SlideShare une entreprise Scribd logo
1  sur  17
SUBMITTED BY SUBMITTED TO
ASHUTOSH YADAV MR. BHUPENDRA GEHLOT
U.I.D.-K10995 ASST. PROFESSOR OF M.E.
BRANCH-MECHANICAL ENGG. DEPT. C.P.U. KOTA
 Introduction
 Definition
 Characteristics
 Functions of ERP
 Implementation
 CASE-1
 CASE-2
 CASE-3
 CASE-4
 Conclusion
 References
 The primary functions of Enterprise Resource Planning
(ERP) are to integrate the inter-departmental operation
procedures and Management Information System (MIS)
modules, and to reallocate the resources of a company.
 The Gartner Group first used the acronym ERP in the
1990s.
 ERP systems experienced rapid growth in the 1990s.
Because of the year 2000 problem and the introduction of
the euro that disrupted legacy systems, many companies
took the opportunity to replace their old systems with ERP
 Enterprise resource planning (ERP) is a category of business-
management software—typically a suite of
integrated applications—that an organization can use to collect,
store, manage and interpret data from many business activities,
including:
 product planning, purchase
 manufacturing or service delivery
 marketing and sales
 inventory management
 shipping and payment
 ERP (Enterprise Resource Planning) systems typically
include the following characteristics:
 An integrated system that operates in (or near) real time
without relying on periodic updates.
 A common database that supports all applications
 A consistent look and feel across modules
 Installation of the system with elaborate application/data
integration by the Information Technology (IT) department,
provided the implementation is not done in small steps.
 Financial accounting General ledger, fixed asset, payables including
vouchering, matching and payment, receivables cash application and
collections, cash management ,financiaL consolidation
 Management accounting: Budgeting, costing, cost
management, activity based costing
 Human
resources: Recruiting, training, rosterin, payroll, benefits, 401K, diversi
ty management, retirement, separation
 Manufacturing: Engineering, bill of materials, work
orders, scheduling, capacity, workflow management, quality control,
manufacturing process, manufacturing projects, manufacturing
flow, product life cycle management
 ERP's scope usually implies significant changes to staff
work processes and practices. Generally, three types of
services are available to help implement such
changes—consulting, customization, and support.
 . Implementation time depends on business size,
number of modules, customization, the scope of
process changes, and the readiness of the customer to
take ownership for the project
 Problem-A family owned chemical manufacturer needed to replace its old
information, inadequate system and solve some important business
problems. The company was growing and management needed to
understand customer profitability.
 Solution-Management believed that they did not have the knowledge to
select a new system by themselves and they wanted to be sure not to make
a mistake. They began to interview consulting firms who had the
knowledge they lacked.
. Management selected Ultra to assist the company with a selection of a
new information system. Ultra was selected for two reasons: first, the
ability of the Ultra Partners to work with the management team, and
second, Ultra’s depth of knowledge about ERP software vendors
 This client has received the following benefits through an
 Ultra engagement:
 Development of new processes for sales and service
 Management understanding of how to solve a critical business problem
 Clear justification for the new system
 Accurate selection of a new information system that fits their unique business
requirements
 Purchase of a tier I ERP vendor at tier II prices
 Availability of outside ERP knowledge and experience to supplement the management
 team during the implementation of the selected system.
 CHALLENGE-Miljoco gauges and thermometers are
installed by original equipment manufacturers and
mechanical contractors on products such as refrigerated
cases, boilers, compressors, burners, chillers and food
holding cabinets. With 35 people in its headquarters and
manufacturing facility in Detroit, and 55 more at a plant
in Shanghai, China and with more than 1,500 customers
around the world Miljoco’s management knew it needed
an Enterprise Resource Management (ERP) system to
manage the increasing complexity and still remain
competitive in a market.
 After the decision, that same team of four future users
built the datasets that would drive the new ERP system.
The datasets were complex and extensive: 25,000
stock-keeping units (SKUs) the company sells, 15,000
SKUs they make, 5,000 components from more than
300 vendors, and, of course, detailed records from
1,500 customers.
 Market-Manufacturer of Structural Steel Tubing Annual
Revenues $200 million.
 Problem-LTV - Copperweld was constantly forced into a
position of borrowing convertible raw materials from
various production runs to meet spikes in demand in
another production line. Copperweld’s Materials Resource
Planning (MRP) system did not support visualization of the
stock outs or inventory fluctuations that resulted from these
practices. Consequently, Copperweld suffered from
inaccurate raw material inventory levels and periodic
shortages of vital materials in several productionruns.
 Working directly with Copperweld IT Executives and Production staff, Ultra
Consultants designed a Raw Materials Pipeline Model. Utilizing a custom
application and Microsoft SQL Server, this model extracted raw materials
inventory data, pipeline data, finished goods orders and forecasts from the
operational systems. Detailed conversion/precedence rules, and exceptions to
rules, were acquired from the operational system and interviews with the
master scheduler. These rules allowed the Raw Materials Pipeline Model to
simulate raw-material consumption into the future. Furthermore, Ultra
Corporation technicians designed a Decision Support System (DSS) and
reporting writer,
 Benefits
 Stock-out reduced significantly by giving suppliers longer lead times
 Scrap was reduced by nearly 2%
 Raw materials inventory reduced by 40%
 Market-Full Compass Systems, Inc. distributes professional audio, visual,
and lighting equipment. Located inMadison, Wisconsin, the company
markets over 100,000 SKU’s to over 300,000 customers.
 Problem-Twenty-five years ago the company implemented its current
information system. They called the system TeleManager because is
primarily supported the telemarketing efforts or their in house sales
organization. The system used the Informix database and was eventually
ported to a Linux operation system. Over the years the information system
has grown to include purchasing, warehouse operations, and accounting.
 In 2010, management began to see that TeleManager was beginning to
impact the company’s double-digit growth. It became difficult for IT to
keep up with changing business environment and business process change.
The company was becoming a true multi channel marketing company and
the business users needed an information system that addressed the needs
of this rapid changing industry.
 In early 2011, Full Compass Systems retained Ultra
Consultants to help them with the transition from a 25- year-
old legacy system to a modern multi-channel marketing ERP
system. The top management of the company was involved in
every step of the process. The team involved the top officers
of the company including the founder, COO, CFO,
procurement, operations, and sales and marketing.With Ultra’s
guidance, the team documented all of the current business
processes. Over 300 business processes were identified and
documented. Ultra facilitated an ERP education curriculum we
called ERP University. Ultra provided ERP professionals from
the industry to teach the team about ERP best practices for
their industry so they could envision “what is possible” with
modern ERP.
 There is a limiting factor, and this brings us full circle.
Small suppliers do need to integrate with their larger
suppliers’ ERP systems, but their internal processes and
requirements will often be very different. Many will buy the
ERP application that most suits their internal use and seek
to integrate it with whatever applications are used by
organisations they trade with. In other words, tier-two
fragmentation of ERP is not just something that exists in
large organisations, it is also a fact of life across broader
business communities. The interests of ERP users are so
diverse that the market will continue to support a wide
range of products, including those for enterprise-wide needs
and those for specialist niches, and the various products will
always need to talk to each other at some level
THANK YOU

Contenu connexe

Tendances

Evolution & structure of erp
Evolution & structure of erpEvolution & structure of erp
Evolution & structure of erp
Somya Bagai
 
Enterprise resource planning
Enterprise resource planningEnterprise resource planning
Enterprise resource planning
ALTANAI BISHT
 
Impact of erp in retail sector
Impact of erp in retail sectorImpact of erp in retail sector
Impact of erp in retail sector
Projects Kart
 
Textile industry oac solution - 20130416
Textile industry   oac solution - 20130416Textile industry   oac solution - 20130416
Textile industry oac solution - 20130416
safdarpak
 

Tendances (19)

Evolution & structure of erp
Evolution & structure of erpEvolution & structure of erp
Evolution & structure of erp
 
ERP systems
ERP systemsERP systems
ERP systems
 
Introduction to ERP Systems
Introduction to ERP SystemsIntroduction to ERP Systems
Introduction to ERP Systems
 
Enterprise Resource Planning (erp)
Enterprise Resource Planning (erp)Enterprise Resource Planning (erp)
Enterprise Resource Planning (erp)
 
The History of ERP Software Systems
The History of ERP Software SystemsThe History of ERP Software Systems
The History of ERP Software Systems
 
Today's Successful Business and the Evolution of ERP: Three Issues to Address...
Today's Successful Business and the Evolution of ERP: Three Issues to Address...Today's Successful Business and the Evolution of ERP: Three Issues to Address...
Today's Successful Business and the Evolution of ERP: Three Issues to Address...
 
025 Enterprise Resources Management
025 Enterprise Resources Management025 Enterprise Resources Management
025 Enterprise Resources Management
 
ERP
ERPERP
ERP
 
Enterprise business systems
Enterprise business systemsEnterprise business systems
Enterprise business systems
 
an-overview-enterprise-resource-planning erp-
 an-overview-enterprise-resource-planning  erp- an-overview-enterprise-resource-planning  erp-
an-overview-enterprise-resource-planning erp-
 
Effect of erp system
Effect of erp system Effect of erp system
Effect of erp system
 
How 2-Tier ERP Can Benefit Your Business
How 2-Tier ERP Can Benefit Your BusinessHow 2-Tier ERP Can Benefit Your Business
How 2-Tier ERP Can Benefit Your Business
 
Enterprise Resource Planning
Enterprise Resource PlanningEnterprise Resource Planning
Enterprise Resource Planning
 
Enterprise resource planning
Enterprise resource planningEnterprise resource planning
Enterprise resource planning
 
Erp pptx
Erp pptxErp pptx
Erp pptx
 
ERP System Implementation Benefits and Economic
ERP System Implementation Benefits and EconomicERP System Implementation Benefits and Economic
ERP System Implementation Benefits and Economic
 
Impact of erp in retail sector
Impact of erp in retail sectorImpact of erp in retail sector
Impact of erp in retail sector
 
Textile industry oac solution - 20130416
Textile industry   oac solution - 20130416Textile industry   oac solution - 20130416
Textile industry oac solution - 20130416
 
Erp
ErpErp
Erp
 

Similaire à k10995 ashutosh yadav(Operation planning & control)

Entreprise Resource Planning s unit 2.ppt
Entreprise Resource Planning s unit 2.pptEntreprise Resource Planning s unit 2.ppt
Entreprise Resource Planning s unit 2.ppt
RAJESH S
 

Similaire à k10995 ashutosh yadav(Operation planning & control) (20)

k10988 (wasique ahmad ) opc
k10988 (wasique ahmad ) opc k10988 (wasique ahmad ) opc
k10988 (wasique ahmad ) opc
 
Erp1&2nd unit
Erp1&2nd unitErp1&2nd unit
Erp1&2nd unit
 
dheeraj
dheerajdheeraj
dheeraj
 
Entreprise Resource Planning s unit 2.ppt
Entreprise Resource Planning s unit 2.pptEntreprise Resource Planning s unit 2.ppt
Entreprise Resource Planning s unit 2.ppt
 
evolution of Erp
evolution of Erp evolution of Erp
evolution of Erp
 
Enterprise Resource Planning
Enterprise Resource PlanningEnterprise Resource Planning
Enterprise Resource Planning
 
Case Study U.S. Strollers
Case Study U.S. StrollersCase Study U.S. Strollers
Case Study U.S. Strollers
 
9. erp pgp1
9. erp pgp19. erp pgp1
9. erp pgp1
 
Enterprise resource planning unit 2 ERP solutions and functional modules
Enterprise resource planning unit 2 ERP solutions and functional modulesEnterprise resource planning unit 2 ERP solutions and functional modules
Enterprise resource planning unit 2 ERP solutions and functional modules
 
ERP, SAP
ERP, SAPERP, SAP
ERP, SAP
 
ERP Implementation Coca-Cola Hellenic
ERP Implementation Coca-Cola HellenicERP Implementation Coca-Cola Hellenic
ERP Implementation Coca-Cola Hellenic
 
Erp notes
Erp notesErp notes
Erp notes
 
ERP and related technology
ERP and related technology ERP and related technology
ERP and related technology
 
ERP (ENTERPRISE RESOURCE PLANNING) PROJECT PRESENTATION 2020
ERP (ENTERPRISE RESOURCE PLANNING) PROJECT PRESENTATION 2020 ERP (ENTERPRISE RESOURCE PLANNING) PROJECT PRESENTATION 2020
ERP (ENTERPRISE RESOURCE PLANNING) PROJECT PRESENTATION 2020
 
Final presentation mis (erp)
Final presentation mis (erp)Final presentation mis (erp)
Final presentation mis (erp)
 
Evolution of erp systems
Evolution of erp systemsEvolution of erp systems
Evolution of erp systems
 
Group 1 Presentation after mid.pptx
Group 1 Presentation after mid.pptxGroup 1 Presentation after mid.pptx
Group 1 Presentation after mid.pptx
 
Evolution
EvolutionEvolution
Evolution
 
ERP Case Study - Failure case - FoxMeyer Case
ERP Case Study - Failure case - FoxMeyer CaseERP Case Study - Failure case - FoxMeyer Case
ERP Case Study - Failure case - FoxMeyer Case
 
ERP MUP Report
ERP MUP ReportERP MUP Report
ERP MUP Report
 

Plus de shailesh yadav

Anam rajkumar sarvesh k10779,k10626
Anam rajkumar sarvesh k10779,k10626Anam rajkumar sarvesh k10779,k10626
Anam rajkumar sarvesh k10779,k10626
shailesh yadav
 
K 10716 mukesh beniwal(basic quality tools in small companies)
K 10716 mukesh beniwal(basic quality tools in small companies)K 10716 mukesh beniwal(basic quality tools in small companies)
K 10716 mukesh beniwal(basic quality tools in small companies)
shailesh yadav
 
K 10716 mukesh beniwal (centrifugal pumps working as turbine)
K 10716 mukesh beniwal (centrifugal pumps working as turbine)K 10716 mukesh beniwal (centrifugal pumps working as turbine)
K 10716 mukesh beniwal (centrifugal pumps working as turbine)
shailesh yadav
 
K 10716 mukesh beniwal (automatic pneumatic bumper)
K 10716 mukesh beniwal (automatic pneumatic bumper)K 10716 mukesh beniwal (automatic pneumatic bumper)
K 10716 mukesh beniwal (automatic pneumatic bumper)
shailesh yadav
 

Plus de shailesh yadav (20)

k10715 ankit kr. verma (Case study)
k10715 ankit kr. verma (Case study)k10715 ankit kr. verma (Case study)
k10715 ankit kr. verma (Case study)
 
k10995 ashutosh yadav( ic engine)
 k10995 ashutosh yadav( ic engine) k10995 ashutosh yadav( ic engine)
k10995 ashutosh yadav( ic engine)
 
k10995 ashutosh yadav(RAC)
k10995 ashutosh yadav(RAC)k10995 ashutosh yadav(RAC)
k10995 ashutosh yadav(RAC)
 
k10995 ashutosh yadav(control theory)
k10995 ashutosh yadav(control theory)k10995 ashutosh yadav(control theory)
k10995 ashutosh yadav(control theory)
 
(10714) Abhishek kr. verma( TQM)
(10714) Abhishek kr. verma( TQM)(10714) Abhishek kr. verma( TQM)
(10714) Abhishek kr. verma( TQM)
 
(K10708)Shailesh KUMAR YADAV (CASE STUDY)
(K10708)Shailesh KUMAR YADAV (CASE STUDY)(K10708)Shailesh KUMAR YADAV (CASE STUDY)
(K10708)Shailesh KUMAR YADAV (CASE STUDY)
 
K-10714 ABHISHEK(MATLAB )
K-10714 ABHISHEK(MATLAB )K-10714 ABHISHEK(MATLAB )
K-10714 ABHISHEK(MATLAB )
 
Anam rajkumar sarvesh
Anam rajkumar sarveshAnam rajkumar sarvesh
Anam rajkumar sarvesh
 
K-10714 ABHISHEK(AUTOMOBILE SURVEILLANCE)
K-10714 ABHISHEK(AUTOMOBILE SURVEILLANCE)K-10714 ABHISHEK(AUTOMOBILE SURVEILLANCE)
K-10714 ABHISHEK(AUTOMOBILE SURVEILLANCE)
 
K-10714 ABHISHEK(TQM )
K-10714 ABHISHEK(TQM )K-10714 ABHISHEK(TQM )
K-10714 ABHISHEK(TQM )
 
K-10714 ABHISHEK(TQM )
K-10714 ABHISHEK(TQM )K-10714 ABHISHEK(TQM )
K-10714 ABHISHEK(TQM )
 
Anam rajkumar sarvesh k10779,k10626
Anam rajkumar sarvesh k10779,k10626Anam rajkumar sarvesh k10779,k10626
Anam rajkumar sarvesh k10779,k10626
 
K 10716 mukesh beniwal(basic quality tools in small companies)
K 10716 mukesh beniwal(basic quality tools in small companies)K 10716 mukesh beniwal(basic quality tools in small companies)
K 10716 mukesh beniwal(basic quality tools in small companies)
 
K 10716 mukesh beniwal (centrifugal pumps working as turbine)
K 10716 mukesh beniwal (centrifugal pumps working as turbine)K 10716 mukesh beniwal (centrifugal pumps working as turbine)
K 10716 mukesh beniwal (centrifugal pumps working as turbine)
 
K 10716 mukesh beniwal (automatic pneumatic bumper)
K 10716 mukesh beniwal (automatic pneumatic bumper)K 10716 mukesh beniwal (automatic pneumatic bumper)
K 10716 mukesh beniwal (automatic pneumatic bumper)
 
Ankit ic engine pnumetic THREE AXIS MODERN TRAILER
Ankit ic engine pnumetic THREE AXIS MODERN TRAILERAnkit ic engine pnumetic THREE AXIS MODERN TRAILER
Ankit ic engine pnumetic THREE AXIS MODERN TRAILER
 
Rac 2 ppt
Rac 2 pptRac 2 ppt
Rac 2 ppt
 
K10715 control thory ankit verma
K10715 control thory ankit vermaK10715 control thory ankit verma
K10715 control thory ankit verma
 
rupesh k10741
rupesh  k10741rupesh  k10741
rupesh k10741
 
Rac shailesh
Rac shaileshRac shailesh
Rac shailesh
 

Dernier

1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Dernier (20)

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 

k10995 ashutosh yadav(Operation planning & control)

  • 1. SUBMITTED BY SUBMITTED TO ASHUTOSH YADAV MR. BHUPENDRA GEHLOT U.I.D.-K10995 ASST. PROFESSOR OF M.E. BRANCH-MECHANICAL ENGG. DEPT. C.P.U. KOTA
  • 2.  Introduction  Definition  Characteristics  Functions of ERP  Implementation  CASE-1  CASE-2  CASE-3  CASE-4  Conclusion  References
  • 3.  The primary functions of Enterprise Resource Planning (ERP) are to integrate the inter-departmental operation procedures and Management Information System (MIS) modules, and to reallocate the resources of a company.  The Gartner Group first used the acronym ERP in the 1990s.  ERP systems experienced rapid growth in the 1990s. Because of the year 2000 problem and the introduction of the euro that disrupted legacy systems, many companies took the opportunity to replace their old systems with ERP
  • 4.  Enterprise resource planning (ERP) is a category of business- management software—typically a suite of integrated applications—that an organization can use to collect, store, manage and interpret data from many business activities, including:  product planning, purchase  manufacturing or service delivery  marketing and sales  inventory management  shipping and payment
  • 5.  ERP (Enterprise Resource Planning) systems typically include the following characteristics:  An integrated system that operates in (or near) real time without relying on periodic updates.  A common database that supports all applications  A consistent look and feel across modules  Installation of the system with elaborate application/data integration by the Information Technology (IT) department, provided the implementation is not done in small steps.
  • 6.  Financial accounting General ledger, fixed asset, payables including vouchering, matching and payment, receivables cash application and collections, cash management ,financiaL consolidation  Management accounting: Budgeting, costing, cost management, activity based costing  Human resources: Recruiting, training, rosterin, payroll, benefits, 401K, diversi ty management, retirement, separation  Manufacturing: Engineering, bill of materials, work orders, scheduling, capacity, workflow management, quality control, manufacturing process, manufacturing projects, manufacturing flow, product life cycle management
  • 7.  ERP's scope usually implies significant changes to staff work processes and practices. Generally, three types of services are available to help implement such changes—consulting, customization, and support.  . Implementation time depends on business size, number of modules, customization, the scope of process changes, and the readiness of the customer to take ownership for the project
  • 8.  Problem-A family owned chemical manufacturer needed to replace its old information, inadequate system and solve some important business problems. The company was growing and management needed to understand customer profitability.  Solution-Management believed that they did not have the knowledge to select a new system by themselves and they wanted to be sure not to make a mistake. They began to interview consulting firms who had the knowledge they lacked. . Management selected Ultra to assist the company with a selection of a new information system. Ultra was selected for two reasons: first, the ability of the Ultra Partners to work with the management team, and second, Ultra’s depth of knowledge about ERP software vendors
  • 9.  This client has received the following benefits through an  Ultra engagement:  Development of new processes for sales and service  Management understanding of how to solve a critical business problem  Clear justification for the new system  Accurate selection of a new information system that fits their unique business requirements  Purchase of a tier I ERP vendor at tier II prices  Availability of outside ERP knowledge and experience to supplement the management  team during the implementation of the selected system.
  • 10.  CHALLENGE-Miljoco gauges and thermometers are installed by original equipment manufacturers and mechanical contractors on products such as refrigerated cases, boilers, compressors, burners, chillers and food holding cabinets. With 35 people in its headquarters and manufacturing facility in Detroit, and 55 more at a plant in Shanghai, China and with more than 1,500 customers around the world Miljoco’s management knew it needed an Enterprise Resource Management (ERP) system to manage the increasing complexity and still remain competitive in a market.
  • 11.  After the decision, that same team of four future users built the datasets that would drive the new ERP system. The datasets were complex and extensive: 25,000 stock-keeping units (SKUs) the company sells, 15,000 SKUs they make, 5,000 components from more than 300 vendors, and, of course, detailed records from 1,500 customers.
  • 12.  Market-Manufacturer of Structural Steel Tubing Annual Revenues $200 million.  Problem-LTV - Copperweld was constantly forced into a position of borrowing convertible raw materials from various production runs to meet spikes in demand in another production line. Copperweld’s Materials Resource Planning (MRP) system did not support visualization of the stock outs or inventory fluctuations that resulted from these practices. Consequently, Copperweld suffered from inaccurate raw material inventory levels and periodic shortages of vital materials in several productionruns.
  • 13.  Working directly with Copperweld IT Executives and Production staff, Ultra Consultants designed a Raw Materials Pipeline Model. Utilizing a custom application and Microsoft SQL Server, this model extracted raw materials inventory data, pipeline data, finished goods orders and forecasts from the operational systems. Detailed conversion/precedence rules, and exceptions to rules, were acquired from the operational system and interviews with the master scheduler. These rules allowed the Raw Materials Pipeline Model to simulate raw-material consumption into the future. Furthermore, Ultra Corporation technicians designed a Decision Support System (DSS) and reporting writer,  Benefits  Stock-out reduced significantly by giving suppliers longer lead times  Scrap was reduced by nearly 2%  Raw materials inventory reduced by 40%
  • 14.  Market-Full Compass Systems, Inc. distributes professional audio, visual, and lighting equipment. Located inMadison, Wisconsin, the company markets over 100,000 SKU’s to over 300,000 customers.  Problem-Twenty-five years ago the company implemented its current information system. They called the system TeleManager because is primarily supported the telemarketing efforts or their in house sales organization. The system used the Informix database and was eventually ported to a Linux operation system. Over the years the information system has grown to include purchasing, warehouse operations, and accounting.  In 2010, management began to see that TeleManager was beginning to impact the company’s double-digit growth. It became difficult for IT to keep up with changing business environment and business process change. The company was becoming a true multi channel marketing company and the business users needed an information system that addressed the needs of this rapid changing industry.
  • 15.  In early 2011, Full Compass Systems retained Ultra Consultants to help them with the transition from a 25- year- old legacy system to a modern multi-channel marketing ERP system. The top management of the company was involved in every step of the process. The team involved the top officers of the company including the founder, COO, CFO, procurement, operations, and sales and marketing.With Ultra’s guidance, the team documented all of the current business processes. Over 300 business processes were identified and documented. Ultra facilitated an ERP education curriculum we called ERP University. Ultra provided ERP professionals from the industry to teach the team about ERP best practices for their industry so they could envision “what is possible” with modern ERP.
  • 16.  There is a limiting factor, and this brings us full circle. Small suppliers do need to integrate with their larger suppliers’ ERP systems, but their internal processes and requirements will often be very different. Many will buy the ERP application that most suits their internal use and seek to integrate it with whatever applications are used by organisations they trade with. In other words, tier-two fragmentation of ERP is not just something that exists in large organisations, it is also a fact of life across broader business communities. The interests of ERP users are so diverse that the market will continue to support a wide range of products, including those for enterprise-wide needs and those for specialist niches, and the various products will always need to talk to each other at some level