This presentation gives in depth details about Doing AAC Blockwork with thin mortar adhesive.
It covers all aspect of blockwork activity start from panning till completion.
it also contains the common mistakes made by mason labour during execution of work.
The instructions below are recommendations from Deziner Panels on how to install our Recycled Timber mosaic tiles and interlocking panels.
http://www.dezinerpanels.com.au/wp-content/uploads/2017/09/Timber-Panels-Installation-Procedure.pdf
This presentation gives in depth details about Doing AAC Blockwork with thin mortar adhesive.
It covers all aspect of blockwork activity start from panning till completion.
it also contains the common mistakes made by mason labour during execution of work.
Building Materials & Construction Module - 5Abhilash B L
To recognize good construction materials based on properties, Characteristics, Location, Activities according to IS standards for wall finishes like Plastering, painting and finishing
Whether you want to have a new look on your patio, or maybe have an impressive pool deck, or probably have a durable, low maintenance and yet beautiful driveway, stamped concrete overlays is perfect for you.
Nuance Studio | 3D fiber reinforced concrete panels and tiles for interior de...AjaaySrinivaas
Nuance Studio introduces the Linea Series, designed specifically for those who dont want to settle for cliche! Along with the aesthetic appeal of concrete, Linea Series gives an edge to the designer to create innumerable patterns that would suite their design language. Simple to complex patterns can be made that dresses the wall with the right attitude and look! Get in touch with us for more details.
Once your floor tiles are laid and set, it’s time to grout! Grout completes the look of your tiles and also gives strength to your tiles, preventing them from moving and cracking. Our guide makes grouting easy.
The power point presentation is all about plaster of paris (pop) and its information, its basic introduction, manufacture, types, advantages, disadvantages, tools, application, finishing, defects, market forms and its market rate.
What is pointing?
Scope of pointing
Method of pointing
What is plastering?
Objective of plastering
Lime plaster
Cement plaster
Gypsum plaster (plaster of Paris)
Water proof plaster of Mortar
Heat resistant plasters
Defects in plastering
1.Stretcher bond
2.Header bond
3.English bond and
4.Flemish bond.
I want to construct house/home.
give me(any) sugestion, such as
How to start and plan for construction of house.
How money can be saved, in constructing a building. - Some rough Thumb rules
How can long life buildings can be contructed. – safty Thumb rules
How a house can be made eco freindly.
How cracks can be avoided on the wall.
How to select building material for construction of house.
Where Should I buy site.
Is it necessary to provide PILLERS.
Is it necessary to contact Engineers.
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Dr. Vinod Kumar Kanvaria
Exploiting Artificial Intelligence for Empowering Researchers and Faculty,
International FDP on Fundamentals of Research in Social Sciences
at Integral University, Lucknow, 06.06.2024
By Dr. Vinod Kumar Kanvaria
Contenu connexe
Similaire à hb building construction project rai.pptx
Building Materials & Construction Module - 5Abhilash B L
To recognize good construction materials based on properties, Characteristics, Location, Activities according to IS standards for wall finishes like Plastering, painting and finishing
Whether you want to have a new look on your patio, or maybe have an impressive pool deck, or probably have a durable, low maintenance and yet beautiful driveway, stamped concrete overlays is perfect for you.
Nuance Studio | 3D fiber reinforced concrete panels and tiles for interior de...AjaaySrinivaas
Nuance Studio introduces the Linea Series, designed specifically for those who dont want to settle for cliche! Along with the aesthetic appeal of concrete, Linea Series gives an edge to the designer to create innumerable patterns that would suite their design language. Simple to complex patterns can be made that dresses the wall with the right attitude and look! Get in touch with us for more details.
Once your floor tiles are laid and set, it’s time to grout! Grout completes the look of your tiles and also gives strength to your tiles, preventing them from moving and cracking. Our guide makes grouting easy.
The power point presentation is all about plaster of paris (pop) and its information, its basic introduction, manufacture, types, advantages, disadvantages, tools, application, finishing, defects, market forms and its market rate.
What is pointing?
Scope of pointing
Method of pointing
What is plastering?
Objective of plastering
Lime plaster
Cement plaster
Gypsum plaster (plaster of Paris)
Water proof plaster of Mortar
Heat resistant plasters
Defects in plastering
1.Stretcher bond
2.Header bond
3.English bond and
4.Flemish bond.
I want to construct house/home.
give me(any) sugestion, such as
How to start and plan for construction of house.
How money can be saved, in constructing a building. - Some rough Thumb rules
How can long life buildings can be contructed. – safty Thumb rules
How a house can be made eco freindly.
How cracks can be avoided on the wall.
How to select building material for construction of house.
Where Should I buy site.
Is it necessary to provide PILLERS.
Is it necessary to contact Engineers.
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Dr. Vinod Kumar Kanvaria
Exploiting Artificial Intelligence for Empowering Researchers and Faculty,
International FDP on Fundamentals of Research in Social Sciences
at Integral University, Lucknow, 06.06.2024
By Dr. Vinod Kumar Kanvaria
How to Build a Module in Odoo 17 Using the Scaffold MethodCeline George
Odoo provides an option for creating a module by using a single line command. By using this command the user can make a whole structure of a module. It is very easy for a beginner to make a module. There is no need to make each file manually. This slide will show how to create a module using the scaffold method.
How to Add Chatter in the odoo 17 ERP ModuleCeline George
In Odoo, the chatter is like a chat tool that helps you work together on records. You can leave notes and track things, making it easier to talk with your team and partners. Inside chatter, all communication history, activity, and changes will be displayed.
A review of the growth of the Israel Genealogy Research Association Database Collection for the last 12 months. Our collection is now passed the 3 million mark and still growing. See which archives have contributed the most. See the different types of records we have, and which years have had records added. You can also see what we have for the future.
Strategies for Effective Upskilling is a presentation by Chinwendu Peace in a Your Skill Boost Masterclass organisation by the Excellence Foundation for South Sudan on 08th and 09th June 2024 from 1 PM to 3 PM on each day.
This presentation was provided by Steph Pollock of The American Psychological Association’s Journals Program, and Damita Snow, of The American Society of Civil Engineers (ASCE), for the initial session of NISO's 2024 Training Series "DEIA in the Scholarly Landscape." Session One: 'Setting Expectations: a DEIA Primer,' was held June 6, 2024.
বাংলাদেশের অর্থনৈতিক সমীক্ষা ২০২৪ [Bangladesh Economic Review 2024 Bangla.pdf] কম্পিউটার , ট্যাব ও স্মার্ট ফোন ভার্সন সহ সম্পূর্ণ বাংলা ই-বুক বা pdf বই " সুচিপত্র ...বুকমার্ক মেনু 🔖 ও হাইপার লিংক মেনু 📝👆 যুক্ত ..
আমাদের সবার জন্য খুব খুব গুরুত্বপূর্ণ একটি বই ..বিসিএস, ব্যাংক, ইউনিভার্সিটি ভর্তি ও যে কোন প্রতিযোগিতা মূলক পরীক্ষার জন্য এর খুব ইম্পরট্যান্ট একটি বিষয় ...তাছাড়া বাংলাদেশের সাম্প্রতিক যে কোন ডাটা বা তথ্য এই বইতে পাবেন ...
তাই একজন নাগরিক হিসাবে এই তথ্য গুলো আপনার জানা প্রয়োজন ...।
বিসিএস ও ব্যাংক এর লিখিত পরীক্ষা ...+এছাড়া মাধ্যমিক ও উচ্চমাধ্যমিকের স্টুডেন্টদের জন্য অনেক কাজে আসবে ...
Executive Directors Chat Leveraging AI for Diversity, Equity, and InclusionTechSoup
Let’s explore the intersection of technology and equity in the final session of our DEI series. Discover how AI tools, like ChatGPT, can be used to support and enhance your nonprofit's DEI initiatives. Participants will gain insights into practical AI applications and get tips for leveraging technology to advance their DEI goals.
The simplified electron and muon model, Oscillating Spacetime: The Foundation...RitikBhardwaj56
Discover the Simplified Electron and Muon Model: A New Wave-Based Approach to Understanding Particles delves into a groundbreaking theory that presents electrons and muons as rotating soliton waves within oscillating spacetime. Geared towards students, researchers, and science buffs, this book breaks down complex ideas into simple explanations. It covers topics such as electron waves, temporal dynamics, and the implications of this model on particle physics. With clear illustrations and easy-to-follow explanations, readers will gain a new outlook on the universe's fundamental nature.
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...Levi Shapiro
Letter from the Congress of the United States regarding Anti-Semitism sent June 3rd to MIT President Sally Kornbluth, MIT Corp Chair, Mark Gorenberg
Dear Dr. Kornbluth and Mr. Gorenberg,
The US House of Representatives is deeply concerned by ongoing and pervasive acts of antisemitic
harassment and intimidation at the Massachusetts Institute of Technology (MIT). Failing to act decisively to ensure a safe learning environment for all students would be a grave dereliction of your responsibilities as President of MIT and Chair of the MIT Corporation.
This Congress will not stand idly by and allow an environment hostile to Jewish students to persist. The House believes that your institution is in violation of Title VI of the Civil Rights Act, and the inability or
unwillingness to rectify this violation through action requires accountability.
Postsecondary education is a unique opportunity for students to learn and have their ideas and beliefs challenged. However, universities receiving hundreds of millions of federal funds annually have denied
students that opportunity and have been hijacked to become venues for the promotion of terrorism, antisemitic harassment and intimidation, unlawful encampments, and in some cases, assaults and riots.
The House of Representatives will not countenance the use of federal funds to indoctrinate students into hateful, antisemitic, anti-American supporters of terrorism. Investigations into campus antisemitism by the Committee on Education and the Workforce and the Committee on Ways and Means have been expanded into a Congress-wide probe across all relevant jurisdictions to address this national crisis. The undersigned Committees will conduct oversight into the use of federal funds at MIT and its learning environment under authorities granted to each Committee.
• The Committee on Education and the Workforce has been investigating your institution since December 7, 2023. The Committee has broad jurisdiction over postsecondary education, including its compliance with Title VI of the Civil Rights Act, campus safety concerns over disruptions to the learning environment, and the awarding of federal student aid under the Higher Education Act.
• The Committee on Oversight and Accountability is investigating the sources of funding and other support flowing to groups espousing pro-Hamas propaganda and engaged in antisemitic harassment and intimidation of students. The Committee on Oversight and Accountability is the principal oversight committee of the US House of Representatives and has broad authority to investigate “any matter” at “any time” under House Rule X.
• The Committee on Ways and Means has been investigating several universities since November 15, 2023, when the Committee held a hearing entitled From Ivory Towers to Dark Corners: Investigating the Nexus Between Antisemitism, Tax-Exempt Universities, and Terror Financing. The Committee followed the hearing with letters to those institutions on January 10, 202
2. 01
Introduction
Theme color makes
PPT more convenient.
02
Project Overview
Theme color makes
PPT more convenient.
03
Architectural design
Theme color makes
PPT more convenient.
04
Structural design
Theme color makes
PPT more convenient.
05
Design summary
Theme color makes
PPT more convenient.
CONTENTS
3. Plastering
One
is a process of applying one or more coats of mortar to a concrete surface, brickwork, stone masonry or lathing. It must be
durable such that it resists the penetration of moisture and should be able to weather uniformly. It should also be pleasing in
appearance. These properties depend upon materials used, composition of mix, and degree of mechanical bond between
the plaster and the backing surface and workmanship.
4. STEPS FOR PLASTERING :
STEP 1 : PREPARATION OF SURFACE:-
Keep all the mortar joint of wall rough.
Brush out all the dust and loose mortar
Surface should be properly cured and dry surface.
STEP 2: HACKING :-
Hacking of concrete surface can start after curing for 1
day. It is easier to hack at this stage.
The Hacking hammer is brought in contact with the
concrete surface with an impact, such that only a small
portion of well finished concrete surface is chipped off.
Also we can use a mechanical device instead of
hammer.
The indent caused by such an action should be
approximately 25 mm in length by visual observation
and not more than 2 to 3 mm in depth. Very deep
indents on concrete member can affects its strength.
NOTE * : INDENT – mark caused during hacking on
concrete surface due to impact.
5. • STEP 4: MIXING OF INGREDIENTS :-
• Mixing of ingredients is done by a mixer.
• Dry mortar is mixed initially and thereafter water
is added to the dry mix to get required
consistency.
• The quantity of the mortar made at a time should
be such that it can be consumed within 30
minutes.
• Generally, on this site , for plastering mix ratio is
1:4 .
• STEP 3: INSTALLATION OF BUTTON MARKS:-
• Button marks for Plastering should be fixed and checked. The button mark should be at
not more than 2m from each other in both horizontal and vertical direction.
• Button marks are installed using right angle triangle 📐 and string .
• Button marks on opposite wall should be fixed exactly opposite of each other.
6. • To measure the quantities of cement and sand
during
• plastering , a Measuring Box is used .
• This box made of wood and its size in our site is
• 300*300*380 mm .
• STEP 4: APPLYING THE MIX :-
• In this site , a two – coat method is used for
plastering.
• In this method , the first coat is known as Under Coat
and second coat is known as Float or Finishing Coat.
• Undercoat plasters are usually applied at 10 mm and
most finish
• coat plasters are applied at 2 mm.
• Internal Plaster : Thickness of the internal plaster is
maintained
• Up to 10 to 15 mm. The mortar should be used within
30 to 45 minutes of its preparation.
• External Plaster : The no of coats for external plaster
should not exceeds 2 coats.
• Thickness of the external plaster is maintained up to
20 to 25 mm.
8. •TILING:
• Tiles in building construction are thin plates
or elements used to cover surfaces like roofs , floors, and
walls. Tiles in the present scenario are a primary element in
bringing building interior as well exterior finishing and
beauty.
• Also we define tiling as ,
• The process of fixing tiles on the
walls and floors to give them a desired finish and a durable
surface. Tiles are available in different colors ,
• types and textures.
• Tiles that are used in our site are :
• Vitrified tiles
• Kota Stone
• Ceramic tiles
• Pegasus Beige
• Terracotta tiles
• Terrazzo Eton Beige
9. • STEPS FOR TILING :-
• STEP 1 : PREPARING THE SURFACE :-
•
• The surface on which the tiles will be laid should
be cleared of all the debris
• and loose particles. It should be washed , if
required.
• 5% of the total quantity of tiles that arrive in each
batch is kept as wastage.
• For floor tiling, the concrete slab surface has to be
thoroughly cleaned.
• For bathroom, under-tile waterproofing should be
complete.
• The surface is free of cracks and holes.
• Also , surface is properly level by tube level and a
1m marking is marked on
the walls from FFL ( floor finish level) by the
surveyor.
10. STEP 2: INSTALLATION OF BUTTON MARKS :-
With the help of One meter mark that previously made , we established our button marks and distance
between each other is 1 meter.
Firstly, we made button marks on the corners point , so with the help string we can mark our
intermediate button marks.
Secondly, during installation of button marks , we have to keep in mind about the slope that we
provide in the floor and accordingly to the slope , thickness of the button marks decreases.
Use of spirit level is must as with the help of this , we can check the level of the button marks in both
direction ( latitude and longitudinal ).
11. • STEP 3 : PREPARAING THE MIX AND TILE FIXING :-
• ( FLOOR TILES )
• Generally , the mix prepared for tiling can be 1:4 ,1:5 or 1:6 , as per
the
• requirements.
• Mechanical mixing ( Mixer) is preferred for mixing instead of hand
• mixing as proper mixing of cement + sand + water takes place in the
• mixer.
• Also , cement slurry ( 0.6/0.8 – 1 ) is prepared and used during tile
• fixing by spreading between mix and tile. This cement slurry acts as a
• thin , smooth layer that fills gaps and enhances tile adhesion.
• These materials ensure proper alignment and provide a strong base
for
• tiling application.
• For the floor tiles ( 600*600) , cover – up-to 40 mm and 3 mm spacer
• are used.
12. The tiles along the border will be fixed after the full tiles have been fixed.
The level of tiles should be checked every time a tile is laid using spirit level. Any
undulation can be leveled using a rubber hammer.
A skirting of 10-12 cm height is provided with the tiles , on the walls as per the
requirements.
At the end , the floor tile grouting is done and different – different chemicals are used.
Example : Tile joint filler and tile joint additive ( ROFF).
After the Grouting , sufficient curing should be done for a minimum of 3 days and then
protection sheets are laid to prevent the tiles from damaging .
13.
14.
15.
16. Title text
After you hit your
Title text
After you hit your
Title text
After you hit your
Title text
After you hit your
Introduction
After you hit your content here, or by copying your text
17. Title text Title text
01
02
Your content is hit here, or by copying your text, in this
box After you hit your content here, or by copying your
text, choose to paste your content in this box By
copying your text, choose to paste
Your content is hit here, or by copying your text, in this
box After you hit your content here, or by copying your
text, choose to paste your content in this box By
copying your text, choose to paste
Your content is hit here, or by copying your text, in this
box After you hit your content here, or by copying your
text, choose to paste your content in this box By
copying your text, choose to paste
Your content is hit here, or by copying your text, in this
box After you hit your content here, or by copying your
text, choose to paste your content in this box By
copying your text, choose to paste
Introduction
After you hit your content here, or by copying your text
18. Please enter your
Title text
Your content is hit here, or by copying your text, in this box After you hit your content here,
or by copying your text, choose to paste your content in this box By copying your text,
choose to paste your content in this box after hitting here, or by copying your text, choose
to paste your content in this box after hitting here, or by copying your text, in this box
Choose Paste in this box After you hit your content here, or by copying your text, choose
Introduction
After you hit your content here, or by copying your text
19. Please enter your
Your content is hit here, or by copying your text, in this box After you hit
your content here, or by copying your text, choose to
Please enter your
Your content is hit here, or by copying your text, in this box After you hit
your content here, or by copying your text, choose to
Please enter your
Project Overview
After you hit your content here, or by copying your text
20. Please enter your
Title text
After you hit your content here, or by copying
your text, choose paste in this box
Title text
After you hit your content here, or by
copying your text, choose paste in this
Title text
After you hit your content here, or by
copying your text, choose paste in this
01
Project Overview
After you hit your content here, or by copying your text
21. Your content is hit here, or by copying
your text, in this
Your content is hit here, or by copying
your text, in this
Your content is hit here, or by copying
your text, in this
Your content is hit here, or by copying
your text, in this
Project Overview
After you hit your content here, or by copying your text
23. After you hit your content here, or by copying
your text, choose paste in this box
After you hit your content here, or
by copying your text, choose
After you hit your content here, or
by copying your text, choose
After you hit your content here, or
by copying your text, choose
After you hit your content here, or
by copying your text, choose
Your content is hit here, or by copying your
text, in this box After you hit your content
here, or by copying your text, choose to
paste your content in this box After copying
your text, select Paste in this box
Architectural design
After you hit your content here, or by copying your text
24. Please enter your
• Your content is hit here, or by copying your
text, in this box choose paste After you hit
your content here, or by copying your text,
choose paste in this box
Please enter your
• Your content is hit here, or by copying your
text, in this box choose paste After you hit
your content here, or by copying your text,
choose paste in this box
01 02
Please enter your
• Your content is hit here, or by copying your
text, in this box choose paste After you hit
your content here, or by copying your text,
choose paste in this box
Please enter your
• Your content is hit here, or by copying your
text, in this box choose paste After you hit
your content here, or by copying your text,
choose paste in this box
03 04
Architectural design
After you hit your content here, or by copying your text
25. Please enter your
Your content is hit here, or by copying your text, in this box
After you hit your content here, or by copying your text,
choose to paste your content in this box By copying your
text, choose to paste your content in this box after hitting
here, or by copying your text, choose to paste your content
in this box after hitting here, or by copying your text, in this
box Select Paste in this box
Title text
Title text
Your content is hit here, or by copying your text, in this
box After you hit your content here, or by copying your
text, choose to paste your content in this box By copying
your text, choose to paste your content in this box after
hitting here, or by copying your text, choose to paste
your content in this box after hitting here, or by copying
your text, in this
Architectural design
After you hit your content here, or by copying your text
27. Please enter
Your title text
Your content is hit here, or by copying your text, in this box After you hit your content here, or by
copying your text, choose to paste your content in this box By copying your text, select Paste in
this box After hitting your content here, or by copying your text, Select
Title text Title text Title text Title text
After you hit your
content here, or by
copying your text
After you hit your
content here, or by
copying your text
After you hit your
content here, or by
copying your text
After you hit your
content here, or by
copying your text
Title text
After you hit your
content here, or by
copying your text
Structural design
After you hit your content here, or by copying your text
28. 03 Please enter your
• Your content is hit here, or by
copying your text, in this box
choose paste After you
01 Please enter your
• Your content is hit here, or by copying your
text, in this box choose paste After you hit
your content here, or by copying your text,
choose paste in this box
02
Please enter your
• Your content is hit here, or by copying your
text, in this box choose paste After you hit
your content here, or by copying your text,
choose paste in this box
04
Please enter your
• Your content is hit here, or by copying your
text, in this box choose paste After you hit
your content here, or by copying your text,
choose paste in this box
Structural design
After you hit your content here, or by copying your text
29. Your content is hit here, or by copying your text, in this box After you hit your
content here, or by copying your text, choose to paste your content in this
box By copying your text, select Paste in this box After hitting your content
here, or by copying your text, Select Paste in this
Please enter
Your title text
Title text
After you hit your content here, or by copying your text,
choose paste in this box
Structural design
After you hit your content here, or by copying your text
31. Please enter your title text
Your content is hit here, or by copying your text, in this box After you hit your content here, or by copying your text, choose to paste your
content in this box After copying your text, select Paste in this box
After you hit your content here, or by copying your text
Your content is hit here, or by copying your text, in this box choose paste After you hit your
content here, or by copying your text, choose paste in this box
Design summary
After you hit your content here, or by copying your text
32. Your content is hit here, or by copying your text, in this box
Please enter your
Word
Title text
After you hit your
content here, or by
copying your text
Title text
After you hit your
content here, or by
copying your text
Design summary
After you hit your content here, or by copying your text
33. THANKS
T h a n k y o u f o r w a t c h i n g
Reporter: XXX Date: 20XX.XX