Selecting the current
rating
of an RCD
1 Revision 01
AS/NZS 3000:2007 (Amendment 2)
3 Revision 01
To Calculate the loading for the lighting portion of the installation use
Load group A (i) - lighting
• A lighting point is where the
fixed wiring terminates
• E.g. a twin Fluorescent light
fitting is counted as one
point ClipsalClipsal
4 Revision 01
Load group A - lighting
Loading is calculated on the basis of:
–Average size lamp
–Not all lights will be on at the same
time
–As part of the overall diversity of the
installation
Lighting
For example if a domestic installation has 46 lights this equals 46 points
Using the above table A(i) allows:
3 A for the first 20 points (1 to 20)
2 A for the next 20 points (21 to 40
2 A for the remaining 6 points (41 to 60)
7 A total maximum demand for A(i)
Load group A – lighting
Particular attention must be paid to the footnotes when
using table C1
To Calculate the loading for the lighting portion of the
installation use
Load group B – socket outlets
• Load group B covers All
socket outlets for
general purpose use
• Permanently connected
equipment not covered
in other load groups
• One point represents
one outlet
• E.g. a 4 gang outlet is
equal to 4 points
ClipsalClipsal
8 Revision 01
If an installation has 10 double and 12 single socket outlets the
maximum demand would be
10 x double outlets = 20 point + 12 single outlets = 32 points
B(i) allows
10A for first 20 outlets (1 to 20)
5A for next 12 outlets (21 to 40)
Total demand = 15A for this portion of the installation.
Example 2.1
To calculate the
current rating of
this RCD the
maximum demand
of this portion of
the installation
must be calculated
using Table C1
From the switchboard schedule in example 2.1
CCT 4 has 12 points (socket outlets)
CCT 5 has 13 points (socket outlets)
CCT 6 has 20 lighting points
Note: Individual final sub circuit loadings calculated
using table C8 are not used to calculate the maximum
demand of a portion of an installation.
Maximum demand for this portion of the installation
Step 1; calculate the socket outlets maximum demand using Table C1
Total points = (CCT 4),12 points + (CCT 5),13 points = 25 points for this portion of the
installation
Maximum demand calculation
10A for first 20 points (1 to 20)
5A for next 5 points (21 to 40)
15A is the maximum demand for the sockets outlets in this portion of the
installation
12 Revision 01
Step 2; calculate the lighting maximum demand using Table C1
CCT 6 = 20 points
Maximum demand calculation A(i)
3A for first 20 points therefore maximum demand for the lighting of this portion of
the installation = 3A
Step 3 add the socket outlet max demand 15A to the lighting max demand 3A the total
maximum demand of this portion of this installation is 18 Amps
AS/NZS:3000:2007 Clause 2.6.2.1 General
Any device for the provision of additional protection shall be capable of interrupting the part
of the circuit protected by the device when an earth leakage current is above a
predetermined value.
The load current rating of an RCD shall be not less than the greater of the following—
(a) the maximum demand of the portion of the electrical installation being protected by the
device; or
(b) the highest current rating of any overload protective device on the portion of the electrical
installation being protected.
As the calculated maximum demand for the portion of the installation
being protected by the first RCD has been calculated to be 18A and the
highest rated circuit breaker being protected by the RCD is 20A the RCD
must have a minimum current rating of 20A
If the maximum demand was calculated to be above 20A then the
maximum demand value would be the minimum RCD rating

Contenu connexe

Tendances

Protection of alternator
Protection of alternator Protection of alternator
Protection of alternator MILAN MANAVAR
 
Pumped storage hydro power plant
Pumped storage hydro power plantPumped storage hydro power plant
Pumped storage hydro power plantCraZzy Shubh
 
Effect of change in burden and power factor on CTs
Effect of change in burden and power factor on  CTsEffect of change in burden and power factor on  CTs
Effect of change in burden and power factor on CTsManish Sadhu
 
1.8 overhead vs underground system
1.8 overhead vs underground system1.8 overhead vs underground system
1.8 overhead vs underground systemW3Edify
 
Voltage sag and it’s mitigation
Voltage sag and it’s mitigationVoltage sag and it’s mitigation
Voltage sag and it’s mitigationMayur Dhande
 
Ppt of ehv ac transmission
Ppt of ehv ac transmissionPpt of ehv ac transmission
Ppt of ehv ac transmissionSumit Kumar
 
Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substationsvishalgohel12195
 
Triggatron gap
Triggatron gapTriggatron gap
Triggatron gapsarunkutti
 
Automatic voltaer regulator and it's modelling
Automatic voltaer regulator and it's modellingAutomatic voltaer regulator and it's modelling
Automatic voltaer regulator and it's modellingrajani51
 
Streamer Theory of Breakdown in Gases.pptx
Streamer Theory of Breakdown in Gases.pptxStreamer Theory of Breakdown in Gases.pptx
Streamer Theory of Breakdown in Gases.pptxKarthikeyanK816516
 
Substation grounding
Substation groundingSubstation grounding
Substation groundingSyed Ubaid
 
TREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERING
TREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERINGTREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERING
TREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERINGPrasant Kumar
 
Presentation on Over-/under-voltage protection of electrical appliance
Presentation on Over-/under-voltage protection of electrical appliancePresentation on Over-/under-voltage protection of electrical appliance
Presentation on Over-/under-voltage protection of electrical applianceNishant Kumar
 
EE8701-High Voltage Engineering (1).pptx
EE8701-High Voltage Engineering (1).pptxEE8701-High Voltage Engineering (1).pptx
EE8701-High Voltage Engineering (1).pptxsai karthick
 
Vector diagram and phasor diagram of synchronous motor
Vector diagram and phasor diagram of synchronous motorVector diagram and phasor diagram of synchronous motor
Vector diagram and phasor diagram of synchronous motorkarthi1017
 
Power Quality Measurement Devices & Monotoring
Power Quality Measurement Devices & MonotoringPower Quality Measurement Devices & Monotoring
Power Quality Measurement Devices & MonotoringParth Patel
 
1.7 transmission and distribution system of electrical energy
1.7 transmission and distribution system of electrical energy1.7 transmission and distribution system of electrical energy
1.7 transmission and distribution system of electrical energyW3Edify
 

Tendances (20)

Protection of alternator
Protection of alternator Protection of alternator
Protection of alternator
 
Pumped storage hydro power plant
Pumped storage hydro power plantPumped storage hydro power plant
Pumped storage hydro power plant
 
Effect of change in burden and power factor on CTs
Effect of change in burden and power factor on  CTsEffect of change in burden and power factor on  CTs
Effect of change in burden and power factor on CTs
 
Townsend ’s theory
Townsend ’s theoryTownsend ’s theory
Townsend ’s theory
 
1.8 overhead vs underground system
1.8 overhead vs underground system1.8 overhead vs underground system
1.8 overhead vs underground system
 
Voltage sag and it’s mitigation
Voltage sag and it’s mitigationVoltage sag and it’s mitigation
Voltage sag and it’s mitigation
 
Ppt of ehv ac transmission
Ppt of ehv ac transmissionPpt of ehv ac transmission
Ppt of ehv ac transmission
 
Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substations
 
Triggatron gap
Triggatron gapTriggatron gap
Triggatron gap
 
Harmonic study and analysis
Harmonic study and analysisHarmonic study and analysis
Harmonic study and analysis
 
Automatic voltaer regulator and it's modelling
Automatic voltaer regulator and it's modellingAutomatic voltaer regulator and it's modelling
Automatic voltaer regulator and it's modelling
 
Streamer Theory of Breakdown in Gases.pptx
Streamer Theory of Breakdown in Gases.pptxStreamer Theory of Breakdown in Gases.pptx
Streamer Theory of Breakdown in Gases.pptx
 
Protection of alternator
Protection of alternatorProtection of alternator
Protection of alternator
 
Substation grounding
Substation groundingSubstation grounding
Substation grounding
 
TREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERING
TREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERINGTREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERING
TREEING & TRACKING|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERING
 
Presentation on Over-/under-voltage protection of electrical appliance
Presentation on Over-/under-voltage protection of electrical appliancePresentation on Over-/under-voltage protection of electrical appliance
Presentation on Over-/under-voltage protection of electrical appliance
 
EE8701-High Voltage Engineering (1).pptx
EE8701-High Voltage Engineering (1).pptxEE8701-High Voltage Engineering (1).pptx
EE8701-High Voltage Engineering (1).pptx
 
Vector diagram and phasor diagram of synchronous motor
Vector diagram and phasor diagram of synchronous motorVector diagram and phasor diagram of synchronous motor
Vector diagram and phasor diagram of synchronous motor
 
Power Quality Measurement Devices & Monotoring
Power Quality Measurement Devices & MonotoringPower Quality Measurement Devices & Monotoring
Power Quality Measurement Devices & Monotoring
 
1.7 transmission and distribution system of electrical energy
1.7 transmission and distribution system of electrical energy1.7 transmission and distribution system of electrical energy
1.7 transmission and distribution system of electrical energy
 

Similaire à Max demand

L08 power amplifier (class a)
L08 power amplifier (class a)L08 power amplifier (class a)
L08 power amplifier (class a)hasanen22
 
cable sizing.ppt
cable sizing.pptcable sizing.ppt
cable sizing.pptChadWood16
 
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDEsolpowerpeople
 
Tibre table of contents
Tibre table of contentsTibre table of contents
Tibre table of contentsxquitah
 
RF Module Design - [Chapter 6] Power Amplifier
RF Module Design - [Chapter 6]  Power AmplifierRF Module Design - [Chapter 6]  Power Amplifier
RF Module Design - [Chapter 6] Power AmplifierSimen Li
 
امتحان جهد عالي 2015-2016
امتحان جهد عالي 2015-2016امتحان جهد عالي 2015-2016
امتحان جهد عالي 2015-2016eslam elfayoumy
 
امتحان جهد عالي 2016
امتحان  جهد عالي  2016امتحان  جهد عالي  2016
امتحان جهد عالي 2016Eslam Elfayoumy
 
finAL 4TH PRESENATION 2
finAL 4TH PRESENATION 2finAL 4TH PRESENATION 2
finAL 4TH PRESENATION 2Hamza Ahmad
 
Standalone PV plant sizing guide
Standalone PV plant sizing guideStandalone PV plant sizing guide
Standalone PV plant sizing guideHashim Hasnain Hadi
 
Series Voltage Compensator Modeling and Design for Reduction of Grid-Tie Sola...
Series Voltage Compensator Modeling and Design for Reduction of Grid-Tie Sola...Series Voltage Compensator Modeling and Design for Reduction of Grid-Tie Sola...
Series Voltage Compensator Modeling and Design for Reduction of Grid-Tie Sola...IRJET Journal
 
IRJET-Comparative Analysis of Rectangular and Square Column for Axial loading...
IRJET-Comparative Analysis of Rectangular and Square Column for Axial loading...IRJET-Comparative Analysis of Rectangular and Square Column for Axial loading...
IRJET-Comparative Analysis of Rectangular and Square Column for Axial loading...IRJET Journal
 
Solar power mppt controller
Solar power mppt controllerSolar power mppt controller
Solar power mppt controllerTung Huynh
 
Service cabinetandtransformerbreakersizing1082004
Service cabinetandtransformerbreakersizing1082004Service cabinetandtransformerbreakersizing1082004
Service cabinetandtransformerbreakersizing1082004michaeljmack
 
Poweramplifiers 170726051202
Poweramplifiers 170726051202Poweramplifiers 170726051202
Poweramplifiers 170726051202raju reddy
 
Igbt gate driver power supply flyback converter
Igbt gate driver power supply flyback converterIgbt gate driver power supply flyback converter
Igbt gate driver power supply flyback converterKunwar Aditya
 

Similaire à Max demand (20)

L08 power amplifier (class a)
L08 power amplifier (class a)L08 power amplifier (class a)
L08 power amplifier (class a)
 
cable sizing.ppt
cable sizing.pptcable sizing.ppt
cable sizing.ppt
 
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE
 
Tibre table of contents
Tibre table of contentsTibre table of contents
Tibre table of contents
 
RF Module Design - [Chapter 6] Power Amplifier
RF Module Design - [Chapter 6]  Power AmplifierRF Module Design - [Chapter 6]  Power Amplifier
RF Module Design - [Chapter 6] Power Amplifier
 
امتحان جهد عالي 2015-2016
امتحان جهد عالي 2015-2016امتحان جهد عالي 2015-2016
امتحان جهد عالي 2015-2016
 
امتحان جهد عالي 2016
امتحان  جهد عالي  2016امتحان  جهد عالي  2016
امتحان جهد عالي 2016
 
finAL 4TH PRESENATION 2
finAL 4TH PRESENATION 2finAL 4TH PRESENATION 2
finAL 4TH PRESENATION 2
 
Standalone PV plant sizing guide
Standalone PV plant sizing guideStandalone PV plant sizing guide
Standalone PV plant sizing guide
 
K2917.pptx
K2917.pptxK2917.pptx
K2917.pptx
 
Olano
OlanoOlano
Olano
 
Series Voltage Compensator Modeling and Design for Reduction of Grid-Tie Sola...
Series Voltage Compensator Modeling and Design for Reduction of Grid-Tie Sola...Series Voltage Compensator Modeling and Design for Reduction of Grid-Tie Sola...
Series Voltage Compensator Modeling and Design for Reduction of Grid-Tie Sola...
 
IRJET-Comparative Analysis of Rectangular and Square Column for Axial loading...
IRJET-Comparative Analysis of Rectangular and Square Column for Axial loading...IRJET-Comparative Analysis of Rectangular and Square Column for Axial loading...
IRJET-Comparative Analysis of Rectangular and Square Column for Axial loading...
 
Solar power mppt controller
Solar power mppt controllerSolar power mppt controller
Solar power mppt controller
 
Service cabinetandtransformerbreakersizing1082004
Service cabinetandtransformerbreakersizing1082004Service cabinetandtransformerbreakersizing1082004
Service cabinetandtransformerbreakersizing1082004
 
Poweramplifiers 170726051202
Poweramplifiers 170726051202Poweramplifiers 170726051202
Poweramplifiers 170726051202
 
Power amplifiers
Power amplifiersPower amplifiers
Power amplifiers
 
Igbt gate driver power supply flyback converter
Igbt gate driver power supply flyback converterIgbt gate driver power supply flyback converter
Igbt gate driver power supply flyback converter
 
power amplifiers
power amplifierspower amplifiers
power amplifiers
 
Power amplifier
Power amplifierPower amplifier
Power amplifier
 

Plus de popet

Start stop circuit
Start stop circuitStart stop circuit
Start stop circuitpopet
 
3 phase motors 1
3 phase motors 13 phase motors 1
3 phase motors 1popet
 
Earth fault loop
Earth fault loopEarth fault loop
Earth fault looppopet
 
E104 B Topic 1
E104 B Topic 1E104 B Topic 1
E104 B Topic 1popet
 
E104 B Topic 1
E104 B Topic 1E104 B Topic 1
E104 B Topic 1popet
 
Transducers
TransducersTransducers
Transducerspopet
 
Inverters
InvertersInverters
Inverterspopet
 
Power control devices
Power control devicesPower control devices
Power control devicespopet
 
Voltage regulation
Voltage regulationVoltage regulation
Voltage regulationpopet
 
Filter circuits
Filter circuitsFilter circuits
Filter circuitspopet
 
Session 2 & 3 rectifiers
Session 2 & 3 rectifiersSession 2 & 3 rectifiers
Session 2 & 3 rectifierspopet
 
Session1semiconductors
Session1semiconductorsSession1semiconductors
Session1semiconductorspopet
 
Electrical Heating
Electrical HeatingElectrical Heating
Electrical Heatingpopet
 
E004B Topic 1
E004B Topic 1E004B Topic 1
E004B Topic 1popet
 
E003B multiples & si units
E003B multiples & si unitsE003B multiples & si units
E003B multiples & si unitspopet
 
E003B sources
E003B sourcesE003B sources
E003B sourcespopet
 
E003B current effects
E003B current effectsE003B current effects
E003B current effectspopet
 
E003B power
E003B powerE003B power
E003B powerpopet
 
E003B resistors
E003B  resistorsE003B  resistors
E003B resistorspopet
 
E003B protection devices
E003B protection devicesE003B protection devices
E003B protection devicespopet
 

Plus de popet (20)

Start stop circuit
Start stop circuitStart stop circuit
Start stop circuit
 
3 phase motors 1
3 phase motors 13 phase motors 1
3 phase motors 1
 
Earth fault loop
Earth fault loopEarth fault loop
Earth fault loop
 
E104 B Topic 1
E104 B Topic 1E104 B Topic 1
E104 B Topic 1
 
E104 B Topic 1
E104 B Topic 1E104 B Topic 1
E104 B Topic 1
 
Transducers
TransducersTransducers
Transducers
 
Inverters
InvertersInverters
Inverters
 
Power control devices
Power control devicesPower control devices
Power control devices
 
Voltage regulation
Voltage regulationVoltage regulation
Voltage regulation
 
Filter circuits
Filter circuitsFilter circuits
Filter circuits
 
Session 2 & 3 rectifiers
Session 2 & 3 rectifiersSession 2 & 3 rectifiers
Session 2 & 3 rectifiers
 
Session1semiconductors
Session1semiconductorsSession1semiconductors
Session1semiconductors
 
Electrical Heating
Electrical HeatingElectrical Heating
Electrical Heating
 
E004B Topic 1
E004B Topic 1E004B Topic 1
E004B Topic 1
 
E003B multiples & si units
E003B multiples & si unitsE003B multiples & si units
E003B multiples & si units
 
E003B sources
E003B sourcesE003B sources
E003B sources
 
E003B current effects
E003B current effectsE003B current effects
E003B current effects
 
E003B power
E003B powerE003B power
E003B power
 
E003B resistors
E003B  resistorsE003B  resistors
E003B resistors
 
E003B protection devices
E003B protection devicesE003B protection devices
E003B protection devices
 

Dernier

Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiMalviyaNagarCallGirl
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 

Dernier (20)

Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 

Max demand

  • 1. Selecting the current rating of an RCD 1 Revision 01
  • 3. 3 Revision 01 To Calculate the loading for the lighting portion of the installation use Load group A (i) - lighting • A lighting point is where the fixed wiring terminates • E.g. a twin Fluorescent light fitting is counted as one point ClipsalClipsal
  • 4. 4 Revision 01 Load group A - lighting Loading is calculated on the basis of: –Average size lamp –Not all lights will be on at the same time –As part of the overall diversity of the installation
  • 5. Lighting For example if a domestic installation has 46 lights this equals 46 points Using the above table A(i) allows: 3 A for the first 20 points (1 to 20) 2 A for the next 20 points (21 to 40 2 A for the remaining 6 points (41 to 60) 7 A total maximum demand for A(i)
  • 6. Load group A – lighting Particular attention must be paid to the footnotes when using table C1
  • 7. To Calculate the loading for the lighting portion of the installation use Load group B – socket outlets • Load group B covers All socket outlets for general purpose use • Permanently connected equipment not covered in other load groups • One point represents one outlet • E.g. a 4 gang outlet is equal to 4 points ClipsalClipsal
  • 8. 8 Revision 01 If an installation has 10 double and 12 single socket outlets the maximum demand would be 10 x double outlets = 20 point + 12 single outlets = 32 points B(i) allows 10A for first 20 outlets (1 to 20) 5A for next 12 outlets (21 to 40) Total demand = 15A for this portion of the installation.
  • 9.
  • 10. Example 2.1 To calculate the current rating of this RCD the maximum demand of this portion of the installation must be calculated using Table C1 From the switchboard schedule in example 2.1 CCT 4 has 12 points (socket outlets) CCT 5 has 13 points (socket outlets) CCT 6 has 20 lighting points Note: Individual final sub circuit loadings calculated using table C8 are not used to calculate the maximum demand of a portion of an installation.
  • 11. Maximum demand for this portion of the installation Step 1; calculate the socket outlets maximum demand using Table C1 Total points = (CCT 4),12 points + (CCT 5),13 points = 25 points for this portion of the installation Maximum demand calculation 10A for first 20 points (1 to 20) 5A for next 5 points (21 to 40) 15A is the maximum demand for the sockets outlets in this portion of the installation
  • 12. 12 Revision 01 Step 2; calculate the lighting maximum demand using Table C1 CCT 6 = 20 points Maximum demand calculation A(i) 3A for first 20 points therefore maximum demand for the lighting of this portion of the installation = 3A Step 3 add the socket outlet max demand 15A to the lighting max demand 3A the total maximum demand of this portion of this installation is 18 Amps
  • 13. AS/NZS:3000:2007 Clause 2.6.2.1 General Any device for the provision of additional protection shall be capable of interrupting the part of the circuit protected by the device when an earth leakage current is above a predetermined value. The load current rating of an RCD shall be not less than the greater of the following— (a) the maximum demand of the portion of the electrical installation being protected by the device; or (b) the highest current rating of any overload protective device on the portion of the electrical installation being protected. As the calculated maximum demand for the portion of the installation being protected by the first RCD has been calculated to be 18A and the highest rated circuit breaker being protected by the RCD is 20A the RCD must have a minimum current rating of 20A If the maximum demand was calculated to be above 20A then the maximum demand value would be the minimum RCD rating