Task time estimates for the modification of an assembly line at Jim Goodale's Carbondale, Illinois, factory are as follows: This exercise contains only parts d,b, and c. d) Using the line drawing tool five times, draw a Gantt chart for activities C through G of the project based on the early times. Carefully follow the instructions above, and only draw the required objects..