Network scheduling in Glassware
           industry


                  By
             Ravi Shekhar
              08bme181
          B.Tech( Mechanical)
        Network scheduling in Glassware Industry
Abstract:
The case study is being carried out from the data made available
by LA OPALA Glassware industry situated at Madhupur in
Deoghar, Jharkhand.
Study is based on the daily production processes taking place in
the industry.
Case study is based on Network scheduling and critical path
method(CPM) technique is used to solve the problem.
It is a step by step process to find out the critical path which
determine the time required to produce glass product.
The main aim is to reduce the production time and gain the
maximum profit to survive competition in modern day scenario.

          Network scheduling in Glassware Industry
Methodology:
Problem statement:
  There are around 15 -20 steps involved in the production of a
  finished glassware product from raw materials.
  Some of the steps are relatively insignificant as compared to
  others.
  The problem is to find out the longest path that includes all
  the necessary processes.
Solution:
  Network scheduling is being used to solve the problem.


             Network scheduling in Glassware Industry
Network design




•The critical path method (CPM) is used to find the
solution of this Network scheduling problem.
•It determines the longest path that includes all the
necessary production processes.
          Network scheduling in Glassware Industry
Results and Discussions:
Result:
  The critical path is found out to be 1-2-4-5-6-7-8-9-10-11-
  12-13-14-15-16-17-18.
  The critical length of duration is: 793 min.
Discussions:
  All the techniques applied in any industry results is based on
  maximum production in minimum time.
  To optimize the model the manufactures need to carry out
  more no. of processes simultaneously.
  Projects having independent activities are better suited to the
  network scheduling technique.
Conclusion:
The case study was carried out keeping in mind the daily
production activities taking place at LA OPALA glassware
industry.
The analysis was carried out using by Network scheduling
using CPM technique.
The case study has enabled me to apply the theoretical
studies in real time industrial scenario.
The study provides an overview of modern day industrial
scenario and how the day to day problems are being tackled
and solutions are brought to application.
THANK YOU

Contenu connexe

Tendances

Project management
Project managementProject management
Project management
Shankaran Rd
 
Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)
Byron Pang
 
Comparative characteristics of pert and cpm
Comparative characteristics of pert and cpmComparative characteristics of pert and cpm
Comparative characteristics of pert and cpm
Kinshook Chaturvedi
 

Tendances (19)

Pert & cpm
Pert & cpmPert & cpm
Pert & cpm
 
CPM-Updating
CPM-UpdatingCPM-Updating
CPM-Updating
 
A Study on Project Planning Using the Deterministic and Probabilistic Models ...
A Study on Project Planning Using the Deterministic and Probabilistic Models ...A Study on Project Planning Using the Deterministic and Probabilistic Models ...
A Study on Project Planning Using the Deterministic and Probabilistic Models ...
 
Project management
Project managementProject management
Project management
 
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap ReductionESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
 
Project management cpm-pert
Project management   cpm-pertProject management   cpm-pert
Project management cpm-pert
 
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
 
PDM - Precedence Diagram Method
PDM - Precedence Diagram MethodPDM - Precedence Diagram Method
PDM - Precedence Diagram Method
 
IDEF0 and Software Process Engineering Model
IDEF0 and Software Process Engineering ModelIDEF0 and Software Process Engineering Model
IDEF0 and Software Process Engineering Model
 
Ray stratton aace presentation
Ray stratton aace presentationRay stratton aace presentation
Ray stratton aace presentation
 
Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)
 
Comparative characteristics of pert and cpm
Comparative characteristics of pert and cpmComparative characteristics of pert and cpm
Comparative characteristics of pert and cpm
 
cpmpertmy (1)
cpmpertmy (1)cpmpertmy (1)
cpmpertmy (1)
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERT
 
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
 
EARNED VALUE MANAGEMENT
EARNED VALUE MANAGEMENTEARNED VALUE MANAGEMENT
EARNED VALUE MANAGEMENT
 
Bballard2000 dissertation
Bballard2000 dissertationBballard2000 dissertation
Bballard2000 dissertation
 
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
 
Process Modeling with IDEF 0
Process Modeling with IDEF 0Process Modeling with IDEF 0
Process Modeling with IDEF 0
 

En vedette (11)

Project network scheduling and S-curve
Project network scheduling and S-curve Project network scheduling and S-curve
Project network scheduling and S-curve
 
Network scheduling with limited_resources- revised1
Network scheduling with limited_resources- revised1Network scheduling with limited_resources- revised1
Network scheduling with limited_resources- revised1
 
Network scheduling
Network scheduling Network scheduling
Network scheduling
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
Ch17 scheduling
Ch17 schedulingCh17 scheduling
Ch17 scheduling
 
Pert & Cpm
Pert & CpmPert & Cpm
Pert & Cpm
 
Network Problem CPM & PERT
Network Problem CPM &  PERTNetwork Problem CPM &  PERT
Network Problem CPM & PERT
 
Project Management PERT and CPM
Project Management PERT and CPMProject Management PERT and CPM
Project Management PERT and CPM
 
Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 

Similaire à Network scheduling

Process improvement-using-dmaic-approach-case-study-in-downtime-reduction-ije...
Process improvement-using-dmaic-approach-case-study-in-downtime-reduction-ije...Process improvement-using-dmaic-approach-case-study-in-downtime-reduction-ije...
Process improvement-using-dmaic-approach-case-study-in-downtime-reduction-ije...
AjitsinghDaud
 
Failure of tube reduced in split air conditioner
Failure of tube reduced in split air conditionerFailure of tube reduced in split air conditioner
Failure of tube reduced in split air conditioner
prjpublications
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPT
FASI93
 

Similaire à Network scheduling (20)

IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
 
Improvement strategy by using ML and TM. A case study for solving cracking i...
Improvement strategy by using ML and TM. A  case study for solving cracking i...Improvement strategy by using ML and TM. A  case study for solving cracking i...
Improvement strategy by using ML and TM. A case study for solving cracking i...
 
Bryan allcock trl9 ready
Bryan allcock   trl9 readyBryan allcock   trl9 ready
Bryan allcock trl9 ready
 
Real-time Manufacturing Management for a Hybrid Process
Real-time Manufacturing Management for a Hybrid ProcessReal-time Manufacturing Management for a Hybrid Process
Real-time Manufacturing Management for a Hybrid Process
 
COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...
COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...
COMPUTER INTEGRATED MANUFACTURING (CIM) IN DIE MANUFACTURING INDUSTRY FOR PRO...
 
Nc verification and re processing for collaborative machining
Nc verification and re processing for collaborative machiningNc verification and re processing for collaborative machining
Nc verification and re processing for collaborative machining
 
Krishnan_Resume
Krishnan_ResumeKrishnan_Resume
Krishnan_Resume
 
Process improvement-using-dmaic-approach-case-study-in-downtime-reduction-ije...
Process improvement-using-dmaic-approach-case-study-in-downtime-reduction-ije...Process improvement-using-dmaic-approach-case-study-in-downtime-reduction-ije...
Process improvement-using-dmaic-approach-case-study-in-downtime-reduction-ije...
 
Post Processing
Post Processing Post Processing
Post Processing
 
Optimization of sealing casting by identifying solidification defect and impr...
Optimization of sealing casting by identifying solidification defect and impr...Optimization of sealing casting by identifying solidification defect and impr...
Optimization of sealing casting by identifying solidification defect and impr...
 
Optimization of sealing casting by identifying solidification defect and impr...
Optimization of sealing casting by identifying solidification defect and impr...Optimization of sealing casting by identifying solidification defect and impr...
Optimization of sealing casting by identifying solidification defect and impr...
 
Failure of tube reduced in split air conditioner
Failure of tube reduced in split air conditionerFailure of tube reduced in split air conditioner
Failure of tube reduced in split air conditioner
 
M.tech (Production and Industrial Engineering) Thesis Presentation
M.tech (Production and Industrial Engineering) Thesis PresentationM.tech (Production and Industrial Engineering) Thesis Presentation
M.tech (Production and Industrial Engineering) Thesis Presentation
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPT
 
AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...
AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...
AN ARTIFICIAL NEURAL NETWORK-BASED APPROACH COUPLED WITH TAGUCHI'S METHOD FOR...
 
Development frameworks and methods
Development frameworks and methodsDevelopment frameworks and methods
Development frameworks and methods
 
Sunil David Presentation on Traceability-automation expo 22.pptx
Sunil David Presentation on Traceability-automation expo 22.pptxSunil David Presentation on Traceability-automation expo 22.pptx
Sunil David Presentation on Traceability-automation expo 22.pptx
 
Concurrent Engineering- for Environment & Sustainability
Concurrent Engineering- for Environment & SustainabilityConcurrent Engineering- for Environment & Sustainability
Concurrent Engineering- for Environment & Sustainability
 
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...IRJET-  	  Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
IRJET- Enhancing Line Efficiency of Road Machinery Assembly Line at Volvo...
 
Ffeb69332c5a484
Ffeb69332c5a484Ffeb69332c5a484
Ffeb69332c5a484
 

Plus de Ravi Shekhar

Intro to radiography 1_2(NDT)
Intro to radiography 1_2(NDT)Intro to radiography 1_2(NDT)
Intro to radiography 1_2(NDT)
Ravi Shekhar
 

Plus de Ravi Shekhar (6)

"Vidura" The ancient Management Guru
"Vidura" The ancient Management Guru"Vidura" The ancient Management Guru
"Vidura" The ancient Management Guru
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Design of half shaft and wheel hub assembly for racing car
Design of half shaft and wheel hub assembly for racing carDesign of half shaft and wheel hub assembly for racing car
Design of half shaft and wheel hub assembly for racing car
 
Fea of springback on perforated sheet metal
Fea of springback on perforated sheet metalFea of springback on perforated sheet metal
Fea of springback on perforated sheet metal
 
Fabrication of prototype of stirling engine
Fabrication of prototype of stirling engineFabrication of prototype of stirling engine
Fabrication of prototype of stirling engine
 
Intro to radiography 1_2(NDT)
Intro to radiography 1_2(NDT)Intro to radiography 1_2(NDT)
Intro to radiography 1_2(NDT)
 

Dernier

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 

Dernier (20)

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 

Network scheduling

  • 1. Network scheduling in Glassware industry By Ravi Shekhar 08bme181 B.Tech( Mechanical) Network scheduling in Glassware Industry
  • 2. Abstract: The case study is being carried out from the data made available by LA OPALA Glassware industry situated at Madhupur in Deoghar, Jharkhand. Study is based on the daily production processes taking place in the industry. Case study is based on Network scheduling and critical path method(CPM) technique is used to solve the problem. It is a step by step process to find out the critical path which determine the time required to produce glass product. The main aim is to reduce the production time and gain the maximum profit to survive competition in modern day scenario. Network scheduling in Glassware Industry
  • 3. Methodology: Problem statement: There are around 15 -20 steps involved in the production of a finished glassware product from raw materials. Some of the steps are relatively insignificant as compared to others. The problem is to find out the longest path that includes all the necessary processes. Solution: Network scheduling is being used to solve the problem. Network scheduling in Glassware Industry
  • 4. Network design •The critical path method (CPM) is used to find the solution of this Network scheduling problem. •It determines the longest path that includes all the necessary production processes. Network scheduling in Glassware Industry
  • 5. Results and Discussions: Result: The critical path is found out to be 1-2-4-5-6-7-8-9-10-11- 12-13-14-15-16-17-18. The critical length of duration is: 793 min. Discussions: All the techniques applied in any industry results is based on maximum production in minimum time. To optimize the model the manufactures need to carry out more no. of processes simultaneously. Projects having independent activities are better suited to the network scheduling technique.
  • 6. Conclusion: The case study was carried out keeping in mind the daily production activities taking place at LA OPALA glassware industry. The analysis was carried out using by Network scheduling using CPM technique. The case study has enabled me to apply the theoretical studies in real time industrial scenario. The study provides an overview of modern day industrial scenario and how the day to day problems are being tackled and solutions are brought to application.