SlideShare une entreprise Scribd logo
1  sur  14
7-1
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
Risk Management
Chapter 7
7-2
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
Risk
Risk management - the art and science of
identifying, analyzing, and responding to risk
factors throughout the life of a project and in
the best interest of its objectives.
Project risk – any possible event that can
negatively affect the viability of a project
7-3
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
Risk Vs Amount at Stake
Phase 1
Conceive
(C)
Phase 2
Develop
(D)
Phase 3
Execute
(E)
Phase 4
Finish
(F)
Time
$
Value
Increasing
Risk
Total Project Life Cycle
Amount at stake
Plan Produce
Opportunity and risk
Period of
highest
risk impact
7-4
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
Process of Risk Management
• What is likely to happen?
• What can be done?
• What are the warning signs?
• What are the likely outcomes?
Project Risk = (Probability of Event)(Consequences of Event)
7-5
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
Four Stages of Risk Management
1. Risk identification
2. Analysis of probability and consequences
3. Risk mitigation strategies
4. Control and documentation
7-6
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
Risk Clusters
• Financial
• Technical
• Contractual/Legal
• Commercial
• Execution
Common Types
• Absenteeism
• Resignation
• Staff pulled away
• Time overruns
• Skills unavailable
• Ineffective Training
• Specs incomplete
• Change orders
7-7
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
Risk Factor Identification
 Brainstorming meetings
 Expert opinion
 Past history
 Multiple (or team based) assessments
7-8
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
Risk Impact Matrix
Consequences
Likelihood
High
Low
Low High
7-9
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
Project Risk Scoring
1. Identify factors and assess the probability
(Pf ) and consequences (Cf) of failure
2. Calculate overall probability & consequence
3. Calculate overall risk factor
3
m c d
f
P P P
P
 

4
c s r p
f
C C C C
C
  

( )( )
f f f f
RF P C P C
  
7-10
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
Risk Mitigation Strategies
• Accept
• Minimize
• Share
• Transfer
• Contingency Reserves
–Task contingency
–Managerial contingency
• Mentoring
• Cross training
7-11
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
Control & Documentation
Help managers classify and codify risks,
responses, and outcomes
Change management report system answers
• What?
• Who?
• When?
• Why?
• How?
7-12
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
Project Risk Analysis & Management
Extends risk management over project’s life cycle
Key Features of PRAM
Risk management follows a life cycle
Risk management strategy changes over the
project life cycle
Synthesized, coherent approach
7-13
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
Nine Phases of Risk Assessment
1.Define
2.Focus
3.Identify
4.Structure
5.Clarify ownership of risks
6.Estimate
7.Evaluate
8.Plan
9.Manage
7-14
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

Contenu connexe

Similaire à pinto_pm2_ch07-useful for beginners_.ppt

Risk ManagementRisks and Risk ManagementRisks a.docx
Risk ManagementRisks and Risk ManagementRisks a.docxRisk ManagementRisks and Risk ManagementRisks a.docx
Risk ManagementRisks and Risk ManagementRisks a.docxjoellemurphey
 
Twelve Risks to Enterprise Software Projects-And What to Do About Them
Twelve Risks to Enterprise Software Projects-And What to Do About ThemTwelve Risks to Enterprise Software Projects-And What to Do About Them
Twelve Risks to Enterprise Software Projects-And What to Do About ThemTechWell
 
Running head VOIP WORK BREAKDOWN STRUCTURE 1VOIP WORK BRE.docx
Running head VOIP WORK BREAKDOWN STRUCTURE 1VOIP WORK BRE.docxRunning head VOIP WORK BREAKDOWN STRUCTURE 1VOIP WORK BRE.docx
Running head VOIP WORK BREAKDOWN STRUCTURE 1VOIP WORK BRE.docxrtodd599
 
Project Risk Management - Introduction 2011
Project Risk Management - Introduction 2011Project Risk Management - Introduction 2011
Project Risk Management - Introduction 2011Sasha Lazarevic
 
Project Management Class ( based on PMBOK) - Day 1
Project Management Class ( based on PMBOK) - Day 1Project Management Class ( based on PMBOK) - Day 1
Project Management Class ( based on PMBOK) - Day 1Highmark Health
 
Risk-based Testing: Not for the Fainthearted
Risk-based Testing: Not for the FaintheartedRisk-based Testing: Not for the Fainthearted
Risk-based Testing: Not for the FaintheartedTechWell
 
Project Risk Management (10)
 Project Risk Management (10) Project Risk Management (10)
Project Risk Management (10)Serdar Temiz
 
Materi Environmental Program Framework_Kelas Green Planet & Future Living.pptx
Materi Environmental Program Framework_Kelas Green Planet & Future Living.pptxMateri Environmental Program Framework_Kelas Green Planet & Future Living.pptx
Materi Environmental Program Framework_Kelas Green Planet & Future Living.pptxWaridZulIlmi1
 
Rethinking Risk-Based Project Management in the Emerging IT initiatives.pptx
Rethinking Risk-Based Project Management in the Emerging IT initiatives.pptxRethinking Risk-Based Project Management in the Emerging IT initiatives.pptx
Rethinking Risk-Based Project Management in the Emerging IT initiatives.pptxInflectra
 
Risk Management Readiness by James Wilson, PMP
Risk Management Readiness by James Wilson, PMPRisk Management Readiness by James Wilson, PMP
Risk Management Readiness by James Wilson, PMPJames John Wilson
 
Risk Based Software Planning
Risk Based Software PlanningRisk Based Software Planning
Risk Based Software PlanningMuhammad Alhalaby
 
МАРИНА ШУЛЬГА «Чому розробка ядерних програм США може навчити софтверних тест...
МАРИНА ШУЛЬГА «Чому розробка ядерних програм США може навчити софтверних тест...МАРИНА ШУЛЬГА «Чому розробка ядерних програм США може навчити софтверних тест...
МАРИНА ШУЛЬГА «Чому розробка ядерних програм США може навчити софтверних тест...QADay
 
Risk and Procurement ManagementDr Paul BaguleyClass Slides.docx
Risk and Procurement ManagementDr Paul BaguleyClass Slides.docxRisk and Procurement ManagementDr Paul BaguleyClass Slides.docx
Risk and Procurement ManagementDr Paul BaguleyClass Slides.docxlillie234567
 
PMP Training - 11 project risk management
PMP Training - 11 project risk managementPMP Training - 11 project risk management
PMP Training - 11 project risk managementejlp12
 
Risk management and opprtuinty _pp10.ppt
Risk management and opprtuinty _pp10.pptRisk management and opprtuinty _pp10.ppt
Risk management and opprtuinty _pp10.pptDrAtefRagab2
 
Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...
Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...
Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...Project Controls Expo
 
Project Risk Register
Project Risk Register Project Risk Register
Project Risk Register simplesteps
 
ECC_Black_Swan_2008_4
ECC_Black_Swan_2008_4ECC_Black_Swan_2008_4
ECC_Black_Swan_2008_4Dean Wenner
 

Similaire à pinto_pm2_ch07-useful for beginners_.ppt (20)

Risk ManagementRisks and Risk ManagementRisks a.docx
Risk ManagementRisks and Risk ManagementRisks a.docxRisk ManagementRisks and Risk ManagementRisks a.docx
Risk ManagementRisks and Risk ManagementRisks a.docx
 
Twelve Risks to Enterprise Software Projects-And What to Do About Them
Twelve Risks to Enterprise Software Projects-And What to Do About ThemTwelve Risks to Enterprise Software Projects-And What to Do About Them
Twelve Risks to Enterprise Software Projects-And What to Do About Them
 
Running head VOIP WORK BREAKDOWN STRUCTURE 1VOIP WORK BRE.docx
Running head VOIP WORK BREAKDOWN STRUCTURE 1VOIP WORK BRE.docxRunning head VOIP WORK BREAKDOWN STRUCTURE 1VOIP WORK BRE.docx
Running head VOIP WORK BREAKDOWN STRUCTURE 1VOIP WORK BRE.docx
 
Project Risk Management - Introduction 2011
Project Risk Management - Introduction 2011Project Risk Management - Introduction 2011
Project Risk Management - Introduction 2011
 
Project Management Class ( based on PMBOK) - Day 1
Project Management Class ( based on PMBOK) - Day 1Project Management Class ( based on PMBOK) - Day 1
Project Management Class ( based on PMBOK) - Day 1
 
Risk-based Testing: Not for the Fainthearted
Risk-based Testing: Not for the FaintheartedRisk-based Testing: Not for the Fainthearted
Risk-based Testing: Not for the Fainthearted
 
Project Risk Management (10)
 Project Risk Management (10) Project Risk Management (10)
Project Risk Management (10)
 
Materi Environmental Program Framework_Kelas Green Planet & Future Living.pptx
Materi Environmental Program Framework_Kelas Green Planet & Future Living.pptxMateri Environmental Program Framework_Kelas Green Planet & Future Living.pptx
Materi Environmental Program Framework_Kelas Green Planet & Future Living.pptx
 
Rethinking Risk-Based Project Management in the Emerging IT initiatives.pptx
Rethinking Risk-Based Project Management in the Emerging IT initiatives.pptxRethinking Risk-Based Project Management in the Emerging IT initiatives.pptx
Rethinking Risk-Based Project Management in the Emerging IT initiatives.pptx
 
Risk Management Readiness by James Wilson, PMP
Risk Management Readiness by James Wilson, PMPRisk Management Readiness by James Wilson, PMP
Risk Management Readiness by James Wilson, PMP
 
Risk Based Software Planning
Risk Based Software PlanningRisk Based Software Planning
Risk Based Software Planning
 
МАРИНА ШУЛЬГА «Чому розробка ядерних програм США може навчити софтверних тест...
МАРИНА ШУЛЬГА «Чому розробка ядерних програм США може навчити софтверних тест...МАРИНА ШУЛЬГА «Чому розробка ядерних програм США може навчити софтверних тест...
МАРИНА ШУЛЬГА «Чому розробка ядерних програм США може навчити софтверних тест...
 
Risk and Procurement ManagementDr Paul BaguleyClass Slides.docx
Risk and Procurement ManagementDr Paul BaguleyClass Slides.docxRisk and Procurement ManagementDr Paul BaguleyClass Slides.docx
Risk and Procurement ManagementDr Paul BaguleyClass Slides.docx
 
ADOPT 2012 FFI CRC
ADOPT 2012 FFI CRCADOPT 2012 FFI CRC
ADOPT 2012 FFI CRC
 
PMP Training - 11 project risk management
PMP Training - 11 project risk managementPMP Training - 11 project risk management
PMP Training - 11 project risk management
 
PROJECT RISK MANAGEMENT .docx
PROJECT RISK MANAGEMENT                                           .docxPROJECT RISK MANAGEMENT                                           .docx
PROJECT RISK MANAGEMENT .docx
 
Risk management and opprtuinty _pp10.ppt
Risk management and opprtuinty _pp10.pptRisk management and opprtuinty _pp10.ppt
Risk management and opprtuinty _pp10.ppt
 
Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...
Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...
Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...
 
Project Risk Register
Project Risk Register Project Risk Register
Project Risk Register
 
ECC_Black_Swan_2008_4
ECC_Black_Swan_2008_4ECC_Black_Swan_2008_4
ECC_Black_Swan_2008_4
 

Dernier

Pragya Champions Chalice 2024 Prelims & Finals Q/A set, General Quiz
Pragya Champions Chalice 2024 Prelims & Finals Q/A set, General QuizPragya Champions Chalice 2024 Prelims & Finals Q/A set, General Quiz
Pragya Champions Chalice 2024 Prelims & Finals Q/A set, General QuizPragya - UEM Kolkata Quiz Club
 
factors influencing drug absorption-final-2.pptx
factors influencing drug absorption-final-2.pptxfactors influencing drug absorption-final-2.pptx
factors influencing drug absorption-final-2.pptxSanjay Shekar
 
size separation d pharm 1st year pharmaceutics
size separation d pharm 1st year pharmaceuticssize separation d pharm 1st year pharmaceutics
size separation d pharm 1st year pharmaceuticspragatimahajan3
 
IATP How-to Foreign Travel May 2024.pdff
IATP How-to Foreign Travel May 2024.pdffIATP How-to Foreign Travel May 2024.pdff
IATP How-to Foreign Travel May 2024.pdff17thcssbs2
 
ppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyesppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyesashishpaul799
 
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & EngineeringBasic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & EngineeringDenish Jangid
 
Dementia (Alzheimer & vasular dementia).
Dementia (Alzheimer & vasular dementia).Dementia (Alzheimer & vasular dementia).
Dementia (Alzheimer & vasular dementia).Mohamed Rizk Khodair
 
How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17Celine George
 
Mbaye_Astou.Education Civica_Human Rights.pptx
Mbaye_Astou.Education Civica_Human Rights.pptxMbaye_Astou.Education Civica_Human Rights.pptx
Mbaye_Astou.Education Civica_Human Rights.pptxnuriaiuzzolino1
 
Championnat de France de Tennis de table/
Championnat de France de Tennis de table/Championnat de France de Tennis de table/
Championnat de France de Tennis de table/siemaillard
 
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽中 央社
 
[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online Presentation[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online PresentationGDSCYCCE
 
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptxslides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptxCapitolTechU
 
....................Muslim-Law notes.pdf
....................Muslim-Law notes.pdf....................Muslim-Law notes.pdf
....................Muslim-Law notes.pdfVikramadityaRaj
 
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17Celine George
 
Essential Safety precautions during monsoon season
Essential Safety precautions during monsoon seasonEssential Safety precautions during monsoon season
Essential Safety precautions during monsoon seasonMayur Khatri
 
Features of Video Calls in the Discuss Module in Odoo 17
Features of Video Calls in the Discuss Module in Odoo 17Features of Video Calls in the Discuss Module in Odoo 17
Features of Video Calls in the Discuss Module in Odoo 17Celine George
 
The basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptxThe basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptxheathfieldcps1
 
The Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational ResourcesThe Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational Resourcesaileywriter
 

Dernier (20)

Pragya Champions Chalice 2024 Prelims & Finals Q/A set, General Quiz
Pragya Champions Chalice 2024 Prelims & Finals Q/A set, General QuizPragya Champions Chalice 2024 Prelims & Finals Q/A set, General Quiz
Pragya Champions Chalice 2024 Prelims & Finals Q/A set, General Quiz
 
factors influencing drug absorption-final-2.pptx
factors influencing drug absorption-final-2.pptxfactors influencing drug absorption-final-2.pptx
factors influencing drug absorption-final-2.pptx
 
size separation d pharm 1st year pharmaceutics
size separation d pharm 1st year pharmaceuticssize separation d pharm 1st year pharmaceutics
size separation d pharm 1st year pharmaceutics
 
IATP How-to Foreign Travel May 2024.pdff
IATP How-to Foreign Travel May 2024.pdffIATP How-to Foreign Travel May 2024.pdff
IATP How-to Foreign Travel May 2024.pdff
 
ppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyesppt your views.ppt your views of your college in your eyes
ppt your views.ppt your views of your college in your eyes
 
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & EngineeringBasic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
Basic Civil Engg Notes_Chapter-6_Environment Pollution & Engineering
 
Dementia (Alzheimer & vasular dementia).
Dementia (Alzheimer & vasular dementia).Dementia (Alzheimer & vasular dementia).
Dementia (Alzheimer & vasular dementia).
 
How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17How to the fix Attribute Error in odoo 17
How to the fix Attribute Error in odoo 17
 
Mbaye_Astou.Education Civica_Human Rights.pptx
Mbaye_Astou.Education Civica_Human Rights.pptxMbaye_Astou.Education Civica_Human Rights.pptx
Mbaye_Astou.Education Civica_Human Rights.pptx
 
Championnat de France de Tennis de table/
Championnat de France de Tennis de table/Championnat de France de Tennis de table/
Championnat de France de Tennis de table/
 
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
 
[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online Presentation[GDSC YCCE] Build with AI Online Presentation
[GDSC YCCE] Build with AI Online Presentation
 
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptxslides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
 
....................Muslim-Law notes.pdf
....................Muslim-Law notes.pdf....................Muslim-Law notes.pdf
....................Muslim-Law notes.pdf
 
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
 
Word Stress rules esl .pptx
Word Stress rules esl               .pptxWord Stress rules esl               .pptx
Word Stress rules esl .pptx
 
Essential Safety precautions during monsoon season
Essential Safety precautions during monsoon seasonEssential Safety precautions during monsoon season
Essential Safety precautions during monsoon season
 
Features of Video Calls in the Discuss Module in Odoo 17
Features of Video Calls in the Discuss Module in Odoo 17Features of Video Calls in the Discuss Module in Odoo 17
Features of Video Calls in the Discuss Module in Odoo 17
 
The basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptxThe basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptx
 
The Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational ResourcesThe Benefits and Challenges of Open Educational Resources
The Benefits and Challenges of Open Educational Resources
 

pinto_pm2_ch07-useful for beginners_.ppt

  • 1. 7-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Risk Management Chapter 7
  • 2. 7-2 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Risk Risk management - the art and science of identifying, analyzing, and responding to risk factors throughout the life of a project and in the best interest of its objectives. Project risk – any possible event that can negatively affect the viability of a project
  • 3. 7-3 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Risk Vs Amount at Stake Phase 1 Conceive (C) Phase 2 Develop (D) Phase 3 Execute (E) Phase 4 Finish (F) Time $ Value Increasing Risk Total Project Life Cycle Amount at stake Plan Produce Opportunity and risk Period of highest risk impact
  • 4. 7-4 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Process of Risk Management • What is likely to happen? • What can be done? • What are the warning signs? • What are the likely outcomes? Project Risk = (Probability of Event)(Consequences of Event)
  • 5. 7-5 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Four Stages of Risk Management 1. Risk identification 2. Analysis of probability and consequences 3. Risk mitigation strategies 4. Control and documentation
  • 6. 7-6 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Risk Clusters • Financial • Technical • Contractual/Legal • Commercial • Execution Common Types • Absenteeism • Resignation • Staff pulled away • Time overruns • Skills unavailable • Ineffective Training • Specs incomplete • Change orders
  • 7. 7-7 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Risk Factor Identification  Brainstorming meetings  Expert opinion  Past history  Multiple (or team based) assessments
  • 8. 7-8 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Risk Impact Matrix Consequences Likelihood High Low Low High
  • 9. 7-9 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Risk Scoring 1. Identify factors and assess the probability (Pf ) and consequences (Cf) of failure 2. Calculate overall probability & consequence 3. Calculate overall risk factor 3 m c d f P P P P    4 c s r p f C C C C C     ( )( ) f f f f RF P C P C   
  • 10. 7-10 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Risk Mitigation Strategies • Accept • Minimize • Share • Transfer • Contingency Reserves –Task contingency –Managerial contingency • Mentoring • Cross training
  • 11. 7-11 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Control & Documentation Help managers classify and codify risks, responses, and outcomes Change management report system answers • What? • Who? • When? • Why? • How?
  • 12. 7-12 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Risk Analysis & Management Extends risk management over project’s life cycle Key Features of PRAM Risk management follows a life cycle Risk management strategy changes over the project life cycle Synthesized, coherent approach
  • 13. 7-13 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Nine Phases of Risk Assessment 1.Define 2.Focus 3.Identify 4.Structure 5.Clarify ownership of risks 6.Estimate 7.Evaluate 8.Plan 9.Manage
  • 14. 7-14 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall