- 2. 2007
The pad was poured in late 2006 and in 2007
the lower section was raised by PSS crew
- 3. 2008
In 2008 museum visitors and local wildlife
enjoyed the new structure at the rear of the site.
- 5. 2009
In 2009 we learned that the roof would need
snow stops
- 6. 2010
By 2010 the
windows and snow
stops were
installed
- 7. 2011
2011 saw much activity in behind the cedars.
The new porch was added….
- 8. 2011
and water/electricity were roughed in.
- 9. 2012
The Building in the spring of 2012….it’s been
a long project but we’re almost finished!