Assessing and Managing Risks of
Product Portfolios


Ruedi Klein, NPDP, PMP

Product Manager

Alcatel-Lucent
Agenda


1. ‘Efficient Frontier’ of New Product Portfolios
2. Portfolio Risk Assessments
3. Integration of Portfolio and Project Risk Management




2 | Assessing and Managing Risks of Product Portfolios | May 2008   All Rights Reserved © Alcatel-Lucent 2007
State of the Mobility Market


                                                                    Double digit growth is a thing of the past
             Market Growth                                           • Growth areas for voice are China and India
                                                                     • In NAR, declining voice ARPU will be countered with blended
                                                                       offers driving data usage

                                                                    Data adoption remains a major opportunity
                                                                     • Beginning to see data demand in enterprises
              Market Trends                                          • Driven by lifestyle applications for mass market
                                                                     • IMS enables operators to capture these segments
                                                                       with blended services
                                                                    3G alternatives continue to generate interest
               Technologies                                          • EV-DO has first to market advantage
                                                                     • Wi-Fi and WiMAX distract the DO market

                                                                    Cost control and revenue growth still top priority
     Operator Challenges                                             • Capex and Opex efficiency still key in maturing markets
                                                                     • Squeezing value from embedded base while moving to Packet


                                                                    Market consolidation
   Landscape Challenges                                              • Non-traditional competitors entering to own “telecom wallet”
                                                                     • Legislative impacts


3 | Assessing and Managing Risks of Product Portfolios | May 2008          All Rights Reserved © Alcatel-Lucent 2007
1
                                 ‘Efficient Frontier’ of New Product
                                 Portfolios




4 | Assessing and Managing Risks of Product Portfolios | May 2008   All Rights Reserved © Alcatel-Lucent 2007
What is Product Portfolio Management?



Portfolio Management

A method to compare the attractiveness of alternative investments.

Unknown




Product Portfolio Management

Portfolio management is a dynamic decision process, whereby a business’s list of
active new product (and R&D) projects is constantly updated and revised. In this
process, new projects are evaluated, selected, and prioritized; existing projects
may be accelerated, killed, or deprioritized; and resources are allocated and
reallocated to the active projects.

Bob Cooper




5 | Assessing and Managing Risks of Product Portfolios | May 2008   All Rights Reserved © Alcatel-Lucent 2007
Objectives of Portfolio Management (*)

1. Maximization of Value
             Allocate Resources to maximize the Value of the Portfolio in terms of some
             Company Objective
2. Balance
             Achieve a balance of Projects in terms of a Number of Parameters
3. Strategic Direction
             Portfolio is strategically aligned and truly reflects the Business’s Strategy




                                ‘Strategic’ Projects
         A project is ‘strategic’, when the money will come outside the
       planning horizon. In business case lingo the project has a ‘Terminal
                                      Value’.

  (*) Cooper, Robert G.; Edgett, Scott J.; Kleinschmidt, Elko J.” Portfolio Management for New Products”,
  1998, Addison-Wesley
6 | Assessing and Managing Risks of Product Portfolios | May 2008   All Rights Reserved © Alcatel-Lucent 2007
Two Asset Investment Decision




     R2                                                                                                            A2
                                ρ = -1

                                                                    ρ=0                           ρ= 1

     R1
                                                                          A1
          Return




                          Risk                                        X1                                          X2


7 | Assessing and Managing Risks of Product Portfolios | May 2008     All Rights Reserved © Alcatel-Lucent 2007
Varying Investment Levels, result in varying Rate of Returns



                                  New Product
                                       Return
E(rG)                                                                                                            Asset
                                                                                                                Return
           Return




                             WACC


                          Investment Level
              New Products are better evaluated as Projects, not as ongoing
                                       Businesses
8 | Assessing and Managing Risks of Product Portfolios | May 2008   All Rights Reserved © Alcatel-Lucent 2007
Comparing Product to Asset Investments




     R2                                                                                                            P2
                                ρ = -1
                                                                                                                       Threats to
                                                                                                                       Independence
                                                                    ρ=0                           ρ= 1
                                                                                                                       1.Markets
                                                                                                                       2.Product Lines
     R1                                                                                                                3.Technology or
                                                                          P1                                           Platforms
          Return




                                                                                                                       4.Resources
                                                                                                                       5.Project Types



                          Risk                                        X1                                          X2
                “Put all your eggs in one basket and watch that basket!” &
               “Diversification is a hedge against stupidity!” – Warren Buffet
9 | Assessing and Managing Risks of Product Portfolios | May 2008     All Rights Reserved © Alcatel-Lucent 2007
Efficient Frontier for New Products (*)



                                                                     Two Portfolios

E(rG)
                                                                                                                      O2


                                                                                       O1
                                                                                                                           Individual
                                                                                                                           Projects
           Return




                             rf = WACC                                                                                     ‘Efficient’
                                                                                                                           Frontier

                          Risk                                                                          σG

(*) Efficient Portfolios were first mentioned in H.M. Markowitz, “Portfolio Selection”, Journal of Finance,
7:77-91 (March 1952)

10 | Assessing and Managing Risks of Product Portfolios | May 2008        All Rights Reserved © Alcatel-Lucent 2007
Limitations of Efficient Frontier Model

1. New Product Project Investment
       Levels and Returns are linked

            Return Rate drops as Project Investment
            Level differs from Optimum
            Optimum Portfolio is unlikely to result in
            Portfolio Investment Level at the
            Company’s R&D Budget Level

2. New Product Investments are rarely
       independent

3. Any Model purely based on IRR/NPV
       ignores the Existence and Value of
       Options




11 | Assessing and Managing Risks of Product Portfolios | May 2008   All Rights Reserved © Alcatel-Lucent 2007
Efficient Frontier Conclusion




      Helps to devise a New Product ‘Strategy’

      Enhances traditional Risk / Return Maps

      Visualizes the Return of New Product Projects

      Explains, why we need to subtract the WACC from Returns, when using Return / Risk
      Ratios for Prioritization


                       Theoretical Model, applicable to New Product Portfolios
12 | Assessing and Managing Risks of Product Portfolios | May 2008   All Rights Reserved © Alcatel-Lucent 2007
2
                                 Portfolio Risk Assessments




13 | Assessing and Managing Risks of Product Portfolios | May 2008   All Rights Reserved © Alcatel-Lucent 2007
Inputs to the Portfolio Decision

         Markets and Customer Lists                                               “The information you have is not the
         Resource Information and Total R&D                                      information you want.
         Spending Level                                                           The information you want is not the
         Products and R&D Project Lists                                          information you need.
         Business Cases                                                           The information you need is not the
                                                                                 information you can obtain.
         Risk Assessments                                                         The information you can obtain costs
                                                                                 more than you want to pay.”
                                                                                 – Anonymous




14 | Assessing and Managing Risks of Product Portfolios | May 2008   All Rights Reserved © Alcatel-Lucent 2007
Risk in Product Portfolio Management




                                               Quantities
               Unit Cost


                       R&D                      Unit Price
                                                                       &
                 Expense



         “Risk is the central element that influences financial behavior.” –
                               Robert C. Merton (1999)

15 | Assessing and Managing Risks of Product Portfolios | May 2008   All Rights Reserved © Alcatel-Lucent 2007
Most Success Factors in New Product Development are Not Technical (*)

1.            Unique, differentiated, superior Products
2.            Strong Market Orientation
3.            Sharp, early, fact-based Product Definition
4.            Solid up-front Homework (competitive, market, technical, and financial Studies)
5.            True cross-functional Teams
6.            Leverage (building on Core Strengths)
7.            Market Attractiveness
8.            Quality Launch Processes (well-executed Marketing Actions)
9.            Technical Competence/Technology Actions well-executed




      “Anything that won’t sell, I don’t want to invent. Its sale is proof of
                utility, and utility is success.” – Thomas Edison
(*) Source: Robert Cooper

16 | Assessing and Managing Risks of Product Portfolios | May 2008   All Rights Reserved © Alcatel-Lucent 2007
Uncertainty Reduction for Risk Areas (*)



                         High                                                                             Market                     Product Launch
                                                                                                          Acceptance
Level of Uncertainty




                                                                                                Product
                                                                          Product               Unit Cost
                       Medium                                             Performance




                                           Technical
                         Low               Feasibility

                                   0                        1                    2                                3              4            Years
      (*) Source: F.M. Scherer , "New Perspectives on Economic Growth and Technological Innovation"
      prepared for publication by the British-North American Committee, and derived from Merton J. Peck and
      Frederic M. Scherer, "Uncertainty and Time in Program Decisions" in The Weapons Acquisition Process:
      An Economic Analysis (Boston: Harvard Business School Press, 1962) pp. 299-323.
     17 | Assessing and Managing Risks of Product Portfolios | May 2008              All Rights Reserved © Alcatel-Lucent 2007
Risk Assessments


                                                                                    Delay                                          Volume / Quantities
                      Price                                          • What competitive Scenario does your
• What alternatives are buyers aware of                                                                                           • What specific markets does this Project
                                                                       Project face? (Consequence of Delay)
  when making a purchase?                                                                                                           support?
                                                                     • Does your Project have any 3rd Party
• Does the product have any unique                                                                                                • Who are the Key Customers for your
                                                                       Dependencies?
  attributes that differentiate it from                                                                                             Project and how many
                                                                     • When will the market/customer require
  competing products?                                                                                                             • Have customer commitments already been
                                                                       this Project?
• What amount of change, technological or                                                                                           made?
                                                                     • How long can we sell the product? The
  business will the customer be required to                                                                                       • What percentage of the project volume
                                                                       shorter the riskier.
  make?                                                                                                                             comes from current products?
                                                                     • Does your Project have any cross-
• How significant are buyers expenditures                                                                                         • There is a 10% chance that the volume of
                                                                       company Dependencies?
  for the product in absolute dollar terms?                                                                                         this project will be reduced by ___.
                                                                     • What is the probability that this project
• Product Expenditures (Cost) relative to                              will be delayed by one or more releases?
  End-Benefits?
• There is a 10% chance that the discounted
  price of this project will be reduced by ___.


                                                                            Profitability
                Unit Cost                                                      / NPV                                                     R&D Expense
• Have Target Costs been established?                                                                                             • What is the estimated size and complexity
• Has Lucent built something similar before?                            • Risk Scores capture                                       of this project?
• Are the hardware requirements clear and                                 Variability                                             • How much capital/other expense is
  stable?                                                                                                                           required?
• Is the Product Definition clear and stable?                           • Correlation Coefficients                                • How stable are the requirements?
• What phase is the project currently in?                                 capture Weights                                         • Availability and readiness of development
• What is the Cost Estimate based on?                                                                                               staff?
• How volume-sensitive is the Unit Cost?                                • Delay has Impact on                                     • Availability and readiness of test staff?
• There is a 10% chance that the unit cost of                             either Price or Volume                                  • What are the schedule risks for this
  this project will be increased by ___.                                • Validate Questions                                        project?
                                                                                                                                  • Availability and readiness of lab space /
                                                                                                                                    time?

18 | Assessing and Managing Risks of Product Portfolios | May 2008                    All Rights Reserved © Alcatel-Lucent 2007
Sample Assessment Question
Example: Pricing Risk / Sensitivity



Q19               How significant are buyers expenditures for the product in absolute dollar terms? Product Expenditures
                  relative to CAPEX?
                           Very Small / <1% of Total CAPEX   .............................................................................................................
                           Small / <5% of Total CAPEX ....................................................................................................................
                           Medium / <10% of Total CAPEX ................................................................................................................
                           High / <25% of Total CAPEX ....................................................................................................................
                           Very High / >25% of Total CAPEX .............................................................................................................




          Five Categories – Multiple-Choice
          Anchored Scales – As unambiguous as possible
          Easily answerable, if a Customer Value Proposition exists
          Run a Dry-Run with someone, who sees the Survey for the first Time
          Derive Risk Scores / Variability




(*) CAPEX – Capital Expenditures

19 | Assessing and Managing Risks of Product Portfolios | May 2008                     All Rights Reserved © Alcatel-Lucent 2007
Four Delay Scenarios

             Competition                                 Restricted Competition                                      Perfect Competition
                                                         (Interoperability Issues                                   (Standard Interfaces /
Product                                                     /Network Effects)                                       standalone Products)
Growth
No-Growth                                            Customers don’t switch to                             Customers switch to Competing
                                                    Competition                                           Products
Products                                             Volume overall stays same – Price                     Volume is reduced throughout
                                                    somewhat reduced                                      Lifecycle



High-Growth                                          Customers don’t switch to                             Customers switch to Competing
                                                    Competition                                           Products
Products                                             Volume overall stays same – Price                     Volume is reduced throughout
                                                    somewhat reduced                                      Lifecycle, but more severely in
                                                     Margins depressed more severely                      later Stages, due to lower Growth
                                                    in later Stages                                       Sales


   Just Two Parameters: 1) Delay Time and 2) Percent Revenue Reduction
                             (Price or Volume)
 20 | Assessing and Managing Risks of Product Portfolios | May 2008     All Rights Reserved © Alcatel-Lucent 2007
Four Delay Scenarios – Revenue Outcomes (*)

         Case 1 – No-Growth / Restricted Competition                                                                  120%
                                                                                                                                       Case 2 – No-Growth / Perfect Competition
120%

100%                                                                                                                  100%

 80%                                                                                                                   80%

 60%                                                                                                                   60%

 40%                                                                                                                   40%

 20%                                                                                                                   20%

  0%                                                                                                                     0%




                                                                                                                               Y1-Q1


                                                                                                                                         Y1-Q3


                                                                                                                                                   Y2-Q1


                                                                                                                                                               Y2-Q3


                                                                                                                                                                         Y3-Q1


                                                                                                                                                                                  Y3-Q3


                                                                                                                                                                                           Y4-Q1


                                                                                                                                                                                                      Y4-Q3


                                                                                                                                                                                                               Y5-Q1


                                                                                                                                                                                                                        Y5-Q3


                                                                                                                                                                                                                                Y6-Q1


                                                                                                                                                                                                                                        Y6-Q3
         Y1-Q1


                 Y1-Q3


                         Y2-Q1


                                   Y2-Q3


                                           Y3-Q1


                                                   Y3-Q3


                                                            Y4-Q1


                                                                       Y4-Q3


                                                                               Y5-Q1


                                                                                       Y5-Q3


                                                                                               Y6-Q1


                                                                                                       Y6-Q3
                                 Initial Sales - Baseline           Total Sales - Case 1                                                                     Initial Sales - Baseline               Total Sales - Case 2

         Case 3 – Hi-Growth / Restricted Competition                                                                                   Case 4 – Hi-Growth / Perfect Competition
250%                                                                                                                   250%

200%                                                                                                                   200%

150%                                                                                                                   150%

100%                                                                                                                   100%

 50%                                                                                                                     50%

  0%                                                                                                                      0%
                                                                                                                                 Y1-Q1


                                                                                                                                           Y1-Q3


                                                                                                                                                     Y2-Q1


                                                                                                                                                                 Y2-Q3


                                                                                                                                                                          Y3-Q1


                                                                                                                                                                                   Y3-Q3


                                                                                                                                                                                            Y4-Q1


                                                                                                                                                                                                       Y4-Q3


                                                                                                                                                                                                                Y5-Q1


                                                                                                                                                                                                                        Y5-Q3


                                                                                                                                                                                                                                Y6-Q1


                                                                                                                                                                                                                                        Y6-Q3
         Y1-Q1


                 Y1-Q3


                         Y2-Q1


                                   Y2-Q3


                                           Y3-Q1


                                                   Y3-Q3


                                                            Y4-Q1


                                                                       Y4-Q3


                                                                               Y5-Q1


                                                                                       Y5-Q3


                                                                                               Y6-Q1


                                                                                                       Y6-Q3




                                 Initial Sales - Baseline           Total Sales - Baseline                                                                   Initial Sales - Baseline               Total Sales - Baseline
                                 Initial Sales - Case 3             Total Sales - Case 3                                                                     Initial Sales - Case 4                 Total Sales - Case 4
(*) Partial Source: Preston Smith, Don Reinertsen, ‘Developing Products in Half the Time’
       21 | Assessing and Managing Risks of Product Portfolios | May 2008                                      All Rights Reserved © Alcatel-Lucent 2007
NPV Probability Distribution and Risk Weights / Impacts


                      Net Present Value Probability
                                                                                                                            Tornado Diagram
                              Distribution
           1.6
                                                                                                      Unit Price                                                                            0.826
                                                      M ean = 387217.5
           1.4

           1.2
                                                                                                         Volume                                                               0.485
             1

           0.8

           0.6                                                                                         Unit Cost                            -0.34

           0.4

           0.2                                                                                 R&D Expense                                           -0.028

             0
             -$0.4                $0.0                $0.4               $0.8   $1.2                                    -1    -0.8   -0.6    -0.4   -0.2      0   0.2   0.4    0.6    0.8       1

                                         Values in Millions
                                                                                                                                             Std b Coefficients


          Positive Business with a low Probability to fall below NPV=$0

          Wide Range of possible Outcomes

          Typical Profile of Influence Factor Impact on NPV

          R&D Expense, while an important Constraint, is almost never the
                   Factor with the most Impact on Profitability
22 | Assessing and Managing Risks of Product Portfolios | May 2008              All Rights Reserved © Alcatel-Lucent 2007
Portfolio Risk Map (*)


               100%


                                                                                                                                 50%
            Probability
             NPV < 0




                                                                                                                                        Expected
                                                                                                                                        Losses



                  10%
                                  $1,000                             $10,000             $100,000                          $1,000,000
                                                                        Maximum Loss
                                                                                  [000s]
(*) Adapted from Preston G. Smith and Guy M. Merritt, “Proactive Risk Management – Controlling
Uncertainty in Product Development”, 2002, Productivity Press
23 | Assessing and Managing Risks of Product Portfolios | May 2008             All Rights Reserved © Alcatel-Lucent 2007
3
                                 Integration of Portfolio and Project Risk
                                 Management




24 | Assessing and Managing Risks of Product Portfolios | May 2008   All Rights Reserved © Alcatel-Lucent 2007
CMMi Risk Management Process Area (*)


                              Prepare for Risk Management
                                                                                                                               Identify and
           Determine                                                                                Establish                 Analyze Risks
          Risk Sources                                         Define Risk                           A Risk
              And                                              Parameters                          Management
           Categories                                                                               Strategy
                                                                                                                                 Identify
                                                                                                                                  Risks



                                                                              Risk Repository


                                                                                                                                Evaluate,
                                                                                                                               Categorize,
                                                                                 Mitigate                                     And Prioritize
                                                                Implement         Risks               Develop                    Risks
                                                                   Risk                                 Risk
                                                                 Mitigation                           Mitigation
                                                                  Plans                                Plans


(*) © 2002 by Carnegie Mellon University

25 | Assessing and Managing Risks of Product Portfolios | May 2008                All Rights Reserved © Alcatel-Lucent 2007
Project Level Risk Analysis (*)

  Probability of                                                     Probability of
  Risk Event                                                         Impact
  Ex. 30%                                                            Ex. 80%


                                                                                                                       Total
                            Risk Event                                                        Impact
                                                                                                                       Loss
                     Ex. Gate 1 Postponed                                        Ex. Delay Release by 2
                                                                                 Weeks                                 Ex. Missed
                                                                                                                       major Customer
                                                                                                                       Budget Cycle
  Risk Event                                                         Impact Driver(s)                                  $50M NPV
  Driver(s)
  Ex. Dev. Not ready to                                              Ex. Takes 2 Weeks to re-
  commit                                                             schedule Gates
      “Volatility per se, be it related to weather, portfolio returns, or the
        timing of one’s morning newspaper delivery, is simply a benign
       statistical probability factor that tells us nothing about risk until
            coupled with a consequence” – Robert H. Jeffrey, 1984
(*) Source: Preston G. Smith and Guy M. Merritt, “Proactive Risk Management – Controlling Uncertainty
in Product Development”, 2002, Productivity Press
26 | Assessing and Managing Risks of Product Portfolios | May 2008         All Rights Reserved © Alcatel-Lucent 2007
Sc
                                                                                                h   e




                                                                                                                0
                                                                                                                5
                                                                                                               10
                                                                                                               15
                                                                                                               20
                                                                                                               25
                                                                                                               30
                                                                                                               35
                                                                                                               40
                                                                                                               45
                                                                                             R dule
                                                                                                es
                                                                                                   ou
                                                                                                       rc
                                                                                     Fe So e
                                                                                        a t f tw
                                                                                            ur         ar
                                                                                                e
                                                                                                   C e
                                                                                                     h




27 | Assessing and Managing Risks of Product Portfolios | May 2008
                                                                                             H urn
                                                                                      T e ar d
                                                                                          ch w a
                                                                                               no re
                                                                                                  lo
                                                                                                     gi
                                                                                                       c
                                                                                                Pr al
                                                                                                                    Typical Distribution of Technical Risks




                                                                                                   oc
                                                                               Pr                      es
                                                                                   od                     s
                                                                                       uc
                                                                                           t R Co
                                                                                                oa st
                                                                                                   dm
                                                                          Ve Re                 Ex ap
                                                                               nd qu ter n
                                                                                                         a


    All Rights Reserved © Alcatel-Lucent 2007
                                                                                   or          ir
                                                                     O                 Pe em l
                                                                       rg                   r fo e n t
                                                                         an                      rm s
                                                                            iz            C         a
                                                                               at
                                                                                  io         o n nc
                                                                                     na          tra e
                                                                                        l /M c
                                                                                              an tua
                                                                                                  ag l
                                                                                                     er
                                                                                                        ia
                                                                                                           l
Risk Resolution Process (*)



                                                                     Review Risks



                       Defer Action for                              Take no Action                                   Develop Action
                          more Info                                   (Accept Risk)                                       Plans



       Avoid Risk                                    Transfer Risk to a                        Provide                           Mitigate Risk
                                                         3rd Party                           Redundancy



                                                      Prevention of the                 Contingency if                            Reserves of
                                                         Risk Event                   Risk Event Occurs                         Budget/Schedule


(*) Source: Preston G. Smith and Guy M. Merritt, “Proactive Risk Management – Controlling Uncertainty
in Product Development”, 2002, Productivity Press
28 | Assessing and Managing Risks of Product Portfolios | May 2008        All Rights Reserved © Alcatel-Lucent 2007
Risk Management Benefits and Uses

     Crucial Part of Investment
     Evaluation

     Integration with Project
     Management is 2-Way

     Risk Assessment –Continuity is Key

     Lower Costs and less Chaos




29 | Assessing and Managing Risks of Product Portfolios | May 2008   All Rights Reserved © Alcatel-Lucent 2007
Next Steps – Implementation


1. Start with a Review / Identify Areas of Weakness
2. Put in Place a simple regular Risk Assessment within your
   Portfolio Review Process
3. Using Prompt Lists
4. Covering the whole Portfolio
5. Involving all Stakeholders
6. Follow-Through
7. Making sure identified Risks are addressed
8. Risks are known throughout Company
9. Don’t let Risk get a bad Name


       “In preparing for Battle I have always found that Plans are useless,
              but Planning is indispensable.” – Dwight Eisenhower
30 | Assessing and Managing Risks of Product Portfolios | May 2008   All Rights Reserved © Alcatel-Lucent 2007
www.alcatel-lucent.com

                                          Ruedi Klein, NPDP, PMP
                                          Product Manager
                                          Alcatel-Lucent
                                          Tel. (973) 386-6695
                                          ruediklein@alcatel-lucent.com
                                          http://www.alcatel-lucent.com




31 | Assessing and Managing Risks of Product Portfolios | May 2008   All Rights Reserved © Alcatel-Lucent 2007

Contenu connexe

Tendances

Lean Product Management for Web 2.0 Products
Lean Product Management for Web 2.0 ProductsLean Product Management for Web 2.0 Products
Lean Product Management for Web 2.0 ProductsDan Olsen
 
Benefits Identification, Assessment, Validation and Realisation for Informati...
Benefits Identification, Assessment, Validation and Realisation for Informati...Benefits Identification, Assessment, Validation and Realisation for Informati...
Benefits Identification, Assessment, Validation and Realisation for Informati...Alan McSweeney
 
Value analysis with Value Stream and Capability modeling
Value analysis with Value Stream and Capability modelingValue analysis with Value Stream and Capability modeling
Value analysis with Value Stream and Capability modelingCOMPETENSIS
 
Agile Product Development Playbook - Popular Tools and Techniques
Agile Product Development Playbook - Popular Tools and TechniquesAgile Product Development Playbook - Popular Tools and Techniques
Agile Product Development Playbook - Popular Tools and TechniquesAndy Birds
 
ArchiMate application and data architecture layer - Simplify the models
ArchiMate application and data architecture layer - Simplify the modelsArchiMate application and data architecture layer - Simplify the models
ArchiMate application and data architecture layer - Simplify the modelsCOMPETENSIS
 
Solution architecture
Solution architectureSolution architecture
Solution architectureiasaglobal
 
Business capability mapping and business architecture
Business capability mapping and business architectureBusiness capability mapping and business architecture
Business capability mapping and business architectureSatyaIluri
 
Object Oriented Business Capability Map - IIBA 2022 - Draft.pptx
Object Oriented Business Capability Map - IIBA 2022 - Draft.pptxObject Oriented Business Capability Map - IIBA 2022 - Draft.pptx
Object Oriented Business Capability Map - IIBA 2022 - Draft.pptxAustraliaChapterIIBA
 
Large Scale Agile Transformation in Government: Field report
Large Scale Agile Transformation in Government: Field reportLarge Scale Agile Transformation in Government: Field report
Large Scale Agile Transformation in Government: Field reportCGI Québec Formation
 
Product Management 101: #1 How To Create Products Customer Love.
Product Management 101: #1 How To Create Products Customer Love.Product Management 101: #1 How To Create Products Customer Love.
Product Management 101: #1 How To Create Products Customer Love.Jean-Yves SIMON
 
The Future of Business Applications
The Future of Business ApplicationsThe Future of Business Applications
The Future of Business ApplicationsOrangeScape
 
Agile2009 Product Manager - Product Owner Dilemma
Agile2009 Product Manager - Product Owner DilemmaAgile2009 Product Manager - Product Owner Dilemma
Agile2009 Product Manager - Product Owner DilemmaEnthiosys Inc
 
CAPABILITY & CAPACITE - Guide de survie en Business Architecture n°1
CAPABILITY & CAPACITE - Guide de survie en Business Architecture n°1CAPABILITY & CAPACITE - Guide de survie en Business Architecture n°1
CAPABILITY & CAPACITE - Guide de survie en Business Architecture n°1COMPETENSIS
 
Enterprise Data Architecture Deliverables
Enterprise Data Architecture DeliverablesEnterprise Data Architecture Deliverables
Enterprise Data Architecture DeliverablesLars E Martinsson
 
Strategic Planning With A Business Capability Map
Strategic Planning With A Business Capability MapStrategic Planning With A Business Capability Map
Strategic Planning With A Business Capability MapAcorn
 
Finding Product / Market Fit: Introducing the PMF Matrix - Presentation by Ri...
Finding Product / Market Fit: Introducing the PMF Matrix - Presentation by Ri...Finding Product / Market Fit: Introducing the PMF Matrix - Presentation by Ri...
Finding Product / Market Fit: Introducing the PMF Matrix - Presentation by Ri...Rishi Dean
 
Lean Inception: how to align people and build the right product
Lean Inception: how to align people and build the right productLean Inception: how to align people and build the right product
Lean Inception: how to align people and build the right productPaulo Caroli
 
Information Architecture - Sample Artifacts
Information Architecture - Sample ArtifactsInformation Architecture - Sample Artifacts
Information Architecture - Sample ArtifactsMichael Moir
 
The Agile BA (Business Analyst)
The Agile BA (Business Analyst)The Agile BA (Business Analyst)
The Agile BA (Business Analyst)Bill Gaiennie
 

Tendances (20)

Lean Product Management for Web 2.0 Products
Lean Product Management for Web 2.0 ProductsLean Product Management for Web 2.0 Products
Lean Product Management for Web 2.0 Products
 
Benefits Identification, Assessment, Validation and Realisation for Informati...
Benefits Identification, Assessment, Validation and Realisation for Informati...Benefits Identification, Assessment, Validation and Realisation for Informati...
Benefits Identification, Assessment, Validation and Realisation for Informati...
 
Value analysis with Value Stream and Capability modeling
Value analysis with Value Stream and Capability modelingValue analysis with Value Stream and Capability modeling
Value analysis with Value Stream and Capability modeling
 
Agile Product Development Playbook - Popular Tools and Techniques
Agile Product Development Playbook - Popular Tools and TechniquesAgile Product Development Playbook - Popular Tools and Techniques
Agile Product Development Playbook - Popular Tools and Techniques
 
ArchiMate application and data architecture layer - Simplify the models
ArchiMate application and data architecture layer - Simplify the modelsArchiMate application and data architecture layer - Simplify the models
ArchiMate application and data architecture layer - Simplify the models
 
Solution architecture
Solution architectureSolution architecture
Solution architecture
 
Business capability mapping and business architecture
Business capability mapping and business architectureBusiness capability mapping and business architecture
Business capability mapping and business architecture
 
Object Oriented Business Capability Map - IIBA 2022 - Draft.pptx
Object Oriented Business Capability Map - IIBA 2022 - Draft.pptxObject Oriented Business Capability Map - IIBA 2022 - Draft.pptx
Object Oriented Business Capability Map - IIBA 2022 - Draft.pptx
 
Large Scale Agile Transformation in Government: Field report
Large Scale Agile Transformation in Government: Field reportLarge Scale Agile Transformation in Government: Field report
Large Scale Agile Transformation in Government: Field report
 
Product Management 101: #1 How To Create Products Customer Love.
Product Management 101: #1 How To Create Products Customer Love.Product Management 101: #1 How To Create Products Customer Love.
Product Management 101: #1 How To Create Products Customer Love.
 
The Future of Business Applications
The Future of Business ApplicationsThe Future of Business Applications
The Future of Business Applications
 
Agile2009 Product Manager - Product Owner Dilemma
Agile2009 Product Manager - Product Owner DilemmaAgile2009 Product Manager - Product Owner Dilemma
Agile2009 Product Manager - Product Owner Dilemma
 
CAPABILITY & CAPACITE - Guide de survie en Business Architecture n°1
CAPABILITY & CAPACITE - Guide de survie en Business Architecture n°1CAPABILITY & CAPACITE - Guide de survie en Business Architecture n°1
CAPABILITY & CAPACITE - Guide de survie en Business Architecture n°1
 
Enterprise Data Architecture Deliverables
Enterprise Data Architecture DeliverablesEnterprise Data Architecture Deliverables
Enterprise Data Architecture Deliverables
 
Strategic Planning With A Business Capability Map
Strategic Planning With A Business Capability MapStrategic Planning With A Business Capability Map
Strategic Planning With A Business Capability Map
 
Finding Product / Market Fit: Introducing the PMF Matrix - Presentation by Ri...
Finding Product / Market Fit: Introducing the PMF Matrix - Presentation by Ri...Finding Product / Market Fit: Introducing the PMF Matrix - Presentation by Ri...
Finding Product / Market Fit: Introducing the PMF Matrix - Presentation by Ri...
 
Lean Inception: how to align people and build the right product
Lean Inception: how to align people and build the right productLean Inception: how to align people and build the right product
Lean Inception: how to align people and build the right product
 
Information Architecture - Sample Artifacts
Information Architecture - Sample ArtifactsInformation Architecture - Sample Artifacts
Information Architecture - Sample Artifacts
 
Product Market Fit and Beyond
Product Market Fit and BeyondProduct Market Fit and Beyond
Product Market Fit and Beyond
 
The Agile BA (Business Analyst)
The Agile BA (Business Analyst)The Agile BA (Business Analyst)
The Agile BA (Business Analyst)
 

En vedette

Portfolio Management
Portfolio ManagementPortfolio Management
Portfolio ManagementSVPMA
 
Demystifying ISO 20000-1 Standard
Demystifying ISO 20000-1 StandardDemystifying ISO 20000-1 Standard
Demystifying ISO 20000-1 StandardNUS-ISS
 
Experience from Implementation of ISO 20000
Experience from Implementation of ISO 20000Experience from Implementation of ISO 20000
Experience from Implementation of ISO 20000Ana Meskovska
 
CMMi level 3 presentation
CMMi level 3 presentationCMMi level 3 presentation
CMMi level 3 presentationadinmani
 
Iso 20000 standard implementation
Iso 20000 standard implementationIso 20000 standard implementation
Iso 20000 standard implementationIITSW Company
 
What is ISO20000
What is ISO20000What is ISO20000
What is ISO20000Ben Kalland
 
How to Use Your Product Roadmap as a Communication Tool
How to Use Your Product Roadmap as a Communication ToolHow to Use Your Product Roadmap as a Communication Tool
How to Use Your Product Roadmap as a Communication ToolJanna Bastow
 
Implementing Enterprise Risk Management with ISO 31000:2009
Implementing Enterprise Risk Management with ISO 31000:2009Implementing Enterprise Risk Management with ISO 31000:2009
Implementing Enterprise Risk Management with ISO 31000:2009Goutama Bachtiar
 
Project Portfolio Management
Project Portfolio ManagementProject Portfolio Management
Project Portfolio ManagementAnand Subramaniam
 
Understanding IT Governance and Risk Management
Understanding IT Governance and Risk ManagementUnderstanding IT Governance and Risk Management
Understanding IT Governance and Risk Managementjiricejka
 

En vedette (13)

Portfolio Management
Portfolio ManagementPortfolio Management
Portfolio Management
 
Program portfolio risk management solutions
Program portfolio risk management solutionsProgram portfolio risk management solutions
Program portfolio risk management solutions
 
Demystifying ISO 20000-1 Standard
Demystifying ISO 20000-1 StandardDemystifying ISO 20000-1 Standard
Demystifying ISO 20000-1 Standard
 
Iso 20000 presentation
Iso 20000 presentationIso 20000 presentation
Iso 20000 presentation
 
Experience from Implementation of ISO 20000
Experience from Implementation of ISO 20000Experience from Implementation of ISO 20000
Experience from Implementation of ISO 20000
 
CMMi level 3 presentation
CMMi level 3 presentationCMMi level 3 presentation
CMMi level 3 presentation
 
Iso 20000 standard implementation
Iso 20000 standard implementationIso 20000 standard implementation
Iso 20000 standard implementation
 
What is ISO20000
What is ISO20000What is ISO20000
What is ISO20000
 
How to Use Your Product Roadmap as a Communication Tool
How to Use Your Product Roadmap as a Communication ToolHow to Use Your Product Roadmap as a Communication Tool
How to Use Your Product Roadmap as a Communication Tool
 
Implementing Enterprise Risk Management with ISO 31000:2009
Implementing Enterprise Risk Management with ISO 31000:2009Implementing Enterprise Risk Management with ISO 31000:2009
Implementing Enterprise Risk Management with ISO 31000:2009
 
Project Portfolio Management
Project Portfolio ManagementProject Portfolio Management
Project Portfolio Management
 
Understanding IT Governance and Risk Management
Understanding IT Governance and Risk ManagementUnderstanding IT Governance and Risk Management
Understanding IT Governance and Risk Management
 
Risk Management Framework
Risk Management FrameworkRisk Management Framework
Risk Management Framework
 

Similaire à Product Portfolio Risk Management

Wave Energy Startup - Richard Yemm - Pelamis Wave Power - Stanford May409
Wave Energy Startup - Richard Yemm - Pelamis Wave Power - Stanford May409Wave Energy Startup - Richard Yemm - Pelamis Wave Power - Stanford May409
Wave Energy Startup - Richard Yemm - Pelamis Wave Power - Stanford May409Burton Lee
 
Key Banc Conference Final[1]
Key Banc Conference Final[1]Key Banc Conference Final[1]
Key Banc Conference Final[1]BSTRINGE
 
Energy Commercialization Background 07 29 2011[Compatibility Mode]
Energy Commercialization Background 07 29 2011[Compatibility Mode]Energy Commercialization Background 07 29 2011[Compatibility Mode]
Energy Commercialization Background 07 29 2011[Compatibility Mode]kevincobrien
 
Sitra Hans Nilsson FourFact 2012-6-7
Sitra Hans Nilsson FourFact 2012-6-7Sitra Hans Nilsson FourFact 2012-6-7
Sitra Hans Nilsson FourFact 2012-6-7Sitra Energia
 
Intrapreneurship at Alcatel-Lucent
Intrapreneurship at Alcatel-LucentIntrapreneurship at Alcatel-Lucent
Intrapreneurship at Alcatel-LucentJean-Yves Huwart
 
energy future holindings _062805
energy future holindings _062805energy future holindings _062805
energy future holindings _062805finance29
 
energy future holindings 062805
energy future holindings 062805energy future holindings 062805
energy future holindings 062805finance29
 
Aero project 2013- Herve CALMELLY
Aero project 2013- Herve CALMELLYAero project 2013- Herve CALMELLY
Aero project 2013- Herve CALMELLYHervé Calmelly
 
PMG Oct 2011 Patents and intellectual property 101 for product managers final
PMG Oct 2011 Patents and intellectual property 101 for product managers finalPMG Oct 2011 Patents and intellectual property 101 for product managers final
PMG Oct 2011 Patents and intellectual property 101 for product managers finalDerek Pettingale
 
Global Water Investment Conference June 20, 2012
Global Water Investment Conference   June 20, 2012Global Water Investment Conference   June 20, 2012
Global Water Investment Conference June 20, 2012BSTRINGE
 
Dymedex Exec Overview 1 Brief
Dymedex Exec Overview 1 BriefDymedex Exec Overview 1 Brief
Dymedex Exec Overview 1 Briefrmeisner66
 
Presentation Susan Mc Lean
Presentation Susan Mc LeanPresentation Susan Mc Lean
Presentation Susan Mc LeanONEIA
 
Eirmaapril08jirevwebsite
Eirmaapril08jirevwebsiteEirmaapril08jirevwebsite
Eirmaapril08jirevwebsiteJohnIrven
 
Analysis design gsw
Analysis design gswAnalysis design gsw
Analysis design gswwoznite65
 
Sterne Agee Harvest Fest Conference
Sterne Agee Harvest Fest ConferenceSterne Agee Harvest Fest Conference
Sterne Agee Harvest Fest Conferencefinance40
 
PacWest E&P Vertical Integration Trends, Nov 2011
PacWest E&P Vertical Integration Trends, Nov 2011PacWest E&P Vertical Integration Trends, Nov 2011
PacWest E&P Vertical Integration Trends, Nov 2011PacWest Consulting Partners
 

Similaire à Product Portfolio Risk Management (20)

Wave Energy Startup - Richard Yemm - Pelamis Wave Power - Stanford May409
Wave Energy Startup - Richard Yemm - Pelamis Wave Power - Stanford May409Wave Energy Startup - Richard Yemm - Pelamis Wave Power - Stanford May409
Wave Energy Startup - Richard Yemm - Pelamis Wave Power - Stanford May409
 
Key Banc Conference Final[1]
Key Banc Conference Final[1]Key Banc Conference Final[1]
Key Banc Conference Final[1]
 
TEX110308
TEX110308TEX110308
TEX110308
 
Energy Commercialization Background 07 29 2011[Compatibility Mode]
Energy Commercialization Background 07 29 2011[Compatibility Mode]Energy Commercialization Background 07 29 2011[Compatibility Mode]
Energy Commercialization Background 07 29 2011[Compatibility Mode]
 
Sitra Hans Nilsson FourFact 2012-6-7
Sitra Hans Nilsson FourFact 2012-6-7Sitra Hans Nilsson FourFact 2012-6-7
Sitra Hans Nilsson FourFact 2012-6-7
 
Intrapreneurship at Alcatel-Lucent
Intrapreneurship at Alcatel-LucentIntrapreneurship at Alcatel-Lucent
Intrapreneurship at Alcatel-Lucent
 
energy future holindings _062805
energy future holindings _062805energy future holindings _062805
energy future holindings _062805
 
energy future holindings 062805
energy future holindings 062805energy future holindings 062805
energy future holindings 062805
 
Aero project 2013- Herve CALMELLY
Aero project 2013- Herve CALMELLYAero project 2013- Herve CALMELLY
Aero project 2013- Herve CALMELLY
 
PMG Oct 2011 Patents and intellectual property 101 for product managers final
PMG Oct 2011 Patents and intellectual property 101 for product managers finalPMG Oct 2011 Patents and intellectual property 101 for product managers final
PMG Oct 2011 Patents and intellectual property 101 for product managers final
 
TEX110308
TEX110308TEX110308
TEX110308
 
Global Water Investment Conference June 20, 2012
Global Water Investment Conference   June 20, 2012Global Water Investment Conference   June 20, 2012
Global Water Investment Conference June 20, 2012
 
Dymedex Exec Overview 1 Brief
Dymedex Exec Overview 1 BriefDymedex Exec Overview 1 Brief
Dymedex Exec Overview 1 Brief
 
Presentation Susan Mc Lean
Presentation Susan Mc LeanPresentation Susan Mc Lean
Presentation Susan Mc Lean
 
Eirmaapril08jirevwebsite
Eirmaapril08jirevwebsiteEirmaapril08jirevwebsite
Eirmaapril08jirevwebsite
 
Analysis design gsw
Analysis design gswAnalysis design gsw
Analysis design gsw
 
Sterne Agee Harvest Fest Conference
Sterne Agee Harvest Fest ConferenceSterne Agee Harvest Fest Conference
Sterne Agee Harvest Fest Conference
 
PacWest E&P Vertical Integration Trends, Nov 2011
PacWest E&P Vertical Integration Trends, Nov 2011PacWest E&P Vertical Integration Trends, Nov 2011
PacWest E&P Vertical Integration Trends, Nov 2011
 
Cogentic Case Studies 2010 Q4
Cogentic  Case Studies 2010  Q4Cogentic  Case Studies 2010  Q4
Cogentic Case Studies 2010 Q4
 
The Multiple Benefits of Efficiency Policies
The Multiple Benefits of Efficiency PoliciesThe Multiple Benefits of Efficiency Policies
The Multiple Benefits of Efficiency Policies
 

Dernier

How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 

Dernier (20)

How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 

Product Portfolio Risk Management

  • 1. Assessing and Managing Risks of Product Portfolios Ruedi Klein, NPDP, PMP Product Manager Alcatel-Lucent
  • 2. Agenda 1. ‘Efficient Frontier’ of New Product Portfolios 2. Portfolio Risk Assessments 3. Integration of Portfolio and Project Risk Management 2 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 3. State of the Mobility Market Double digit growth is a thing of the past Market Growth • Growth areas for voice are China and India • In NAR, declining voice ARPU will be countered with blended offers driving data usage Data adoption remains a major opportunity • Beginning to see data demand in enterprises Market Trends • Driven by lifestyle applications for mass market • IMS enables operators to capture these segments with blended services 3G alternatives continue to generate interest Technologies • EV-DO has first to market advantage • Wi-Fi and WiMAX distract the DO market Cost control and revenue growth still top priority Operator Challenges • Capex and Opex efficiency still key in maturing markets • Squeezing value from embedded base while moving to Packet Market consolidation Landscape Challenges • Non-traditional competitors entering to own “telecom wallet” • Legislative impacts 3 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 4. 1 ‘Efficient Frontier’ of New Product Portfolios 4 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 5. What is Product Portfolio Management? Portfolio Management A method to compare the attractiveness of alternative investments. Unknown Product Portfolio Management Portfolio management is a dynamic decision process, whereby a business’s list of active new product (and R&D) projects is constantly updated and revised. In this process, new projects are evaluated, selected, and prioritized; existing projects may be accelerated, killed, or deprioritized; and resources are allocated and reallocated to the active projects. Bob Cooper 5 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 6. Objectives of Portfolio Management (*) 1. Maximization of Value Allocate Resources to maximize the Value of the Portfolio in terms of some Company Objective 2. Balance Achieve a balance of Projects in terms of a Number of Parameters 3. Strategic Direction Portfolio is strategically aligned and truly reflects the Business’s Strategy ‘Strategic’ Projects A project is ‘strategic’, when the money will come outside the planning horizon. In business case lingo the project has a ‘Terminal Value’. (*) Cooper, Robert G.; Edgett, Scott J.; Kleinschmidt, Elko J.” Portfolio Management for New Products”, 1998, Addison-Wesley 6 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 7. Two Asset Investment Decision R2 A2 ρ = -1 ρ=0 ρ= 1 R1 A1 Return Risk X1 X2 7 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 8. Varying Investment Levels, result in varying Rate of Returns New Product Return E(rG) Asset Return Return WACC Investment Level New Products are better evaluated as Projects, not as ongoing Businesses 8 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 9. Comparing Product to Asset Investments R2 P2 ρ = -1 Threats to Independence ρ=0 ρ= 1 1.Markets 2.Product Lines R1 3.Technology or P1 Platforms Return 4.Resources 5.Project Types Risk X1 X2 “Put all your eggs in one basket and watch that basket!” & “Diversification is a hedge against stupidity!” – Warren Buffet 9 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 10. Efficient Frontier for New Products (*) Two Portfolios E(rG) O2 O1 Individual Projects Return rf = WACC ‘Efficient’ Frontier Risk σG (*) Efficient Portfolios were first mentioned in H.M. Markowitz, “Portfolio Selection”, Journal of Finance, 7:77-91 (March 1952) 10 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 11. Limitations of Efficient Frontier Model 1. New Product Project Investment Levels and Returns are linked Return Rate drops as Project Investment Level differs from Optimum Optimum Portfolio is unlikely to result in Portfolio Investment Level at the Company’s R&D Budget Level 2. New Product Investments are rarely independent 3. Any Model purely based on IRR/NPV ignores the Existence and Value of Options 11 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 12. Efficient Frontier Conclusion Helps to devise a New Product ‘Strategy’ Enhances traditional Risk / Return Maps Visualizes the Return of New Product Projects Explains, why we need to subtract the WACC from Returns, when using Return / Risk Ratios for Prioritization Theoretical Model, applicable to New Product Portfolios 12 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 13. 2 Portfolio Risk Assessments 13 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 14. Inputs to the Portfolio Decision Markets and Customer Lists “The information you have is not the Resource Information and Total R&D information you want. Spending Level The information you want is not the Products and R&D Project Lists information you need. Business Cases The information you need is not the information you can obtain. Risk Assessments The information you can obtain costs more than you want to pay.” – Anonymous 14 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 15. Risk in Product Portfolio Management Quantities Unit Cost R&D Unit Price & Expense “Risk is the central element that influences financial behavior.” – Robert C. Merton (1999) 15 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 16. Most Success Factors in New Product Development are Not Technical (*) 1. Unique, differentiated, superior Products 2. Strong Market Orientation 3. Sharp, early, fact-based Product Definition 4. Solid up-front Homework (competitive, market, technical, and financial Studies) 5. True cross-functional Teams 6. Leverage (building on Core Strengths) 7. Market Attractiveness 8. Quality Launch Processes (well-executed Marketing Actions) 9. Technical Competence/Technology Actions well-executed “Anything that won’t sell, I don’t want to invent. Its sale is proof of utility, and utility is success.” – Thomas Edison (*) Source: Robert Cooper 16 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 17. Uncertainty Reduction for Risk Areas (*) High Market Product Launch Acceptance Level of Uncertainty Product Product Unit Cost Medium Performance Technical Low Feasibility 0 1 2 3 4 Years (*) Source: F.M. Scherer , "New Perspectives on Economic Growth and Technological Innovation" prepared for publication by the British-North American Committee, and derived from Merton J. Peck and Frederic M. Scherer, "Uncertainty and Time in Program Decisions" in The Weapons Acquisition Process: An Economic Analysis (Boston: Harvard Business School Press, 1962) pp. 299-323. 17 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 18. Risk Assessments Delay Volume / Quantities Price • What competitive Scenario does your • What alternatives are buyers aware of • What specific markets does this Project Project face? (Consequence of Delay) when making a purchase? support? • Does your Project have any 3rd Party • Does the product have any unique • Who are the Key Customers for your Dependencies? attributes that differentiate it from Project and how many • When will the market/customer require competing products? • Have customer commitments already been this Project? • What amount of change, technological or made? • How long can we sell the product? The business will the customer be required to • What percentage of the project volume shorter the riskier. make? comes from current products? • Does your Project have any cross- • How significant are buyers expenditures • There is a 10% chance that the volume of company Dependencies? for the product in absolute dollar terms? this project will be reduced by ___. • What is the probability that this project • Product Expenditures (Cost) relative to will be delayed by one or more releases? End-Benefits? • There is a 10% chance that the discounted price of this project will be reduced by ___. Profitability Unit Cost / NPV R&D Expense • Have Target Costs been established? • What is the estimated size and complexity • Has Lucent built something similar before? • Risk Scores capture of this project? • Are the hardware requirements clear and Variability • How much capital/other expense is stable? required? • Is the Product Definition clear and stable? • Correlation Coefficients • How stable are the requirements? • What phase is the project currently in? capture Weights • Availability and readiness of development • What is the Cost Estimate based on? staff? • How volume-sensitive is the Unit Cost? • Delay has Impact on • Availability and readiness of test staff? • There is a 10% chance that the unit cost of either Price or Volume • What are the schedule risks for this this project will be increased by ___. • Validate Questions project? • Availability and readiness of lab space / time? 18 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 19. Sample Assessment Question Example: Pricing Risk / Sensitivity Q19 How significant are buyers expenditures for the product in absolute dollar terms? Product Expenditures relative to CAPEX? Very Small / <1% of Total CAPEX ............................................................................................................. Small / <5% of Total CAPEX .................................................................................................................... Medium / <10% of Total CAPEX ................................................................................................................ High / <25% of Total CAPEX .................................................................................................................... Very High / >25% of Total CAPEX ............................................................................................................. Five Categories – Multiple-Choice Anchored Scales – As unambiguous as possible Easily answerable, if a Customer Value Proposition exists Run a Dry-Run with someone, who sees the Survey for the first Time Derive Risk Scores / Variability (*) CAPEX – Capital Expenditures 19 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 20. Four Delay Scenarios Competition Restricted Competition Perfect Competition (Interoperability Issues (Standard Interfaces / Product /Network Effects) standalone Products) Growth No-Growth Customers don’t switch to Customers switch to Competing Competition Products Products Volume overall stays same – Price Volume is reduced throughout somewhat reduced Lifecycle High-Growth Customers don’t switch to Customers switch to Competing Competition Products Products Volume overall stays same – Price Volume is reduced throughout somewhat reduced Lifecycle, but more severely in Margins depressed more severely later Stages, due to lower Growth in later Stages Sales Just Two Parameters: 1) Delay Time and 2) Percent Revenue Reduction (Price or Volume) 20 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 21. Four Delay Scenarios – Revenue Outcomes (*) Case 1 – No-Growth / Restricted Competition 120% Case 2 – No-Growth / Perfect Competition 120% 100% 100% 80% 80% 60% 60% 40% 40% 20% 20% 0% 0% Y1-Q1 Y1-Q3 Y2-Q1 Y2-Q3 Y3-Q1 Y3-Q3 Y4-Q1 Y4-Q3 Y5-Q1 Y5-Q3 Y6-Q1 Y6-Q3 Y1-Q1 Y1-Q3 Y2-Q1 Y2-Q3 Y3-Q1 Y3-Q3 Y4-Q1 Y4-Q3 Y5-Q1 Y5-Q3 Y6-Q1 Y6-Q3 Initial Sales - Baseline Total Sales - Case 1 Initial Sales - Baseline Total Sales - Case 2 Case 3 – Hi-Growth / Restricted Competition Case 4 – Hi-Growth / Perfect Competition 250% 250% 200% 200% 150% 150% 100% 100% 50% 50% 0% 0% Y1-Q1 Y1-Q3 Y2-Q1 Y2-Q3 Y3-Q1 Y3-Q3 Y4-Q1 Y4-Q3 Y5-Q1 Y5-Q3 Y6-Q1 Y6-Q3 Y1-Q1 Y1-Q3 Y2-Q1 Y2-Q3 Y3-Q1 Y3-Q3 Y4-Q1 Y4-Q3 Y5-Q1 Y5-Q3 Y6-Q1 Y6-Q3 Initial Sales - Baseline Total Sales - Baseline Initial Sales - Baseline Total Sales - Baseline Initial Sales - Case 3 Total Sales - Case 3 Initial Sales - Case 4 Total Sales - Case 4 (*) Partial Source: Preston Smith, Don Reinertsen, ‘Developing Products in Half the Time’ 21 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 22. NPV Probability Distribution and Risk Weights / Impacts Net Present Value Probability Tornado Diagram Distribution 1.6 Unit Price 0.826 M ean = 387217.5 1.4 1.2 Volume 0.485 1 0.8 0.6 Unit Cost -0.34 0.4 0.2 R&D Expense -0.028 0 -$0.4 $0.0 $0.4 $0.8 $1.2 -1 -0.8 -0.6 -0.4 -0.2 0 0.2 0.4 0.6 0.8 1 Values in Millions Std b Coefficients Positive Business with a low Probability to fall below NPV=$0 Wide Range of possible Outcomes Typical Profile of Influence Factor Impact on NPV R&D Expense, while an important Constraint, is almost never the Factor with the most Impact on Profitability 22 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 23. Portfolio Risk Map (*) 100% 50% Probability NPV < 0 Expected Losses 10% $1,000 $10,000 $100,000 $1,000,000 Maximum Loss [000s] (*) Adapted from Preston G. Smith and Guy M. Merritt, “Proactive Risk Management – Controlling Uncertainty in Product Development”, 2002, Productivity Press 23 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 24. 3 Integration of Portfolio and Project Risk Management 24 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 25. CMMi Risk Management Process Area (*) Prepare for Risk Management Identify and Determine Establish Analyze Risks Risk Sources Define Risk A Risk And Parameters Management Categories Strategy Identify Risks Risk Repository Evaluate, Categorize, Mitigate And Prioritize Implement Risks Develop Risks Risk Risk Mitigation Mitigation Plans Plans (*) © 2002 by Carnegie Mellon University 25 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 26. Project Level Risk Analysis (*) Probability of Probability of Risk Event Impact Ex. 30% Ex. 80% Total Risk Event Impact Loss Ex. Gate 1 Postponed Ex. Delay Release by 2 Weeks Ex. Missed major Customer Budget Cycle Risk Event Impact Driver(s) $50M NPV Driver(s) Ex. Dev. Not ready to Ex. Takes 2 Weeks to re- commit schedule Gates “Volatility per se, be it related to weather, portfolio returns, or the timing of one’s morning newspaper delivery, is simply a benign statistical probability factor that tells us nothing about risk until coupled with a consequence” – Robert H. Jeffrey, 1984 (*) Source: Preston G. Smith and Guy M. Merritt, “Proactive Risk Management – Controlling Uncertainty in Product Development”, 2002, Productivity Press 26 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 27. Sc h e 0 5 10 15 20 25 30 35 40 45 R dule es ou rc Fe So e a t f tw ur ar e C e h 27 | Assessing and Managing Risks of Product Portfolios | May 2008 H urn T e ar d ch w a no re lo gi c Pr al Typical Distribution of Technical Risks oc Pr es od s uc t R Co oa st dm Ve Re Ex ap nd qu ter n a All Rights Reserved © Alcatel-Lucent 2007 or ir O Pe em l rg r fo e n t an rm s iz C a at io o n nc na tra e l /M c an tua ag l er ia l
  • 28. Risk Resolution Process (*) Review Risks Defer Action for Take no Action Develop Action more Info (Accept Risk) Plans Avoid Risk Transfer Risk to a Provide Mitigate Risk 3rd Party Redundancy Prevention of the Contingency if Reserves of Risk Event Risk Event Occurs Budget/Schedule (*) Source: Preston G. Smith and Guy M. Merritt, “Proactive Risk Management – Controlling Uncertainty in Product Development”, 2002, Productivity Press 28 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 29. Risk Management Benefits and Uses Crucial Part of Investment Evaluation Integration with Project Management is 2-Way Risk Assessment –Continuity is Key Lower Costs and less Chaos 29 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 30. Next Steps – Implementation 1. Start with a Review / Identify Areas of Weakness 2. Put in Place a simple regular Risk Assessment within your Portfolio Review Process 3. Using Prompt Lists 4. Covering the whole Portfolio 5. Involving all Stakeholders 6. Follow-Through 7. Making sure identified Risks are addressed 8. Risks are known throughout Company 9. Don’t let Risk get a bad Name “In preparing for Battle I have always found that Plans are useless, but Planning is indispensable.” – Dwight Eisenhower 30 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007
  • 31. www.alcatel-lucent.com Ruedi Klein, NPDP, PMP Product Manager Alcatel-Lucent Tel. (973) 386-6695 ruediklein@alcatel-lucent.com http://www.alcatel-lucent.com 31 | Assessing and Managing Risks of Product Portfolios | May 2008 All Rights Reserved © Alcatel-Lucent 2007