Meenach Corporation uses a job-order costing system with a single plantwide predetermined overhead rate. The rate was based on 54,000 direct labor-hours, $102,600 in fixed overhead costs, and $2.40 variable overhead per direct labor-hour. Job X387 required 250 direct labor-hours.