding WBS for IS • Codes define levels and elements in – WBS – Work Packages – Budget/cost information • Allows reports to be consolidated at any level in the organization structure GGSB- Project Management 14
  • 15. Example: Integration of WBS and OBS 3R-237A-P2-33.61 Facility Area Pipe 2” WP# GGSB- Project Management 15
  • 16. Process Breakdown Structure • PBS vs. WBS Process-oriented projects USE Intangible projects: phases • Project organized around phases GGSB- Project Management 16
  • 17. Communication Plan • Project Communication Plan – WWWH the information will be transmeted • 5 Steps – Stakhoder analysis – Information needs – Sources of Information – Disseminiation modes – Responsibility and timing GGSB- Project Management 17
  • 18. Key factors to remember • Scope definition  focuses on end items • Priorities (PM)  trade-off decisions • BS  project control Key stones • Use of WBS, PBS or RM depends on size and nature • First step of planning / Major reason for failure GGSB- Project Management 18
  • 19. Thank you We would be delighted to answer any question. GGSB- Project Management 19