SlideShare une entreprise Scribd logo
1  sur  28
Télécharger pour lire hors ligne
Ref : IB/D/Q113/113/13 
Date : 04th Jan. 2013 
Mr. Santosh Agarwala 
M/s Sonthalia Rice Mill., 
S3/36,37, Sec-A, Zone –B, 
Mancheshwar Indl. Estate, 
Bhubhneshwar (Orissa) 
Dear Sir, 
As desired by you, we are pleased to submit our offer for high pressure 
husk fired FBC boiler and Back Pressure Steam Turbine for co-generation 
purpose. 
While designing the system, we have assumed the following data:- 
Boiler Capacity from feed water at 900C 6000 Kg/hr 
Steam Flow to Turbine / Plant Consumption 4000 Kg/hr 
Steam temperature at Boiler Outlet 350 +/-10 0C 
Boiler Design Pressure 32 Kg/cm2 
Steam temperature at turbine inlet (max) 350 0C 
Turbine Inlet pressure 30 Kg/cm2 
Outlet Pressure of Steam from Turbine(max) 3.50 Kg/cm2 
Power Output based on above steam demand 202 KW / 252 KVA
For the purpose of clarity and simplification our quotation is grouped separately as 
follows. 
BOILER DATA 
Design Data Annexure - I 
Scope of Supply. Annexure - II 
Technical Specification. Annexure –III 
TURBINE DATA 
Material Specification Of Turbine Annexure - IV 
Turbine Technical Information Annexure - V 
COMMERCIAL DATA 
Commercial Offer Annexure- VI 
General Terms & Conditions. Annexure - VII 
We hope you will find this quotation informative and we look forward to your 
comments and suggestions to fine tune the system to suit your requirements. 
Thanking you, 
for INDUSTRIAL BOILERS LTD. 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 2 - 
H.S.ANAND 
Executive Director 
Mob : 09350169001 
HUSKOGEN
ANNEXURE - I 
BOILER DESIGN PARAMETERS 
Unique features of the Huskogen Boiler 
¾ Unique Non Membrane Radiant water tube design furnace. 
¾ Straight Tube convection Bank. 
¾ Microprocessor based Continuously Modulating fuel feeding. 
¾ Expandable Boiler thru In-bed tubes for long life. 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 3 - 
¾ Seamless in bed tubes 
¾ Super heater tubes suitable for 370 Deg C 
¾ Stainless Steel Fluidising Air Nozzles. 
¾ High Efficiency TREXMA Dust Collector.
The following parameters have been taken as the basis for the design of 
the proposed boiler. 
Boiler parameters at Maximum Continuous Rating :- 
Steam flow at Superheater outlet 6000 kg/hr 
Steam pressure at superheater outlet 32.00 kg/cm² (g) 
Steam temp. at superheater outlet 350°C ± 10°C 
Superheater temperature control range 75 - 100% load 
Feed water temp. at inlet to Boiler 90° C 
The Type of Boiler selected is :- 
Location Indoor 
Type of Boiler Single Drum, Water Tube, Natural 
Circulation 
Combustion system Fluidised Bed 
Draft system Balanced draft 
Support Bottom supported on RCC construction. 
Fuel Specifications 
• Primary Fuel Rice Husk 
• GCV of Rice husk 3300 Kcal/Kg (Moisture -6 %) 
ƒ Emergency Fuels Coal, Lignite. (Size < 6 mm) 
• Start up Fuel Kerosene + Charcoal (Size15 – 30 mm) 
Site Conditions :- 
Ambient temp (for design) 40°C 
Relative humidity (for design) 60% 
Wind load As per IS 875 
Seismic coefficient As per IS 1893 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 4 -
Codes & Standards :- 
Pressure parts As per IBR with its latest amendments. 
Non pressure parts As per our Standard Engineering Practice. 
Boiler Thermal Efficiency As per BS 845 Part I, Indirect method. 
Radiation loss As per standard ABMA radiation loss chart 
Utility Requirements :- 
Electrical Requirements for Motors 
Voltage 415 ± 6% V 
Frequency 50 ± 3% Hz 
Phase 3 phase, 4 wire 
Electrical Requirements for Instrumentation and Panel 
Voltage 230 V 
Frequency 50 Hz 
Phase Single Phase 
INSTRUMENT AIR 
Pressure 7.0 Kg/cm² g 
Quality Dry, free from oil & dirt 
Dew point temp. - 15° C 
BED MATERIAL 
Material Sieved Natural river bed sand / 
Crushed Refractory 
Size 1 to 2.5 mm 
Bulk density 1200 to 1500 Kg/m3 
Melting Point + 1500oC 
COOLING WATER REQUIREMENT 
Quantity 0.5 m3/hr 
Temperature < 40 oC 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 5 -
ANNEXURE - II 
SCOPE OF SUPPLY 
HUSK GEN MODEL FBC FIRED BOILERS 
CONSTRUCTION : 
The Fluidised Bed Boilers offered by us are made as per the latest IBR 
Regulations and are of Class-I Fusion welded construction. Stringent 
quality control is observed at every stage of manufacture right from raw 
material stage to testing of Boiler prior to dispatch. The pressure parts 
are manufactured from Boiler Quality Steel, fully welded construction, 
shell radiograph and hydraulically tested. 
One Steam Cum Water drum which incorporates the Smoke Tube boiler 
bank.Water tubes are provided within the combustion area to maintain a 
furnace temperature range of 6500C to 7500C. These tubes are connected 
with header at the bottom along with downcomers to form a natural water 
circulation circuit. 
A convective evaporator section consisting of a Smoke tube boiler section 
is so designed as an inline arrangement. 
FLUE GAS PATHS : 
The Boiler consists of a configuration enabling high turn down ratios. The 
combustion once completed in the bed is released into the free board 
zone at a temperature slightly higher than 750oC. The Water Tubes 
absorb the heat before leading the gases into the super heater zone and 
then to Smoke tube boiler section (Convection Bank). The flue gases are 
then taken into an APH, Dust Collector, I.D.Fan and into the chimney. 
STEAM CUM WATER DRUM 
The boiler consist of one Steam cum water drum. This drum connects the 
Risers and Downcomers to various Heating Surface Sections within the 
Boiler. Feed Water is fed from the Feed Pumps into this drum. Water level 
is maintained in the drum thru Mobrey control provided.This drum also 
contains the Convection Bank of Tubes.The Drum is provided with Hinged 
doors at the Rear for easy approach and Cleaning. A Blowdown 
connection is provided to remove the sludge during operation. 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 6 -
FERRULES : 
Stainless Steel Ferrules are provided at the entry of 
Furnace gases to the smoke tubes. These protect and 
increase the life of the smoke tubes. 
WATER TUBES : 
Tubes of BS 3059 ERW grade are used for Water tubes in the furnace 
zone. These tubes maintain proper Furnace temperature to prevent 
overheating and clinker formation. 
CONVECTION BANK TUBES : 
Tubes of BS 3059 ERW grade are used for the convection Bank. 
These are all straight tubes which can easily be replaced when required. 
The first pass tube is protected from erosion at the ends thru Stainless 
Steel Ferrules. 
INBED TUBES : 
Extra Heavy and Thick Seamless In-Bed Tubes are provided directly 
immersed within the Fluidising area. These tubes are directly connected 
to the Steam Drum at the Top thru separate Risers and Downcomers. 
HEADERS : 
Extra Thick Seamless headers as per BS3059/ASTM 106 
are provided. The headers have one side opening and the 
tube holes are drilled on them. 
MOUNTINGS & FITTINGS (STEAM DRUM) : 
One Air Vent Valve. 
Two Single Post Safety Valves. 
Two Sets of Water level gauges. 
One Pressure gauge with siphon and cock. 
One Inspectors pressure gauge cock. 
One Blow down valve. 
MOUNTINGS & FITTINGS (WATER DRUM) : 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 7 - 
One Blow down valve. 
One Feed Stop valve. 
One Feed Check valve.
MOUNTINGS & FITTINGS (WATER WALL HEADERS) : 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 8 - 
Two Blow down valves. 
MOUNTINGS & FITTINGS (INBED HEADERS) : 
One Blow down valve. 
MOUNTINGS & FITTINGS (SUPER HEATER) : 
One Main Steam Stop Valve 
One Air Vent Valve. 
One Single Post Safety Valve. 
One Pressure gauge with siphon and cock. 
One Drain valve on header. 
FEED PUMPS : 
Two numbers (One duty and One stand by) 
electrically driven reciprocating Feed Pumps with 
motors will be provided. 
AUTOMATIC WATER LEVEL CONTROL : 
Feed water regulating system to ensure correct water level in the Boiler. 
In case of extreme low water level an alarm is provided. The system 
consist of the following : 
¾ A level controller with a control valve to maintain the correct water 
level in the boiler drum. 
¾ Manual Pump on / off control to start and stop the pump to maintain 
the desired water level in the boiler in case of an emergency. 
¾ High & Low water level Annunciation system with an audio (Alarm) 
& visual indication is given. 
¾ In case of extreme low water the boiler goes in a lock out 
condition and the an audio (Alarm) & visual indication is given. 
¾ An Mobrey control is provided for additional safety. In case of 
extreme low water the boiler goes into a lockout condition and an 
audio & visual indication is given.
CONTROL PANEL : 
The panel consist of a sophisticated but user friendly circuit enabling the 
operator to run the boiler in automatic or manual mode as desired. 
Various instruments and safety features are as detailed 
below: 
In auto mode the boiler will operate all sequences 
automatically. The boiler can be also adjusted to start 
and stop automatically within a pressure range of 3 to 5 
Kg/cm2. However in case of Low Loads, below 75% of 
MCR, steam superheat temperature will differ from 
Designed Values.Initially during pre fluidisation state the 
boiler needs to be started manually. 
The Panel is lockable by a key to prevent unauthorised operation of the 
boiler. The MCC will be fixed (non-draw out) type modular with single front 
and is suitable for indoor application. The cable entry will be from bottom. 
In the control panel Switches, Motors Starters, Indication Lamps, Control 
Fuses, Main Incoming Switch and Inter connecting wiring for the following 
is provided. 
F.D. Fan 
I. D. Fan 
Feed Pumps (2 Nos.) 
Fuel Feeder 
Temperature indicators with selector switch. 
Annunciation windows to show unhealthy operation for the following are 
provided: 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 9 - 
F. D. Fan Trip 
I. D. Fan Trip 
Feed Pumps Trip 
Fuel feeder Trip 
Drum Level Low 
Drum Level High 
Bed Temperature high
MICRO PROCESSOR BASED FUEL FEEDING : 
Microprocessor based indicator cum controller(s) is provided 
for Fuel Feeding. The controller senses the temperature of 
fluidisation and delivers a precise signal to the dynodrive(s) 
to increase / decrease the fuel feeding rate. By the use of 
this advanced micro processor technology precise control of 
feel feeding is maintained leading to Low excess air losses 
and subsequently a very high fuel efficiency. 
FORCED DRAFT FAN : 
The Forced Draft Fan provides air for combustion. This Fan is a 
Centrifugal machine with impellers directly fitted onto the Motor Shaft. A 
Damper on the Inlet is provided to control the Air Flow. The D fan includes 
a drive Motor. 
INDUCED DRAFT FAN : 
The Induced Draft Fan removes Flue Gases by Suction from the Boiler. 
This Fan is a Centrifugal machine with impellers fitted to a Shaft which is 
driven by Pulleys from a motor. A cooling Disc is provided on the shaft to 
cool it sufficiently before the heat reaches the Pulley Blocks. 
The Impellers are lined at crucial Places by Hard, Wear Resistant Liners. 
A Damper on the Inlet is provided to control the Gas Flow. 
AIR HEATER : 
A Multi tubular Air Preheater having a cross flow of Air to flue gases is 
Provided. The Flue Gases move in Two Passes, substantially transferring 
the heat before gases exit to the ID Fan. 
A Rotary Air Lock Valve is provided at the bottom of the Air Preheater to 
continuously discharge the Ash collected. 
Inlet / outlet manifolds of the Air and Flue gases are provided. 
SMOKE DOORS : 
Easily operational double hinged type doors are provided at the Back end 
of the Boiler to give clear access to the tubes. 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 10 -
MANHOLE : 
A large size manhole is provided at the top to give 
convenient access to the water side of the shell. 
DUST COLLECTOR : 
A highly efficient Cyclone Type TREXMA Dust Collector is 
provided to check carry over the dust particles which 
otherwise would escape to the 
atmosphere. The precipitator separates the dust particles 
by the use of centrifugal and gravitational forces. Ash is 
continiously discharged from the Bottom of the dust 
collector. The Dust Particulate Emission is well within most 
Pollution Norms. 
STRUCTURE : 
The Boiler is mounted on its chairs which are in turn placed 
on Civil Structures. 
NSTRUMENTATION AND SAFETY INTERLOCKS : 
The system offered is extremely simple and convenient to operate. 
Amongst the Instruments provided are :- 
Bed Temperature Indicator cum controller 
Bed Height Indicator. (Indirect Indication) 
Fuel Feeder Speed Indicator. 
Water Level Controller cum Alarm. 
Multiple point annunciator for displaying unhealthy operating conditions. 
The following are a few of the safety interlocks :- 
In case of high bed temperature the feeders shut down. 
In case of high steam pressure the boiler fans and feeders shut off. 
In case of low water the pumps operate. 
In case of extreme low water level the whole system automatically goes 
into a lockout condition. 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 11 - 
EMISSION 
GUARANTEED 
LESS THAN 350 
mg/Nm3
DRAWINGS & DOCUMENTS : 
We shall provide tentative drawings showing the general layout and the 
foundation plans. This will only be used as guidance by our clients as the 
site location will vary from place to place. 
A complete set of Drawings and Documents duly certified by the 
Inspecting Authority of the State of Origin will be given within 4 to 6 weeks 
after the dispatch of the boiler. 
BATTERY LIMITS : 
Water - Inlet of Feed Pumps and Drum 
Steam - Outlet of Main Steam Stop Valve at Superheater 
Blow down - Outlet of Blow down Valves 
Drain - Outlet of Level Gauges and Controllers 
Ash - Outlet of Dust Collector, Air Preheater 
- Outlet of Gates at Boiler 
- Outlet of Slide Gates for Bed Ash removal 
Flue Gas - Outlet of Boiler 
- In & Out of APH and Dust Collector 
- Suction and Delivery of I.D. Fan 
Electricals - Inlet of all motors and controls and panel 
Fuel - Inlet of Screw Feeder 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 12 -
EXCLUSIONS : 
# Water treatment plant. 
# Main Chimney and Flue Duct between boiler, Heat Recovery 
Unit, Dust Collector and Chimney. 
# Interconnecting Ducting of Air Preheater 
# Fuel handling system upto screw feeder. 
# Feed Water Tanks, Feed Water Piping upto the terminal point. 
# Steam, Blow down and Drain Piping from terminal Valves on 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 13 - 
the boiler. 
# Insulation of boiler and Steam pipeline. 
# Refractory Materials for the Furnace. 
# Structural materials such as platform, ladders, supports, etc. 
# All civil and structural design work for installing the boiler. 
# Electrical work in the boiler house upto the terminal points and 
interconnecting cables. 
# Instrument and accessories for performance test. 
# Labour, Tools, Tackles, Utilities, Consumables like charcoal, 
Kerosene, Inert, materials, cleaning and lubricating agents 
required for assembling, erecting and commissioning of the 
boiler.
ANNEXURE - III 
TECHNICAL SPECIFICATIONS OF BOILER 
Max. continuous rating : 6000 Kg/hr (From 90oC) 
Type of Boiler : Fluidised Bed Combustion 
Model No. : HUSKO-60 
Design Code : Indian Boiler Regulations 
Safety valve set pressure : 34 Kg/cm2 
Design Pressure : 32 Kg/cm2 
Hydraulic Test Pressure : 48 Kg/cm2 
Superheat Temperature : 350oC +/- 10oC 
Feed water Temperature : 90oC 
Thermal Efficiency : 80% +/- 2% 
as BS:845 Pt. 1 Indirect Method 
Fuel consumption on GCV of : 1480 Kg/hr at 6 TPH load 
Husk 3300 Kcal/Kg. 
Material Specifications : 
Boiler Drums : ASTM 515/516 Gr 60/70 
Headers : ASTM 106 Gr B 
Boiler Tubes : BS 3059 Pt 1 ERW 
Super Heater Tubes : BS 3059 Pt 1 ERW 
In Bed Tubes : BS 3059 Pt 1 Seamless 
Fluidised Bed Nozzles : AISI Stainless Steel 304 
Ferrules : AISI Stainless Steel 304 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 14 -
F.D. Fan details : 
Type : Centrifugal Direct Drive 
Motor : 30 H.P. 
CFM : 5250 
Pressure : 600 mm 
RPM : 2900 
Quantity : 1 No. 
I.D. Fan details : 
Type : Centrifugal V- Belt Drive 
Motor : 25 H.P. 
CFM : 9000 
Pressure : 250 mm 
RPM : 1200 
Feed Pump details 
Type : Reciprocating 
Flow : 8000 Ltr/hr 
Head : 36 Kg/cm2 
Motor : 20 HP 
No. of pumps : 2 Nos. 
Fuel Feeder details : 
Type : Screw Feeder 
Control : Variable Speed Dynodrive 
Motor : 1 HP 
Gear Box Ratio : 1:20 
No. of Feeders : 1 No. 
Velocity Profile : 
Fluidised Bed : 3 – 2 m/sec 
Freeboard Zone : 8 –10 m/sec 
Superheater Zone : 6 – 8 m/sec 
Convection Bank : 20 – 15 m/sec 
Air Preheater Bank : 20 – 25 m/sec 
Dust Collector : 250 – 100 m/sec 
Gas Ducting : 8 – 10 m/sec 
Chimney : 6 –8 m/sec 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 15 -
Temperature Profile 
Fluidised Bed : 700 – 800oC 
Free Board : 1000 - 1200oC 
Exit of Radiation Zone : 500 – 600oC 
From Boiler : 240 – 260oC 
After Air Preheater : 150 – 180oC 
Draft Losses Profile 
Boiler : 25 mm WG 
H.R.U. : 40 mm WG 
Dust Collector : 100 mm WG 
BOILER VALVE SIZING 
MOUNTINGS & FITTINGS (STEAM DRUM) : 
One Air Vent Valve. 
Two Single Post Safety Valves. 
Two Sets of Water level gauges. 
One Pressure gauge with siphon and cock. 
One Blow down valve. 
MOUNTINGS & FITTINGS (WATER DRUM) : 
One Blow down valve. 
One Feed Stop valve. 
One Feed Check valve. 
MOUNTINGS & FITTINGS (WATER WALL HEADERS) : 
Two Drain valves. 
MOUNTINGS & FITTINGS (INBED HEADERS) : 
One Drain valve. 
MOUNTINGS & FITTINGS (SUPER HEATER) : 
One Main Steam Stop Valve 
One Air Vent Valve. 
One Single Post Safety Valve. 
One Pressure gauge with siphon and cock. 
One Drain valve on header. 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 16 -
FEED WATER SPECIFICATIONS 
Deaerated and Demineralised water is recommended for the boiler. 
Feed water should meet the following requirements. 
Water Hardness : 0.2 ppm max. 
pH : 8.5 - 9.5 
Dissolved Oxygen : 0.1 ppm max. 
Oil Content : Nil 
TDS : 200 ppm max. 
BOILER WATER SPECIFICATIONS 
Water Hardness : 0.5 ppm max. 
Total Alkalinity ( as CaCo3 ) : 700 ppm max. but 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 17 - 
not exceeding 20% of TDS 
Caustic Alkalinity ( as CaCo3) : 350 ppm max. 
pH : 11 - 12 
Unreacted Sodium Sulphate (as Na2So3) : 30 -50 ppm. 
Phosphates ( as Po4 ) : 20 - 40 ppm. 
TDS : 1000 ppm max., 
Residual Hydrazine ( as N2H4 ) : 0.5 ppm max. 
FUEL SPECIFICATIONS FOR GUARANTEES 
Fuel : Husk 
Moisture : <10% 
Calorific Value : 3300 Kcal/Kg 
Impurities : Nil
UNIQUE FEATURES OF IBL BT-4 TURBINES 
¾ Horizontally Split Steam casing. 
Permits easy inspection of the internals without disturbing 
the steam lines. 
¾ True Centre line support. 
Enables equal expansion of all the components, permitting 
safe and quick startup. Allows precise alignment of the 
turbine with the driven machine. 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 18 - 
¾ Curtis Blades. 
Two sets of blade rows to achieve higher efficiency. 
¾ Pressurised Lubrication. 
The Bearings of the Turbine and the gearbox are supplied 
with a Forced Lubrication and a Oil Cooling system which 
enables the turbine to run smoothly and effortlessly. 
¾ Metaflex Couplings Type 
High Speed metaflex type couplings are provided between 
the Turbine and Gearbox. These couplings have 
outstanding flexibility at high speeds. 
¾ Loaded with safety features. 
All standard features such as Emergency valve, Over speed 
governor, High Pressure trip, Low Lube Oil Pressure trip.
ANNEXURE - IV 
MATERIAL SPECIFICATIONS OF IBL BT-4 TURBINE 
CASTINGS 
The Castings are made out of robust alloy steel of Radiography quality. 
The casing is split horizontally at the center line, permitting easy access to 
the interior for inspection without disturbing the steam inlet and outlet 
lines. Centre line support ensures precise alignment of the turbine with 
driven machine. 
WHEEL 
The Forged wheel is accurately profiled and machined to very close 
tolerances, and located between heavy duty Bearings for continuous and 
long operations. The Built-up Rotor is dynamically balanced to a high 
degree of accuracy to ensure vibration free, smooth, and years of trouble 
free operation of the Turbine. 
SHAFT 
The shaft is made out of Forged Carbon Steel & the Section under the 
Carbon glands is chrome plated to minimize erosion & corrosion. 
NOZZLES 
Nozzles are made of S.S. and manufactured with High accuracy as per 
the specified Steam parameters for developing optimum efficiency. 
BLADES 
These are manufactured out of a thick section of erosion and corrosion 
resistance stainless steel and fitted firmly in the rim of the wheel. A 
sectional shroud ensures added rigidity. These blades are renewable and 
replaceable, if need arises, on account of changing operating conditions. 
BEARINGS 
Precision split sleeve journal bearings incorporate Babbitt lining, and are 
forced lubricated. 
GLANDS 
The glands are of carbon ring type, each composed of three segments 
held together by an inconel spring that incorporates anti-rotation stops. 
Carbon rings require no lubrication. 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 19 -
EMERGENCY VALVE 
A Butterfly type valve for extreme emergency is housed in the Governor 
Valve Body. This valve is made in high grade material and accurately 
machined to maintain maximum seal to cut off live steam in case of 
tripping of Turbine. 
A stainless steel steam strainer is provided before the emergency valve 
to preclude any thick impurities into entering. 
OVERSPEED TRIP GOVERNOR 
IBL BT-4 Turbines include an Overspeed Governor. It consists of a Ring 
carried on the Turbine Shaft and operates the Emergency Valve when the 
Turbine speed reaches a preset speed at 10% above the normal running 
speed of the rotor. 
HAND NOZZLE VALVE 
One Hand operated nozzle control valve is provided to maintain 
reasonable high efficiency on part load operation. 
LUBRICATION 
Forced lubrication is provide by a geared type oil pump which is fitted on 
to the reduction Gear Box. The capacity of the pump is 90 LPM. A full duty 
motor driven Oil pump is standard to flood the Bearings during start up 
and shut down of the Turbine. 
GEAR BOX 
This non-integrated unit is housed separately and coupled with the 
Turbine with metaflex type coupling. The advantage is smooth and long 
life performance. This coupling with thin stainless steel flexible 
Membranes gives better performance. The Gear box is a single helical 
type speed reduction unit as per AGMA standard. 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 20 -
ANNEXURE - V 
TURBINE TECHNICAL INFORMATION 
The following parameters have been taken for the design of 
the turbo alternator set. 
TURBINE DETAILS 
Model BT – 4 / 320 
Maximum Power output 320 KW 
Type Velocity compounded 
Design Curtis (2 Rows) 
Driven Equipment Alternator / Ind. Gen. 
Turbine operating Speed 7000 RPM 
TURBINE INLET CONDITIONS 
Steam flow 4,000 kg/hr 
Steam pressure 30.00 kg/cm² (g) 
Steam temperature 350°C 
Steam Rate 19.80 Kg/KW-hr 
Steam Inlet Size 4” 
Steam Quality Dry, Free from any Impurities 
TURBINE OUTLET CONDITIONS 
Steam flow 4,000 kg/hr 
Steam Back pressure 3.50 kg/cm² (g) 
Steam temperature 217°C ± 10°C 
Steam Outlet size 8” 
Power Output 202 KW 
If Steam Load is 6000 Kg/hr the Power output will be 320 KW 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 21 -
ALTERNATOR (For Alternator based Sets only) 
Make Leroy Somer 
KW 320 KW 
Voltage 415 V 
Voltage Variation 5% 
Frequency 50 Hz 
Speed 1500 r.p.m. 
Phase 3 
Pf 0.8 Lagging 
AVR Self Exciting 
No of Poles Four 
Connections Star 
Insulation Class H 
Overload capacity 10% overload for I hour in 
every 12 hours. 
Mounting Horizontal Foot Mounting 
Bearing arrangement Double Sleeve Bearing 
Excitation Brushless, Self Excitation 
Voltage Regulation +/- 1% of Set Voltage 
Voltage Setting +/-10% of Set Voltage 
Coupling Geared Type 
Duty Continuous 
GEAR BOX 
Make Triveni/Walchandnagar 
Input RPM 7000 
Output RPM 1500 
Gear Ratio 1: 4.66 
Lubrication Forced 
Type Single Reduction, 
parallel Shaft, Helical Type 
Foot Mounted 
Service Factor 1:5 
Duty Continuous Input & Output 
Design Standard AGMA 6011 G92 
Class of accuracy DIN-415 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 22 -
MATERIAL OF CONSTRUCTION (GEAR BOX) 
Gear Wheel & Pinion Shaft 820 M 17 BS: 970-PT:1-1991 
(EN 354) case carburised, Hardened to 60 +/-2 RC and ground to DIN- 
4/5 class of accuracy. 
Gear Shaft 080 M40 – BS 1970:PT:1-92 (EN8) 
Casing Cast Iron 
Bearings White Metal Lined 
MATERIAL OF CONSTRUCTION (TURBINE) 
Casing Carbon Steel casting 
Nozzles Stainless Steel ANSI 410/EN56A 
Blades Stainless Steel AISI 420 
Rotor Forging and Shaft 080, M40 Annealed, Hardened 
and Tempered steel 
Gear Wheel EN19 
Gear Pinion EN 8 
Labyrinth Packing Bronze 
Steam Strainer Stainless Steel 
Base Frame MS Fabricated 
Bearings Tin Rich Babbit Lining 
(White metal) 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 23 -
CONTROL PANEL 
Type Free Standing type 
Controller Schneider Programmable Logic Control 
Initial Control Auto Synchronising Mode 
Running Control Back Pressure Mode 
Display on Panel 
Turbine 
Voltage 
Frequency 
Power Factor 
KW 
Turbine RPM 
Steam Back 
Pressure 
Vent Valve Position 
Steam Inlet Valve 
Position 
Display on Panel 
Turbine Bearing Temperatures 
Status of Elec Oil Pump 
Voltage 
Amperes 
Electronic Synchroscope 
FIELD PRESSURE GUAGES 
Locations Steam Inlet pressure 
Steam Exhaust pressure 
Steam Nozzle Box pressure 
Oil Pressure 
FIELD TEMPERATURE GUAGES 
Locations Steam Inlet 
Steam Exhaust 
Gear Box Bearing 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 24 -
BATTERY LIMITS 
Inlet flange of steam turbine 
Exhaust flange of steam turbine 
Turbine Drains at respective points 
Inlet and outlet flange for cooling water for Oil coolers 
Electrical Inlet of all Controls 
Protection and metering panel terminal box 
Breaker panel terminal box 
Turbine control panel terminal box 
Power at generator terminals 
EXCLUSIONS FROM TURBINE SCOPE 
Steam Pipeline with inlet valve. 
Exhaust Steam Piping. 
Water supply for Oil Cooler. 
Electrical Cabling wherever required. 
Earth protection. 
Thermal Insulation. 
All civil works alongwith their design. 
Erection and assembly at site. 
Statutory permissions. 
Steam Flow meter. 
Flush and first fill of Oil. 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 25 -
ANNEXURE - VI 
TECHNO COMMERCIAL OFFER 
Supply of One No. IBL, Hybrid, Fluidised Bed Combustion 
Boiler, Model Huskogen-60 capable of generating 6000 
Kg/hr of Steam (From 90oC.) at the max. working pressure 
455 PSI (32 Kg/cm2) at Super heater outlet with Superheated 
steam temp. of 350oC. alongwith Superheater, Air Preheater 
and Trexma Dust Collector. 
Rs. 51,00,000/-each 
(Rupees Fifty One Lac only) 
Supply of One No. IBT, Captive Generation Type Steam 
Turbine, Model BT- 4/320 (Alternator 320 KW) suitable for 
the following duty conditions along with Alternator & Gear 
Box And as per scope of supply enclosed. 
Steam Inlet 30 Kg/cm2g, 350o C 
Steam Pressure at Exit 3.50 Kg/cm2g 
Steam Flow 4,000 Kg/hr 
Estimated Power Output 230 KW 
Rs. 33,00,000/-each 
(Rupees Thirty Three Lacs Only) 
Supervision Of Erection & Commissioning on lump sum 
basis,.Lodging & Boarding for our engineer will be provided 
by you on free of cost at site 
Rs. 2,40,000/-Lumpsum 
(Rupees Two Lacs Forty Thousand Only) 
NOTE : 
THE ABOVE PRICES ARE EX-WORKS VAPI. 
PACKING & FORWARDING IS CHARGEABLE EXTRA @ 2%. 
THIS QUOTATION IS GOVERNED BY THE STANDARD TERMS & 
CONDITIONS OF OUR OFFER ENCLOSED HEREWITH. 
for INDUSTRIAL BOILERS LTD. 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 26 - 
MARKETING DIVISION
ANNEXURE - VII 
GENERAL TERMS & CONDITIONS 
PRICE : 
The prices quoted are Ex-works Vapi. 2% Packing & Forwarding charges, Insurance 
and Freight charges are extra. Besides sales tax, octroi, excise and bank charges are 
also payable by you as applicable. 
DELIVERY : 
The delivery 3 – 4 months from the date of receipt of your technically and 
commercially clear order accompanied by necessary advance. 
We are not responsible for any delay caused by extraneous circumstances or Acts of 
God beyond our control and cannot pay any damages or penalties on this account. 
The equipment ordered may be dispatched in 1,2 or more lots. If required we can 
undertake the dispatch of the equipment on behalf of the buyer by road transport only 
to any destination given by the buyer on freight TO - PAY basis, on the clear 
understanding that we will not be liable for any damages whatsoever. The freight 
charges contracted by us on behalf of the buyer will be deemed as negotiated under 
the buyer's authority and therefore it shall be binding on the Buyer to make full 
payment. 
WARRANTY : 
Our products are warranted for a period of ONE YEAR from the date of dispatch, 
against any manufacturing defect or faulty workmanship reported in writing during the 
Warranty Period, The Warranty does not extend to consequential damages or losses. 
The Warranty is NULL & VOID if repairs and/or replacements are carried out without 
our consent in writing. It also does not cover bought-out items. 
This warranty is not applicable if full payment with `C' form has not been given to us. 
CONFIDENTIALITY : 
The client shall treat all quotations, drawings, data, technical information etc. received 
from Industrial Boilers Ltd., as strictly confidential an shall take all precautions 
necessary to prevent the unauthorised disclosure in part or parcel of any of the above 
mentioned, to any third party. 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 27 -
TERMS OF PAYMENT : 
First 30% of the order value is payable as Advance with your firm order. 
The balance within 15 days on submission of our Proforma Invoice, including all costs 
and levies, such as price increase if any, Excise Duty, Sales Tax, Octroi and Insurance 
charges `C' Form etc. is payable before the materials are dispatched from our Vapi 
works. 
PLACE OF JURISDICTION 
In the event of any dispute arising as a result of contracting to supply against this offer 
and quotation, the place of Jurisdiction will be Greater Bombay and no other place. 
ARBITRATION 
All disputes or differences whatsoever arising between the parties out of or relating to 
the construction, meaning and operation or effect of this contract or the breach thereof 
shall be settled by arbitration in accordance with the Rules of Arbitration of the Indian 
Council of Arbitration and the Award made in pursuance thereof shall be binding on 
both the parties. 
All orders will only be accepted after the realisation after of the agreed advance which 
shall not be subject to any interest under any circumstances whatsoever. We however 
reserve the right to adjust such advance against any payments which might fall due 
because of delay in lifting of the ordered equipment or on account of incidental 
expenses incurred on buyer's behalf. An order placed with us cannot be canceled for 
any reason whatsoever without our consent in writing. Any cancellation of order 
without or consent will result in the forfeiture of Advance, without prejudice to our claim 
for compensation and other legal remedies. 
Before effecting dispatch, your Sales Tax Registration Numbers both State and 
Central are to be intimated to us. It is to be clearly understood that for Inter State 
dispatches Central Sales Tax Declaration Form should be handed over to us at the 
time of taking delivery of the boiler. If you fail to do so, Sales Tax charges in full will be 
payable to us. 
for INDUSTRIAL BOILERS LTD. 
INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI 
- 28 - 
MARKETING DIVISION

Contenu connexe

Tendances

An inside view of thermal power stations and DDCMIS in power plants
An inside view of thermal power stations and DDCMIS in power plantsAn inside view of thermal power stations and DDCMIS in power plants
An inside view of thermal power stations and DDCMIS in power plantsRg Lokkesh
 
Bokaro Thermal Power Plant
Bokaro Thermal Power PlantBokaro Thermal Power Plant
Bokaro Thermal Power PlantSourav Mahato
 
Air & flue gas system
Air & flue gas system Air & flue gas system
Air & flue gas system Kushjani1
 
COAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERING
COAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERINGCOAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERING
COAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERINGBalamurugan Subburaj
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)Baibhav Saha
 
Sipat thermal power plant
Sipat thermal power plantSipat thermal power plant
Sipat thermal power plantJinendra Ninama
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plantSHIVAJI CHOUDHURY
 
Grid frequency control using step response in free governor mode of operation
Grid frequency control using step response in free governor mode of operationGrid frequency control using step response in free governor mode of operation
Grid frequency control using step response in free governor mode of operationeSAT Publishing House
 
Ppt on btps bokaro industrial training
Ppt on btps bokaro industrial trainingPpt on btps bokaro industrial training
Ppt on btps bokaro industrial trainingRadhe Shyam
 
Vocational training report
Vocational training reportVocational training report
Vocational training reportATUL RAJ
 
Diesel engine power plant
Diesel engine power plantDiesel engine power plant
Diesel engine power plantSURAJ PRASAD
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesVaibhav Paydelwar
 
Rakhoh boilers india presentation
Rakhoh boilers india   presentationRakhoh boilers india   presentation
Rakhoh boilers india presentationRakhohIndustry
 
Chhattisgarh State Power Generation Company Limited
Chhattisgarh State Power Generation Company LimitedChhattisgarh State Power Generation Company Limited
Chhattisgarh State Power Generation Company LimitedDeepak Kurrey
 
660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boilerAshvani Shukla
 

Tendances (20)

An inside view of thermal power stations and DDCMIS in power plants
An inside view of thermal power stations and DDCMIS in power plantsAn inside view of thermal power stations and DDCMIS in power plants
An inside view of thermal power stations and DDCMIS in power plants
 
Bokaro Thermal Power Plant
Bokaro Thermal Power PlantBokaro Thermal Power Plant
Bokaro Thermal Power Plant
 
Air & flue gas system
Air & flue gas system Air & flue gas system
Air & flue gas system
 
Practa
PractaPracta
Practa
 
COAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERING
COAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERINGCOAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERING
COAL BASED POWER PLANT UNIT 1 - POWER PLANT ENGINEERING
 
Air cooled condensers
Air cooled condensersAir cooled condensers
Air cooled condensers
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
 
Sipat thermal power plant
Sipat thermal power plantSipat thermal power plant
Sipat thermal power plant
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plant
 
Project report on MTPS
Project report on MTPSProject report on MTPS
Project report on MTPS
 
Grid frequency control using step response in free governor mode of operation
Grid frequency control using step response in free governor mode of operationGrid frequency control using step response in free governor mode of operation
Grid frequency control using step response in free governor mode of operation
 
Ppt on btps bokaro industrial training
Ppt on btps bokaro industrial trainingPpt on btps bokaro industrial training
Ppt on btps bokaro industrial training
 
Vocational training report
Vocational training reportVocational training report
Vocational training report
 
Case Studies on CFBC Boilers
Case Studies on CFBC BoilersCase Studies on CFBC Boilers
Case Studies on CFBC Boilers
 
Aprds system
Aprds systemAprds system
Aprds system
 
Diesel engine power plant
Diesel engine power plantDiesel engine power plant
Diesel engine power plant
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its Auxillaries
 
Rakhoh boilers india presentation
Rakhoh boilers india   presentationRakhoh boilers india   presentation
Rakhoh boilers india presentation
 
Chhattisgarh State Power Generation Company Limited
Chhattisgarh State Power Generation Company LimitedChhattisgarh State Power Generation Company Limited
Chhattisgarh State Power Generation Company Limited
 
660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boiler
 

En vedette (6)

TENARIS - Manual de uso de Casing y Tubing
TENARIS - Manual de uso de Casing y TubingTENARIS - Manual de uso de Casing y Tubing
TENARIS - Manual de uso de Casing y Tubing
 
Ge company profile
Ge company profileGe company profile
Ge company profile
 
Boilers
BoilersBoilers
Boilers
 
Steam Turbines
Steam TurbinesSteam Turbines
Steam Turbines
 
Boiler operation
Boiler operationBoiler operation
Boiler operation
 
Boiler Presentation
Boiler PresentationBoiler Presentation
Boiler Presentation
 

Similaire à Husk based power plant 6 t 32 kg fbc with single stage turbine for finance, subsidy & project related support contact - 9861458008

Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsSHIVAJI CHOUDHURY
 
Bhushan powers and steels thalkuli,regali
Bhushan powers and steels thalkuli,regaliBhushan powers and steels thalkuli,regali
Bhushan powers and steels thalkuli,regaliBaroda
 
A Brief Introduction to Boilers
A Brief Introduction to BoilersA Brief Introduction to Boilers
A Brief Introduction to BoilersSATYAKAM MOHAPATRA
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC RamagunadamAbhinay Angari
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]Amardeep Jadeja
 
Sabardairy Training Report
Sabardairy Training ReportSabardairy Training Report
Sabardairy Training ReportNiravDesai66
 
BOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptxBOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptxSatwikSingh25
 
Boiler Operation and Maintenance - New.ppt
Boiler Operation and Maintenance - New.pptBoiler Operation and Maintenance - New.ppt
Boiler Operation and Maintenance - New.pptEsosa8
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerVaibhav Paydelwar
 
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~iNtpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~ihaxxo24
 
Steam_Boiler_Basics_tim_powell_hughes.pdf
Steam_Boiler_Basics_tim_powell_hughes.pdfSteam_Boiler_Basics_tim_powell_hughes.pdf
Steam_Boiler_Basics_tim_powell_hughes.pdfGaluhAjeng26
 
Air source heat pump Brochure-BLUEWAY
Air source heat pump Brochure-BLUEWAYAir source heat pump Brochure-BLUEWAY
Air source heat pump Brochure-BLUEWAYRoger Luo
 
Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Abhijeet Thakur
 
280 Series One & Two Stage Turbines/Multi-Stage Vertical In-Line Boiler Feed ...
280 Series One & Two Stage Turbines/Multi-Stage Vertical In-Line Boiler Feed ...280 Series One & Two Stage Turbines/Multi-Stage Vertical In-Line Boiler Feed ...
280 Series One & Two Stage Turbines/Multi-Stage Vertical In-Line Boiler Feed ...Callaghan Pump and Controls, Inc.
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccppDurgSingh
 
mech 2nd yr lab report.pdf
mech 2nd yr lab report.pdfmech 2nd yr lab report.pdf
mech 2nd yr lab report.pdfMOHDAHMED52
 

Similaire à Husk based power plant 6 t 32 kg fbc with single stage turbine for finance, subsidy & project related support contact - 9861458008 (20)

Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
 
Bhushan powers and steels thalkuli,regali
Bhushan powers and steels thalkuli,regaliBhushan powers and steels thalkuli,regali
Bhushan powers and steels thalkuli,regali
 
kstps training report
kstps training reportkstps training report
kstps training report
 
A Brief Introduction to Boilers
A Brief Introduction to BoilersA Brief Introduction to Boilers
A Brief Introduction to Boilers
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC Ramagunadam
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]
 
Boiler ppt
Boiler pptBoiler ppt
Boiler ppt
 
Sabardairy Training Report
Sabardairy Training ReportSabardairy Training Report
Sabardairy Training Report
 
BOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptxBOILER OPERATION PPT.pptx
BOILER OPERATION PPT.pptx
 
Boiler Operation and Maintenance - New.ppt
Boiler Operation and Maintenance - New.pptBoiler Operation and Maintenance - New.ppt
Boiler Operation and Maintenance - New.ppt
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam Boiler
 
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~iNtpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
 
Steam_Boiler_Basics_tim_powell_hughes.pdf
Steam_Boiler_Basics_tim_powell_hughes.pdfSteam_Boiler_Basics_tim_powell_hughes.pdf
Steam_Boiler_Basics_tim_powell_hughes.pdf
 
Air source heat pump Brochure-BLUEWAY
Air source heat pump Brochure-BLUEWAYAir source heat pump Brochure-BLUEWAY
Air source heat pump Brochure-BLUEWAY
 
BOILER INSTRUMENTATION
BOILER INSTRUMENTATIONBOILER INSTRUMENTATION
BOILER INSTRUMENTATION
 
Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT
 
280 Series One & Two Stage Turbines/Multi-Stage Vertical In-Line Boiler Feed ...
280 Series One & Two Stage Turbines/Multi-Stage Vertical In-Line Boiler Feed ...280 Series One & Two Stage Turbines/Multi-Stage Vertical In-Line Boiler Feed ...
280 Series One & Two Stage Turbines/Multi-Stage Vertical In-Line Boiler Feed ...
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccpp
 
mech 2nd yr lab report.pdf
mech 2nd yr lab report.pdfmech 2nd yr lab report.pdf
mech 2nd yr lab report.pdf
 

Plus de Radha Krishna Sahoo

Venture capital assistance for agri business development for finance, subsi...
Venture capital assistance for agri business development   for finance, subsi...Venture capital assistance for agri business development   for finance, subsi...
Venture capital assistance for agri business development for finance, subsi...Radha Krishna Sahoo
 
Odisha agriculture policy 2013 for finance, subsidy & project related supp...
Odisha agriculture policy  2013   for finance, subsidy & project related supp...Odisha agriculture policy  2013   for finance, subsidy & project related supp...
Odisha agriculture policy 2013 for finance, subsidy & project related supp...Radha Krishna Sahoo
 
Fishery and animal husbandry - for finance, subsidy & project related supp...
Fishery and animal husbandry    - for finance, subsidy & project related supp...Fishery and animal husbandry    - for finance, subsidy & project related supp...
Fishery and animal husbandry - for finance, subsidy & project related supp...Radha Krishna Sahoo
 
Odisha agriculture policy 2013 guideline for subsidy for finance, subsidy &...
Odisha agriculture policy 2013 guideline for subsidy   for finance, subsidy &...Odisha agriculture policy 2013 guideline for subsidy   for finance, subsidy &...
Odisha agriculture policy 2013 guideline for subsidy for finance, subsidy &...Radha Krishna Sahoo
 
Rice husk power plant project for finance, subsidy & project related suppor...
Rice husk power plant project   for finance, subsidy & project related suppor...Rice husk power plant project   for finance, subsidy & project related suppor...
Rice husk power plant project for finance, subsidy & project related suppor...Radha Krishna Sahoo
 
Rice husk based cogeneration power plant for finance, subsidy & project rel...
Rice husk based cogeneration power plant   for finance, subsidy & project rel...Rice husk based cogeneration power plant   for finance, subsidy & project rel...
Rice husk based cogeneration power plant for finance, subsidy & project rel...Radha Krishna Sahoo
 
Rice husk ash fuel to wealth - for finance, subsidy & project related suppo...
Rice husk ash   fuel to wealth - for finance, subsidy & project related suppo...Rice husk ash   fuel to wealth - for finance, subsidy & project related suppo...
Rice husk ash fuel to wealth - for finance, subsidy & project related suppo...Radha Krishna Sahoo
 
Energy & safety audit of rice mill for husk based power plant for finance, ...
Energy & safety audit of rice mill for husk based power plant   for finance, ...Energy & safety audit of rice mill for husk based power plant   for finance, ...
Energy & safety audit of rice mill for husk based power plant for finance, ...Radha Krishna Sahoo
 
List of project available for finance, subsidy & project related support co...
List of project available   for finance, subsidy & project related support co...List of project available   for finance, subsidy & project related support co...
List of project available for finance, subsidy & project related support co...Radha Krishna Sahoo
 
Quality control of milk processing for finance, subsidy & project related s...
Quality control of milk processing   for finance, subsidy & project related s...Quality control of milk processing   for finance, subsidy & project related s...
Quality control of milk processing for finance, subsidy & project related s...Radha Krishna Sahoo
 
Odisha agriculture policy 2013 guideline for subsidy for finance, subsidy &...
Odisha agriculture policy 2013 guideline for subsidy   for finance, subsidy &...Odisha agriculture policy 2013 guideline for subsidy   for finance, subsidy &...
Odisha agriculture policy 2013 guideline for subsidy for finance, subsidy &...Radha Krishna Sahoo
 
Odisha food processing policy 2013 for finance, subsidy & project related s...
Odisha food processing policy 2013   for finance, subsidy & project related s...Odisha food processing policy 2013   for finance, subsidy & project related s...
Odisha food processing policy 2013 for finance, subsidy & project related s...Radha Krishna Sahoo
 
Jibanadhara for finance, subsidy & project related support contact - 986145...
Jibanadhara   for finance, subsidy & project related support contact - 986145...Jibanadhara   for finance, subsidy & project related support contact - 986145...
Jibanadhara for finance, subsidy & project related support contact - 986145...Radha Krishna Sahoo
 
Msme iniciative for finance, subsidy & project related support contact - 98...
Msme iniciative   for finance, subsidy & project related support contact - 98...Msme iniciative   for finance, subsidy & project related support contact - 98...
Msme iniciative for finance, subsidy & project related support contact - 98...Radha Krishna Sahoo
 
Portland cement mfg. process for finance, subsidy & project related support...
Portland cement mfg. process   for finance, subsidy & project related support...Portland cement mfg. process   for finance, subsidy & project related support...
Portland cement mfg. process for finance, subsidy & project related support...Radha Krishna Sahoo
 
Risk capital and msm es in india for finance, subsidy & project related sup...
Risk capital and msm es in india   for finance, subsidy & project related sup...Risk capital and msm es in india   for finance, subsidy & project related sup...
Risk capital and msm es in india for finance, subsidy & project related sup...Radha Krishna Sahoo
 
Orissa industry for finance, subsidy & project related support contact - 98...
Orissa industry   for finance, subsidy & project related support contact - 98...Orissa industry   for finance, subsidy & project related support contact - 98...
Orissa industry for finance, subsidy & project related support contact - 98...Radha Krishna Sahoo
 
Odisha agriculture policy 2013 for finance, subsidy & project related supp...
Odisha agriculture policy  2013   for finance, subsidy & project related supp...Odisha agriculture policy  2013   for finance, subsidy & project related supp...
Odisha agriculture policy 2013 for finance, subsidy & project related supp...Radha Krishna Sahoo
 
Credit linked capital subsidy scheme for technology upgradation for finance...
Credit linked capital subsidy scheme for technology upgradation   for finance...Credit linked capital subsidy scheme for technology upgradation   for finance...
Credit linked capital subsidy scheme for technology upgradation for finance...Radha Krishna Sahoo
 

Plus de Radha Krishna Sahoo (20)

Buy transfer home loan
Buy transfer home loanBuy transfer home loan
Buy transfer home loan
 
Venture capital assistance for agri business development for finance, subsi...
Venture capital assistance for agri business development   for finance, subsi...Venture capital assistance for agri business development   for finance, subsi...
Venture capital assistance for agri business development for finance, subsi...
 
Odisha agriculture policy 2013 for finance, subsidy & project related supp...
Odisha agriculture policy  2013   for finance, subsidy & project related supp...Odisha agriculture policy  2013   for finance, subsidy & project related supp...
Odisha agriculture policy 2013 for finance, subsidy & project related supp...
 
Fishery and animal husbandry - for finance, subsidy & project related supp...
Fishery and animal husbandry    - for finance, subsidy & project related supp...Fishery and animal husbandry    - for finance, subsidy & project related supp...
Fishery and animal husbandry - for finance, subsidy & project related supp...
 
Odisha agriculture policy 2013 guideline for subsidy for finance, subsidy &...
Odisha agriculture policy 2013 guideline for subsidy   for finance, subsidy &...Odisha agriculture policy 2013 guideline for subsidy   for finance, subsidy &...
Odisha agriculture policy 2013 guideline for subsidy for finance, subsidy &...
 
Rice husk power plant project for finance, subsidy & project related suppor...
Rice husk power plant project   for finance, subsidy & project related suppor...Rice husk power plant project   for finance, subsidy & project related suppor...
Rice husk power plant project for finance, subsidy & project related suppor...
 
Rice husk based cogeneration power plant for finance, subsidy & project rel...
Rice husk based cogeneration power plant   for finance, subsidy & project rel...Rice husk based cogeneration power plant   for finance, subsidy & project rel...
Rice husk based cogeneration power plant for finance, subsidy & project rel...
 
Rice husk ash fuel to wealth - for finance, subsidy & project related suppo...
Rice husk ash   fuel to wealth - for finance, subsidy & project related suppo...Rice husk ash   fuel to wealth - for finance, subsidy & project related suppo...
Rice husk ash fuel to wealth - for finance, subsidy & project related suppo...
 
Energy & safety audit of rice mill for husk based power plant for finance, ...
Energy & safety audit of rice mill for husk based power plant   for finance, ...Energy & safety audit of rice mill for husk based power plant   for finance, ...
Energy & safety audit of rice mill for husk based power plant for finance, ...
 
List of project available for finance, subsidy & project related support co...
List of project available   for finance, subsidy & project related support co...List of project available   for finance, subsidy & project related support co...
List of project available for finance, subsidy & project related support co...
 
Quality control of milk processing for finance, subsidy & project related s...
Quality control of milk processing   for finance, subsidy & project related s...Quality control of milk processing   for finance, subsidy & project related s...
Quality control of milk processing for finance, subsidy & project related s...
 
Odisha agriculture policy 2013 guideline for subsidy for finance, subsidy &...
Odisha agriculture policy 2013 guideline for subsidy   for finance, subsidy &...Odisha agriculture policy 2013 guideline for subsidy   for finance, subsidy &...
Odisha agriculture policy 2013 guideline for subsidy for finance, subsidy &...
 
Odisha food processing policy 2013 for finance, subsidy & project related s...
Odisha food processing policy 2013   for finance, subsidy & project related s...Odisha food processing policy 2013   for finance, subsidy & project related s...
Odisha food processing policy 2013 for finance, subsidy & project related s...
 
Jibanadhara for finance, subsidy & project related support contact - 986145...
Jibanadhara   for finance, subsidy & project related support contact - 986145...Jibanadhara   for finance, subsidy & project related support contact - 986145...
Jibanadhara for finance, subsidy & project related support contact - 986145...
 
Msme iniciative for finance, subsidy & project related support contact - 98...
Msme iniciative   for finance, subsidy & project related support contact - 98...Msme iniciative   for finance, subsidy & project related support contact - 98...
Msme iniciative for finance, subsidy & project related support contact - 98...
 
Portland cement mfg. process for finance, subsidy & project related support...
Portland cement mfg. process   for finance, subsidy & project related support...Portland cement mfg. process   for finance, subsidy & project related support...
Portland cement mfg. process for finance, subsidy & project related support...
 
Risk capital and msm es in india for finance, subsidy & project related sup...
Risk capital and msm es in india   for finance, subsidy & project related sup...Risk capital and msm es in india   for finance, subsidy & project related sup...
Risk capital and msm es in india for finance, subsidy & project related sup...
 
Orissa industry for finance, subsidy & project related support contact - 98...
Orissa industry   for finance, subsidy & project related support contact - 98...Orissa industry   for finance, subsidy & project related support contact - 98...
Orissa industry for finance, subsidy & project related support contact - 98...
 
Odisha agriculture policy 2013 for finance, subsidy & project related supp...
Odisha agriculture policy  2013   for finance, subsidy & project related supp...Odisha agriculture policy  2013   for finance, subsidy & project related supp...
Odisha agriculture policy 2013 for finance, subsidy & project related supp...
 
Credit linked capital subsidy scheme for technology upgradation for finance...
Credit linked capital subsidy scheme for technology upgradation   for finance...Credit linked capital subsidy scheme for technology upgradation   for finance...
Credit linked capital subsidy scheme for technology upgradation for finance...
 

Husk based power plant 6 t 32 kg fbc with single stage turbine for finance, subsidy & project related support contact - 9861458008

  • 1. Ref : IB/D/Q113/113/13 Date : 04th Jan. 2013 Mr. Santosh Agarwala M/s Sonthalia Rice Mill., S3/36,37, Sec-A, Zone –B, Mancheshwar Indl. Estate, Bhubhneshwar (Orissa) Dear Sir, As desired by you, we are pleased to submit our offer for high pressure husk fired FBC boiler and Back Pressure Steam Turbine for co-generation purpose. While designing the system, we have assumed the following data:- Boiler Capacity from feed water at 900C 6000 Kg/hr Steam Flow to Turbine / Plant Consumption 4000 Kg/hr Steam temperature at Boiler Outlet 350 +/-10 0C Boiler Design Pressure 32 Kg/cm2 Steam temperature at turbine inlet (max) 350 0C Turbine Inlet pressure 30 Kg/cm2 Outlet Pressure of Steam from Turbine(max) 3.50 Kg/cm2 Power Output based on above steam demand 202 KW / 252 KVA
  • 2. For the purpose of clarity and simplification our quotation is grouped separately as follows. BOILER DATA Design Data Annexure - I Scope of Supply. Annexure - II Technical Specification. Annexure –III TURBINE DATA Material Specification Of Turbine Annexure - IV Turbine Technical Information Annexure - V COMMERCIAL DATA Commercial Offer Annexure- VI General Terms & Conditions. Annexure - VII We hope you will find this quotation informative and we look forward to your comments and suggestions to fine tune the system to suit your requirements. Thanking you, for INDUSTRIAL BOILERS LTD. INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 2 - H.S.ANAND Executive Director Mob : 09350169001 HUSKOGEN
  • 3. ANNEXURE - I BOILER DESIGN PARAMETERS Unique features of the Huskogen Boiler ¾ Unique Non Membrane Radiant water tube design furnace. ¾ Straight Tube convection Bank. ¾ Microprocessor based Continuously Modulating fuel feeding. ¾ Expandable Boiler thru In-bed tubes for long life. INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 3 - ¾ Seamless in bed tubes ¾ Super heater tubes suitable for 370 Deg C ¾ Stainless Steel Fluidising Air Nozzles. ¾ High Efficiency TREXMA Dust Collector.
  • 4. The following parameters have been taken as the basis for the design of the proposed boiler. Boiler parameters at Maximum Continuous Rating :- Steam flow at Superheater outlet 6000 kg/hr Steam pressure at superheater outlet 32.00 kg/cm² (g) Steam temp. at superheater outlet 350°C ± 10°C Superheater temperature control range 75 - 100% load Feed water temp. at inlet to Boiler 90° C The Type of Boiler selected is :- Location Indoor Type of Boiler Single Drum, Water Tube, Natural Circulation Combustion system Fluidised Bed Draft system Balanced draft Support Bottom supported on RCC construction. Fuel Specifications • Primary Fuel Rice Husk • GCV of Rice husk 3300 Kcal/Kg (Moisture -6 %) ƒ Emergency Fuels Coal, Lignite. (Size < 6 mm) • Start up Fuel Kerosene + Charcoal (Size15 – 30 mm) Site Conditions :- Ambient temp (for design) 40°C Relative humidity (for design) 60% Wind load As per IS 875 Seismic coefficient As per IS 1893 INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 4 -
  • 5. Codes & Standards :- Pressure parts As per IBR with its latest amendments. Non pressure parts As per our Standard Engineering Practice. Boiler Thermal Efficiency As per BS 845 Part I, Indirect method. Radiation loss As per standard ABMA radiation loss chart Utility Requirements :- Electrical Requirements for Motors Voltage 415 ± 6% V Frequency 50 ± 3% Hz Phase 3 phase, 4 wire Electrical Requirements for Instrumentation and Panel Voltage 230 V Frequency 50 Hz Phase Single Phase INSTRUMENT AIR Pressure 7.0 Kg/cm² g Quality Dry, free from oil & dirt Dew point temp. - 15° C BED MATERIAL Material Sieved Natural river bed sand / Crushed Refractory Size 1 to 2.5 mm Bulk density 1200 to 1500 Kg/m3 Melting Point + 1500oC COOLING WATER REQUIREMENT Quantity 0.5 m3/hr Temperature < 40 oC INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 5 -
  • 6. ANNEXURE - II SCOPE OF SUPPLY HUSK GEN MODEL FBC FIRED BOILERS CONSTRUCTION : The Fluidised Bed Boilers offered by us are made as per the latest IBR Regulations and are of Class-I Fusion welded construction. Stringent quality control is observed at every stage of manufacture right from raw material stage to testing of Boiler prior to dispatch. The pressure parts are manufactured from Boiler Quality Steel, fully welded construction, shell radiograph and hydraulically tested. One Steam Cum Water drum which incorporates the Smoke Tube boiler bank.Water tubes are provided within the combustion area to maintain a furnace temperature range of 6500C to 7500C. These tubes are connected with header at the bottom along with downcomers to form a natural water circulation circuit. A convective evaporator section consisting of a Smoke tube boiler section is so designed as an inline arrangement. FLUE GAS PATHS : The Boiler consists of a configuration enabling high turn down ratios. The combustion once completed in the bed is released into the free board zone at a temperature slightly higher than 750oC. The Water Tubes absorb the heat before leading the gases into the super heater zone and then to Smoke tube boiler section (Convection Bank). The flue gases are then taken into an APH, Dust Collector, I.D.Fan and into the chimney. STEAM CUM WATER DRUM The boiler consist of one Steam cum water drum. This drum connects the Risers and Downcomers to various Heating Surface Sections within the Boiler. Feed Water is fed from the Feed Pumps into this drum. Water level is maintained in the drum thru Mobrey control provided.This drum also contains the Convection Bank of Tubes.The Drum is provided with Hinged doors at the Rear for easy approach and Cleaning. A Blowdown connection is provided to remove the sludge during operation. INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 6 -
  • 7. FERRULES : Stainless Steel Ferrules are provided at the entry of Furnace gases to the smoke tubes. These protect and increase the life of the smoke tubes. WATER TUBES : Tubes of BS 3059 ERW grade are used for Water tubes in the furnace zone. These tubes maintain proper Furnace temperature to prevent overheating and clinker formation. CONVECTION BANK TUBES : Tubes of BS 3059 ERW grade are used for the convection Bank. These are all straight tubes which can easily be replaced when required. The first pass tube is protected from erosion at the ends thru Stainless Steel Ferrules. INBED TUBES : Extra Heavy and Thick Seamless In-Bed Tubes are provided directly immersed within the Fluidising area. These tubes are directly connected to the Steam Drum at the Top thru separate Risers and Downcomers. HEADERS : Extra Thick Seamless headers as per BS3059/ASTM 106 are provided. The headers have one side opening and the tube holes are drilled on them. MOUNTINGS & FITTINGS (STEAM DRUM) : One Air Vent Valve. Two Single Post Safety Valves. Two Sets of Water level gauges. One Pressure gauge with siphon and cock. One Inspectors pressure gauge cock. One Blow down valve. MOUNTINGS & FITTINGS (WATER DRUM) : INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 7 - One Blow down valve. One Feed Stop valve. One Feed Check valve.
  • 8. MOUNTINGS & FITTINGS (WATER WALL HEADERS) : INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 8 - Two Blow down valves. MOUNTINGS & FITTINGS (INBED HEADERS) : One Blow down valve. MOUNTINGS & FITTINGS (SUPER HEATER) : One Main Steam Stop Valve One Air Vent Valve. One Single Post Safety Valve. One Pressure gauge with siphon and cock. One Drain valve on header. FEED PUMPS : Two numbers (One duty and One stand by) electrically driven reciprocating Feed Pumps with motors will be provided. AUTOMATIC WATER LEVEL CONTROL : Feed water regulating system to ensure correct water level in the Boiler. In case of extreme low water level an alarm is provided. The system consist of the following : ¾ A level controller with a control valve to maintain the correct water level in the boiler drum. ¾ Manual Pump on / off control to start and stop the pump to maintain the desired water level in the boiler in case of an emergency. ¾ High & Low water level Annunciation system with an audio (Alarm) & visual indication is given. ¾ In case of extreme low water the boiler goes in a lock out condition and the an audio (Alarm) & visual indication is given. ¾ An Mobrey control is provided for additional safety. In case of extreme low water the boiler goes into a lockout condition and an audio & visual indication is given.
  • 9. CONTROL PANEL : The panel consist of a sophisticated but user friendly circuit enabling the operator to run the boiler in automatic or manual mode as desired. Various instruments and safety features are as detailed below: In auto mode the boiler will operate all sequences automatically. The boiler can be also adjusted to start and stop automatically within a pressure range of 3 to 5 Kg/cm2. However in case of Low Loads, below 75% of MCR, steam superheat temperature will differ from Designed Values.Initially during pre fluidisation state the boiler needs to be started manually. The Panel is lockable by a key to prevent unauthorised operation of the boiler. The MCC will be fixed (non-draw out) type modular with single front and is suitable for indoor application. The cable entry will be from bottom. In the control panel Switches, Motors Starters, Indication Lamps, Control Fuses, Main Incoming Switch and Inter connecting wiring for the following is provided. F.D. Fan I. D. Fan Feed Pumps (2 Nos.) Fuel Feeder Temperature indicators with selector switch. Annunciation windows to show unhealthy operation for the following are provided: INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 9 - F. D. Fan Trip I. D. Fan Trip Feed Pumps Trip Fuel feeder Trip Drum Level Low Drum Level High Bed Temperature high
  • 10. MICRO PROCESSOR BASED FUEL FEEDING : Microprocessor based indicator cum controller(s) is provided for Fuel Feeding. The controller senses the temperature of fluidisation and delivers a precise signal to the dynodrive(s) to increase / decrease the fuel feeding rate. By the use of this advanced micro processor technology precise control of feel feeding is maintained leading to Low excess air losses and subsequently a very high fuel efficiency. FORCED DRAFT FAN : The Forced Draft Fan provides air for combustion. This Fan is a Centrifugal machine with impellers directly fitted onto the Motor Shaft. A Damper on the Inlet is provided to control the Air Flow. The D fan includes a drive Motor. INDUCED DRAFT FAN : The Induced Draft Fan removes Flue Gases by Suction from the Boiler. This Fan is a Centrifugal machine with impellers fitted to a Shaft which is driven by Pulleys from a motor. A cooling Disc is provided on the shaft to cool it sufficiently before the heat reaches the Pulley Blocks. The Impellers are lined at crucial Places by Hard, Wear Resistant Liners. A Damper on the Inlet is provided to control the Gas Flow. AIR HEATER : A Multi tubular Air Preheater having a cross flow of Air to flue gases is Provided. The Flue Gases move in Two Passes, substantially transferring the heat before gases exit to the ID Fan. A Rotary Air Lock Valve is provided at the bottom of the Air Preheater to continuously discharge the Ash collected. Inlet / outlet manifolds of the Air and Flue gases are provided. SMOKE DOORS : Easily operational double hinged type doors are provided at the Back end of the Boiler to give clear access to the tubes. INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 10 -
  • 11. MANHOLE : A large size manhole is provided at the top to give convenient access to the water side of the shell. DUST COLLECTOR : A highly efficient Cyclone Type TREXMA Dust Collector is provided to check carry over the dust particles which otherwise would escape to the atmosphere. The precipitator separates the dust particles by the use of centrifugal and gravitational forces. Ash is continiously discharged from the Bottom of the dust collector. The Dust Particulate Emission is well within most Pollution Norms. STRUCTURE : The Boiler is mounted on its chairs which are in turn placed on Civil Structures. NSTRUMENTATION AND SAFETY INTERLOCKS : The system offered is extremely simple and convenient to operate. Amongst the Instruments provided are :- Bed Temperature Indicator cum controller Bed Height Indicator. (Indirect Indication) Fuel Feeder Speed Indicator. Water Level Controller cum Alarm. Multiple point annunciator for displaying unhealthy operating conditions. The following are a few of the safety interlocks :- In case of high bed temperature the feeders shut down. In case of high steam pressure the boiler fans and feeders shut off. In case of low water the pumps operate. In case of extreme low water level the whole system automatically goes into a lockout condition. INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 11 - EMISSION GUARANTEED LESS THAN 350 mg/Nm3
  • 12. DRAWINGS & DOCUMENTS : We shall provide tentative drawings showing the general layout and the foundation plans. This will only be used as guidance by our clients as the site location will vary from place to place. A complete set of Drawings and Documents duly certified by the Inspecting Authority of the State of Origin will be given within 4 to 6 weeks after the dispatch of the boiler. BATTERY LIMITS : Water - Inlet of Feed Pumps and Drum Steam - Outlet of Main Steam Stop Valve at Superheater Blow down - Outlet of Blow down Valves Drain - Outlet of Level Gauges and Controllers Ash - Outlet of Dust Collector, Air Preheater - Outlet of Gates at Boiler - Outlet of Slide Gates for Bed Ash removal Flue Gas - Outlet of Boiler - In & Out of APH and Dust Collector - Suction and Delivery of I.D. Fan Electricals - Inlet of all motors and controls and panel Fuel - Inlet of Screw Feeder INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 12 -
  • 13. EXCLUSIONS : # Water treatment plant. # Main Chimney and Flue Duct between boiler, Heat Recovery Unit, Dust Collector and Chimney. # Interconnecting Ducting of Air Preheater # Fuel handling system upto screw feeder. # Feed Water Tanks, Feed Water Piping upto the terminal point. # Steam, Blow down and Drain Piping from terminal Valves on INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 13 - the boiler. # Insulation of boiler and Steam pipeline. # Refractory Materials for the Furnace. # Structural materials such as platform, ladders, supports, etc. # All civil and structural design work for installing the boiler. # Electrical work in the boiler house upto the terminal points and interconnecting cables. # Instrument and accessories for performance test. # Labour, Tools, Tackles, Utilities, Consumables like charcoal, Kerosene, Inert, materials, cleaning and lubricating agents required for assembling, erecting and commissioning of the boiler.
  • 14. ANNEXURE - III TECHNICAL SPECIFICATIONS OF BOILER Max. continuous rating : 6000 Kg/hr (From 90oC) Type of Boiler : Fluidised Bed Combustion Model No. : HUSKO-60 Design Code : Indian Boiler Regulations Safety valve set pressure : 34 Kg/cm2 Design Pressure : 32 Kg/cm2 Hydraulic Test Pressure : 48 Kg/cm2 Superheat Temperature : 350oC +/- 10oC Feed water Temperature : 90oC Thermal Efficiency : 80% +/- 2% as BS:845 Pt. 1 Indirect Method Fuel consumption on GCV of : 1480 Kg/hr at 6 TPH load Husk 3300 Kcal/Kg. Material Specifications : Boiler Drums : ASTM 515/516 Gr 60/70 Headers : ASTM 106 Gr B Boiler Tubes : BS 3059 Pt 1 ERW Super Heater Tubes : BS 3059 Pt 1 ERW In Bed Tubes : BS 3059 Pt 1 Seamless Fluidised Bed Nozzles : AISI Stainless Steel 304 Ferrules : AISI Stainless Steel 304 INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 14 -
  • 15. F.D. Fan details : Type : Centrifugal Direct Drive Motor : 30 H.P. CFM : 5250 Pressure : 600 mm RPM : 2900 Quantity : 1 No. I.D. Fan details : Type : Centrifugal V- Belt Drive Motor : 25 H.P. CFM : 9000 Pressure : 250 mm RPM : 1200 Feed Pump details Type : Reciprocating Flow : 8000 Ltr/hr Head : 36 Kg/cm2 Motor : 20 HP No. of pumps : 2 Nos. Fuel Feeder details : Type : Screw Feeder Control : Variable Speed Dynodrive Motor : 1 HP Gear Box Ratio : 1:20 No. of Feeders : 1 No. Velocity Profile : Fluidised Bed : 3 – 2 m/sec Freeboard Zone : 8 –10 m/sec Superheater Zone : 6 – 8 m/sec Convection Bank : 20 – 15 m/sec Air Preheater Bank : 20 – 25 m/sec Dust Collector : 250 – 100 m/sec Gas Ducting : 8 – 10 m/sec Chimney : 6 –8 m/sec INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 15 -
  • 16. Temperature Profile Fluidised Bed : 700 – 800oC Free Board : 1000 - 1200oC Exit of Radiation Zone : 500 – 600oC From Boiler : 240 – 260oC After Air Preheater : 150 – 180oC Draft Losses Profile Boiler : 25 mm WG H.R.U. : 40 mm WG Dust Collector : 100 mm WG BOILER VALVE SIZING MOUNTINGS & FITTINGS (STEAM DRUM) : One Air Vent Valve. Two Single Post Safety Valves. Two Sets of Water level gauges. One Pressure gauge with siphon and cock. One Blow down valve. MOUNTINGS & FITTINGS (WATER DRUM) : One Blow down valve. One Feed Stop valve. One Feed Check valve. MOUNTINGS & FITTINGS (WATER WALL HEADERS) : Two Drain valves. MOUNTINGS & FITTINGS (INBED HEADERS) : One Drain valve. MOUNTINGS & FITTINGS (SUPER HEATER) : One Main Steam Stop Valve One Air Vent Valve. One Single Post Safety Valve. One Pressure gauge with siphon and cock. One Drain valve on header. INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 16 -
  • 17. FEED WATER SPECIFICATIONS Deaerated and Demineralised water is recommended for the boiler. Feed water should meet the following requirements. Water Hardness : 0.2 ppm max. pH : 8.5 - 9.5 Dissolved Oxygen : 0.1 ppm max. Oil Content : Nil TDS : 200 ppm max. BOILER WATER SPECIFICATIONS Water Hardness : 0.5 ppm max. Total Alkalinity ( as CaCo3 ) : 700 ppm max. but INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 17 - not exceeding 20% of TDS Caustic Alkalinity ( as CaCo3) : 350 ppm max. pH : 11 - 12 Unreacted Sodium Sulphate (as Na2So3) : 30 -50 ppm. Phosphates ( as Po4 ) : 20 - 40 ppm. TDS : 1000 ppm max., Residual Hydrazine ( as N2H4 ) : 0.5 ppm max. FUEL SPECIFICATIONS FOR GUARANTEES Fuel : Husk Moisture : <10% Calorific Value : 3300 Kcal/Kg Impurities : Nil
  • 18. UNIQUE FEATURES OF IBL BT-4 TURBINES ¾ Horizontally Split Steam casing. Permits easy inspection of the internals without disturbing the steam lines. ¾ True Centre line support. Enables equal expansion of all the components, permitting safe and quick startup. Allows precise alignment of the turbine with the driven machine. INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 18 - ¾ Curtis Blades. Two sets of blade rows to achieve higher efficiency. ¾ Pressurised Lubrication. The Bearings of the Turbine and the gearbox are supplied with a Forced Lubrication and a Oil Cooling system which enables the turbine to run smoothly and effortlessly. ¾ Metaflex Couplings Type High Speed metaflex type couplings are provided between the Turbine and Gearbox. These couplings have outstanding flexibility at high speeds. ¾ Loaded with safety features. All standard features such as Emergency valve, Over speed governor, High Pressure trip, Low Lube Oil Pressure trip.
  • 19. ANNEXURE - IV MATERIAL SPECIFICATIONS OF IBL BT-4 TURBINE CASTINGS The Castings are made out of robust alloy steel of Radiography quality. The casing is split horizontally at the center line, permitting easy access to the interior for inspection without disturbing the steam inlet and outlet lines. Centre line support ensures precise alignment of the turbine with driven machine. WHEEL The Forged wheel is accurately profiled and machined to very close tolerances, and located between heavy duty Bearings for continuous and long operations. The Built-up Rotor is dynamically balanced to a high degree of accuracy to ensure vibration free, smooth, and years of trouble free operation of the Turbine. SHAFT The shaft is made out of Forged Carbon Steel & the Section under the Carbon glands is chrome plated to minimize erosion & corrosion. NOZZLES Nozzles are made of S.S. and manufactured with High accuracy as per the specified Steam parameters for developing optimum efficiency. BLADES These are manufactured out of a thick section of erosion and corrosion resistance stainless steel and fitted firmly in the rim of the wheel. A sectional shroud ensures added rigidity. These blades are renewable and replaceable, if need arises, on account of changing operating conditions. BEARINGS Precision split sleeve journal bearings incorporate Babbitt lining, and are forced lubricated. GLANDS The glands are of carbon ring type, each composed of three segments held together by an inconel spring that incorporates anti-rotation stops. Carbon rings require no lubrication. INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 19 -
  • 20. EMERGENCY VALVE A Butterfly type valve for extreme emergency is housed in the Governor Valve Body. This valve is made in high grade material and accurately machined to maintain maximum seal to cut off live steam in case of tripping of Turbine. A stainless steel steam strainer is provided before the emergency valve to preclude any thick impurities into entering. OVERSPEED TRIP GOVERNOR IBL BT-4 Turbines include an Overspeed Governor. It consists of a Ring carried on the Turbine Shaft and operates the Emergency Valve when the Turbine speed reaches a preset speed at 10% above the normal running speed of the rotor. HAND NOZZLE VALVE One Hand operated nozzle control valve is provided to maintain reasonable high efficiency on part load operation. LUBRICATION Forced lubrication is provide by a geared type oil pump which is fitted on to the reduction Gear Box. The capacity of the pump is 90 LPM. A full duty motor driven Oil pump is standard to flood the Bearings during start up and shut down of the Turbine. GEAR BOX This non-integrated unit is housed separately and coupled with the Turbine with metaflex type coupling. The advantage is smooth and long life performance. This coupling with thin stainless steel flexible Membranes gives better performance. The Gear box is a single helical type speed reduction unit as per AGMA standard. INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 20 -
  • 21. ANNEXURE - V TURBINE TECHNICAL INFORMATION The following parameters have been taken for the design of the turbo alternator set. TURBINE DETAILS Model BT – 4 / 320 Maximum Power output 320 KW Type Velocity compounded Design Curtis (2 Rows) Driven Equipment Alternator / Ind. Gen. Turbine operating Speed 7000 RPM TURBINE INLET CONDITIONS Steam flow 4,000 kg/hr Steam pressure 30.00 kg/cm² (g) Steam temperature 350°C Steam Rate 19.80 Kg/KW-hr Steam Inlet Size 4” Steam Quality Dry, Free from any Impurities TURBINE OUTLET CONDITIONS Steam flow 4,000 kg/hr Steam Back pressure 3.50 kg/cm² (g) Steam temperature 217°C ± 10°C Steam Outlet size 8” Power Output 202 KW If Steam Load is 6000 Kg/hr the Power output will be 320 KW INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 21 -
  • 22. ALTERNATOR (For Alternator based Sets only) Make Leroy Somer KW 320 KW Voltage 415 V Voltage Variation 5% Frequency 50 Hz Speed 1500 r.p.m. Phase 3 Pf 0.8 Lagging AVR Self Exciting No of Poles Four Connections Star Insulation Class H Overload capacity 10% overload for I hour in every 12 hours. Mounting Horizontal Foot Mounting Bearing arrangement Double Sleeve Bearing Excitation Brushless, Self Excitation Voltage Regulation +/- 1% of Set Voltage Voltage Setting +/-10% of Set Voltage Coupling Geared Type Duty Continuous GEAR BOX Make Triveni/Walchandnagar Input RPM 7000 Output RPM 1500 Gear Ratio 1: 4.66 Lubrication Forced Type Single Reduction, parallel Shaft, Helical Type Foot Mounted Service Factor 1:5 Duty Continuous Input & Output Design Standard AGMA 6011 G92 Class of accuracy DIN-415 INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 22 -
  • 23. MATERIAL OF CONSTRUCTION (GEAR BOX) Gear Wheel & Pinion Shaft 820 M 17 BS: 970-PT:1-1991 (EN 354) case carburised, Hardened to 60 +/-2 RC and ground to DIN- 4/5 class of accuracy. Gear Shaft 080 M40 – BS 1970:PT:1-92 (EN8) Casing Cast Iron Bearings White Metal Lined MATERIAL OF CONSTRUCTION (TURBINE) Casing Carbon Steel casting Nozzles Stainless Steel ANSI 410/EN56A Blades Stainless Steel AISI 420 Rotor Forging and Shaft 080, M40 Annealed, Hardened and Tempered steel Gear Wheel EN19 Gear Pinion EN 8 Labyrinth Packing Bronze Steam Strainer Stainless Steel Base Frame MS Fabricated Bearings Tin Rich Babbit Lining (White metal) INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 23 -
  • 24. CONTROL PANEL Type Free Standing type Controller Schneider Programmable Logic Control Initial Control Auto Synchronising Mode Running Control Back Pressure Mode Display on Panel Turbine Voltage Frequency Power Factor KW Turbine RPM Steam Back Pressure Vent Valve Position Steam Inlet Valve Position Display on Panel Turbine Bearing Temperatures Status of Elec Oil Pump Voltage Amperes Electronic Synchroscope FIELD PRESSURE GUAGES Locations Steam Inlet pressure Steam Exhaust pressure Steam Nozzle Box pressure Oil Pressure FIELD TEMPERATURE GUAGES Locations Steam Inlet Steam Exhaust Gear Box Bearing INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 24 -
  • 25. BATTERY LIMITS Inlet flange of steam turbine Exhaust flange of steam turbine Turbine Drains at respective points Inlet and outlet flange for cooling water for Oil coolers Electrical Inlet of all Controls Protection and metering panel terminal box Breaker panel terminal box Turbine control panel terminal box Power at generator terminals EXCLUSIONS FROM TURBINE SCOPE Steam Pipeline with inlet valve. Exhaust Steam Piping. Water supply for Oil Cooler. Electrical Cabling wherever required. Earth protection. Thermal Insulation. All civil works alongwith their design. Erection and assembly at site. Statutory permissions. Steam Flow meter. Flush and first fill of Oil. INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 25 -
  • 26. ANNEXURE - VI TECHNO COMMERCIAL OFFER Supply of One No. IBL, Hybrid, Fluidised Bed Combustion Boiler, Model Huskogen-60 capable of generating 6000 Kg/hr of Steam (From 90oC.) at the max. working pressure 455 PSI (32 Kg/cm2) at Super heater outlet with Superheated steam temp. of 350oC. alongwith Superheater, Air Preheater and Trexma Dust Collector. Rs. 51,00,000/-each (Rupees Fifty One Lac only) Supply of One No. IBT, Captive Generation Type Steam Turbine, Model BT- 4/320 (Alternator 320 KW) suitable for the following duty conditions along with Alternator & Gear Box And as per scope of supply enclosed. Steam Inlet 30 Kg/cm2g, 350o C Steam Pressure at Exit 3.50 Kg/cm2g Steam Flow 4,000 Kg/hr Estimated Power Output 230 KW Rs. 33,00,000/-each (Rupees Thirty Three Lacs Only) Supervision Of Erection & Commissioning on lump sum basis,.Lodging & Boarding for our engineer will be provided by you on free of cost at site Rs. 2,40,000/-Lumpsum (Rupees Two Lacs Forty Thousand Only) NOTE : THE ABOVE PRICES ARE EX-WORKS VAPI. PACKING & FORWARDING IS CHARGEABLE EXTRA @ 2%. THIS QUOTATION IS GOVERNED BY THE STANDARD TERMS & CONDITIONS OF OUR OFFER ENCLOSED HEREWITH. for INDUSTRIAL BOILERS LTD. INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 26 - MARKETING DIVISION
  • 27. ANNEXURE - VII GENERAL TERMS & CONDITIONS PRICE : The prices quoted are Ex-works Vapi. 2% Packing & Forwarding charges, Insurance and Freight charges are extra. Besides sales tax, octroi, excise and bank charges are also payable by you as applicable. DELIVERY : The delivery 3 – 4 months from the date of receipt of your technically and commercially clear order accompanied by necessary advance. We are not responsible for any delay caused by extraneous circumstances or Acts of God beyond our control and cannot pay any damages or penalties on this account. The equipment ordered may be dispatched in 1,2 or more lots. If required we can undertake the dispatch of the equipment on behalf of the buyer by road transport only to any destination given by the buyer on freight TO - PAY basis, on the clear understanding that we will not be liable for any damages whatsoever. The freight charges contracted by us on behalf of the buyer will be deemed as negotiated under the buyer's authority and therefore it shall be binding on the Buyer to make full payment. WARRANTY : Our products are warranted for a period of ONE YEAR from the date of dispatch, against any manufacturing defect or faulty workmanship reported in writing during the Warranty Period, The Warranty does not extend to consequential damages or losses. The Warranty is NULL & VOID if repairs and/or replacements are carried out without our consent in writing. It also does not cover bought-out items. This warranty is not applicable if full payment with `C' form has not been given to us. CONFIDENTIALITY : The client shall treat all quotations, drawings, data, technical information etc. received from Industrial Boilers Ltd., as strictly confidential an shall take all precautions necessary to prevent the unauthorised disclosure in part or parcel of any of the above mentioned, to any third party. INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 27 -
  • 28. TERMS OF PAYMENT : First 30% of the order value is payable as Advance with your firm order. The balance within 15 days on submission of our Proforma Invoice, including all costs and levies, such as price increase if any, Excise Duty, Sales Tax, Octroi and Insurance charges `C' Form etc. is payable before the materials are dispatched from our Vapi works. PLACE OF JURISDICTION In the event of any dispute arising as a result of contracting to supply against this offer and quotation, the place of Jurisdiction will be Greater Bombay and no other place. ARBITRATION All disputes or differences whatsoever arising between the parties out of or relating to the construction, meaning and operation or effect of this contract or the breach thereof shall be settled by arbitration in accordance with the Rules of Arbitration of the Indian Council of Arbitration and the Award made in pursuance thereof shall be binding on both the parties. All orders will only be accepted after the realisation after of the agreed advance which shall not be subject to any interest under any circumstances whatsoever. We however reserve the right to adjust such advance against any payments which might fall due because of delay in lifting of the ordered equipment or on account of incidental expenses incurred on buyer's behalf. An order placed with us cannot be canceled for any reason whatsoever without our consent in writing. Any cancellation of order without or consent will result in the forfeiture of Advance, without prejudice to our claim for compensation and other legal remedies. Before effecting dispatch, your Sales Tax Registration Numbers both State and Central are to be intimated to us. It is to be clearly understood that for Inter State dispatches Central Sales Tax Declaration Form should be handed over to us at the time of taking delivery of the boiler. If you fail to do so, Sales Tax charges in full will be payable to us. for INDUSTRIAL BOILERS LTD. INDUSTRIAL BOILERS LTD, 79-80 SATKAR, NEHRU PLACE , NEW DELHI - 28 - MARKETING DIVISION