QC-SARYU	SYNERGY
FOR	STATION	LEVEL	QUALITY	CIRCLE	CONVENTION
O&M-NTPC	TANDA
A	Case	Study	for
Reducing	chocking	of	RC	Feeder	&	Centre	pipe	of	Mill	G	due	to	wet	coal
SARYU	SYNERGY
Better Together
PROJECT	PROFILE
Project	Name NTPC	Tanda
Location Ambedkar	Nagar
Establishment Year 1979
Taken	Over	By	NTPC 2001
Installed	Capacity 110x4	MW
Under	Commissioning 660x2	MW
PLF >90%	
Main	Raw	Materials Coal,	Water,	Air
SARYU	SYNERGY
Better Together
ABOUT	TEAM
• NAME : SARYU SYNERGY
• DEPARTMENT : OPERATION & BMD
• FORMATION : MAY 2018
• DAY OF MEETING : WEDNESDAY
• TIME : 5:30-6:30 PM
• PERIOD : IN 15 DAYS
• NO. OF MEETINGS : 20
• % OF ATTENDANCE : 92%
• SOLVED PROBLEM : 09 ( TILL DATE)
SARYU	SYNERGY
Better Together
ABOUT	TEAM	MEMBERS
COORDINATOR : SRAWAN KUMAR(OPN)
FACILITATOR : RAVI PAL SINGH(OPN)
TEAM LEADER : PANKAJ YADAV(BMD)
TEAM DY LEADER : ANIL KUMAR(BMD)
Team Members :DINESH KR YADAV(OPN)
RAMESH THAKUR(OPN)
SARYU	SYNERGY
Better Together
SARYU	SYNERGY
Better Together
STEP-1:		IDENTIFICATION		OF	PROBLEMS
BRAIN	STORMING
SARYU	SYNERGY
Better Together
STEP-1:		IDENTIFICATION		OF	PROBLEMS
S NO. NAME OF PROBLEM CATEGORY
1. Atomizing Valve Oil Gun Gland Leakage A
2. Oil Gun Flange leakage A
3. Frequently damage of soot blower line flange gasket A
4. Soot blower line pressure gauge line leakage B
5. M.S. stop valve gland Leakage A
6. Safety Valve passing B
7. Oil gun choking problem A
8 Soot blower mechanical jamming. B
SARYU	SYNERGY
Better Together
S NO. NAME OF PROBLEM CATEGORY
9. Phosphate dosing pump gudgeon pin circlip occasionally
damage.
A
10. Economizer lower most bend erosion problem. C
11. H2 leakage from gen-1 casing C
12. Turbine bearing vibration in unit#2 6h and 7h C
13. In unit #1 ID Fan A current hunting approximate 20A. B
14. Frequency of vertical shaft shearing of mill 1A C
15. Mill 4G continuous poor fineness B
16. Erosion of roller journal housing. A
STEP-1:		IDENTIFICATION		OF	PROBLEMS SARYU	SYNERGY
Better Together
S NO. NAME OF PROBLEM CATEGORY
17. Mill 2A less air flow. A
18. Hinge gate lever spring detachment. A
19. MRHS gate limit switch rod frequently broken. A
20. Mill 1A high vibration below 17A load. B
21. Feeder gear box lube oil leakage from oil seal. A
22. Lube oil leakage from shaft seal(DE) side in mill 2G C
23. View glass of return oil in mill 2 B not visible. A
24. CRH line LHS drain leakage in unit 1 near the condenser pass
A.
A
STEP-1:		IDENTIFICATION		OF	PROBLEMS SARYU	SYNERGY
Better Together
S NO. NAME OF PROBLEM CATEGORY
25. Steam leakage from Ext 7M valve flange in Unit#2. A
26. Frequent PF coal pipe leakages in all units. A
27. Steam leakage from steam ejector near the evacuation line . A
28. MRHS line mill G frequently chocking. B
29. U#2 MOT cooler I/L valve A-1 inoperative. B
30. RC feeder#2A I/L gate jamming and drum locking. A
31 U#1 TG Governing filter chocked but there was no alarm
persisted in Skoda system.
C
32. U#1 PA Fan #B jerky operation. C
STEP-1:		IDENTIFICATION		OF	PROBLEMS
SARYU	SYNERGY
Better Together
S NO. NAME OF PROBLEM CATEGORY
33. APH #2B duct punctured ,flue gas is on dangerous mode. A
34. U#1 barring gear motor cooling fan not available. C
35. U#1 Opacity#A getting out frequently. B
36. U#2 Oil splashing from Tg Bearing 7 lube oil return line . B
37. Station T/F incomer circuit breaker(6.6 KV) not closing in
remote.
C
38. BFP#2B discharge NRV passing. B
39. Mill G Seal air Line leakage A
40 Feeder & Centre pipe choking frequency of Mill G is more A
41 APH gearbox Failure C
STEP-1:		IDENTIFICATION		OF	PROBLEMS
SARYU	SYNERGY
Better Together
STEP-2:	SELECTION	OF	PROBLEMS
SARYU	SYNERGY
Better Together
STEP-2:	SELECTION	OF	PROBLEMS
Problem	Categorization
0
5
10
15
20
25
A B C
TOTAL	NO	OF	PROBLEMS
UNSOLVED	PROBLEMS
SOLVED	PROVLEMS
A B C
TOTAL	NO	OF	PROBLEMS 20 11 10
UNSOLVED	PROBLEMS 14 10 8
SOLVED	PROVLEMS 6 1 2
SARYU	SYNERGY
Better Together
STEP-2:	SELECTION	OF	PROBLEMS
Out of 41 identified problems 09 problems have been already solved
& implemented. From the remaining 32 problems we have selected 4
problems(one by each member).
S.No. Symbol Problem Selected	By
2 P1 Oil Gun Flange leakage Anil Kumar
17 P2 Mill 2A less air flow. Dinesh Kumar Yadav
40 P3
Frequent choking of Mill G Feeder & Centre
pipe
Pankaj Yadav
33 P4
APH #2B duct punctured, flue gas is on
dangerous mode.
Ramesh Thakur
SARYU	SYNERGY
Better Together
Points	Assigned	By	Every	Members	To	Each	Problem	(Scale	1	to	10)
Pankaj Yadav Anil Kumar
Criteria
Safety
Environ
ment
Urgency
Easy To
Work
Time
Saving
Total
Criteria
Safety
Environ
ment
Urgency
Easy To
Work
Time
Saving
Total
Problem Problem
P1 6 4 2 3 3 18 P1 2 3 6 2 6 19
P2 4 4 6 5 5 24 P2 1 3 8 9 3 24
P3 6 7 7 8 9 37 P3 6 8 8 9 4 35
P4 6 5 4 4 5 24 P4 2 4 3 7 5 21
Dinesh Kumar Yadav Ramesh Thakur
Criteria
Safety
Environ
ment
Urgency
Easy To
Work
Time
Saving
Total
Criteria
Safety
Environ
ment
Urgency
Easy To
Work
Time
Saving
Total
Problem Problem
P1 7 4 3 4 3 21 P1 3 3 6 4 3 19
P2 5 5 7 6 6 29 P2 5 2 4 3 1 15
P3 6 6 6 8 9 35 P3 3 8 6 5 7 29
P4 5 6 5 5 5 26 P4 6 7 2 6 1 22
STEP-2:	SELECTION	OF	PROBLEMS
SARYU	SYNERGY
Better Together
Problems	
P1	 P2 P3 P4
Members	
Pankaj Yadav 18 24 37 24
Anil	Kumar 19 24 35 21
Dinesh	Kumar	Yadav 21 29 35 26
Ramesh	Thakur 19 15 24 22
Grand	Total	 77 92 131 93
Rank	 4 3 1 2
STEP-2:	SELECTION	OF	PROBLEMS
Weightage Matrix
SARYU	SYNERGY
Better Together
STEP-2:	SELECTION	OF	PROBLEMS
SARYU	SYNERGY
Better Together
PLAN
DEFINE	PROBLEM
MILE	STONE	
CHART
DO
ANALYSE	PROBLEM
IDENTIFY	CAUSES
FIND	ROOT	CAUSE
FIND	SOLUTION
CHECK
FORESEE	
RESISTANCE
IMPLEMENT
CHECK	RESULTS
ACT
REGULARIZATION
FOLLOW	UP	
REVIEW
PDCA	Cycle
SARYU	SYNERGY
Better Together
Q.	C.	Name Department Facilitator	 Members
SARYU	SYNERGY O&M(OPERATION&BMD)
Mr.	RAVI	PAL	SINGH
1. PANKAJ	YADAV
(Leader)	
Project Reason	for	selection 2.	ANIL	KUMAR
Prevent chocking of RC Feeder & Centre pipe of Mill G
due to wet coal
TO improve Mill G Availability 3.	DINESH YADAV
Date	of	start	
01.05.2018
Date	of	completion
30.10.2018
4.	RAMESH THAKUR
S. N. Steps Weeks 1 2 3 4 5 6 7 8 9 10 11 12 Target Actual
1 Defining the problem 1
2 Analysis of the problem 2
3 Identification of causes 2
4 Root cause analysis 1
5
Data analysis of root
causes
1
6 Developing of solution 2
7
Foreseeing probable
resistances
1
8
Trial implementation and
check performance
1
9 Regular implementation 1
10 Follow up and review
Planning	mile	stone	chart	
(Project	activity	planning)
SARYU	SYNERGY
Better Together
STEP-3:	DEFINE	THE	PROBLEM
SARYU	SYNERGY
Better Together
Rc Feeder Manual Cleaning
Manually cleaned out wet coal
Accumulated wet coal in centre pipe which could not be cleaned out
80	cms
PIN	TYPE	INLET	GATE
PLATE	TYPE	OUTLE	GATE
10	mm	THICK	PLATE
PLATE	TYPE	INLET	GATE
40	mm	THICK	PLATE
SARYU	SYNERGY
Better Together
AREA	OF	
CHOKING
PIN	TYPE	GATE WHEEL	TO	OPERATE	PLATE	TYPE	GATE
(PLATE	THICKNESS	40	MM)
SARYU	SYNERGY
Better Together
300	MT
FEEDER	
NORMAL	
OPERATION
FEEDER	
CHOKE
STEP-4:	ANALYZE	THE	PROBLEM
SARYU	SYNERGY
Better Together
STEP-4:	ANALYZE	THE	PROBLEM
SHIFT	MAINTENANCE	COMPLAINT	BOOK
SARYU	SYNERGY
Better Together
STEP-4:	ANALYZE	THE	PROBLEM
SARYU	SYNERGY
Better Together
FEEDER Frequency
1A 1
1B 1
1C 4
1D 4
1E 1
1F 1
1G 8
2A 1
2B 0
2C 1
2D 0
2E 0
2F 1
2G 15
FREQUENCY	OF	CHOKING	IN	YEAR	2017
FEEDER Frequency
3A 0
3B 2
3C 2
3D 0
3E 2
3F 0
3G 2
4A 3
4B 1
4C 0
4D 1
4E 0
4F 1
4G 4
0
2
4
6
8
10
12
14
1A 1B 1C 1D 1E 1F 1G 2A 2B 2C 2D 2E 2F 2G 3A 3B 3C 3D 3E 3F 3G 4A 4B 4C 4D 4E 4F 4G
Bar	Chart-Frequency	of	choking	between	01.05.2017	to	
30.10.2017
RC	Feeder#G
has	more	
choking
STEP-4:	ANALYZE	THE	PROBLEM
SARYU	SYNERGY
Better Together
STEP-4:	ANALYZE	THE	PROBLEM
SARYU	SYNERGY
Better Together
RCFEEDER#A/B/C/D/E/FRCFEEDER#G
STEP-4:	ANALYZE	THE	PROBLEM
SARYU	SYNERGY
Better Together
ESTIMATION	OF	LOSSES
UNAVAILABILITY	OF	
EQUIPMENT
FINANCIAL	
LOSSES
STEP-4:	ANALYZE	THE	PROBLEM
HEAD	OF	LOSS QUANTIFIED	VALUE	OF	LOSS
LDO	FOR	POOR	FLAME Rs.	95,70,000.00	PER	YEAR
IF	UNIT	TRIP DUE	TO	FLAME	LOSS	RVENUE	LOST Rs 12,54,000.00	PER	TRIP
MILL#G UNAVAILABILITY	DUE TO	PTW 66	HOURS	PER	YEAR
MILL#G	UNAVAILABILITY	FOR	CLEANING 43.5	HOURS	PER	YEAR
SARYU	SYNERGY
Better Together
ESTIMATION	OF	LOSSES
STEP-5:	FIND	OUT	CAUSES
SARYU	SYNERGY
Better Together
STEP-5:	FIND	OUT	CAUSES
SARYU	SYNERGY
Better Together
12 probable causes have been found through brain storming method and the list has been
classified into 04 categories by stratification method
MAN
Laziness	in	cleaning
Improper	coal	cleaning
Wrong	pin	closing	method
MACHINE
Complicated	system
Extra	pin	type	gate
Extra	feeder	outlet	gate
METHOD
• More	time	taking
• Wet	Coal	sticking	on	feeder	
body
• Wet	coal	sticking	on		center	
pipe
MATERIAL
• Penetration	of	gate	plate	is	
difficult
• Coal	accumulation
• MS	PIN	IN	WET	COAL
CAUSE
STEP-5:	FIND	OUT	CAUSES
CASUE	AND	EFFECT	DIAGRAM	
FREQUENT	CHOCKING	OF	RC	FEEDER	G
MATERIAL
METHOD
MACHINEMAN
STEP-6:	FIND	OUT	ROOT	CAUSE
SARYU	SYNERGY
Better Together
STEP-6:	FIND	OUT	ROOT	CAUSE
SARYU	SYNERGY
Better Together
MAIN	CAUSE SUB	CAUSE VALIDITY RANK	OUT	OF	10
MAN
UNTRAINED MANPOWER	USED NO	 0
LACK	OF	MANPOWER NO 0
FATIGUE YES 1
MACHINE
WRONG POSITION	OF	MANHOLE YES 1
GATE PLATE	RAKE	THICKNESS	MORE YES 10
HEAVY COAL	LOAD YES 1
METHOD
DIFFICULT PIN	&	PLATE	CLOSING YES 1
IMPROPER	FEEDER	BODY	CLEANING YES 1
IMPROPER	CENTER PIPE	CLEANING YES 1
MATERIAL
JAMMING	OF	MS	PIN YES 10
WET COAL YES 3
BLIND	HOLE	RAKE YES 2
VALIDATION	METHOD
STEP-7:	DATA	ANALYSIS SARYU	SYNERGY
Better Together
STEP-7:	DATA	ANALYSIS
PARETO	TABLE
SARYU	SYNERGY
Better Together
PROBABLE	ROOT	CAUSES MARKS
CUMULATIVE	
MARKS
PERCENTAGE
CUMMULATIVE	
%
GATE	PLATE	RAKE	THICKNESS	MORE	 10 10 32.3 32.3
JAMMING	OF	MS	PIN	 10 20 32.3 64.5
WET	COAL	 3 23 9.7 74.2
BLIND	HOLE	RAKE	 2 25 6.5 80.6
DIFFICULT	PIN	&	PLATE	CLOSING	 1 26 3.2 83.9
WRONG	POSITION	OF	MANHOLE	 1 27 3.2 87.1
HEAVY	COAL	LOAD	 1 28 3.2 90.3
IMPROPER	FEEDER	BODY	CLEANING 1 29 3.2 93.5
IMPROPER	CENTER	PIPE	CLEANING	 1 30 3.2 96.8
FATIGUE 1 31 3.2 100.0
STEP-7:	DATA	ANALYSIS
PARETO	DIAGRAM
SARYU	SYNERGY
Better Together
VITAL	FEW USEFUL	MANY
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
0
5
10
15
20
25
30
GATE	PLATE	
RAKE	
THICKNESS	
MORE	
JAMMING	
OF	MS	PIN	
WET	COAL	 BLIND	HOLE	
RAKE	
DIFFICULT	
PIN	&	PLATE	
CLOSING	
WRONG	
POSITION	
OF	
MANHOLE	
HEAVY	
COAL	LOAD	
IMPROPER	
FEEDER	
BODY	
CLEANING
IMPROPER	
CENTER	
PIPE	
CLEANING	
FATIGUE
MARKS
CUMMULATIVE	%
BREAK	EVEN	POINT
STEP-8:	DEVELOPMENT	OF	SOLUTION
SARYU	SYNERGY
Better Together
STEP-8:	DEVELOPMENT	OF	SOLUTION
SN. SOLUTION ACCEPT/REJECT REASON
1 USE	SERVICE	AIR	IN	CENTER	PIPE	BETWEEN	
BUNKER	AND	FEEDER
REJECT •REQUIRE	NEW	COMPRESSOR	
•HAVE	HIGH	COST
2 BY	CHANGE	WITH	NEW	FEEDER REJECT •HIGH	COST	
•SAME	PROBLEM
3 POKING	IN	CENTER	PIPE	MAN	HOLE	WITH	
USING A	LONG	BAR
REJECT •MORE	MANPOWER	FOR	POKING
•HAZARDOUS	
4 CHANGE	THE		DESIGN	OF	FEEDER REJECT •HIGH COST	OF	DEVELOPMENT
5 HAMMERING	ON	CENTER	PIPE REJECT •REQUIRE	EXTRA	MANPOWER
•COSTLY
6 PROVIDE	A	POKING	HOLE	IN	CENTER	PIPE	 REJECT •ONLY	PARTIAL	CHOKING	CLEAR
7 USE	SKILLED	LABOUR	FOR	HAMEERING OF	
FEEDER
REJECT •HIGH	COST
8 REPALCE	FEEDER	INLET	GATE FROM	PIN	TYPE	
TO	PLATE	TYPE	PROVIDED	BY	OEM
REJECT •PROVEN	IN	OTHER	FEEDERS
•COSTLY	AND	TIME	TAKING
9 REPALCE	FEEDER	INLET	GATE FROM	PIN	TYPE	
TO	PLATE	TYPE	FABRICATED	INHOUSE.
ACCEPT •PROVEN	IN	OTHER	FEEDERS
•CHEAPEST	AND QUICKEST
SARYU	SYNERGY
Better Together
STEP-9:	FORESEEING	PROBABLE	RESISTANCE
SARYU	SYNERGY
Better Together
STEP-9:	FORESEEING	PROBABLE	RESISTANCE
SARYU	SYNERGY
Better Together
By Brain storming our team have identified the following probable constraints and
found the ways to overcome them..
Sl No	 RESISTANCE ELIMINATION
1 BUNKER	EMPTY BUNKER	EMPTY	ONLY	DURING	
OVERHAULING
2 MATERIAL AND	FABRICATION MATERIAL ARRANGED	FROM	BMD STORE	
COMPONENT	PRE	FABRICATED	IN	CENTRAL	
WORKSHOP
3 PERMISSION	FOR
IMPLEMENTATION	OF	
SOLUTION
DEPARTMENTAL	NOTE	FOR	APPROVAL
4 15 DAYS	FOR	
IMPLEMENTATION	OF	
SOLUTION
SOLUTION	IMPLEMENTED	DURING	
OVERHAULING
STEP-9:	FORESEEING	PROBABLE	RESISTANCE
SARYU	SYNERGY
Better Together
STEP-10:	TRIAL	IMPLEMENTATION	AND	
CHECK	PERFORMANCE
SARYU	SYNERGY
Better Together
Unit#3	and	4	RC	
Feeder#G Inlet	Gates		
replaced	in	July’18	and	
September’18	overhauls
08	Years	rolling	plan	from		MTP	Department	Page	of	Tanda	Website
SARYU	SYNERGY
Better Together
STEP-10:	TRIAL	IMPLEMENTATION	AND	
CHECK	PERFORMANCE
0
2
4
6
8
10
12
14
16
1A 1B 1C 1D 1E 1F 1G 2A 2B 2C 2D 2E 2F 2G 3A 3B 3C 3D 3E 3F 3G 4A 4B 4C 4D 4E 4F 4G
Frequency	of	choking	between	01.05.2018	to	30.10.2018
Frequency	of	choking	between	01.05.2017	to	30.10.2017
STEP-10:	TRIAL	IMPLEMENTATION	AND	
CHECK	PERFORMANCE Unit#3,4	gates	
replaced	and	
frequency	of		
choking	reducedUnit#1,2		
frequency	of		
choking	is	nearly	
same
SARYU	SYNERGY
Better Together
STEP-11:	REGULAR	IMPLEMENTATION	
SARYU	SYNERGY
Better Together
STEP-11:	REGULAR	IMPLEMENTATION	
Unit#1	and	2	RC	
Feeder#G Inlet	Gate	to	
be	replaced	in	July’19	
and	September’19	
overhauls
08	Years	rolling	plan	from		MTP	Department	Page	of	Tanda	Website
SARYU	SYNERGY
Better Together
STEP-12:	FOLLOW-UP	AND	REVIEW	
SARYU	SYNERGY
Better Together
STEP-12:	FOLLOW-UP	AND	REVIEW	
SARYU	SYNERGY
Better Together
Comparative	mile	stone	chart	for	checking	performance
S. N. Steps Weeks 1 2 3 4 5 6 7 8 9 10 11 12 Target Actual
1 Defining the problem 1 1
2 Analysis of the problem 2 2
3 Identification of causes 2 2
4 Root cause analysis 1 1
5 Data analysis of root 1 1
6 Developing of solution 2 2
7 Foreseeing probable 1 1
8 Trial implementation and 1 2
9 Regular implementation 1 1
10
Follow up and review
Q.	C.	Name Department Facilitator	 Members
SARYU	SYNERGY O&M(OPERATION&BMD)
Mr.	RAVI	PAL	SINGH
1. PANKAJ	YADAV
(Leader)	
Project Reason	for	selection 2.	ANIL	KUMAR
Prevent chocking of RC Feeder & Centre pipe of Mill G
due to wet coal
TO improve Mill G Availability 3.	DINESH YADAV
Date	of	start	
01.05.2018
Date	of	completion
30.10.2018
4.	RAMESH THAKUR
COST	OF	FEEDER	GATE
TOTAL	COST	OF	MATERIALS	–
COST	OF	10	MM	SHEETS	–
1.5	M	X	1M	(2	PIECE) TOTAL	AREA	OF	10	MM	SHEET- 6.86	m2
1MX0.8M	(2	PIECE)																				DENSITY	OF		SHEETS-78.5	KG/	m2
1M	X1	M(1	PIECE)																						RATE	OF	SHEET	MATERIALS-60.6/	KG																																			
0.4M	X0.2M	(1	PIECE)													 TOTAL	COST	OF		10	MM	SHEETS-32633.70	RUPEES
1MX.7M	(	1	PIECE)
COST	OF	8	MM	SHEETS	–
0.4	MX	0.7M	(1	PIECE)													TOTAL	AREA	OF	8	MM	SHEETS	-.28	m2
DENSITY	OF		SHEETS- 78.5	KG/	m2
RATE	OF	SHEET	MATERIALS	-60.6/	KG		
TOTAL	COST	OF		08	MM	SHEETS	-902.93	RUPEES
COST	OF	8	MM	LINER	(	SS)-
0.6M	X	0.7M	(	3	PIECE)														TOTAL	AREA	OF	8	MM	LINER		- 0.28	m2
0.2M	X	0.7(	1	PIECE	)																DENSITY	OF		SHEETS	– 80		KG/	m2
RATE	OF	SHEET	MATERIALS		- 182.50/	KG		
TOTAL	COST	OF		08	MM	LINER		- 20440		RUPEES
COST	OF	FEEDER	GATE
COST	OF	BEARING- CAM	FOLLOWER			-
RATE	OF	BEARING-CAM	FOLLOWER	-700RUPEES/	PIECE					
NO		OF	BEARING	(CAM	FOLLOWER)	– 10		PIECE					
TOTAL		COST	OF(	BEARING- CAM	FOLLOWER	)		- 7000	RUPEES
COST	OF	6306	BEARING		-
RATE	OF	6306		- 400	RUPEES/	PIECE				
NO		OF	6306	BEARING		– 02		PIECE				
TOTAL	COST	OF	6306	BEARING		- 800	RUPEES
TOTAL	COST	OF	MS	SPUR	GEAR	(200MM)	FROM	WORKSHOP	-4000	RUPEES
TOTAL	FABRICATION	COST		FROM	WORKSHOP	– 20,000	RUPEES	
TOTAL	IMPLIMENTATION	COST	=		TOTAL	COST	OF	10	MM	SHEETS	+TOTAL		COST	
OF	8	MM	SHEETS	+TOTAL	COST	OF	8	MM	LINER	(	SS)	+	TOTAL		COST	OF	
(BEARING- CAM	FOLLOWER	)		+	COST	OF	6306	BEARING	+	TOTAL	COST	OF	MS	
SPUR	GEAR	(200MM)	FROM	WORKSHOP+	TOTAL	FABRICATION	COST		FROM	
WORKSHOP		=	(32,633.70	+	902.93	+20,440	+	7,000	+800	+4,000+20,000)	RUPEES
=		85776.33	RUPEES
COST	BENEFIT	ANALYSIS	FOR	04	FEEDERS	AND	IN	01	YEAR
STEP-12:	FOLLOW-UP	AND	REVIEW	
COST	OF	FEEDER	GATE
MATERIAL,	COST :	RS	65,776.00
FABRICATION	COST :	RS	20,000.00
TOTAL	FOR	01	FEEDER :	RS	85,776.00
TOTAL	FOR	04	FEEDERS :	RS	3,43,104.00
~Rs.	3,50,000.00
BENEFIT	PER	ANNUM
SAVING	OF	LDO	PER	YEAR :	RS				95,70,000.00
SAVING	DUE	TO	UNIT	AVAILABILIT:	RS				12,54,000.00
TOTAL :	RS	1,08,24,000.00
~Rs.	1,10,00,000.00
SARYU	SYNERGY
Better Together
ADVANTAGES
STEP-12:	FOLLOW-UP	AND	REVIEW	
SARYU	SYNERGY
Better Together
TANGIBLE	ADVANTAGES INTANGIBLE	ADVANTAGES
• Exposure of cross functional area.
• Exposure to QC tools and techniques.
• Motivation and better team spirit.
• Feeling of achievement among team
members.
• Reduce operational stress.
• Rs 95,70,000.00 saved in LDO per
annum.
• Rs 12,54,000.00 saved by preventing
even one tripping of Unit on flame loss.
• Availability of bottom Mill#G and RC
Feeder#G is improved.
• Stability of Unit by availability of Mill#G.
ACKNOWLEDGEMENT
SARYU	SYNERGY
Better Together
SENIORS,	COLLEAGUES	,	FRIENDS	AND	WORKERS	FROM:
•BE	DEPARTMENT
•EEMG	DEPARTMENT
•FM	DEPARTMENT
•OMD	DEPARTMENT
•OPERATION	DEPARTMENT
•BMD	DEPARTMENT
THANK YOU
“Synergy	
is	better	than	my	way	or	your	way.	
It’s	our	way”
Stephen	R.	Covey
SARYU	SYNERGY
Better Together

Contenu connexe

Tendances

STEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGSTEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGAshish Kumar Jain
 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingTahoor Alam Khan
 
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineThermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineManohar Tatwawadi
 
Super Critical Technology-Fundamental Concepts about Super Critical Technolog...
Super Critical Technology-Fundamental Concepts about Super Critical Technolog...Super Critical Technology-Fundamental Concepts about Super Critical Technolog...
Super Critical Technology-Fundamental Concepts about Super Critical Technolog...Raghab Gorain
 
Hydrogen in power plants
Hydrogen in power plantsHydrogen in power plants
Hydrogen in power plantsYogendra Sharma
 
Boiler chemical cleaning_
Boiler chemical cleaning_Boiler chemical cleaning_
Boiler chemical cleaning_rkpandey85
 
Water steam Circuit in Supercritical Boiler for 660MW Power Plant
Water steam Circuit in Supercritical Boiler for 660MW Power PlantWater steam Circuit in Supercritical Boiler for 660MW Power Plant
Water steam Circuit in Supercritical Boiler for 660MW Power PlantHareesh VS
 
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...Manohar Tatwawadi
 
Chemical Cleaning of Boiler in a Thermal Power Plant
Chemical Cleaning of Boiler in a Thermal Power PlantChemical Cleaning of Boiler in a Thermal Power Plant
Chemical Cleaning of Boiler in a Thermal Power PlantSUDHEER KUMAR KALYANAM
 
POWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINEPOWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINEManohar Tatwawadi
 
Theory and Operation - Secondary Reformers -
Theory and Operation - Secondary Reformers - Theory and Operation - Secondary Reformers -
Theory and Operation - Secondary Reformers - Gerard B. Hawkins
 
Boiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFTBoiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFTTahoor Alam Khan
 
Boiler – fundamentals and best practices
Boiler – fundamentals and best practicesBoiler – fundamentals and best practices
Boiler – fundamentals and best practicesBassem Eleaba, MEng
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownAshvani Shukla
 

Tendances (20)

STEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGSTEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTING
 
Ere ction manual bhel
Ere ction manual bhelEre ction manual bhel
Ere ction manual bhel
 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & Working
 
Presentation on CFBC Boilers
Presentation on CFBC BoilersPresentation on CFBC Boilers
Presentation on CFBC Boilers
 
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineThermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
 
Super Critical Technology-Fundamental Concepts about Super Critical Technolog...
Super Critical Technology-Fundamental Concepts about Super Critical Technolog...Super Critical Technology-Fundamental Concepts about Super Critical Technolog...
Super Critical Technology-Fundamental Concepts about Super Critical Technolog...
 
Hydrogen in power plants
Hydrogen in power plantsHydrogen in power plants
Hydrogen in power plants
 
Power Plant Boiler feed pump
Power Plant Boiler feed pump Power Plant Boiler feed pump
Power Plant Boiler feed pump
 
Boiler chemical cleaning_
Boiler chemical cleaning_Boiler chemical cleaning_
Boiler chemical cleaning_
 
Water steam Circuit in Supercritical Boiler for 660MW Power Plant
Water steam Circuit in Supercritical Boiler for 660MW Power PlantWater steam Circuit in Supercritical Boiler for 660MW Power Plant
Water steam Circuit in Supercritical Boiler for 660MW Power Plant
 
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
 
Chemical Cleaning of Boiler in a Thermal Power Plant
Chemical Cleaning of Boiler in a Thermal Power PlantChemical Cleaning of Boiler in a Thermal Power Plant
Chemical Cleaning of Boiler in a Thermal Power Plant
 
Low Pressure Boiler Start-up Procedure
Low Pressure Boiler Start-up ProcedureLow Pressure Boiler Start-up Procedure
Low Pressure Boiler Start-up Procedure
 
POWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINEPOWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINE
 
Theory and Operation - Secondary Reformers -
Theory and Operation - Secondary Reformers - Theory and Operation - Secondary Reformers -
Theory and Operation - Secondary Reformers -
 
Boiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFTBoiler Loss of Flame Protection- MFT
Boiler Loss of Flame Protection- MFT
 
Boiler safety protection
Boiler  safety protectionBoiler  safety protection
Boiler safety protection
 
Steam blowing procedure
Steam blowing procedure Steam blowing procedure
Steam blowing procedure
 
Boiler – fundamentals and best practices
Boiler – fundamentals and best practicesBoiler – fundamentals and best practices
Boiler – fundamentals and best practices
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdown
 

Similaire à QC CASE STUDY: PREVENT OR REDUCE CHOCKING OF RC FEEDER#G AND MILL#G CENTRE PIPE

2W zone presentation of the best 2w in.ppt
2W zone presentation of the best 2w in.ppt2W zone presentation of the best 2w in.ppt
2W zone presentation of the best 2w in.pptShivaguru Venkatraman
 
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...Niranjana B
 
Dtk group of industries 2013
Dtk group of industries 2013Dtk group of industries 2013
Dtk group of industries 2013Aamer Pathan
 
001 QM Stage 1-7 ACME final
001 QM Stage 1-7 ACME final001 QM Stage 1-7 ACME final
001 QM Stage 1-7 ACME finalSachin Dhawale
 
Tpm implementation oee increment
Tpm implementation oee incrementTpm implementation oee increment
Tpm implementation oee incrementVinoth Axus
 
VVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBG
VVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBGVVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBG
VVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBGIndrani7
 
TPM Salalah - Progress
TPM Salalah - ProgressTPM Salalah - Progress
TPM Salalah - ProgressIssa Alshaikh
 
Casting manufacturing process improvement
Casting manufacturing process improvementCasting manufacturing process improvement
Casting manufacturing process improvementAbdullah Ansari
 
Enigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in indiaEnigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in indiaDr. Bikram Jit Singh
 
Anavah corporation Group 6 2015 Design Project Presentation
Anavah corporation Group 6 2015 Design Project PresentationAnavah corporation Group 6 2015 Design Project Presentation
Anavah corporation Group 6 2015 Design Project PresentationWong Chiew Wee
 
L&T Valves - Role of NDT in Valve Industries
L&T Valves - Role of NDT in Valve IndustriesL&T Valves - Role of NDT in Valve Industries
L&T Valves - Role of NDT in Valve IndustriesBabu Kuriakose
 

Similaire à QC CASE STUDY: PREVENT OR REDUCE CHOCKING OF RC FEEDER#G AND MILL#G CENTRE PIPE (20)

JSW KAIZEN Udan.pptx
JSW KAIZEN Udan.pptxJSW KAIZEN Udan.pptx
JSW KAIZEN Udan.pptx
 
2W zone presentation of the best 2w in.ppt
2W zone presentation of the best 2w in.ppt2W zone presentation of the best 2w in.ppt
2W zone presentation of the best 2w in.ppt
 
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
 
Dtk group of industries 2013
Dtk group of industries 2013Dtk group of industries 2013
Dtk group of industries 2013
 
001 QM Stage 1-7 ACME final
001 QM Stage 1-7 ACME final001 QM Stage 1-7 ACME final
001 QM Stage 1-7 ACME final
 
QC_SPARK.pptx
QC_SPARK.pptxQC_SPARK.pptx
QC_SPARK.pptx
 
Tpm implementation oee increment
Tpm implementation oee incrementTpm implementation oee increment
Tpm implementation oee increment
 
VVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBG
VVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBGVVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBG
VVGBJNRGGGGTGTGTGHTHGTGTGTJGNUGNURIEGNRIEUGBUBG
 
TPM Salalah - Progress
TPM Salalah - ProgressTPM Salalah - Progress
TPM Salalah - Progress
 
Case study
Case studyCase study
Case study
 
QC PPT.pptx
QC PPT.pptxQC PPT.pptx
QC PPT.pptx
 
Coining QCC R1.pptx
Coining QCC R1.pptxCoining QCC R1.pptx
Coining QCC R1.pptx
 
Project Report
Project ReportProject Report
Project Report
 
Casting manufacturing process improvement
Casting manufacturing process improvementCasting manufacturing process improvement
Casting manufacturing process improvement
 
Enigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in indiaEnigma of 'six sigma' for foundry sm es in india
Enigma of 'six sigma' for foundry sm es in india
 
Anavah corporation Group 6 2015 Design Project Presentation
Anavah corporation Group 6 2015 Design Project PresentationAnavah corporation Group 6 2015 Design Project Presentation
Anavah corporation Group 6 2015 Design Project Presentation
 
LinkedIn
LinkedInLinkedIn
LinkedIn
 
L&T Valves - Role of NDT in Valve Industries
L&T Valves - Role of NDT in Valve IndustriesL&T Valves - Role of NDT in Valve Industries
L&T Valves - Role of NDT in Valve Industries
 
Pres2023.pptx
Pres2023.pptxPres2023.pptx
Pres2023.pptx
 
TPM ppt.pptx
TPM ppt.pptxTPM ppt.pptx
TPM ppt.pptx
 

Plus de RAVI PAL SINGH

HP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineHP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineRAVI PAL SINGH
 
ENERGY CONSERVATION BACK PRESSURE TURBINE
ENERGY CONSERVATION BACK PRESSURE TURBINEENERGY CONSERVATION BACK PRESSURE TURBINE
ENERGY CONSERVATION BACK PRESSURE TURBINERAVI PAL SINGH
 
COMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDINGCOMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDINGRAVI PAL SINGH
 
CSR and sustainable development innovative possibilities
CSR and sustainable development innovative possibilitiesCSR and sustainable development innovative possibilities
CSR and sustainable development innovative possibilitiesRAVI PAL SINGH
 
DC failiure at NTPC Tanda
DC failiure at NTPC TandaDC failiure at NTPC Tanda
DC failiure at NTPC TandaRAVI PAL SINGH
 

Plus de RAVI PAL SINGH (8)

HP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineHP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam Turbine
 
ENERGY CONSERVATION BACK PRESSURE TURBINE
ENERGY CONSERVATION BACK PRESSURE TURBINEENERGY CONSERVATION BACK PRESSURE TURBINE
ENERGY CONSERVATION BACK PRESSURE TURBINE
 
VALUE ETHICS MORALS
VALUE ETHICS MORALSVALUE ETHICS MORALS
VALUE ETHICS MORALS
 
COMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDINGCOMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDING
 
CSR and sustainable development innovative possibilities
CSR and sustainable development innovative possibilitiesCSR and sustainable development innovative possibilities
CSR and sustainable development innovative possibilities
 
Air cooled condensers
Air cooled condensersAir cooled condensers
Air cooled condensers
 
Condensate system
Condensate systemCondensate system
Condensate system
 
DC failiure at NTPC Tanda
DC failiure at NTPC TandaDC failiure at NTPC Tanda
DC failiure at NTPC Tanda
 

Dernier

Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 

Dernier (20)

Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 

QC CASE STUDY: PREVENT OR REDUCE CHOCKING OF RC FEEDER#G AND MILL#G CENTRE PIPE