Introduction& methodology
The task of this exercise was to carry out a looped levelling survey using the rise and fall booking method
around the CSM building. Our group consisted of Christopher Crabb, Alex Levantis and Robin Watson. The
weather conditions were overcast with a fairly pervasive mist throughout.
We chose the corner of a drain cover closest to the campus buildings to act as our first Backsight(BS) and
last Foresight (FS), the level we determined for this point witha handheld GPS was 124m AOD. From here
we proceeded to take one Intermediate Sight (IS) for each setup of the level, before taking a FS onto our
first Change Point (CP) where the staff remained whilst the instrument was moved to its next setup
position. The difference between each sight and the previous IS or BS was then worked out and applied
to the RL level of the last point as either a rise or fall.This was repeated for 11 different set-ups.
As can be seen on Fig 1., where practicable we kept our sights to the magnitude of 20-25m to reduce
collimation error, with an IS on a memorable location between these two CPs. Each of us took turns to
read the level, book the results and hold the staff.
Results

Fig 1 showing the location of our survey stations, change points and intermediate sights.
Point Name
1

Back Site

2

BS (M)

IS (M)

Corner of wall ESI
Building

White wall below
3 camera
Surveyors Mark
4 "JLI" by Mast
Survey mark "TI"
5 by disabled
Above 'FH' on
6 yellow drain
Lampost side by
7 triangle key
Left corner of
8 drain
Corner of lower
9 curb by reception
"00" in 2008 on
10 plaque
Base of double
11 lampost
12 Drain by bike rail
Drain Kite Mark,
13 by designated
North corner of
14 drain
Drain SE shipping
15 container
16

Rise (M)

Fall (M)

Reduced Level (M)

1.856

Remark

124.000 BM
1.551

0.045

0.305
1.611

0.893

1.999
1.625
0.602

115.585 CP

2.018

2.435

113.567 IS

0.095

113.472 CP

1.550

0.659
0.402

1.926

116.948 CP
119.294 IS

0.055

119.349 CP

3.978

0.714

115.022 IS

2.346

0.509

1.969

116.473 IS
0.888

2.715

4.380

116.099 CP

0.374

2.620

3.060

116.990 IS

0.891

2.513

3.985

119.460 CP

2.470
3.874

120.326 IS

0.866

2.983

121.572 CP

1.246
3.005

121.926 IS

0.354

2.139

124.245 CP

2.319
2.718

0.513

124.305 IS
0.060

2.364

2nd pipe west of car
registration sign

17 Curb Corner
Drain by Nitrogen
18 Tank
Driain by
19 Nitrogen
Base of private
20 property sign
Return to initial
21 BS
Sum of the
recordings:

FS (M)

123.327 IS

0.624
1.687

0.222

123.105 CP

0.609

123.996 FS

19.306

Σ BS - Σ FS =
Σ Rises – Σ Falls =
Last initial RL –
First RL

123.387 IS

1.078
19.302

0.282

11.425

11.429

0.004

-0.004
-0.004
0.004

Fig 2.Booking sheet with arithmetic checks.
On completing our survey we originally calculated our final error to be 0.051m, on examining the booking
sheet, it was noticed that one fall (point 3) had been treated as a rise and this was responsible for 0.047m
of theerror. The booking sheet shown at Fig 2.is the revised version. Our final error was then -0.004m;
well within the allowable misclosure where m=5mm
m√11=0.0165…
Likely sources oferror include wind buffeting the staff,especially at its fullest extension.The mist certainly
made sighting onto the staff difficult at certain points. Changing the position of the staff on the CP is
another possible source of error.
Use of sights of unequal lengthsalong steep slopes may have exacerbated any collimation error present in
the instrument,other calibration issues may also have affected our results.
Reading errors, or inconsistencies in the method of estimating to the nearest 1mm between the three
people taking those readings may also contribute; booking errors would certainly have caused an error
outside the allowable misclosure (0.051m) had this not been identified during our arithmetic checks
(Uren & Price, 2010: 43, 54-55).
Contouring exercise
The next part of the assignment involved the recording of a series of levels in a rough grid across a slop.
The position of these spot heights was then to be worked out using the Stadia Tachometry method. For
each point a bearing was recorded, along with the upper and lower stadia readings, and a reading from
the central crosshair. The difference between these points multiplied by 100 gave a horizontal distance to
the point being levelled.
A=100d,
where d = the difference between the upper and lower stadia. These coordinates and their heights are
shown in Fig 3.
Our coordinates were then calculated with the sin/cosine rule and plotted in fig 3.
ΔN =cosθ°A, ΔE = sinθ°A
where θ=the bearing of the point and A=the distance to the point calculated by the stadia tachometry
method above;

Results

Fig 3.Location of spot heights with Point 19’s adjusted position in red.
POI Point Name
Back sight taken
from 'FH' on
yellow drain
levelling point
1

BS (M)

IS (M)

1.801

FS (M)

HPC (M)

Angle (Deg)

Angle (RAD) Upper Stadia Lower Stadia Distance

Easting

Northing

3
4

33

0.576

1.895

1.706

18.900 10.2936778 15.8508737

1.953

120.129

103

1.798

1.978

1.926

5.200 5.06672434 -1.1697455

120.210

91

1.588

1.897

1.847

5.000 4.99923848

1.813

2

120.281

1.872

First row (near
CSM)

122.082

Level (M)

120.269

79

1.379

1.838

1.787

5.100 5.00629864 0.97312588

-0.087262

1.756

120.326

68

1.187

1.783

1.729

5.400 5.00679281

5

First row (ending
at tree)

1.721

120.361

59

1.030

1.749

1.693

5.600 4.80013688 2.88421322

6

Second row (at
Tree)

1.876

120.206

65

1.134

1.908

1.844

6.400 5.80036984 2.70475688

1.974

120.108

74

1.292

2.004

1.943

6.100 5.86369635 1.68138787

2.014

120.068

84

1.466

2.043

1.983

6.000 5.96713137 0.62717078

2.064

120.018

92

1.606

2.093

2.034

5.900 5.89640588

2.183

119.899

101

1.763

2.214

2.153

6.100 5.98792582 -1.1639349

2.413

119.669

100

1.745

2.448

2.378

7.000 6.89365427 -1.2155372

2.359

119.723

91

1.588

2.394

2.324

7.000 6.99893387 -0.1221668

2.339

119.743

81

1.414

2.377

2.301

7.600 7.50643139 1.18890193

2.318

119.764

72

1.257

2.357

2.280

7.700 7.32313518 2.37943086

2.269

119.813

64

1.117

2.310

2.227

8.300 7.45999058 3.63848052

2.535

119.547

70

1.222

2.579

2.491

8.800 8.26929506 3.00977726

2.718

119.364

77

1.344

2.763

2.675

8.800 8.57445657 1.97956928

2.859

119.223

84

1.466

2.904

2.816

8.800 8.75179268 0.91985048

2.938

119.144

91

1.588

2.993

2.892

10.100 10.0984617 -0.1762693

2.996

119.086

100

1.745

3.040

2.951

7

8
9
10 Second row

(ending at CSM)

11 Third Row
(starting at CSM)
12
13

14
15 Third Row
(ending at tree)
16 Fourth Row

(starting at CSM)

17
18
19

20 Fourth row
(ending at Tree)

8.900

2.0228756

-0.205907

8.764789 -1.5454688

Fig 4. Stadia Tachometry booking sheet with outlying result highlighted. Note conversion to radians for
use in Excel.
An obvious outlier in the results appears to be due to a reading/booking error, as the IS does not lie in the
middle of the upper and lower stadia readings as it should do. The IS for point 19 should be equidistant
between the upper and lower stadia; 2.9425 rather than 2.938 as booked.
Lower Stadia = 2.892 IS = 2.938 Upper Stadia = 2.993
Lower Stadia – IS = -0.044, and IS – Upper Stadia = -0.055
We would expect these two differences to be equal. If we adjust the upper stadia by the difference
between these two differences and recalculate the coordinates, then we can now mark the point at 9m
from the level, 8.998629256 -0.157071658.
2.993 – 0.011 = 2.982
so 100(2.982 – 2.892) = 9m
so cos91x9 = -0.157071658 and sin91x9 = 8.998629256
As shown in Fig 3.this point is far closer to the actual progression of points across the slope. Of course the
exact booking error cannot be known, but it seems reasonable that an extra 0.010m was added, probably
by reading the wrong 0.010m block on the E type staff used.

Alternative levelling methods
An electronic laser level would have eliminated our booking error of 0.047m and any other potential
errors from booking or reading the staff, laser levels can also be used accurately over greater distances
(up to 100m). Poor light or weather would affect the ability of the electronic level to sight on the
barcoded staff but these conditions affect all methods of levelling. Perhaps the only significant
disadvantage of the electronic level is the increase in price compared to the advantages it affords;
competent surveyors with a systematic approach to reading and booking can complete a survey in a
comparable period of time with an automatic level (Uren and Price, 2010: 41).
Levels can be calculated trigonometrically using a theodolite. Trigonometric levelling can be prone to
error as gravity is not used as a control element; sighting and reading of vertical angles must be
absolutely precise or errors in calculation become exacerbated as the slope distance increases (Uren and
Price 2010, p175). Another limitation is that the horizontal distance between the survey station and the
point being levelled must be known or calculated, again increasing the possibility for errors due to
inaccurate sighting. A survey of this kind involves far more calculation than direct levelling with an
automatic level, with the corresponding time required and increased chances of booking error. However,
the trigonometric method is useful (and indeed may be the only possible method) in circumstances
where the points to be levelled are inaccessible, such as mountaintops, or overheard power cables.
Levelling with an EDM or total station is entails using the same calculations involved with trigonometric
levelling, only carried out automatically by the instrument itself. The EDM allows this method to be used
where the distance to a point is not known by accurately measuring the slope distance. The same errors
resulting from inaccurate sighting still remain however, the instrument must be sighted exactly in the
centre of the prism, and it is advised that numerous readings be taken and any anomalies discarded, thus
adding to the length of the survey. Total stations are far more sensitive than automatic levels and
atmospheric conditions require that the instrument be given a chance to acclimatise to the ambient
temperature, and low and high levels of light or ground shimmer can require mathematical adjustments
to be made to the readings . Levelling with a total station is an effective way of obtaining heights for a
topographical or walkover survey (Uren & Price 2010: 174).
Alternative methods for a contouring survey could involve carrying out a detail survey with other
methods (i.e., total station, GPS or even chain survey), then simply adding spot heights with an automatic
level and the height of collimation method. Indeed this is the most common method within the
archaeological profession and one I have some experience of.
As can be seen there are advantages to using survey equipment other than an automatic dumpy level,
but these all have the potential for errors and a greater complexity than the direct levelling method. An
automatic level is economical, simple and robust where other methods may be complicated, delicate or
expensive.
Bibliography
Uren, J and Price, B. 2010, Surveying for Engineers, Fifth Edition, Palgrave Macmillan, Basingstoke.

Contenu connexe

Tendances

Ss report 1 ----levelling eport
Ss report 1 ----levelling eportSs report 1 ----levelling eport
Ss report 1 ----levelling eportMELVIN tan
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in SurveyingRAHUL SINHA
 
Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Sheng Zhe
 
engineering survey 1 report levelling
engineering survey 1 report levellingengineering survey 1 report levelling
engineering survey 1 report levellingYASMINE HASLAN
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1tfkc1212
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2Doreen Yeo
 
Fieldwork 1 (leveling)
Fieldwork 1 (leveling)Fieldwork 1 (leveling)
Fieldwork 1 (leveling)Enoch Wong
 
Site surveying report (levelling)
Site surveying report (levelling) Site surveying report (levelling)
Site surveying report (levelling) Penny3688
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-levelingXinYee Khoo
 
Assignment 1 - Levelling
Assignment 1 - LevellingAssignment 1 - Levelling
Assignment 1 - LevellingKai Yun Pang
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1Tee Joanne
 
Site surveying report ii
Site surveying   report iiSite surveying   report ii
Site surveying report ii마 이환
 
SITE SURVEYING LEVELING
SITE SURVEYING LEVELINGSITE SURVEYING LEVELING
SITE SURVEYING LEVELINGFarah Sham
 
Site Surveying Leveling
Site Surveying LevelingSite Surveying Leveling
Site Surveying Levelingashleyyeap
 

Tendances (18)

Ss report 1 ----levelling eport
Ss report 1 ----levelling eportSs report 1 ----levelling eport
Ss report 1 ----levelling eport
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)
 
engineering survey 1 report levelling
engineering survey 1 report levellingengineering survey 1 report levelling
engineering survey 1 report levelling
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
 
Fieldwork 1 (leveling)
Fieldwork 1 (leveling)Fieldwork 1 (leveling)
Fieldwork 1 (leveling)
 
Site surveying report (levelling)
Site surveying report (levelling) Site surveying report (levelling)
Site surveying report (levelling)
 
Levelling
LevellingLevelling
Levelling
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
 
Levelling report
Levelling reportLevelling report
Levelling report
 
Levelling
LevellingLevelling
Levelling
 
Assignment 1 - Levelling
Assignment 1 - LevellingAssignment 1 - Levelling
Assignment 1 - Levelling
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1
 
Site surveying report ii
Site surveying   report iiSite surveying   report ii
Site surveying report ii
 
SITE SURVEYING LEVELING
SITE SURVEYING LEVELINGSITE SURVEYING LEVELING
SITE SURVEYING LEVELING
 
Site Surveying Leveling
Site Surveying LevelingSite Surveying Leveling
Site Surveying Leveling
 

En vedette

Leveling surveying
Leveling surveyingLeveling surveying
Leveling surveyingMohammed_82
 
Android application for s park system
Android application for s park systemAndroid application for s park system
Android application for s park systemeSAT Journals
 
Field work 1 (1)
Field work 1 (1)Field work 1 (1)
Field work 1 (1)Chee Lee
 
Unit 28 topographic_surveying_in_construction_and_civil_engineering
Unit 28 topographic_surveying_in_construction_and_civil_engineeringUnit 28 topographic_surveying_in_construction_and_civil_engineering
Unit 28 topographic_surveying_in_construction_and_civil_engineeringMehmet Cemal Acar
 
مقدمه في عمل المزانيات المساحيه
مقدمه في عمل المزانيات المساحيهمقدمه في عمل المزانيات المساحيه
مقدمه في عمل المزانيات المساحيهAhmed Mansor
 
Booking sheets, 2011 v1
Booking sheets, 2011 v1Booking sheets, 2011 v1
Booking sheets, 2011 v1jbusse
 
Levelling final
Levelling finalLevelling final
Levelling finalseenyee
 
Hard soft acid_base
Hard soft acid_baseHard soft acid_base
Hard soft acid_basesimachem
 
Dr. david caballero (meteogrid) “ground truth survey in spain”
Dr. david caballero (meteogrid) “ground truth survey in spain”Dr. david caballero (meteogrid) “ground truth survey in spain”
Dr. david caballero (meteogrid) “ground truth survey in spain”anest_trip
 
Hovercraft buyers guide
Hovercraft buyers guideHovercraft buyers guide
Hovercraft buyers guideHov Pod
 
Ground truth survey and spatial data analysis (using ILWIS)
Ground truth survey and spatial data analysis (using ILWIS)Ground truth survey and spatial data analysis (using ILWIS)
Ground truth survey and spatial data analysis (using ILWIS)Serge Rafanoharana
 
Chapter 15.2 Acid-Base Theories
Chapter 15.2 Acid-Base TheoriesChapter 15.2 Acid-Base Theories
Chapter 15.2 Acid-Base TheoriesChris Foltz
 
Total station, wonder kid?
Total station, wonder kid?Total station, wonder kid?
Total station, wonder kid?Kedar Ponkshe
 
How to use GPS and GIS in Surveying - Report
How to use GPS and GIS in Surveying - ReportHow to use GPS and GIS in Surveying - Report
How to use GPS and GIS in Surveying - ReportSarchia Khursheed
 

En vedette (20)

Levelling
LevellingLevelling
Levelling
 
levelling survey
levelling surveylevelling survey
levelling survey
 
Levelling
LevellingLevelling
Levelling
 
Types of level
Types of levelTypes of level
Types of level
 
Leveling surveying
Leveling surveyingLeveling surveying
Leveling surveying
 
Android application for s park system
Android application for s park systemAndroid application for s park system
Android application for s park system
 
Field work 1 (1)
Field work 1 (1)Field work 1 (1)
Field work 1 (1)
 
Unit 28 topographic_surveying_in_construction_and_civil_engineering
Unit 28 topographic_surveying_in_construction_and_civil_engineeringUnit 28 topographic_surveying_in_construction_and_civil_engineering
Unit 28 topographic_surveying_in_construction_and_civil_engineering
 
مقدمه في عمل المزانيات المساحيه
مقدمه في عمل المزانيات المساحيهمقدمه في عمل المزانيات المساحيه
مقدمه في عمل المزانيات المساحيه
 
Booking sheets, 2011 v1
Booking sheets, 2011 v1Booking sheets, 2011 v1
Booking sheets, 2011 v1
 
Levelling final
Levelling finalLevelling final
Levelling final
 
Hard soft acid_base
Hard soft acid_baseHard soft acid_base
Hard soft acid_base
 
Dr. david caballero (meteogrid) “ground truth survey in spain”
Dr. david caballero (meteogrid) “ground truth survey in spain”Dr. david caballero (meteogrid) “ground truth survey in spain”
Dr. david caballero (meteogrid) “ground truth survey in spain”
 
Hovercraft buyers guide
Hovercraft buyers guideHovercraft buyers guide
Hovercraft buyers guide
 
Ground truth survey and spatial data analysis (using ILWIS)
Ground truth survey and spatial data analysis (using ILWIS)Ground truth survey and spatial data analysis (using ILWIS)
Ground truth survey and spatial data analysis (using ILWIS)
 
Hsab theory
Hsab theoryHsab theory
Hsab theory
 
Plane table Survey
Plane table SurveyPlane table Survey
Plane table Survey
 
Chapter 15.2 Acid-Base Theories
Chapter 15.2 Acid-Base TheoriesChapter 15.2 Acid-Base Theories
Chapter 15.2 Acid-Base Theories
 
Total station, wonder kid?
Total station, wonder kid?Total station, wonder kid?
Total station, wonder kid?
 
How to use GPS and GIS in Surveying - Report
How to use GPS and GIS in Surveying - ReportHow to use GPS and GIS in Surveying - Report
How to use GPS and GIS in Surveying - Report
 

Similaire à Levelling

Fly Levelling
Fly LevellingFly Levelling
Fly LevellingBahzad5
 
S2 5 traverses
S2 5 traversesS2 5 traverses
S2 5 traversesEst
 
1963 sep 840-849
1963 sep 840-8491963 sep 840-849
1963 sep 840-849PENKI RAMU
 
Chap.6 traverse surveys
Chap.6 traverse surveysChap.6 traverse surveys
Chap.6 traverse surveysstudent
 
IB Physics HL Full lab report on research question: Galileo’s experiment: mea...
IB Physics HL Full lab report on research question: Galileo’s experiment: mea...IB Physics HL Full lab report on research question: Galileo’s experiment: mea...
IB Physics HL Full lab report on research question: Galileo’s experiment: mea...Kliment Serafimov
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying TraversingDarren Lee
 
Ss report 1
Ss report 1Ss report 1
Ss report 1Shen Sin
 
Indirect contouring 31 35 (IIUI)
Indirect contouring 31 35 (IIUI)Indirect contouring 31 35 (IIUI)
Indirect contouring 31 35 (IIUI)civilengineerf14
 
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdfREPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdfMuhammadMuazzam16
 
TRAVERSE in land surveying and technique
TRAVERSE in land surveying and techniqueTRAVERSE in land surveying and technique
TRAVERSE in land surveying and techniquezaphenathpaneah1
 
Radiacion poligonal abierta
Radiacion   poligonal abiertaRadiacion   poligonal abierta
Radiacion poligonal abiertaJeanCordova7
 
C -users-mmusa-desktop-exams-final exam (1)
C -users-mmusa-desktop-exams-final exam (1)C -users-mmusa-desktop-exams-final exam (1)
C -users-mmusa-desktop-exams-final exam (1)Saad Darras
 
SWE 112 soil and water conservation engineering
SWE 112 soil and water conservation engineeringSWE 112 soil and water conservation engineering
SWE 112 soil and water conservation engineeringMelusinaNorwood
 

Similaire à Levelling (20)

Ss report 1
Ss report 1Ss report 1
Ss report 1
 
Fly Levelling
Fly LevellingFly Levelling
Fly Levelling
 
S2 5 traverses
S2 5 traversesS2 5 traverses
S2 5 traverses
 
Site survey report 1
Site survey report 1Site survey report 1
Site survey report 1
 
1963 sep 840-849
1963 sep 840-8491963 sep 840-849
1963 sep 840-849
 
Chap.6 traverse surveys
Chap.6 traverse surveysChap.6 traverse surveys
Chap.6 traverse surveys
 
IB Physics HL Full lab report on research question: Galileo’s experiment: mea...
IB Physics HL Full lab report on research question: Galileo’s experiment: mea...IB Physics HL Full lab report on research question: Galileo’s experiment: mea...
IB Physics HL Full lab report on research question: Galileo’s experiment: mea...
 
LEVELING.pdf
LEVELING.pdfLEVELING.pdf
LEVELING.pdf
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversing
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
 
Indirect contouring 31 35 (IIUI)
Indirect contouring 31 35 (IIUI)Indirect contouring 31 35 (IIUI)
Indirect contouring 31 35 (IIUI)
 
travesing.pdf
travesing.pdftravesing.pdf
travesing.pdf
 
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdfREPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
 
TRAVERSE in land surveying and technique
TRAVERSE in land surveying and techniqueTRAVERSE in land surveying and technique
TRAVERSE in land surveying and technique
 
Radiacion poligonal abierta
Radiacion   poligonal abiertaRadiacion   poligonal abierta
Radiacion poligonal abierta
 
triangulation.pptx
triangulation.pptxtriangulation.pptx
triangulation.pptx
 
AIAA Paper dlt228
AIAA Paper dlt228AIAA Paper dlt228
AIAA Paper dlt228
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 
C -users-mmusa-desktop-exams-final exam (1)
C -users-mmusa-desktop-exams-final exam (1)C -users-mmusa-desktop-exams-final exam (1)
C -users-mmusa-desktop-exams-final exam (1)
 
SWE 112 soil and water conservation engineering
SWE 112 soil and water conservation engineeringSWE 112 soil and water conservation engineering
SWE 112 soil and water conservation engineering
 

Dernier

Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseAnaAcapella
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...Nguyen Thanh Tu Collection
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Pooja Bhuva
 

Dernier (20)

Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 

Levelling

  • 1. Introduction& methodology The task of this exercise was to carry out a looped levelling survey using the rise and fall booking method around the CSM building. Our group consisted of Christopher Crabb, Alex Levantis and Robin Watson. The weather conditions were overcast with a fairly pervasive mist throughout. We chose the corner of a drain cover closest to the campus buildings to act as our first Backsight(BS) and last Foresight (FS), the level we determined for this point witha handheld GPS was 124m AOD. From here we proceeded to take one Intermediate Sight (IS) for each setup of the level, before taking a FS onto our first Change Point (CP) where the staff remained whilst the instrument was moved to its next setup position. The difference between each sight and the previous IS or BS was then worked out and applied to the RL level of the last point as either a rise or fall.This was repeated for 11 different set-ups. As can be seen on Fig 1., where practicable we kept our sights to the magnitude of 20-25m to reduce collimation error, with an IS on a memorable location between these two CPs. Each of us took turns to read the level, book the results and hold the staff. Results Fig 1 showing the location of our survey stations, change points and intermediate sights.
  • 2. Point Name 1 Back Site 2 BS (M) IS (M) Corner of wall ESI Building White wall below 3 camera Surveyors Mark 4 "JLI" by Mast Survey mark "TI" 5 by disabled Above 'FH' on 6 yellow drain Lampost side by 7 triangle key Left corner of 8 drain Corner of lower 9 curb by reception "00" in 2008 on 10 plaque Base of double 11 lampost 12 Drain by bike rail Drain Kite Mark, 13 by designated North corner of 14 drain Drain SE shipping 15 container 16 Rise (M) Fall (M) Reduced Level (M) 1.856 Remark 124.000 BM 1.551 0.045 0.305 1.611 0.893 1.999 1.625 0.602 115.585 CP 2.018 2.435 113.567 IS 0.095 113.472 CP 1.550 0.659 0.402 1.926 116.948 CP 119.294 IS 0.055 119.349 CP 3.978 0.714 115.022 IS 2.346 0.509 1.969 116.473 IS 0.888 2.715 4.380 116.099 CP 0.374 2.620 3.060 116.990 IS 0.891 2.513 3.985 119.460 CP 2.470 3.874 120.326 IS 0.866 2.983 121.572 CP 1.246 3.005 121.926 IS 0.354 2.139 124.245 CP 2.319 2.718 0.513 124.305 IS 0.060 2.364 2nd pipe west of car registration sign 17 Curb Corner Drain by Nitrogen 18 Tank Driain by 19 Nitrogen Base of private 20 property sign Return to initial 21 BS Sum of the recordings: FS (M) 123.327 IS 0.624 1.687 0.222 123.105 CP 0.609 123.996 FS 19.306 Σ BS - Σ FS = Σ Rises – Σ Falls = Last initial RL – First RL 123.387 IS 1.078 19.302 0.282 11.425 11.429 0.004 -0.004 -0.004 0.004 Fig 2.Booking sheet with arithmetic checks. On completing our survey we originally calculated our final error to be 0.051m, on examining the booking sheet, it was noticed that one fall (point 3) had been treated as a rise and this was responsible for 0.047m of theerror. The booking sheet shown at Fig 2.is the revised version. Our final error was then -0.004m; well within the allowable misclosure where m=5mm m√11=0.0165… Likely sources oferror include wind buffeting the staff,especially at its fullest extension.The mist certainly made sighting onto the staff difficult at certain points. Changing the position of the staff on the CP is another possible source of error. Use of sights of unequal lengthsalong steep slopes may have exacerbated any collimation error present in the instrument,other calibration issues may also have affected our results. Reading errors, or inconsistencies in the method of estimating to the nearest 1mm between the three people taking those readings may also contribute; booking errors would certainly have caused an error outside the allowable misclosure (0.051m) had this not been identified during our arithmetic checks (Uren & Price, 2010: 43, 54-55).
  • 3. Contouring exercise The next part of the assignment involved the recording of a series of levels in a rough grid across a slop. The position of these spot heights was then to be worked out using the Stadia Tachometry method. For each point a bearing was recorded, along with the upper and lower stadia readings, and a reading from the central crosshair. The difference between these points multiplied by 100 gave a horizontal distance to the point being levelled. A=100d, where d = the difference between the upper and lower stadia. These coordinates and their heights are shown in Fig 3. Our coordinates were then calculated with the sin/cosine rule and plotted in fig 3. ΔN =cosθ°A, ΔE = sinθ°A where θ=the bearing of the point and A=the distance to the point calculated by the stadia tachometry method above; Results Fig 3.Location of spot heights with Point 19’s adjusted position in red.
  • 4. POI Point Name Back sight taken from 'FH' on yellow drain levelling point 1 BS (M) IS (M) 1.801 FS (M) HPC (M) Angle (Deg) Angle (RAD) Upper Stadia Lower Stadia Distance Easting Northing 3 4 33 0.576 1.895 1.706 18.900 10.2936778 15.8508737 1.953 120.129 103 1.798 1.978 1.926 5.200 5.06672434 -1.1697455 120.210 91 1.588 1.897 1.847 5.000 4.99923848 1.813 2 120.281 1.872 First row (near CSM) 122.082 Level (M) 120.269 79 1.379 1.838 1.787 5.100 5.00629864 0.97312588 -0.087262 1.756 120.326 68 1.187 1.783 1.729 5.400 5.00679281 5 First row (ending at tree) 1.721 120.361 59 1.030 1.749 1.693 5.600 4.80013688 2.88421322 6 Second row (at Tree) 1.876 120.206 65 1.134 1.908 1.844 6.400 5.80036984 2.70475688 1.974 120.108 74 1.292 2.004 1.943 6.100 5.86369635 1.68138787 2.014 120.068 84 1.466 2.043 1.983 6.000 5.96713137 0.62717078 2.064 120.018 92 1.606 2.093 2.034 5.900 5.89640588 2.183 119.899 101 1.763 2.214 2.153 6.100 5.98792582 -1.1639349 2.413 119.669 100 1.745 2.448 2.378 7.000 6.89365427 -1.2155372 2.359 119.723 91 1.588 2.394 2.324 7.000 6.99893387 -0.1221668 2.339 119.743 81 1.414 2.377 2.301 7.600 7.50643139 1.18890193 2.318 119.764 72 1.257 2.357 2.280 7.700 7.32313518 2.37943086 2.269 119.813 64 1.117 2.310 2.227 8.300 7.45999058 3.63848052 2.535 119.547 70 1.222 2.579 2.491 8.800 8.26929506 3.00977726 2.718 119.364 77 1.344 2.763 2.675 8.800 8.57445657 1.97956928 2.859 119.223 84 1.466 2.904 2.816 8.800 8.75179268 0.91985048 2.938 119.144 91 1.588 2.993 2.892 10.100 10.0984617 -0.1762693 2.996 119.086 100 1.745 3.040 2.951 7 8 9 10 Second row (ending at CSM) 11 Third Row (starting at CSM) 12 13 14 15 Third Row (ending at tree) 16 Fourth Row (starting at CSM) 17 18 19 20 Fourth row (ending at Tree) 8.900 2.0228756 -0.205907 8.764789 -1.5454688 Fig 4. Stadia Tachometry booking sheet with outlying result highlighted. Note conversion to radians for use in Excel. An obvious outlier in the results appears to be due to a reading/booking error, as the IS does not lie in the middle of the upper and lower stadia readings as it should do. The IS for point 19 should be equidistant between the upper and lower stadia; 2.9425 rather than 2.938 as booked. Lower Stadia = 2.892 IS = 2.938 Upper Stadia = 2.993 Lower Stadia – IS = -0.044, and IS – Upper Stadia = -0.055 We would expect these two differences to be equal. If we adjust the upper stadia by the difference between these two differences and recalculate the coordinates, then we can now mark the point at 9m from the level, 8.998629256 -0.157071658. 2.993 – 0.011 = 2.982 so 100(2.982 – 2.892) = 9m so cos91x9 = -0.157071658 and sin91x9 = 8.998629256
  • 5. As shown in Fig 3.this point is far closer to the actual progression of points across the slope. Of course the exact booking error cannot be known, but it seems reasonable that an extra 0.010m was added, probably by reading the wrong 0.010m block on the E type staff used. Alternative levelling methods An electronic laser level would have eliminated our booking error of 0.047m and any other potential errors from booking or reading the staff, laser levels can also be used accurately over greater distances (up to 100m). Poor light or weather would affect the ability of the electronic level to sight on the barcoded staff but these conditions affect all methods of levelling. Perhaps the only significant disadvantage of the electronic level is the increase in price compared to the advantages it affords; competent surveyors with a systematic approach to reading and booking can complete a survey in a comparable period of time with an automatic level (Uren and Price, 2010: 41). Levels can be calculated trigonometrically using a theodolite. Trigonometric levelling can be prone to error as gravity is not used as a control element; sighting and reading of vertical angles must be absolutely precise or errors in calculation become exacerbated as the slope distance increases (Uren and Price 2010, p175). Another limitation is that the horizontal distance between the survey station and the point being levelled must be known or calculated, again increasing the possibility for errors due to inaccurate sighting. A survey of this kind involves far more calculation than direct levelling with an automatic level, with the corresponding time required and increased chances of booking error. However, the trigonometric method is useful (and indeed may be the only possible method) in circumstances where the points to be levelled are inaccessible, such as mountaintops, or overheard power cables. Levelling with an EDM or total station is entails using the same calculations involved with trigonometric levelling, only carried out automatically by the instrument itself. The EDM allows this method to be used where the distance to a point is not known by accurately measuring the slope distance. The same errors resulting from inaccurate sighting still remain however, the instrument must be sighted exactly in the centre of the prism, and it is advised that numerous readings be taken and any anomalies discarded, thus adding to the length of the survey. Total stations are far more sensitive than automatic levels and atmospheric conditions require that the instrument be given a chance to acclimatise to the ambient temperature, and low and high levels of light or ground shimmer can require mathematical adjustments to be made to the readings . Levelling with a total station is an effective way of obtaining heights for a topographical or walkover survey (Uren & Price 2010: 174). Alternative methods for a contouring survey could involve carrying out a detail survey with other methods (i.e., total station, GPS or even chain survey), then simply adding spot heights with an automatic level and the height of collimation method. Indeed this is the most common method within the archaeological profession and one I have some experience of. As can be seen there are advantages to using survey equipment other than an automatic dumpy level, but these all have the potential for errors and a greater complexity than the direct levelling method. An automatic level is economical, simple and robust where other methods may be complicated, delicate or expensive. Bibliography Uren, J and Price, B. 2010, Surveying for Engineers, Fifth Edition, Palgrave Macmillan, Basingstoke.