SlideShare une entreprise Scribd logo
1  sur  2
Télécharger pour lire hors ligne
Lubricating an Electric Motor
“TOOL BOX TRAINING”
Instructor: Maintenance Supervisor
If you would like any back issues of Tool Box Training Series send
an email to rsmith@gpallied.com
www.gpallied.com
Copyright 2010
GPAllied
4360 Corporate Road
Suite 110
Charleston, SC 29405
Office (843) 414-5760
Fax (843) 414-5779
General Rules
- Always follow lubrication procedure
provided
- If an electric motor is not lasting more than
8-10 years read my next Tool Box Training
Session and make something happen
- Anyone lubricating a motor should be
qualified to use the grease gun. This process
requires a procedure to be written with
specifications and ensure the person follows
the procedure
General Issues
Most companies experience motor bearing failure
however and are not sure why the bearing failed.
Three of the reasons we will consider in this in this
Tool Box Training Session are:
1. Lack of Lubrication
2. Over-lubrication (grease enters motor
windings or pushes out seal contaminating
the bearing)
3. Contamination
Steps to Successful Motor Bearing Lubrication
By Matt Spurlock MLA III, MLT, LLA
1. WARNING: Motor needs to be operating
while lubricating if at all possible otherwise
the grease will not transfer around the
bearing as required.
2. Ensure you have a manual grease gun with
the appropriate grease type for electric
motor.
NOTE: If using an ultrasound grease gun add
these steps to the Ultrasound Gun
Procedure.
3. Inspect electric motor for visual defects (i.e.
seals leakage, excessive build up in fins,
grease fitting damage, etc.)
4. Remove grease relief plugs
5. Wipe off any debris or excess grease from
zerk fitting and end of grease gun
6. Attach grease gun to appropriate zerk fitting
7. SLOWLY apply grease paying attention to
any excessive back pressure on the grease
gun
a. If back pressure is felt, this could
indicate the presence of hardened
grease in the lines/tubes that should
be cleaned out
8. Grease should be applied only to a volume
that has been pre-determined either
through OEM or calculated volumes. This
information should be listed on your
lubrication check sheet
9. If fresh grease is seen being expelled from
relief port, discontinue application
10. Allow motor to run a minimum of 15
minutes prior to replacing relief plugs
11. Replace grease cap or put a small amount of
grease on zerk fitting to help with
contamination control
Next Tool Box Session: Why Electric Motors Fail?
Send me the estimated life of your current electric
motors between 5-50 HP at rsmith@gpallied.com
Lubricating an Electric Motor
“TOOL BOX TRAINING”
Instructor: Maintenance Supervisor
If you would like any back issues of Tool Box Training Series send
an email to rsmith@gpallied.com
www.gpallied.com
Copyright 2010
GPAllied
4360 Corporate Road
Suite 110
Charleston, SC 29405
Office (843) 414-5760
Fax (843) 414-5779

Contenu connexe

En vedette

Correas (presentacion - parte1)
Correas (presentacion  - parte1)Correas (presentacion  - parte1)
Correas (presentacion - parte1)
Paralafakyou Mens
 
Procedimiento de aseguramiento de carga ransa comercial
Procedimiento de aseguramiento de carga   ransa comercialProcedimiento de aseguramiento de carga   ransa comercial
Procedimiento de aseguramiento de carga ransa comercial
JOSE CASTRO
 
Diseño y selección del mando a correas en v
Diseño y selección del mando a correas en vDiseño y selección del mando a correas en v
Diseño y selección del mando a correas en v
Lester Juregui
 
Manual ingenieria de mantenimiento
Manual ingenieria de mantenimientoManual ingenieria de mantenimiento
Manual ingenieria de mantenimiento
Francisco Castillo
 
Elementos de máquinas. correas y poleas. transmisiones mecánicas.
Elementos de máquinas. correas y poleas. transmisiones mecánicas.Elementos de máquinas. correas y poleas. transmisiones mecánicas.
Elementos de máquinas. correas y poleas. transmisiones mecánicas.
Jorginho Jhj
 
Transmision Mediante Correas[1]
Transmision Mediante Correas[1]Transmision Mediante Correas[1]
Transmision Mediante Correas[1]
pedro arias
 
Manual para ingenieros mecanicos
Manual para ingenieros mecanicosManual para ingenieros mecanicos
Manual para ingenieros mecanicos
iaspem
 
Catálogo BANDO en castellano
Catálogo BANDO en castellanoCatálogo BANDO en castellano
Catálogo BANDO en castellano
BandoIberica
 

En vedette (18)

Correas (presentacion - parte1)
Correas (presentacion  - parte1)Correas (presentacion  - parte1)
Correas (presentacion - parte1)
 
Procedimiento de aseguramiento de carga ransa comercial
Procedimiento de aseguramiento de carga   ransa comercialProcedimiento de aseguramiento de carga   ransa comercial
Procedimiento de aseguramiento de carga ransa comercial
 
Que es un Engranaje
Que es un EngranajeQue es un Engranaje
Que es un Engranaje
 
SISTEMA POLEA CORREA
SISTEMA POLEA CORREASISTEMA POLEA CORREA
SISTEMA POLEA CORREA
 
Diseño y selección del mando a correas en v
Diseño y selección del mando a correas en vDiseño y selección del mando a correas en v
Diseño y selección del mando a correas en v
 
Manual tecnico industrial
Manual tecnico industrialManual tecnico industrial
Manual tecnico industrial
 
Manual ingenieria de mantenimiento
Manual ingenieria de mantenimientoManual ingenieria de mantenimiento
Manual ingenieria de mantenimiento
 
Zaranda o Criba Vibratoria
Zaranda o Criba VibratoriaZaranda o Criba Vibratoria
Zaranda o Criba Vibratoria
 
Elementos de máquinas. correas y poleas. transmisiones mecánicas.
Elementos de máquinas. correas y poleas. transmisiones mecánicas.Elementos de máquinas. correas y poleas. transmisiones mecánicas.
Elementos de máquinas. correas y poleas. transmisiones mecánicas.
 
Polea y Correas
Polea y CorreasPolea y Correas
Polea y Correas
 
Transmision Mediante Correas[1]
Transmision Mediante Correas[1]Transmision Mediante Correas[1]
Transmision Mediante Correas[1]
 
Manual para ingenieros mecanicos
Manual para ingenieros mecanicosManual para ingenieros mecanicos
Manual para ingenieros mecanicos
 
Material sesion aprendizaje
Material sesion aprendizajeMaterial sesion aprendizaje
Material sesion aprendizaje
 
Engranajes correas cadenas
Engranajes correas cadenasEngranajes correas cadenas
Engranajes correas cadenas
 
Mantenimiento Mecanico
Mantenimiento MecanicoMantenimiento Mecanico
Mantenimiento Mecanico
 
Catálogo BANDO en castellano
Catálogo BANDO en castellanoCatálogo BANDO en castellano
Catálogo BANDO en castellano
 
analisis y calculos de la banda transportadora
analisis y calculos de la banda transportadora analisis y calculos de la banda transportadora
analisis y calculos de la banda transportadora
 
Sistemas de transmisión de poleas con correa
Sistemas de transmisión de poleas con correaSistemas de transmisión de poleas con correa
Sistemas de transmisión de poleas con correa
 

Plus de Ricky Smith CMRP, CMRT

Plus de Ricky Smith CMRP, CMRT (20)

Skills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance TechnicianSkills of a Proactive Maintenance Technician
Skills of a Proactive Maintenance Technician
 
Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance ManagerDay in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life (DILO) of a Proactive Maintenance Manager
 
Day in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance PlannerDay in the Life of a Proactive Maintenance Planner
Day in the Life of a Proactive Maintenance Planner
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
How to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effectiveHow to know if your maintenance planning and scheduling is not effective
How to know if your maintenance planning and scheduling is not effective
 
Day in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance SupervisorDay in the life of a Proactive Maintenance Supervisor
Day in the life of a Proactive Maintenance Supervisor
 
Day in the Life of a Proactive Maintenance Technician Article
Day in the Life of a Proactive Maintenance Technician  ArticleDay in the Life of a Proactive Maintenance Technician  Article
Day in the Life of a Proactive Maintenance Technician Article
 
Best Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleBest Maintenance Repair Practices Article
Best Maintenance Repair Practices Article
 
Tool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts CheckoutTool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Maintenance Parts Checkout
 
Tool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of BearingsTool Box Talk - Lubrication of Bearings
Tool Box Talk - Lubrication of Bearings
 
Tool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and SchedulingTool Box Talk - Maintenance Planning and Scheduling
Tool Box Talk - Maintenance Planning and Scheduling
 
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out AccuratelyTop 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
 
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and WhyTool Box Talk - How to Stop Hydraulic Leaks and Why
Tool Box Talk - How to Stop Hydraulic Leaks and Why
 
Maintenance of Hydraulic Systems
Maintenance of Hydraulic SystemsMaintenance of Hydraulic Systems
Maintenance of Hydraulic Systems
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive MaintenancePM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
How to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training ProgramHow to Develop an Effective Maintenance Skills Training Program
How to Develop an Effective Maintenance Skills Training Program
 
What is Lean Maintenance
What is Lean MaintenanceWhat is Lean Maintenance
What is Lean Maintenance
 
Best Maintenance Repair Practices
Best Maintenance Repair PracticesBest Maintenance Repair Practices
Best Maintenance Repair Practices
 
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 -  Fundamentals of Preventive MaintenancePM Tool Box Talk 101 -  Fundamentals of Preventive Maintenance
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
 
Day in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance TechnicianDay in the Life of (DILO) of a Proactive Maintenance Technician
Day in the Life of (DILO) of a Proactive Maintenance Technician
 

Dernier

Dernier (20)

Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 

Tool Box Talk - Lubricating an Electric Motor

  • 1. Lubricating an Electric Motor “TOOL BOX TRAINING” Instructor: Maintenance Supervisor If you would like any back issues of Tool Box Training Series send an email to rsmith@gpallied.com www.gpallied.com Copyright 2010 GPAllied 4360 Corporate Road Suite 110 Charleston, SC 29405 Office (843) 414-5760 Fax (843) 414-5779 General Rules - Always follow lubrication procedure provided - If an electric motor is not lasting more than 8-10 years read my next Tool Box Training Session and make something happen - Anyone lubricating a motor should be qualified to use the grease gun. This process requires a procedure to be written with specifications and ensure the person follows the procedure General Issues Most companies experience motor bearing failure however and are not sure why the bearing failed. Three of the reasons we will consider in this in this Tool Box Training Session are: 1. Lack of Lubrication 2. Over-lubrication (grease enters motor windings or pushes out seal contaminating the bearing) 3. Contamination Steps to Successful Motor Bearing Lubrication By Matt Spurlock MLA III, MLT, LLA 1. WARNING: Motor needs to be operating while lubricating if at all possible otherwise the grease will not transfer around the bearing as required. 2. Ensure you have a manual grease gun with the appropriate grease type for electric motor. NOTE: If using an ultrasound grease gun add these steps to the Ultrasound Gun Procedure. 3. Inspect electric motor for visual defects (i.e. seals leakage, excessive build up in fins, grease fitting damage, etc.) 4. Remove grease relief plugs 5. Wipe off any debris or excess grease from zerk fitting and end of grease gun 6. Attach grease gun to appropriate zerk fitting 7. SLOWLY apply grease paying attention to any excessive back pressure on the grease gun a. If back pressure is felt, this could indicate the presence of hardened grease in the lines/tubes that should be cleaned out 8. Grease should be applied only to a volume that has been pre-determined either through OEM or calculated volumes. This information should be listed on your lubrication check sheet 9. If fresh grease is seen being expelled from relief port, discontinue application 10. Allow motor to run a minimum of 15 minutes prior to replacing relief plugs 11. Replace grease cap or put a small amount of grease on zerk fitting to help with contamination control Next Tool Box Session: Why Electric Motors Fail? Send me the estimated life of your current electric motors between 5-50 HP at rsmith@gpallied.com
  • 2. Lubricating an Electric Motor “TOOL BOX TRAINING” Instructor: Maintenance Supervisor If you would like any back issues of Tool Box Training Series send an email to rsmith@gpallied.com www.gpallied.com Copyright 2010 GPAllied 4360 Corporate Road Suite 110 Charleston, SC 29405 Office (843) 414-5760 Fax (843) 414-5779