Topics to be Covered/Objectives
Pre Flight Inspection procedure
In-Flight Inspection/adjustment procedure LLZ
In-Flight Inspection/adjustment procedure GP
Post Flight Inspection Procedure LLZ/GP
ILS THALES PLI COURSE RTC-NR
6/6/2023 2
At the end of this session, trainee will be able to:
Take the Backup of Preflight/post flight Backup of System
Must be able to understand the phraseology of flight
inspector before doing adjustment
Competent to do the Transmitter adjustment as
instructed by flight inspector
Competent to do the Monitor adjustment as per station
requirement
ILS THALES PLI COURSE RTC-NR
6/6/2023 3
Pre-Flight Inspection procedure
Readiness of Ground equipment to be calibrated
Co-ordination with Local ATC for withdrawal of ILS Facility
Initiation of NOTAM action for equipment under calibration
Availability of Competent Maintenance personnel to make
corrections and adjustments
Software and Hardware Backup of System Ground check
etc.
Ensure DGPS points intact and availability of last Flight
Inspection Report etc.
ILS THALES PLI COURSE RTC-NR
6/6/2023 4
In-Flight Inspection procedure
Adjustment procedure for LLZ/GP
Understanding adjustment windows of system
Understanding message of flight inspector
Calculation and applying the adjustments
Conveying message to flight inspector
Recording of all adjustments done
ILS THALES PLI COURSE RTC-NR
6/6/2023 5
ILS THALES PLI COURSE RTC-NR
6/6/2023 6
Localizer Flight Checks:
1. Coverage :
2. CRS/CLR Width:
3. LLZ Course Line :
4. LLZ structure:
5. High Angle:
6. Monitor Alarms:
In-Flight Inspection/adjustment procedure LLZ
 Put the LLZ on maintenance mode with key switch on
LCP.
 Login to level 4 or 5 in ADRACS.
 Note down the pre-calibration data and save system
LDA data through ADRACS
 Go to adjustment window shown by maintenance sign
at bottom tool bar.
 Open the Normal waveform data for on Arial
transmitter.
 Select/adjust RF/DDM/SDM as per requirement.
 Enter the desired data as per requirement of FIU.
Adjustment procedure
ILS THALES PLI COURSE RTC-NR
6/6/2023 7
LCP Key in Maintenance Mode
ADRACS Login level 4/5
ADRACS Login Procedure
Access To LLZ/GP system
Access To Enter Maintenance window
Normal waveform and Monitor Windows
Flight Inspection Procedure of LLZ
1. Coverage Check and Power Alarm:
Availability of ILS signal within its service volume
operating on mains & Battery backup.
Adjustment : Course CSB RF Level
Clearance CSB RF Level
ILS THALES PLI COURSE RTC-NR
6/6/2023 14
Power Alarm Window
13 W Nominal Power
13 W Nominal Power
CRS and CLR Width Check LLZ:
Purpose:
• Adjust & Ensure Course Width within tolerance;
• Check signal in the sector +10° and + 35° of C/L
Flight Procedure:
• Cal aircraft flies an arc about Runway center line at approx. 5 NM from LLZ &
1500’ AGL.
Values and tolerances :
• COURSE WIDTH (W) = W ± 17% for CAT I, II & W ± 10% for CAT III
Adjustment : SBO Amplitude ( SBO Power) - Course
• Signal in the course sector increase linearly to 175 μ Amps (18% DDM) till
10° on either side of C/L.
• Minimum Signal in the clearance sector between ±10° to ± 35° sector should be
150 μ Amps (15.5% DDM).
Adjustment : SBO Amplitude ( SBO Power) - Clearance
ILS THALES PLI COURSE RTC-NR
6/6/2023 16
Flight Inspection Procedure of LLZ
Adjustment : SBO Amplitude ( SBO Power) – CRS/CLR
Apply formula as below:
Example : Commissioning Course Width =3.10
Measured Course width = 3.62
Normal CRS SBO value = 53.6
New SBO = 53.6 x 3.62
3.10
New SBO to be entered = 62.7%
ILS THALES PLI COURSE RTC-NR
6/6/2023 17
New SBO=Measured SBO x Measured CW
Required CW
Transmitter Nominal course width and Monitor data
Nominal CW in Monitor
New Course width after adjusted SBO power
CW after Adjustment in Monitor
Course Line Adjustment
ILS THALES PLI COURSE RTC-NR
6/6/2023 20
Nominal Course CSB DDM Value - 0
Go to Normal waveform Data of on Arial
Transmitter.
Adjust Course CSB DDM as per Requirement.
Increase 150 Hz for dominant of C/L on RHS.
Increase 90 Hz for dominant of C/L on LHS.
Course Line Adjustment Procedure
ILS THALES PLI COURSE RTC-NR
6/6/2023 21
Shifting of C/L towards 90 Hz dominance
ILS THALES PLI COURSE RTC-NR
6/6/2023 22
Shifting of C/L towards 150 Hz Dominance
ILS THALES PLI COURSE RTC-NR
6/6/2023 23
Monitor Alarms Check:
ILS THALES PLI COURSE RTC-NR
6/6/2023 24
Course Line: Alarms for change in Course Line
toward left or right of the Centre Line:
Cat I : + 10.5 m or 1.5 % DDM;
Cat II : + 7.5 m or 1.09 % DDM;
Cat III : + 6 m or 0.88 % DDM
Curse width:
Cat I : + 17 % of Nominal Value
Cat II: + 17 % of Nominal Value
Cat III: + 17 % of Nominal Value
Monitor Alarms Procedure C/L:
ILS THALES PLI COURSE RTC-NR
6/6/2023 25
To check dominance of C/L towards
RHS and LHS.
Change CRS CSB DDM as per tested
facility –CAT-I,CAT-II,CAT-III.
Check corresponding change in
Monitor
If any further change is required
follow the instructions of onboard
Flight Inspector.
Course Position Alarm 150 Hz Dominance
-8.13 micro Amp Nominal DDM
Course Position 90 Hz Dominance
-8.13 micro Amp Nominal DDM
Monitor Alarms Check CRS Width:
ILS THALES PLI COURSE RTC-NR
6/6/2023 28
Curse width:
 Cat I : + 17 % of Nominal Value
 Cat II: + 17 % of Nominal Value
 Cat III: + 17 % of Nominal Value
New SBO= Nominal CW X Nominal SBO
Required CW(17 % of Nominal)
CRS Width Narrow Alarm
ILS THALES PLI COURSE RTC-NR
6/6/2023 30
Glide Path Checks:
1. Glide Angle:
2. Sector Width:
3. GP structure:
4. GP coverage:
5. Monitor Alarms:
In-Flight Inspection/adjustment procedure GP
ILS THALES PLI COURSE RTC-NR
6/6/2023 31
Purpose: To check actual the Glide angle of GP
Flight Procedure:
The calibration aircraft approaches inbound on extended center line
at 1500′ AGL from 10 NM to Threshold.
Glide angle
Commissioning : No tolerances allowed
Routine :
± 7.5% of θ for CAT I & II (2.775 to 3.225 Deg for θ=3)
± 4% of θ for CAT III ( 2.88 to 3.12 Deg, for θ=3 )
ILS THALES PLI COURSE RTC-NR
6/6/2023 32
Open Normal Waveform data of on Arial Transmitter.
Adjust CRS CSB1 DDM as per requirement.
Change the DDM setting to µA from percent.
To increase glide angle increase +150 Hz
For decreasing glide angle increase -90 Hz.
Check the corresponding change in Monitor the same
change should appear as you adjusted for transmitter.
Note down the final adjusted values for future
reference.
ILS THALES PLI COURSE RTC-NR
6/6/2023 33
ILS THALES PLI COURSE RTC-NR
6/6/2023 34
Open Normal Waveform data of on Arial Transmitter.
Adjust CRS Width from width adjustment tool.
Apply the formula:
Check the corresponding change in Monitor, the same
change should appear as you adjusted for transmitter.
Note down the final adjusted values for future
reference.
Scale factor=100 x Measured CW
Required CW
ILS THALES PLI COURSE RTC-NR
6/6/2023 35
ILS THALES PLI COURSE RTC-NR
6/6/2023 36
• Under
wider than
above
• Above
wider than
under
• Under
wider than
above
• Above
wider than
under
Glide
Angle
Too High
Glide
Angle
Too High
Glide
Angle
Too Low
Glide
Angle
Too Low
Increase
CSB1
DDM
Decrease
SBO
Amplitude
Increase
SBO
Amplitude
Decrease
CSB1
DDM
ILS THALES PLI COURSE RTC-NR
6/6/2023 37
Increase
CSB1
Amplitude
Decrease
CSB2
Amplitude
Above wider than under
Correct Glide Angle Unsymmetrical Width
Under wider than above
ILS THALES PLI COURSE RTC-NR
6/6/2023 38
Increase
SBO
Amplitude
Decrease
SBO
Amplitude
Glide Angle Too High
In correct Glide Angle symmetrical Width
Glide Angle Too Low
Changing SBO with 1 % changes the glide angle with 0.01 deg.
ILS THALES PLI COURSE RTC-NR
6/6/2023 39
ILS THALES PLI COURSE RTC-NR
6/6/2023 40
ILS THALES PLI COURSE RTC-NR
6/6/2023 41
ILS THALES PLI COURSE RTC-NR
6/6/2023 42
ILS THALES PLI COURSE RTC-NR
6/6/2023 43
ILS THALES PLI COURSE RTC-NR
6/6/2023 44
ILS THALES PLI COURSE RTC-NR
6/6/2023 45
1. Save Transmitter Data and record in
Log Book
2. Take Reference of M1/M2/M3/NF
Data with PIR
3. Monitor and SOAC adjustment if
required
4. Ground Check of LLZ
5. Initiation of Cancelation of NOTAM
6/6/2023 ILS THALES PLI COURSE RTC-NR 46
ILS THALES PLI COURSE RTC-NR
6/6/2023 47

Contenu connexe

Similaire à Flight Inspection practical.pptx

Precission Approach Path Indicator (PAPI)
Precission Approach Path Indicator (PAPI)Precission Approach Path Indicator (PAPI)
Precission Approach Path Indicator (PAPI)Suhanto Tuban
 
Drury 1975 atc-39_ww-15318
Drury 1975 atc-39_ww-15318Drury 1975 atc-39_ww-15318
Drury 1975 atc-39_ww-15318Saipradeepci
 
Changing from ACN-PCN to ACR-PCR.pdf
Changing from ACN-PCN to  ACR-PCR.pdfChanging from ACN-PCN to  ACR-PCR.pdf
Changing from ACN-PCN to ACR-PCR.pdfTimLin82
 
USB 3.1 Gen 2 Compliance Testing and Debug Webinar
USB 3.1 Gen 2 Compliance Testing and Debug WebinarUSB 3.1 Gen 2 Compliance Testing and Debug Webinar
USB 3.1 Gen 2 Compliance Testing and Debug Webinarteledynelecroy
 
3 g huawei ran resource monitoring and management recommended
3 g huawei ran resource monitoring and management recommended3 g huawei ran resource monitoring and management recommended
3 g huawei ran resource monitoring and management recommendedMery Koto
 
Asiasim2004 final
Asiasim2004 finalAsiasim2004 final
Asiasim2004 finalvrsim
 
Approach Control ServicesInstrument Approach Procedure.docx
Approach Control ServicesInstrument Approach Procedure.docxApproach Control ServicesInstrument Approach Procedure.docx
Approach Control ServicesInstrument Approach Procedure.docxjustine1simpson78276
 
Ca code and its properties
Ca code and its propertiesCa code and its properties
Ca code and its propertiesKSINDHU6
 
IMPROVEMENT IN IRVR 'AGL Credit'
IMPROVEMENT IN IRVR 'AGL Credit' IMPROVEMENT IN IRVR 'AGL Credit'
IMPROVEMENT IN IRVR 'AGL Credit' Stephen Clouston
 
#3 gnss requirements & specifications
#3 gnss requirements & specifications#3 gnss requirements & specifications
#3 gnss requirements & specificationsMohammedHusain20
 
WCDMA optimization & Drive test analysis
WCDMA optimization & Drive test analysisWCDMA optimization & Drive test analysis
WCDMA optimization & Drive test analysisTABREZ KHAN
 
GGSR-CPP-Presentation-12 July 2011-C&I
GGSR-CPP-Presentation-12 July 2011-C&IGGSR-CPP-Presentation-12 July 2011-C&I
GGSR-CPP-Presentation-12 July 2011-C&IPawan Deep
 
Iasted Open Loop
Iasted Open LoopIasted Open Loop
Iasted Open Loopandreipopov
 
2015 IES LESSONS LEARNED PRESENTATION 2015-10-10
2015 IES LESSONS LEARNED PRESENTATION 2015-10-102015 IES LESSONS LEARNED PRESENTATION 2015-10-10
2015 IES LESSONS LEARNED PRESENTATION 2015-10-10Carl S. Johnson II - ACE
 

Similaire à Flight Inspection practical.pptx (20)

Precission Approach Path Indicator (PAPI)
Precission Approach Path Indicator (PAPI)Precission Approach Path Indicator (PAPI)
Precission Approach Path Indicator (PAPI)
 
Drury 1975 atc-39_ww-15318
Drury 1975 atc-39_ww-15318Drury 1975 atc-39_ww-15318
Drury 1975 atc-39_ww-15318
 
Atc unit 3
Atc unit 3Atc unit 3
Atc unit 3
 
Changing from ACN-PCN to ACR-PCR.pdf
Changing from ACN-PCN to  ACR-PCR.pdfChanging from ACN-PCN to  ACR-PCR.pdf
Changing from ACN-PCN to ACR-PCR.pdf
 
Lecture10.ppt
Lecture10.pptLecture10.ppt
Lecture10.ppt
 
USB 3.1 Gen 2 Compliance Testing and Debug Webinar
USB 3.1 Gen 2 Compliance Testing and Debug WebinarUSB 3.1 Gen 2 Compliance Testing and Debug Webinar
USB 3.1 Gen 2 Compliance Testing and Debug Webinar
 
3 g huawei ran resource monitoring and management recommended
3 g huawei ran resource monitoring and management recommended3 g huawei ran resource monitoring and management recommended
3 g huawei ran resource monitoring and management recommended
 
Asiasim2004 final
Asiasim2004 finalAsiasim2004 final
Asiasim2004 final
 
Using EGNOS in the General Aviation Community
Using EGNOS in the General Aviation CommunityUsing EGNOS in the General Aviation Community
Using EGNOS in the General Aviation Community
 
Approach Control ServicesInstrument Approach Procedure.docx
Approach Control ServicesInstrument Approach Procedure.docxApproach Control ServicesInstrument Approach Procedure.docx
Approach Control ServicesInstrument Approach Procedure.docx
 
Ca code and its properties
Ca code and its propertiesCa code and its properties
Ca code and its properties
 
IMPROVEMENT IN IRVR 'AGL Credit'
IMPROVEMENT IN IRVR 'AGL Credit' IMPROVEMENT IN IRVR 'AGL Credit'
IMPROVEMENT IN IRVR 'AGL Credit'
 
#3 gnss requirements & specifications
#3 gnss requirements & specifications#3 gnss requirements & specifications
#3 gnss requirements & specifications
 
Aerodrome Operating Minima
Aerodrome Operating MinimaAerodrome Operating Minima
Aerodrome Operating Minima
 
WCDMA optimization & Drive test analysis
WCDMA optimization & Drive test analysisWCDMA optimization & Drive test analysis
WCDMA optimization & Drive test analysis
 
GGSR-CPP-Presentation-12 July 2011-C&I
GGSR-CPP-Presentation-12 July 2011-C&IGGSR-CPP-Presentation-12 July 2011-C&I
GGSR-CPP-Presentation-12 July 2011-C&I
 
Iasted Open Loop
Iasted Open LoopIasted Open Loop
Iasted Open Loop
 
ACNS UNIT-5.pdf
ACNS UNIT-5.pdfACNS UNIT-5.pdf
ACNS UNIT-5.pdf
 
2015 IES LESSONS LEARNED PRESENTATION 2015-10-10
2015 IES LESSONS LEARNED PRESENTATION 2015-10-102015 IES LESSONS LEARNED PRESENTATION 2015-10-10
2015 IES LESSONS LEARNED PRESENTATION 2015-10-10
 
NorthernCross Demo 2009
NorthernCross Demo 2009NorthernCross Demo 2009
NorthernCross Demo 2009
 

Dernier

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 

Dernier (20)

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 

Flight Inspection practical.pptx

  • 1. FLIGHT INSPECTION OF CNS FACILITIES Practical
  • 2. Topics to be Covered/Objectives Pre Flight Inspection procedure In-Flight Inspection/adjustment procedure LLZ In-Flight Inspection/adjustment procedure GP Post Flight Inspection Procedure LLZ/GP ILS THALES PLI COURSE RTC-NR 6/6/2023 2
  • 3. At the end of this session, trainee will be able to: Take the Backup of Preflight/post flight Backup of System Must be able to understand the phraseology of flight inspector before doing adjustment Competent to do the Transmitter adjustment as instructed by flight inspector Competent to do the Monitor adjustment as per station requirement ILS THALES PLI COURSE RTC-NR 6/6/2023 3
  • 4. Pre-Flight Inspection procedure Readiness of Ground equipment to be calibrated Co-ordination with Local ATC for withdrawal of ILS Facility Initiation of NOTAM action for equipment under calibration Availability of Competent Maintenance personnel to make corrections and adjustments Software and Hardware Backup of System Ground check etc. Ensure DGPS points intact and availability of last Flight Inspection Report etc. ILS THALES PLI COURSE RTC-NR 6/6/2023 4
  • 5. In-Flight Inspection procedure Adjustment procedure for LLZ/GP Understanding adjustment windows of system Understanding message of flight inspector Calculation and applying the adjustments Conveying message to flight inspector Recording of all adjustments done ILS THALES PLI COURSE RTC-NR 6/6/2023 5
  • 6. ILS THALES PLI COURSE RTC-NR 6/6/2023 6 Localizer Flight Checks: 1. Coverage : 2. CRS/CLR Width: 3. LLZ Course Line : 4. LLZ structure: 5. High Angle: 6. Monitor Alarms: In-Flight Inspection/adjustment procedure LLZ
  • 7.  Put the LLZ on maintenance mode with key switch on LCP.  Login to level 4 or 5 in ADRACS.  Note down the pre-calibration data and save system LDA data through ADRACS  Go to adjustment window shown by maintenance sign at bottom tool bar.  Open the Normal waveform data for on Arial transmitter.  Select/adjust RF/DDM/SDM as per requirement.  Enter the desired data as per requirement of FIU. Adjustment procedure ILS THALES PLI COURSE RTC-NR 6/6/2023 7
  • 8. LCP Key in Maintenance Mode
  • 12. Access To Enter Maintenance window
  • 13. Normal waveform and Monitor Windows
  • 14. Flight Inspection Procedure of LLZ 1. Coverage Check and Power Alarm: Availability of ILS signal within its service volume operating on mains & Battery backup. Adjustment : Course CSB RF Level Clearance CSB RF Level ILS THALES PLI COURSE RTC-NR 6/6/2023 14
  • 15. Power Alarm Window 13 W Nominal Power 13 W Nominal Power
  • 16. CRS and CLR Width Check LLZ: Purpose: • Adjust & Ensure Course Width within tolerance; • Check signal in the sector +10° and + 35° of C/L Flight Procedure: • Cal aircraft flies an arc about Runway center line at approx. 5 NM from LLZ & 1500’ AGL. Values and tolerances : • COURSE WIDTH (W) = W ± 17% for CAT I, II & W ± 10% for CAT III Adjustment : SBO Amplitude ( SBO Power) - Course • Signal in the course sector increase linearly to 175 μ Amps (18% DDM) till 10° on either side of C/L. • Minimum Signal in the clearance sector between ±10° to ± 35° sector should be 150 μ Amps (15.5% DDM). Adjustment : SBO Amplitude ( SBO Power) - Clearance ILS THALES PLI COURSE RTC-NR 6/6/2023 16 Flight Inspection Procedure of LLZ
  • 17. Adjustment : SBO Amplitude ( SBO Power) – CRS/CLR Apply formula as below: Example : Commissioning Course Width =3.10 Measured Course width = 3.62 Normal CRS SBO value = 53.6 New SBO = 53.6 x 3.62 3.10 New SBO to be entered = 62.7% ILS THALES PLI COURSE RTC-NR 6/6/2023 17 New SBO=Measured SBO x Measured CW Required CW
  • 18. Transmitter Nominal course width and Monitor data Nominal CW in Monitor
  • 19. New Course width after adjusted SBO power CW after Adjustment in Monitor
  • 20. Course Line Adjustment ILS THALES PLI COURSE RTC-NR 6/6/2023 20 Nominal Course CSB DDM Value - 0 Go to Normal waveform Data of on Arial Transmitter. Adjust Course CSB DDM as per Requirement. Increase 150 Hz for dominant of C/L on RHS. Increase 90 Hz for dominant of C/L on LHS.
  • 21. Course Line Adjustment Procedure ILS THALES PLI COURSE RTC-NR 6/6/2023 21
  • 22. Shifting of C/L towards 90 Hz dominance ILS THALES PLI COURSE RTC-NR 6/6/2023 22
  • 23. Shifting of C/L towards 150 Hz Dominance ILS THALES PLI COURSE RTC-NR 6/6/2023 23
  • 24. Monitor Alarms Check: ILS THALES PLI COURSE RTC-NR 6/6/2023 24 Course Line: Alarms for change in Course Line toward left or right of the Centre Line: Cat I : + 10.5 m or 1.5 % DDM; Cat II : + 7.5 m or 1.09 % DDM; Cat III : + 6 m or 0.88 % DDM Curse width: Cat I : + 17 % of Nominal Value Cat II: + 17 % of Nominal Value Cat III: + 17 % of Nominal Value
  • 25. Monitor Alarms Procedure C/L: ILS THALES PLI COURSE RTC-NR 6/6/2023 25 To check dominance of C/L towards RHS and LHS. Change CRS CSB DDM as per tested facility –CAT-I,CAT-II,CAT-III. Check corresponding change in Monitor If any further change is required follow the instructions of onboard Flight Inspector.
  • 26. Course Position Alarm 150 Hz Dominance -8.13 micro Amp Nominal DDM
  • 27. Course Position 90 Hz Dominance -8.13 micro Amp Nominal DDM
  • 28. Monitor Alarms Check CRS Width: ILS THALES PLI COURSE RTC-NR 6/6/2023 28 Curse width:  Cat I : + 17 % of Nominal Value  Cat II: + 17 % of Nominal Value  Cat III: + 17 % of Nominal Value New SBO= Nominal CW X Nominal SBO Required CW(17 % of Nominal)
  • 30. ILS THALES PLI COURSE RTC-NR 6/6/2023 30 Glide Path Checks: 1. Glide Angle: 2. Sector Width: 3. GP structure: 4. GP coverage: 5. Monitor Alarms: In-Flight Inspection/adjustment procedure GP
  • 31. ILS THALES PLI COURSE RTC-NR 6/6/2023 31 Purpose: To check actual the Glide angle of GP Flight Procedure: The calibration aircraft approaches inbound on extended center line at 1500′ AGL from 10 NM to Threshold. Glide angle Commissioning : No tolerances allowed Routine : ± 7.5% of θ for CAT I & II (2.775 to 3.225 Deg for θ=3) ± 4% of θ for CAT III ( 2.88 to 3.12 Deg, for θ=3 )
  • 32. ILS THALES PLI COURSE RTC-NR 6/6/2023 32 Open Normal Waveform data of on Arial Transmitter. Adjust CRS CSB1 DDM as per requirement. Change the DDM setting to µA from percent. To increase glide angle increase +150 Hz For decreasing glide angle increase -90 Hz. Check the corresponding change in Monitor the same change should appear as you adjusted for transmitter. Note down the final adjusted values for future reference.
  • 33. ILS THALES PLI COURSE RTC-NR 6/6/2023 33
  • 34. ILS THALES PLI COURSE RTC-NR 6/6/2023 34 Open Normal Waveform data of on Arial Transmitter. Adjust CRS Width from width adjustment tool. Apply the formula: Check the corresponding change in Monitor, the same change should appear as you adjusted for transmitter. Note down the final adjusted values for future reference. Scale factor=100 x Measured CW Required CW
  • 35. ILS THALES PLI COURSE RTC-NR 6/6/2023 35
  • 36. ILS THALES PLI COURSE RTC-NR 6/6/2023 36 • Under wider than above • Above wider than under • Under wider than above • Above wider than under Glide Angle Too High Glide Angle Too High Glide Angle Too Low Glide Angle Too Low Increase CSB1 DDM Decrease SBO Amplitude Increase SBO Amplitude Decrease CSB1 DDM
  • 37. ILS THALES PLI COURSE RTC-NR 6/6/2023 37 Increase CSB1 Amplitude Decrease CSB2 Amplitude Above wider than under Correct Glide Angle Unsymmetrical Width Under wider than above
  • 38. ILS THALES PLI COURSE RTC-NR 6/6/2023 38 Increase SBO Amplitude Decrease SBO Amplitude Glide Angle Too High In correct Glide Angle symmetrical Width Glide Angle Too Low Changing SBO with 1 % changes the glide angle with 0.01 deg.
  • 39. ILS THALES PLI COURSE RTC-NR 6/6/2023 39
  • 40. ILS THALES PLI COURSE RTC-NR 6/6/2023 40
  • 41. ILS THALES PLI COURSE RTC-NR 6/6/2023 41
  • 42. ILS THALES PLI COURSE RTC-NR 6/6/2023 42
  • 43. ILS THALES PLI COURSE RTC-NR 6/6/2023 43
  • 44. ILS THALES PLI COURSE RTC-NR 6/6/2023 44
  • 45. ILS THALES PLI COURSE RTC-NR 6/6/2023 45
  • 46. 1. Save Transmitter Data and record in Log Book 2. Take Reference of M1/M2/M3/NF Data with PIR 3. Monitor and SOAC adjustment if required 4. Ground Check of LLZ 5. Initiation of Cancelation of NOTAM 6/6/2023 ILS THALES PLI COURSE RTC-NR 46
  • 47. ILS THALES PLI COURSE RTC-NR 6/6/2023 47