Chapter 6
Master Production
Scheduling
Vollmann, Berry, Whybark, Jacobs
What is the MPS?

 The MPS translates the Sales &
  Operations Plan (SOP o PP) into a
  plan for producing specific products in
  the future.
 The MPS is the translation of the SOP
  into producible products that make up
  the output.
At the operational level . .

 The MPS is developed to generate a
  sustainable Materials Requirement
  Planning (MRP) system and to
  provide the information for
  coordination with sales.
 The MPS is a statement of planned
  future output.
As a statement of output, the
MPS

   Forms the basic communication
    between the market and
    manufacturing.

   Is stated in product specification terms
    (part numbers) for which there are Bill
    of Materials (BOM).
MPS can be stated in
       terms of?

   End-item product designations

   Options or modules from which a
    variety of end products could be
    assembled.

   Numbers of units of an “average” final
    product
Conversion of MPS is


   Controlled by a separate Final
    Assembly Schedule (FAS) which is
    defined at the very last moment.
For the Make-to-Stock firm


   The items are produced in batches,
    carrying finished goods inventories for
    most, if not all, end-items.
For the Make-to-Order firm
 In general, it carries no finished goods
  inventory and builds each customer
  order as needed.
 The MPS unit is defined as the
  particular end-item composing a
  customer order.
 Production often starts before a
  complete product definition or BOM
  has been determined.
For the Assembly-to-order
firm

   The MPS unit is typified by an almost
    limitless number of possible end-item
    configurations all made from
    combinations of basic components
    and subassemblies. Probably will not
    start final assembly until order arrives.
Linkages to other firm
         activities
 It receives information from the SOP
  which in turn receives info from Demand
  Management (Forecasting) and resource
  planning.
 In addition it is linked to ERP (planning)
  and rough-cut capacity (make sure we
  can make it) planning.
 It generates information for MRP
MPS Techniques

   Time phased record (cadenza temporale delle
    previsioni per ogni item, con MPS livellato, di inseguimento o
    a lotti)


   Rolling through time (aggiornamento dell’MPS “lungo”
    la cadenza temporale)


   Order promising (ordini a consegna differita)
        Available to promise (ATP) (quanti ordini differiti
         posso accettare
Bill of Materials Structuring
for the MPS

   It is an engineering document that
    specifies the ingredients (or
    subordinate components) required
    physically to make each part number
    or assembly.
Single-level BOM

   Comprises only those subordinate
    components that are immediately
    required (not the components of the
    components). Adatto per il MTS: make to stock,
    dove il MPS è specificato in termini di prodotto finale.
Indented BOM


   Is a list of components, from the end
    item, down to the raw materials (it
    does show components of the
    components).
Other definitions

 BOM files are those computer records
  designed to provide desired output
  formats.
 BOM Structure relates to the architecture
  of the BOM files
 BOM Processor is a computer software
  package that organizes and maintains
  linkages in the BOM as dictated by the
  BOM structure.
More definitions
 Product Structure a company should have
  one and only one set of BOM records.
 Low-Level Code number should be
  designated for each part, component,
  subassembly or finished item in the BOM.
  These numbers indicate where in the
  product structure a particular item is with
  respect to the end item.
Modular BOM
   When the combinations of end-item product are
    many ad esempio in una fabbrica automobilistica che produce grande varietà
    di prodotti finali, tenendo conto delle varie combinazioni di opzioni o moduli, it is
    better to use the MPS at the option or module
    level. The MPS is stated in the terms in which the
    product is sold not built. cioè in termini di BOM dei vari moduli della
    configurazione, ordinata dal cliente
   The most widely used is called the super bill.(6.14)
    : la configurazione costituisce un single-level BOM che serve principalmente per la
    previsione di vendita (ma anche per montare il prodotto finale); nel super-bill ogni
    opzione è pesata con la media della sua presenza nelle configurazioni prodotte (se
    si vendono 1000 auto con 2 porte e 500 con 4 porte, la media è 8/3). Il SOP/PP e
    l’MPS si fanno allora in termini di super bill. Le medie del super-bill sono valide nel
    lungo periodo e vengono assorbite nel breve periodo da Safety Stock dei singoli
    moduli. I livelli dei Safety S. sono mantenuti dall’MRP.
Final Assembly Schedule
                     (FAS) fig. 6.17-6.18-6.19

   FAS job is to convert MPS records into FAS
    records as we roll through time. (6.17)
La configurazione finale è gestita con il FAS secondo un principio pull: dall’ordine si
    risale alla configurazione e si accetta l’ordine (eventualmente differito) se sono (o
    saranno) disponibili i componenti; quindi parte l’ordine di eventuale loro finitura e
    l’assemblaggio finale. In sostanza i componenti sono prodotti make-to-stock e il
    finale assembly-to-order.
Tutto ciò va bene per produzioni ripetitive a numerosità medio-alta o al più media
    (ricordare il diagramma). Quando la numerosità è più bassa ci può essere la
    variante che componenti non disponibili, necessari ad accettare un ordine,
    vengono inseriti, con una variante, nell’MPS di produzione dei componenti.
The Master Production
              Scheduler

   Its useful to think of the MPS as a set of
    firm planned orders. The scheduler
    needs to convert planned orders to firm
    planned orders and to manage the
    “timing” and amounts of the firm planned
    orders.
The Job of the Master PS
 Primary responsibility for making any
  additions or changes to the MPS records.
 Has also has responsibility for
  disaggregating the production plan to create
  the MPS and that the sum of the detailed
  MPS matches the Production Plan (SOP).
The Job of the Master PS

 Responsible for launching the FAS.
 Making sure that there is only one unified
  database for the MPS
 Measure actual performance against the
  MPS and production plan (SOP)
effettivo                 50

 previsto

    To production




Conflitto tra B e C
in sett 8



              150     150




                      150
MPS Stability
 A stable MPS translates into stable
  component schedules, which means
  improved performance in plant operations.
 Too many changes – lower productivity

 Too few changes – lower customer service
  levels.
Increasing MPS stability
   Stability is monitored and managed by:
     Frozen time periods for the MPS and
     Time fencing to establish clear guidelines
      for the kinds of changes that can be made.
Frozen Schedule

   This means that for the more recent time
    buckets it will be very difficult (but still
    negotiable) to change the sequence in
    which the orders will be processed.
Time Fencing

   This is an extension of the freeze concept.

 Many companies set time fences that
  specify periods in which various types of
  change can be handled.
 In the Demand fence the forecast is
  ignored in calculating the available
  (difficult to change the MPS).
 The planning fence indicates the time at
  which the scheduler should be planning
  more MPS quantities. per consentire
Managing the MPS

   Start by having a realistic MPS

 Stability and proper buffering are
  important to remove all the excuses for
  not attaining the performance for which
  the proper budget has been provided.
 6.24

Contenu connexe

Tendances

Forward scheduling vs. backward scheduling in production planning
Forward scheduling vs. backward scheduling in production planningForward scheduling vs. backward scheduling in production planning
Forward scheduling vs. backward scheduling in production planningMRPeasy
 
Manufacturing plng and control
Manufacturing plng and controlManufacturing plng and control
Manufacturing plng and controlNikhil Pandey
 
Contingency based information system.
Contingency based information system.Contingency based information system.
Contingency based information system.shoaibzaheer1
 
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)Somashekar S.M
 
Manufacturing planning and control systems
Manufacturing planning and control systemsManufacturing planning and control systems
Manufacturing planning and control systemshaitham shehata
 
Master Scheduling and Material Requirement
Master Scheduling and Material RequirementMaster Scheduling and Material Requirement
Master Scheduling and Material RequirementMd Nur Islam Rohman
 
Mrp MRPII Erp Implementation
Mrp MRPII Erp ImplementationMrp MRPII Erp Implementation
Mrp MRPII Erp ImplementationAnand Subramaniam
 
MRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chainMRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chainSaad Munami
 
Materials requirements planning
Materials requirements planningMaterials requirements planning
Materials requirements planningjetromarquez
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP. shoaibzaheer1
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec domsBabasab Patil
 
Role of production planning and control in operation management
Role of production planning and control in operation managementRole of production planning and control in operation management
Role of production planning and control in operation managementRiya Sunny
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planningNaushii Khan
 
Manufacturing plng and control
Manufacturing plng and controlManufacturing plng and control
Manufacturing plng and controlKarthik Yadav
 
manufacturing resource planning
manufacturing resource planningmanufacturing resource planning
manufacturing resource planningDinesh Nikam
 
Production planning hierarchy
Production planning hierarchy Production planning hierarchy
Production planning hierarchy Cher Dong Theng
 

Tendances (20)

Forward scheduling vs. backward scheduling in production planning
Forward scheduling vs. backward scheduling in production planningForward scheduling vs. backward scheduling in production planning
Forward scheduling vs. backward scheduling in production planning
 
Mrp ppt.
Mrp ppt.Mrp ppt.
Mrp ppt.
 
Manufacturing plng and control
Manufacturing plng and controlManufacturing plng and control
Manufacturing plng and control
 
MRP,MRP-II,JIT
MRP,MRP-II,JITMRP,MRP-II,JIT
MRP,MRP-II,JIT
 
Contingency based information system.
Contingency based information system.Contingency based information system.
Contingency based information system.
 
Resource Requirement Planning
Resource Requirement PlanningResource Requirement Planning
Resource Requirement Planning
 
Material requirement planning (mrp)
Material requirement planning (mrp)Material requirement planning (mrp)
Material requirement planning (mrp)
 
Manufacturing planning and control systems
Manufacturing planning and control systemsManufacturing planning and control systems
Manufacturing planning and control systems
 
Master Scheduling and Material Requirement
Master Scheduling and Material RequirementMaster Scheduling and Material Requirement
Master Scheduling and Material Requirement
 
Mrp MRPII Erp Implementation
Mrp MRPII Erp ImplementationMrp MRPII Erp Implementation
Mrp MRPII Erp Implementation
 
MRP-II
MRP-IIMRP-II
MRP-II
 
MRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chainMRP, MRP2 and ERP system in supply chain
MRP, MRP2 and ERP system in supply chain
 
Materials requirements planning
Materials requirements planningMaterials requirements planning
Materials requirements planning
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP.
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec doms
 
Role of production planning and control in operation management
Role of production planning and control in operation managementRole of production planning and control in operation management
Role of production planning and control in operation management
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
Manufacturing plng and control
Manufacturing plng and controlManufacturing plng and control
Manufacturing plng and control
 
manufacturing resource planning
manufacturing resource planningmanufacturing resource planning
manufacturing resource planning
 
Production planning hierarchy
Production planning hierarchy Production planning hierarchy
Production planning hierarchy
 

En vedette

Master Production Scheduling (MPS)
Master Production Scheduling (MPS) Master Production Scheduling (MPS)
Master Production Scheduling (MPS) Pankil Shah
 
CPIM - MPR - Master Production Schedule
CPIM - MPR - Master Production ScheduleCPIM - MPR - Master Production Schedule
CPIM - MPR - Master Production ScheduleStephan Pire
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and ControlSwatanu Satpathy
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & controlamirthakarthi
 
Production & Operations Management
Production & Operations ManagementProduction & Operations Management
Production & Operations ManagementCochin University
 
Building a Master Schedule
Building a Master ScheduleBuilding a Master Schedule
Building a Master ScheduleDRPF Consults
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & controlVikash Kumar
 
Beginners Guide to Production Management - In Tamil Language
Beginners Guide to Production Management - In Tamil LanguageBeginners Guide to Production Management - In Tamil Language
Beginners Guide to Production Management - In Tamil LanguageAnanth Palaniappan
 
production,planning and control
production,planning and controlproduction,planning and control
production,planning and controlAnil Kollur
 
Unit iv Shop floor control and FMS
Unit iv Shop floor control and FMSUnit iv Shop floor control and FMS
Unit iv Shop floor control and FMSmanimaran m
 
4. materials requirement planning
4. materials requirement planning4. materials requirement planning
4. materials requirement planningkunal.kakkad
 
S&OP - Sales and Operations Planning
S&OP - Sales and Operations PlanningS&OP - Sales and Operations Planning
S&OP - Sales and Operations PlanningAitor Barinaga
 

En vedette (20)

Master Production Scheduling (MPS)
Master Production Scheduling (MPS) Master Production Scheduling (MPS)
Master Production Scheduling (MPS)
 
CPIM - MPR - Master Production Schedule
CPIM - MPR - Master Production ScheduleCPIM - MPR - Master Production Schedule
CPIM - MPR - Master Production Schedule
 
Operations MRP
Operations MRPOperations MRP
Operations MRP
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
 
Production & Operations Management
Production & Operations ManagementProduction & Operations Management
Production & Operations Management
 
Building a Master Schedule
Building a Master ScheduleBuilding a Master Schedule
Building a Master Schedule
 
UNIT 14 LO1
UNIT 14 LO1UNIT 14 LO1
UNIT 14 LO1
 
Production planning & control
Production planning & controlProduction planning & control
Production planning & control
 
Chapter 4_OM
Chapter 4_OMChapter 4_OM
Chapter 4_OM
 
Star comprehensive health insurance presentation
Star comprehensive health insurance presentationStar comprehensive health insurance presentation
Star comprehensive health insurance presentation
 
Beginners Guide to Production Management - In Tamil Language
Beginners Guide to Production Management - In Tamil LanguageBeginners Guide to Production Management - In Tamil Language
Beginners Guide to Production Management - In Tamil Language
 
Session 4
Session 4Session 4
Session 4
 
production,planning and control
production,planning and controlproduction,planning and control
production,planning and control
 
MRP
MRPMRP
MRP
 
Sales & Operations Planning
Sales & Operations PlanningSales & Operations Planning
Sales & Operations Planning
 
Unit iv Shop floor control and FMS
Unit iv Shop floor control and FMSUnit iv Shop floor control and FMS
Unit iv Shop floor control and FMS
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
4. materials requirement planning
4. materials requirement planning4. materials requirement planning
4. materials requirement planning
 
S&OP - Sales and Operations Planning
S&OP - Sales and Operations PlanningS&OP - Sales and Operations Planning
S&OP - Sales and Operations Planning
 

Similaire à Mp cn6 master production schedule

Mps in eresource erp
Mps in eresource erpMps in eresource erp
Mps in eresource erpVivek Jingade
 
MASTER PRODUCTION SCHEDULE (MPS).pptx
MASTER PRODUCTION SCHEDULE (MPS).pptxMASTER PRODUCTION SCHEDULE (MPS).pptx
MASTER PRODUCTION SCHEDULE (MPS).pptxGulaHangus
 
Planificador de Producción a capacidad finita Simatic IT Preactor AP
Planificador de Producción a capacidad finita Simatic IT Preactor AP Planificador de Producción a capacidad finita Simatic IT Preactor AP
Planificador de Producción a capacidad finita Simatic IT Preactor AP Planning Manufacturing.
 
Sap mrp-configuration-pp
Sap mrp-configuration-ppSap mrp-configuration-pp
Sap mrp-configuration-ppLokesh Modem
 
Material Requirements planning system 01Page to 04 Page
Material Requirements planning system                      01Page to 04 PageMaterial Requirements planning system                      01Page to 04 Page
Material Requirements planning system 01Page to 04 PageHasibul Islam
 
Imt 89 material requirement planning
Imt 89 material requirement planningImt 89 material requirement planning
Imt 89 material requirement planningsmumbahelp
 
PP-OVE_1.PPT
PP-OVE_1.PPTPP-OVE_1.PPT
PP-OVE_1.PPTSIPLSIPL
 
Material requirement planning and its importance om
Material requirement planning and its importance   omMaterial requirement planning and its importance   om
Material requirement planning and its importance omHallmark B-school
 
Preactor Sage1000 Integration
Preactor Sage1000 IntegrationPreactor Sage1000 Integration
Preactor Sage1000 Integrationsteve littlewood
 
Operation engine ii session iv operations scheduling
Operation engine  ii session iv  operations schedulingOperation engine  ii session iv  operations scheduling
Operation engine ii session iv operations schedulingFatima Aliza
 
MBALN-670 Operations Management Title of the topic 6 .docx
MBALN-670 Operations Management  Title of the topic 6 .docxMBALN-670 Operations Management  Title of the topic 6 .docx
MBALN-670 Operations Management Title of the topic 6 .docxARIV4
 
SAP ERP1. Describe the Production Planning and Execution process.docx
SAP ERP1. Describe the Production Planning and Execution process.docxSAP ERP1. Describe the Production Planning and Execution process.docx
SAP ERP1. Describe the Production Planning and Execution process.docxkenjordan97598
 
ExpressMRP - MRP (Material Requirements Planning) Software - Manual
ExpressMRP - MRP (Material Requirements Planning) Software - ManualExpressMRP - MRP (Material Requirements Planning) Software - Manual
ExpressMRP - MRP (Material Requirements Planning) Software - ManualZlatko Matic
 
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-infoMBA, MSc, Alberto Castellano
 

Similaire à Mp cn6 master production schedule (20)

Mps in eresource erp
Mps in eresource erpMps in eresource erp
Mps in eresource erp
 
MASTER PRODUCTION SCHEDULE (MPS).pptx
MASTER PRODUCTION SCHEDULE (MPS).pptxMASTER PRODUCTION SCHEDULE (MPS).pptx
MASTER PRODUCTION SCHEDULE (MPS).pptx
 
Planificador de Producción a capacidad finita Simatic IT Preactor AP
Planificador de Producción a capacidad finita Simatic IT Preactor AP Planificador de Producción a capacidad finita Simatic IT Preactor AP
Planificador de Producción a capacidad finita Simatic IT Preactor AP
 
Lect 6.ppt
Lect 6.pptLect 6.ppt
Lect 6.ppt
 
Sap mrp-configuration-pp
Sap mrp-configuration-ppSap mrp-configuration-pp
Sap mrp-configuration-pp
 
MPS.pptx
MPS.pptxMPS.pptx
MPS.pptx
 
Material Requirements planning system 01Page to 04 Page
Material Requirements planning system                      01Page to 04 PageMaterial Requirements planning system                      01Page to 04 Page
Material Requirements planning system 01Page to 04 Page
 
MRP and Planning Overview
MRP and Planning OverviewMRP and Planning Overview
MRP and Planning Overview
 
Overview of ERP System
Overview of ERP SystemOverview of ERP System
Overview of ERP System
 
Imt 89 material requirement planning
Imt 89 material requirement planningImt 89 material requirement planning
Imt 89 material requirement planning
 
PP-OVE_1.PPT
PP-OVE_1.PPTPP-OVE_1.PPT
PP-OVE_1.PPT
 
Material requirement planning and its importance om
Material requirement planning and its importance   omMaterial requirement planning and its importance   om
Material requirement planning and its importance om
 
Operations Planning
Operations PlanningOperations Planning
Operations Planning
 
Preactor Sage1000 Integration
Preactor Sage1000 IntegrationPreactor Sage1000 Integration
Preactor Sage1000 Integration
 
Mrpc final
Mrpc finalMrpc final
Mrpc final
 
Operation engine ii session iv operations scheduling
Operation engine  ii session iv  operations schedulingOperation engine  ii session iv  operations scheduling
Operation engine ii session iv operations scheduling
 
MBALN-670 Operations Management Title of the topic 6 .docx
MBALN-670 Operations Management  Title of the topic 6 .docxMBALN-670 Operations Management  Title of the topic 6 .docx
MBALN-670 Operations Management Title of the topic 6 .docx
 
SAP ERP1. Describe the Production Planning and Execution process.docx
SAP ERP1. Describe the Production Planning and Execution process.docxSAP ERP1. Describe the Production Planning and Execution process.docx
SAP ERP1. Describe the Production Planning and Execution process.docx
 
ExpressMRP - MRP (Material Requirements Planning) Software - Manual
ExpressMRP - MRP (Material Requirements Planning) Software - ManualExpressMRP - MRP (Material Requirements Planning) Software - Manual
ExpressMRP - MRP (Material Requirements Planning) Software - Manual
 
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
 

Dernier

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 

Dernier (20)

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 

Mp cn6 master production schedule

  • 2. What is the MPS?  The MPS translates the Sales & Operations Plan (SOP o PP) into a plan for producing specific products in the future.  The MPS is the translation of the SOP into producible products that make up the output.
  • 3. At the operational level . .  The MPS is developed to generate a sustainable Materials Requirement Planning (MRP) system and to provide the information for coordination with sales.  The MPS is a statement of planned future output.
  • 4. As a statement of output, the MPS  Forms the basic communication between the market and manufacturing.  Is stated in product specification terms (part numbers) for which there are Bill of Materials (BOM).
  • 5. MPS can be stated in terms of?  End-item product designations  Options or modules from which a variety of end products could be assembled.  Numbers of units of an “average” final product
  • 6. Conversion of MPS is  Controlled by a separate Final Assembly Schedule (FAS) which is defined at the very last moment.
  • 7. For the Make-to-Stock firm  The items are produced in batches, carrying finished goods inventories for most, if not all, end-items.
  • 8. For the Make-to-Order firm  In general, it carries no finished goods inventory and builds each customer order as needed.  The MPS unit is defined as the particular end-item composing a customer order.  Production often starts before a complete product definition or BOM has been determined.
  • 9. For the Assembly-to-order firm  The MPS unit is typified by an almost limitless number of possible end-item configurations all made from combinations of basic components and subassemblies. Probably will not start final assembly until order arrives.
  • 10. Linkages to other firm activities  It receives information from the SOP which in turn receives info from Demand Management (Forecasting) and resource planning.  In addition it is linked to ERP (planning) and rough-cut capacity (make sure we can make it) planning.  It generates information for MRP
  • 11. MPS Techniques  Time phased record (cadenza temporale delle previsioni per ogni item, con MPS livellato, di inseguimento o a lotti)  Rolling through time (aggiornamento dell’MPS “lungo” la cadenza temporale)  Order promising (ordini a consegna differita)  Available to promise (ATP) (quanti ordini differiti posso accettare
  • 12. Bill of Materials Structuring for the MPS  It is an engineering document that specifies the ingredients (or subordinate components) required physically to make each part number or assembly.
  • 13. Single-level BOM  Comprises only those subordinate components that are immediately required (not the components of the components). Adatto per il MTS: make to stock, dove il MPS è specificato in termini di prodotto finale.
  • 14. Indented BOM  Is a list of components, from the end item, down to the raw materials (it does show components of the components).
  • 15. Other definitions  BOM files are those computer records designed to provide desired output formats.  BOM Structure relates to the architecture of the BOM files  BOM Processor is a computer software package that organizes and maintains linkages in the BOM as dictated by the BOM structure.
  • 16. More definitions  Product Structure a company should have one and only one set of BOM records.  Low-Level Code number should be designated for each part, component, subassembly or finished item in the BOM. These numbers indicate where in the product structure a particular item is with respect to the end item.
  • 17. Modular BOM  When the combinations of end-item product are many ad esempio in una fabbrica automobilistica che produce grande varietà di prodotti finali, tenendo conto delle varie combinazioni di opzioni o moduli, it is better to use the MPS at the option or module level. The MPS is stated in the terms in which the product is sold not built. cioè in termini di BOM dei vari moduli della configurazione, ordinata dal cliente  The most widely used is called the super bill.(6.14) : la configurazione costituisce un single-level BOM che serve principalmente per la previsione di vendita (ma anche per montare il prodotto finale); nel super-bill ogni opzione è pesata con la media della sua presenza nelle configurazioni prodotte (se si vendono 1000 auto con 2 porte e 500 con 4 porte, la media è 8/3). Il SOP/PP e l’MPS si fanno allora in termini di super bill. Le medie del super-bill sono valide nel lungo periodo e vengono assorbite nel breve periodo da Safety Stock dei singoli moduli. I livelli dei Safety S. sono mantenuti dall’MRP.
  • 18. Final Assembly Schedule (FAS) fig. 6.17-6.18-6.19  FAS job is to convert MPS records into FAS records as we roll through time. (6.17) La configurazione finale è gestita con il FAS secondo un principio pull: dall’ordine si risale alla configurazione e si accetta l’ordine (eventualmente differito) se sono (o saranno) disponibili i componenti; quindi parte l’ordine di eventuale loro finitura e l’assemblaggio finale. In sostanza i componenti sono prodotti make-to-stock e il finale assembly-to-order. Tutto ciò va bene per produzioni ripetitive a numerosità medio-alta o al più media (ricordare il diagramma). Quando la numerosità è più bassa ci può essere la variante che componenti non disponibili, necessari ad accettare un ordine, vengono inseriti, con una variante, nell’MPS di produzione dei componenti.
  • 19. The Master Production Scheduler  Its useful to think of the MPS as a set of firm planned orders. The scheduler needs to convert planned orders to firm planned orders and to manage the “timing” and amounts of the firm planned orders.
  • 20. The Job of the Master PS  Primary responsibility for making any additions or changes to the MPS records.  Has also has responsibility for disaggregating the production plan to create the MPS and that the sum of the detailed MPS matches the Production Plan (SOP).
  • 21. The Job of the Master PS  Responsible for launching the FAS.  Making sure that there is only one unified database for the MPS  Measure actual performance against the MPS and production plan (SOP)
  • 22. effettivo 50 previsto To production Conflitto tra B e C in sett 8 150 150 150
  • 23. MPS Stability  A stable MPS translates into stable component schedules, which means improved performance in plant operations.  Too many changes – lower productivity  Too few changes – lower customer service levels.
  • 24. Increasing MPS stability  Stability is monitored and managed by:  Frozen time periods for the MPS and  Time fencing to establish clear guidelines for the kinds of changes that can be made.
  • 25. Frozen Schedule  This means that for the more recent time buckets it will be very difficult (but still negotiable) to change the sequence in which the orders will be processed.
  • 26. Time Fencing  This is an extension of the freeze concept.  Many companies set time fences that specify periods in which various types of change can be handled.  In the Demand fence the forecast is ignored in calculating the available (difficult to change the MPS).  The planning fence indicates the time at which the scheduler should be planning more MPS quantities. per consentire
  • 27. Managing the MPS  Start by having a realistic MPS  Stability and proper buffering are important to remove all the excuses for not attaining the performance for which the proper budget has been provided.  6.24

Notes de l'éditeur

  1. Figures 6.2; 6.3; 6.4 and 6.5