CONTENT :-
 Introduction
 Working
 Applications
 Factors Affecting
 Some Types
 Advantages & Disadvantages
2
INTRODUCTION
 Dragline falls in heavy equipment’s category.
 Dragline excavator is used for civil engineering projects
and surface mining.
 Dragline is the largest equipment ever built on this planet.
It has the ability to excavate very deep down the earth.
 Word drag is used because it has the ability to drag
material at far distance from the machine.
3
 Dragline consists of drag cable, large bucket, boom, hoist
cable, drag chain and driving motors.
DRAGLINE EXCAVATOR
4
WORKING OF DRAGLINE
 The bucket is lowered in fully dumped position, released
both hoist & drag cable, till it rest on ground with the teeth
digging into earth.
 The hoist cable is slackened slightly and then the drag pull
is applied . This action fills in earth and bucket takes
horizontal position. It is then hoisted.
 When dumping height is attained, the boom is swung to the
position of dumping and the drag brake is released. This
will dump the load of bucket.
 The boom is swung back to digging position and the same
cycles are proceed.
5
WORKING OF DRAGLINE
6
APPLICATIONS
 Most suitable for digging softer material.
 Useful for excavating trenches.
 Mostly used in excavating canals & embankments.
 Suitable for loose soils, marshy land and areas containing
water.
7
FACTORS AFFECTING ON DRAGLINE
 Size & Type of Bucket :-
Light Bucket : for loose, dry soils, sand & gravel.
Medium: for clays & compacted gravel.
Heavy : for hard & broken rocks.
 Length of Boom :-
 Longer boom with smaller bucket increased
digging rate.
It is possible of dispose off the earth in one operation so
cost and time is saved.
 Type of material :-
 loose, dry & soft soil => Output More.
 Hard & Tough soil => Output Less.
8
FACTORS AFFECTING ON DRAGLINE
 Angle of Swing :- The time cycle is directly proportional to
angle of swing. If Angle of swing increases, output
decreases.
 Depth of cut :- If work at optimum depth and A.O.S=90,
output will be max.
 optimum depth depends on type of soil &
size of bucket, if bucket size is increase, optimum depth of
cut also increases.
 Size of Hauling unit :- The hauling units (trucks) of desired
sizes should be made available, to avoid delay, to get more
output.
 Skill of Operator
9
TYPES OF DRAGLINES
 Crawler mounted draglines :-
 low travel speed.
 suitable for soft ground.
 Wheel mounted draglines :-
 high travel speed.
 suitable for firm ground.
 Truck mounted draglines :-
 same as wheel mounted.
10
ADVANTAGES & DISADVANTAGES OF DRAGLINE
 ADVANTAGES it can work on natural ground while
power shovel take a pit or trench.
 hauling units do not have to go into trench
while using dragline.
 range of working is more than power
shovel.
 excavated material disposed off in one
operation.
 DISADVANTAGES  it has less digging force than P.S
 output is less than as compared to
shovel.
11
Thank You
12

Contenu connexe

Tendances (20)

Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
 
Oc mechanical excavation
Oc mechanical excavationOc mechanical excavation
Oc mechanical excavation
 
Bulldozers
BulldozersBulldozers
Bulldozers
 
Dragline
DraglineDragline
Dragline
 
DRAG-LINE CONSTRUCTION EQUIPMENT
DRAG-LINE CONSTRUCTION EQUIPMENTDRAG-LINE CONSTRUCTION EQUIPMENT
DRAG-LINE CONSTRUCTION EQUIPMENT
 
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
 
Ripper
RipperRipper
Ripper
 
Tunnel boring machine
Tunnel boring machineTunnel boring machine
Tunnel boring machine
 
Dredging equipment
Dredging equipmentDredging equipment
Dredging equipment
 
Excavating Equipment
Excavating EquipmentExcavating Equipment
Excavating Equipment
 
Road Header and Bolter Miner
Road Header and Bolter MinerRoad Header and Bolter Miner
Road Header and Bolter Miner
 
Scraper
ScraperScraper
Scraper
 
Bucket wheel excavator ppt
Bucket wheel excavator pptBucket wheel excavator ppt
Bucket wheel excavator ppt
 
BACKHOE CONSTRUCTION EQUIPMENT
BACKHOE CONSTRUCTION EQUIPMENTBACKHOE CONSTRUCTION EQUIPMENT
BACKHOE CONSTRUCTION EQUIPMENT
 
Tunneling & Drilling Equipments
Tunneling & Drilling EquipmentsTunneling & Drilling Equipments
Tunneling & Drilling Equipments
 
Pile and pile driving equipments
Pile and pile driving equipmentsPile and pile driving equipments
Pile and pile driving equipments
 
Excavating Equipments
Excavating EquipmentsExcavating Equipments
Excavating Equipments
 
Earth work equipment
Earth work equipmentEarth work equipment
Earth work equipment
 
Power shovel
Power shovelPower shovel
Power shovel
 
Excavation in hard rock
Excavation in hard rockExcavation in hard rock
Excavation in hard rock
 

En vedette

En vedette (9)

Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)
 
Physical Properties Of Rocks
Physical Properties Of RocksPhysical Properties Of Rocks
Physical Properties Of Rocks
 
Rocks & minerals
Rocks & mineralsRocks & minerals
Rocks & minerals
 
Design of compression members
Design of compression membersDesign of compression members
Design of compression members
 
Earthwork
EarthworkEarthwork
Earthwork
 
Porosity
Porosity Porosity
Porosity
 
DESIGN OF STEEL STRUCTURE
DESIGN OF STEEL STRUCTUREDESIGN OF STEEL STRUCTURE
DESIGN OF STEEL STRUCTURE
 
5. construction equipment Building Construction
5. construction equipment Building Construction5. construction equipment Building Construction
5. construction equipment Building Construction
 
Earthwork Volume Calculation Methods
Earthwork Volume Calculation MethodsEarthwork Volume Calculation Methods
Earthwork Volume Calculation Methods
 

Similaire à Dragline ppt

EXCAVATION AND EARTHMOVING EQUIPMENTS
EXCAVATION AND EARTHMOVING EQUIPMENTSEXCAVATION AND EARTHMOVING EQUIPMENTS
EXCAVATION AND EARTHMOVING EQUIPMENTSsauravchandel1
 
Advance Construction equipment's reports
Advance Construction equipment's reports Advance Construction equipment's reports
Advance Construction equipment's reports ssuser061280
 
EARTH MOVING EQUIPMENTS
EARTH MOVING EQUIPMENTSEARTH MOVING EQUIPMENTS
EARTH MOVING EQUIPMENTSdks
 
Bulldozer as machinery equipment
Bulldozer as machinery equipmentBulldozer as machinery equipment
Bulldozer as machinery equipmentAnand Kumar
 
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
1522901342777_constructionequipment-130411074220-phpapp01-1.pptxvikrantsingh170151
 
Construction equipment
Construction equipmentConstruction equipment
Construction equipmentTareq Shreehah
 
construction equipment
construction equipment construction equipment
construction equipment Purav Patel
 
Construction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationConstruction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationSagar Radadiya
 
chapter 4 construction equipments.pptx
chapter 4  construction equipments.pptxchapter 4  construction equipments.pptx
chapter 4 construction equipments.pptxDine38
 
construction equipment.pptx
construction equipment.pptxconstruction equipment.pptx
construction equipment.pptxkingbutu
 
Classification of heavy duty and construction equipment
Classification of heavy duty and construction equipment Classification of heavy duty and construction equipment
Classification of heavy duty and construction equipment debasdessie
 
2 1 excavation_basementconstruction
2 1 excavation_basementconstruction2 1 excavation_basementconstruction
2 1 excavation_basementconstructionvietcgxd
 
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTUVATSAL PATEL
 
Granular subbase and equipments used for its construction
Granular subbase and equipments used for its constructionGranular subbase and equipments used for its construction
Granular subbase and equipments used for its constructionshubham shama
 

Similaire à Dragline ppt (20)

EXCAVATION AND EARTHMOVING EQUIPMENTS
EXCAVATION AND EARTHMOVING EQUIPMENTSEXCAVATION AND EARTHMOVING EQUIPMENTS
EXCAVATION AND EARTHMOVING EQUIPMENTS
 
Bulldozer
BulldozerBulldozer
Bulldozer
 
Advance Construction equipment's reports
Advance Construction equipment's reports Advance Construction equipment's reports
Advance Construction equipment's reports
 
EARTH MOVING EQUIPMENTS
EARTH MOVING EQUIPMENTSEARTH MOVING EQUIPMENTS
EARTH MOVING EQUIPMENTS
 
POWER SHOVEL PARUL UNIVERSITY
POWER SHOVEL PARUL UNIVERSITYPOWER SHOVEL PARUL UNIVERSITY
POWER SHOVEL PARUL UNIVERSITY
 
Bulldozer as machinery equipment
Bulldozer as machinery equipmentBulldozer as machinery equipment
Bulldozer as machinery equipment
 
Auxiliary equipment
Auxiliary equipmentAuxiliary equipment
Auxiliary equipment
 
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
1522901342777_constructionequipment-130411074220-phpapp01-1.pptx
 
Construction equipment
Construction equipmentConstruction equipment
Construction equipment
 
HEAVY MACHINERIES ASSINGMENT
HEAVY MACHINERIES ASSINGMENTHEAVY MACHINERIES ASSINGMENT
HEAVY MACHINERIES ASSINGMENT
 
construction equipment
construction equipment construction equipment
construction equipment
 
Construction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationConstruction equipments - Introduction and Classification
Construction equipments - Introduction and Classification
 
chapter 4 construction equipments.pptx
chapter 4  construction equipments.pptxchapter 4  construction equipments.pptx
chapter 4 construction equipments.pptx
 
construction equipment.pptx
construction equipment.pptxconstruction equipment.pptx
construction equipment.pptx
 
Classification of heavy duty and construction equipment
Classification of heavy duty and construction equipment Classification of heavy duty and construction equipment
Classification of heavy duty and construction equipment
 
PCM-crawler loaders
PCM-crawler loadersPCM-crawler loaders
PCM-crawler loaders
 
2 1 excavation_basementconstruction
2 1 excavation_basementconstruction2 1 excavation_basementconstruction
2 1 excavation_basementconstruction
 
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
 
Granular subbase and equipments used for its construction
Granular subbase and equipments used for its constructionGranular subbase and equipments used for its construction
Granular subbase and equipments used for its construction
 
earth moving equipments
earth moving equipmentsearth moving equipments
earth moving equipments
 

Dernier

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 

Dernier (20)

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 

Dragline ppt

  • 1. Advanced Construction & Equipments (2160601) Submitted to :- Proff. Purvesh Raval Submitted by :- Parth Maheta (141210106020) 1
  • 2. CONTENT :-  Introduction  Working  Applications  Factors Affecting  Some Types  Advantages & Disadvantages 2
  • 3. INTRODUCTION  Dragline falls in heavy equipment’s category.  Dragline excavator is used for civil engineering projects and surface mining.  Dragline is the largest equipment ever built on this planet. It has the ability to excavate very deep down the earth.  Word drag is used because it has the ability to drag material at far distance from the machine. 3
  • 4.  Dragline consists of drag cable, large bucket, boom, hoist cable, drag chain and driving motors. DRAGLINE EXCAVATOR 4
  • 5. WORKING OF DRAGLINE  The bucket is lowered in fully dumped position, released both hoist & drag cable, till it rest on ground with the teeth digging into earth.  The hoist cable is slackened slightly and then the drag pull is applied . This action fills in earth and bucket takes horizontal position. It is then hoisted.  When dumping height is attained, the boom is swung to the position of dumping and the drag brake is released. This will dump the load of bucket.  The boom is swung back to digging position and the same cycles are proceed. 5
  • 7. APPLICATIONS  Most suitable for digging softer material.  Useful for excavating trenches.  Mostly used in excavating canals & embankments.  Suitable for loose soils, marshy land and areas containing water. 7
  • 8. FACTORS AFFECTING ON DRAGLINE  Size & Type of Bucket :- Light Bucket : for loose, dry soils, sand & gravel. Medium: for clays & compacted gravel. Heavy : for hard & broken rocks.  Length of Boom :-  Longer boom with smaller bucket increased digging rate. It is possible of dispose off the earth in one operation so cost and time is saved.  Type of material :-  loose, dry & soft soil => Output More.  Hard & Tough soil => Output Less. 8
  • 9. FACTORS AFFECTING ON DRAGLINE  Angle of Swing :- The time cycle is directly proportional to angle of swing. If Angle of swing increases, output decreases.  Depth of cut :- If work at optimum depth and A.O.S=90, output will be max.  optimum depth depends on type of soil & size of bucket, if bucket size is increase, optimum depth of cut also increases.  Size of Hauling unit :- The hauling units (trucks) of desired sizes should be made available, to avoid delay, to get more output.  Skill of Operator 9
  • 10. TYPES OF DRAGLINES  Crawler mounted draglines :-  low travel speed.  suitable for soft ground.  Wheel mounted draglines :-  high travel speed.  suitable for firm ground.  Truck mounted draglines :-  same as wheel mounted. 10
  • 11. ADVANTAGES & DISADVANTAGES OF DRAGLINE  ADVANTAGES it can work on natural ground while power shovel take a pit or trench.  hauling units do not have to go into trench while using dragline.  range of working is more than power shovel.  excavated material disposed off in one operation.  DISADVANTAGES  it has less digging force than P.S  output is less than as compared to shovel. 11