The main topics
Overview of Project Management in Engineering & Construction Environment 2
Setting the scene - Definitions
Project management methodology
Life cycles – various perspectives
Project management functions and processes
Project success
Case Studies
Setting the Scene
Overview of Project Management in Engineering & Construction Environment 3
Operations and Projects
Overview of Project Management in Engineering & Construction Environment 4
Business-as-usual
Business change
Another View
Overview of Project Management in Engineering & Construction Environment 5
From PMI Publication
Project Owner vs. Service Provider
Overview of Project Management in Engineering & Construction Environment 6
Careers Perspective
Overview of Project Management in Engineering & Construction Environment 7
Something to think about: where do you see
yourself?
What is a project? (PMBOK® Guide)
Overview of Project Management in Engineering & Construction Environment 8
“A project is a temporary endeavor
undertaken to create a unique product,
service, or results”
The focus here is on the output for a project
Material from the PMBOK® Guide has been
reproduced with the permission of PMI
What is a project? (SUKAD)
Overview of Project Management in Engineering & Construction Environment 9
We add to the PMI definition:
A project is anything we create from scratch or a
major change to an existing system,
That requires (major) effort in terms of planning
and delivery, and
It creates value to the organization, realizing the
benefits expected when authorizing the project
Definition: Project Management
Overview of Project Management in Engineering & Construction Environment 10
“Project management is the application of
knowledge, skills, tools, and techniques to
project activities to meet project requirements”
PMBOK® Guide, Chapter 1
Project Management
Methodology
Overview of Project Management in Engineering & Construction Environment 11
Product Life Cycle
Overview of Project Management in Engineering & Construction Environment 12
Project Life Cycle
Overview of Project Management in Engineering & Construction Environment 13
Project
If this box represents a project?
Then, a project life cycle represents how to
transform an idea (concept, vision, goal) into
reality, producing benefits!
Idea
Closure
Phases and Stages
Overview of Project Management in Engineering & Construction Environment 14
Project Life Cycle
Phase 1 Phase 3Phase 2
Stage
1
Stage
2
Stage 3 Stage 4 Stage 5 Stage 6 Stage 7 Stage 8
Deliverables and Gates
Overview of Project Management in Engineering & Construction Environment 15
A Deliverable is the output of a given stage
A Gate is stage/phase Exit: decision point
The
Overview of Project Management in Engineering & Construction Environment 16
Customized: Construction Project
Overview of Project Management in Engineering & Construction Environment 17
Service Provider Perspective
Overview of Project Management in Engineering & Construction Environment 18
Project Management
Functions and Processes
Overview of Project Management in Engineering & Construction Environment 19
A process
Overview of Project Management in Engineering & Construction Environment 20
A process is a series of actions (using tools and
techniques) to bring about a result
Input is what we need before we start …
Output is what we get when done
To achieve output, we use tools and follow certain
techniques
Tools and
Techniques
Input Output
P-D-C-A
Overview of Project Management in Engineering & Construction Environment 21
P-D-C-A – 2
Overview of Project Management in Engineering & Construction Environment 22
PM process groups within a phase
Overview of Project Management in Engineering & Construction Environment 23
PMBOK Guide
The knowledge areas
Overview of Project Management in Engineering & Construction Environment 24
Integration
Scope
Time
Cost
Quality
HR
Communication
Risk
Procurement
Stakeholders
Process groups repeating along PLC
Overview of Project Management in Engineering & Construction Environment 25
PMBOK® Guide versus CAM2P™
Overview of Project Management in Engineering & Construction Environment 26
Small & simple projects
Overview of Project Management in Engineering & Construction Environment 27
Use the standard
model; and
modify as
necessary
Or, the modified
process groups
Medium & moderate projects
Overview of Project Management in Engineering & Construction Environment 28
Large & complex projects
Overview of Project Management in Engineering & Construction Environment 29
Overview of Planning and Control
Overview of Project Management in Engineering & Construction Environment 30
WBS: a critical initial step
Overview of Project Management in Engineering & Construction Environment 31
WBS
Q/SHE
Time
(Schedule)
Cost
(CBS)
People
(RBS)
Commu
nication
Risk
(RBS)
Procure
rement
Trip
France
Paris
Tour Eiffel Louvre
Arc de
Triumph
Nice
Italy
Rome
Coliseum
Venice
Spain
Another sample WBS: trip project
Overview of Project Management in Engineering & Construction Environment 32
Project Success
Overview of Project Management in Engineering & Construction Environment 33
SUKAD four dimensions of success
Overview of Project Management in Engineering & Construction Environment 34
This first dimension focus on the product of the project.
We measure success at the time of handover and final acceptance.
We measure it in comparison to project plan (design, specifications, standards, etc.)
The first dimension
Overview of Project Management in Engineering & Construction Environment 35
Close
(COR)
Initial
Ops
Idea
Concept/
Feasibility
Project
Definition
(Detailed Plan)
Project
Plan
Handover
Charter
Accept.
PM
PlanningPMPlan
1 2 3 4
Implementation
5 6
D1: Success of the Product
This second dimension focus on project management.
We measure at the time project close out.
We measure it in comparison to the project management plan (time, cost, etc.)
The second dimension
Overview of Project Management in Engineering & Construction Environment 36
D2: Success of Project Management
Close (COR)
Initial
Ops
Idea
Concept/
Feasibility
Project
Definition
(Detailed Plan)
Project
Plan
Handover
Charter
Accept.
PM
Planning
PMPlan
1 2 3 4
Implementation
5 6
The third dimension
Overview of Project Management in Engineering & Construction Environment 37
D3: Success of Project
Close (COR)
Initial
Ops
Idea
Concept/
Feasibility
Project
Definition
(Detailed Plan)
Project
Plan
Handover
Charter
Accept.
PM
Planning
PMPlan
1 2 3 4
Implementation
5 6
This third dimension focus on project delivery.
We might be able to measure at acceptance but often not possible until later.
We measure it in comparison to the project authorization (charter).
This fourth dimension focus on the project business case and objectives.
Most likely we cannot measure this at acceptance
We can only measure after completion; possibly months or years later.
We measure it in comparison to the Idea Statement (Business Case/Feasibility).
The fourth dimension
Overview of Project Management in Engineering & Construction Environment 38
Close (COR)
Initial
Ops
Idea
Concept/
Feasibility
Project
Definition
(Detailed Plan)
ProjectPlan
Handover
Charter
Accept.
PM
PlanningPMPlan
1 2 3 4
Implementation
5 6
D4: Success of The Idea – Business Objective
Case Studies
Overview of Project Management in Engineering & Construction Environment 39
Case Study: Project Success
Overview of Project Management in Engineering & Construction Environment 40
Pipe and valve vendors
Wanted to build a gym in warehouse facility
What would you do if you are the PM?
Most PM will build a gym
So if we build the gym, per specification, can
say we have achieved success?
How about completion per time and cost
parameters, is this success?
Case study, continued
Overview of Project Management in Engineering & Construction Environment 41
We asked the question: “Why are we building
a gym?”
The answer is: “We are building a gym to
improve employees health”
Is the project different? If yes – how?
Would you do anything different in term of
deliverables of the project?
From project success perspective, would that
make a difference to how to deliver project?
Case Study 2: “Building” Project
Overview of Project Management in Engineering & Construction Environment 42
Project was to build a certain “building”
Project completed
Significantly over budget (x10),
6 years later than planned
Is this project successful?
What could help us decide?
Case Study 2, continued
Overview of Project Management in Engineering & Construction Environment 43
How about this:
“The ----- is a great architectural work of the 20th
century that brings together multiple strands of
creativity and innovation in both architectural form
and structural design.”
“Outstanding Universal Value “ ----- is positioned as a
world-famous icon of architecture. The building is a
great artistic monument and an icon, accessible to
society at large.
Is this project successful?
Ref. UNESCO Website
Dimensions of success – CS2
Overview of Project Management in Engineering & Construction Environment 44
Case Study: Geotechnical
Overview of Project Management in Engineering & Construction Environment 45
Major project in Dubai – housing community
Preliminary sub-surface investigation
Consultant requested more – client refused
Result: 40+ villas are useless due to differential
settlement – causing cracks and other damage
Similar project in Abu Dhabi
Houses were sinking
Discovered underground voids collapsing with time
Case Study: Design Errors
Overview of Project Management in Engineering & Construction Environment 46
Building to house doctors clinics
Engineering did not fully understand purpose
Today, one can perform outpatient surgery in clinics
Results
Normal corridors and elevators
• Cannot bring in patient on stretchers
No UPS facilities
Two Mega Projects
Overview of Project Management in Engineering & Construction Environment 47
Projects’ Common Factors
Overview of Project Management in Engineering & Construction Environment 48
Both projects were about equal in value
Both ~ US$ 2 – 4 billion in today market
Both projects were joint/triple ventures
Both projects parts of larger programs
Included: major grass root facilities
Included: modifications within existing refineries
owned by one of the partners
Material Procurement & Sourcing
Overview of Project Management in Engineering & Construction Environment 49
Projects’ Differentiation Factors – 1
Overview of Project Management in Engineering & Construction Environment 50
Contract: commercial aspects
AP: reimbursable cost/cost plus incentive
• Incentive for Cost, Safety, and Schedule
UP: fixed price (initially open book)
Contract: execution approach
AP: EPCM + multiple construction contracts
• Engineering: UK // Construction: SE Asia
UP: EPCM + 1 general contractor
EPCM: Engineering, Procurement, and Construction Management
Projects’ Differentiation Factors - 2
Overview of Project Management in Engineering & Construction Environment 51
AP: was on a small island
About 60% of area reclaimed from sea
Engineering in Europe
UP: was inland
No major logistical challenges
Engineering office 2 hours away by car
Overview of Project Management in
Engineering & Construction Environment
52
53
The USA
Project
Overview of Project Management in
Engineering & Construction Environment
Capital Investment Risk Continuum
(Contract Types Versus Risk)
Overview of Project Management in Engineering & Construction Environment 54
Figure not by the author – download from internet and source is lost
AP UP
Which project was
a success
Overview of Project Management in Engineering & Construction Environment 55
What made the difference?
Overview of Project Management in Engineering & Construction Environment 56
PM maturity: major contributing factor
Team size & experience: significant
Senior stakeholders involvement: crucial
Proper pre-planning; impact on change
Communication
For AP a major focus
For UP monthly reports an email
Once again: careers perspective
Overview of Project Management in Engineering & Construction Environment 57
Something to think about: where do you see
yourself?
Thank you
Overview of Project Management in Engineering & Construction Environment 58
@mounirajam
@SUKADgroup

Contenu connexe

Tendances

Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementKimmo Haapea
 
Project management.pptx
Project management.pptxProject management.pptx
Project management.pptxNimra zaman
 
Project management in construction
Project management in constructionProject management in construction
Project management in constructionNAVNEET KUMAR JHA
 
Project Management
Project ManagementProject Management
Project ManagementXubitech
 
Project Management
Project ManagementProject Management
Project ManagementMark Roman
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementBarry Hodge
 
Project Planning and Management Notes
Project Planning and Management NotesProject Planning and Management Notes
Project Planning and Management NotesHaris Hassan
 
Fundamentals of Project Management
Fundamentals of Project Management Fundamentals of Project Management
Fundamentals of Project Management Yesica Adicondro
 
Project management PPT
Project management  PPTProject management  PPT
Project management PPTRaj Sampat
 
Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.Ashutosh Mishra
 
Project Life Cycle and Phases with Risk Management discussion
Project Life Cycle and Phases with Risk Management discussionProject Life Cycle and Phases with Risk Management discussion
Project Life Cycle and Phases with Risk Management discussionAbigail Pugal-Somera
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project managementMohamed Amin
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementSlav Karaslavov
 
Project-Planning
Project-PlanningProject-Planning
Project-PlanningRon Drew
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycleSAJID ALI RUK
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management Rajat Nainwal
 
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTEpisode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTSAJJAD KHUDHUR ABBAS
 

Tendances (20)

Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Project management.pptx
Project management.pptxProject management.pptx
Project management.pptx
 
Project management in construction
Project management in constructionProject management in construction
Project management in construction
 
Project Management
Project ManagementProject Management
Project Management
 
Project Management
Project ManagementProject Management
Project Management
 
Project Planning, Design and Management
Project Planning, Design and ManagementProject Planning, Design and Management
Project Planning, Design and Management
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Project Planning and Management Notes
Project Planning and Management NotesProject Planning and Management Notes
Project Planning and Management Notes
 
Fundamentals of Project Management
Fundamentals of Project Management Fundamentals of Project Management
Fundamentals of Project Management
 
Project management PPT
Project management  PPTProject management  PPT
Project management PPT
 
Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.
 
Project Life Cycle and Phases with Risk Management discussion
Project Life Cycle and Phases with Risk Management discussionProject Life Cycle and Phases with Risk Management discussion
Project Life Cycle and Phases with Risk Management discussion
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project management
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
Project-Planning
Project-PlanningProject-Planning
Project-Planning
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycle
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTEpisode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXT
 
Chapter 3
Chapter 3Chapter 3
Chapter 3
 

En vedette

Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.NAVNEET KUMAR JHA
 
DIACHRON Project Overview
DIACHRON Project OverviewDIACHRON Project Overview
DIACHRON Project OverviewPRELIDA Project
 
Ground Zero On Campusv3 Aacc
Ground Zero On Campusv3 AaccGround Zero On Campusv3 Aacc
Ground Zero On Campusv3 Aaccsunil.b.gupta
 
II Barómetro de las perspectivas profesionales de los ingenieros realizado po...
II Barómetro de las perspectivas profesionales de los ingenieros realizado po...II Barómetro de las perspectivas profesionales de los ingenieros realizado po...
II Barómetro de las perspectivas profesionales de los ingenieros realizado po...Cristóbal TeBe
 
Unit no.01 project management and engineering economics
Unit no.01 project management and engineering economicsUnit no.01 project management and engineering economics
Unit no.01 project management and engineering economicsRAMCHANDRA KODAM
 
EPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group
 
Contract, Construction Sequence 01 rev 00, 13,05,11 start date 23,05,11.PDF
Contract, Construction Sequence 01 rev 00, 13,05,11 start date 23,05,11.PDFContract, Construction Sequence 01 rev 00, 13,05,11 start date 23,05,11.PDF
Contract, Construction Sequence 01 rev 00, 13,05,11 start date 23,05,11.PDFLucian Gerea
 
Project controls manager, project management, project planner, cost controls ...
Project controls manager, project management, project planner, cost controls ...Project controls manager, project management, project planner, cost controls ...
Project controls manager, project management, project planner, cost controls ...Aswadimanor Safeie
 
Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM
Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM
Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM Lenka Larson
 
Engineering management 1
Engineering management 1Engineering management 1
Engineering management 1Paul Matthews
 
Build-IT - An Interactive Web Application for 3D Construction, Interior & Ext...
Build-IT - An Interactive Web Application for 3D Construction, Interior & Ext...Build-IT - An Interactive Web Application for 3D Construction, Interior & Ext...
Build-IT - An Interactive Web Application for 3D Construction, Interior & Ext...Renien Joseph
 
Kaleo apps case study final
Kaleo apps case study finalKaleo apps case study final
Kaleo apps case study finalKT Apps
 
Unit 02 unit – ii project planning and scheduling
Unit 02 unit – ii project planning and schedulingUnit 02 unit – ii project planning and scheduling
Unit 02 unit – ii project planning and schedulingRAMCHANDRA KODAM
 
Complexity - Advanced Engineering Project Management
Complexity - Advanced Engineering Project ManagementComplexity - Advanced Engineering Project Management
Complexity - Advanced Engineering Project ManagementMDCSystems
 
Construction Management Plan Guideline 2 15 12
Construction Management Plan Guideline 2 15 12Construction Management Plan Guideline 2 15 12
Construction Management Plan Guideline 2 15 12pfmshamrock
 

En vedette (19)

Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
Project management
Project managementProject management
Project management
 
DIACHRON Project Overview
DIACHRON Project OverviewDIACHRON Project Overview
DIACHRON Project Overview
 
Jam shid khan
Jam shid khanJam shid khan
Jam shid khan
 
Ground Zero On Campusv3 Aacc
Ground Zero On Campusv3 AaccGround Zero On Campusv3 Aacc
Ground Zero On Campusv3 Aacc
 
II Barómetro de las perspectivas profesionales de los ingenieros realizado po...
II Barómetro de las perspectivas profesionales de los ingenieros realizado po...II Barómetro de las perspectivas profesionales de los ingenieros realizado po...
II Barómetro de las perspectivas profesionales de los ingenieros realizado po...
 
Study Languages
Study LanguagesStudy Languages
Study Languages
 
Unit no.01 project management and engineering economics
Unit no.01 project management and engineering economicsUnit no.01 project management and engineering economics
Unit no.01 project management and engineering economics
 
EPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s Methodology
 
Contract, Construction Sequence 01 rev 00, 13,05,11 start date 23,05,11.PDF
Contract, Construction Sequence 01 rev 00, 13,05,11 start date 23,05,11.PDFContract, Construction Sequence 01 rev 00, 13,05,11 start date 23,05,11.PDF
Contract, Construction Sequence 01 rev 00, 13,05,11 start date 23,05,11.PDF
 
Project controls manager, project management, project planner, cost controls ...
Project controls manager, project management, project planner, cost controls ...Project controls manager, project management, project planner, cost controls ...
Project controls manager, project management, project planner, cost controls ...
 
Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM
Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM
Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM
 
Engineering management 1
Engineering management 1Engineering management 1
Engineering management 1
 
Introduction to engineering economy
Introduction to engineering economyIntroduction to engineering economy
Introduction to engineering economy
 
Build-IT - An Interactive Web Application for 3D Construction, Interior & Ext...
Build-IT - An Interactive Web Application for 3D Construction, Interior & Ext...Build-IT - An Interactive Web Application for 3D Construction, Interior & Ext...
Build-IT - An Interactive Web Application for 3D Construction, Interior & Ext...
 
Kaleo apps case study final
Kaleo apps case study finalKaleo apps case study final
Kaleo apps case study final
 
Unit 02 unit – ii project planning and scheduling
Unit 02 unit – ii project planning and schedulingUnit 02 unit – ii project planning and scheduling
Unit 02 unit – ii project planning and scheduling
 
Complexity - Advanced Engineering Project Management
Complexity - Advanced Engineering Project ManagementComplexity - Advanced Engineering Project Management
Complexity - Advanced Engineering Project Management
 
Construction Management Plan Guideline 2 15 12
Construction Management Plan Guideline 2 15 12Construction Management Plan Guideline 2 15 12
Construction Management Plan Guideline 2 15 12
 

Similaire à Overview of project management in engineering environment

Prince 2 - Project Management principles
Prince 2  - Project Management principlesPrince 2  - Project Management principles
Prince 2 - Project Management principlesscharique01
 
Arega Siyum D/r revised
Arega  Siyum D/r revisedArega  Siyum D/r revised
Arega Siyum D/r revisedFiker Love
 
ChapterPM_1.pptx for the course project management
ChapterPM_1.pptx for the course project managementChapterPM_1.pptx for the course project management
ChapterPM_1.pptx for the course project managementDerbewBirhanu2
 
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...Tareq Al-Behairi,PMP,PMI-ACP
 
On the Road to 6D Challenges and Responsibilities in all Stages of the Projec...
On the Road to 6D Challenges and Responsibilities in all Stages of the Projec...On the Road to 6D Challenges and Responsibilities in all Stages of the Projec...
On the Road to 6D Challenges and Responsibilities in all Stages of the Projec...Mauricio Munoz
 
Question 17 The internal and external environmental factors that su.pdf
Question 17 The internal and external environmental factors that su.pdfQuestion 17 The internal and external environmental factors that su.pdf
Question 17 The internal and external environmental factors that su.pdfezzi552
 
Project Management Fundamentals Course Preview
Project Management Fundamentals Course PreviewProject Management Fundamentals Course Preview
Project Management Fundamentals Course PreviewInvensis Learning
 
Rice Global Forum_IM_CE_Rick Khadimally PMP_9-Jan-2015
Rice Global Forum_IM_CE_Rick Khadimally PMP_9-Jan-2015Rice Global Forum_IM_CE_Rick Khadimally PMP_9-Jan-2015
Rice Global Forum_IM_CE_Rick Khadimally PMP_9-Jan-2015Rafiq Khadimally PMP
 
project analysis and management for the masters students.
project analysis and management for the masters students.project analysis and management for the masters students.
project analysis and management for the masters students.abuzertaju
 
Lecture 1 23-01-2020 - Compatibility Mode.pdf
Lecture 1 23-01-2020  -  Compatibility Mode.pdfLecture 1 23-01-2020  -  Compatibility Mode.pdf
Lecture 1 23-01-2020 - Compatibility Mode.pdfTanzeelShahid5
 
project_management_notes_based_on_ioe_syllabus.pdf
project_management_notes_based_on_ioe_syllabus.pdfproject_management_notes_based_on_ioe_syllabus.pdf
project_management_notes_based_on_ioe_syllabus.pdfBigyaptiBashyal1
 
Basics in Project Management
Basics in Project ManagementBasics in Project Management
Basics in Project Managementchaitanyakrsk
 
SDLC Methodologies
SDLC MethodologiesSDLC Methodologies
SDLC MethodologiesRavikanth-BA
 
The Impact of Project Management Practices on Project Success
The Impact of Project Management Practices on Project SuccessThe Impact of Project Management Practices on Project Success
The Impact of Project Management Practices on Project SuccessIRJET Journal
 

Similaire à Overview of project management in engineering environment (20)

Prince 2 - Project Management principles
Prince 2  - Project Management principlesPrince 2  - Project Management principles
Prince 2 - Project Management principles
 
Arega Siyum D/r revised
Arega  Siyum D/r revisedArega  Siyum D/r revised
Arega Siyum D/r revised
 
Project Management overview talk 2021
Project Management overview talk  2021Project Management overview talk  2021
Project Management overview talk 2021
 
Ch3 proj.mgt
Ch3 proj.mgtCh3 proj.mgt
Ch3 proj.mgt
 
ChapterPM_1.pptx for the course project management
ChapterPM_1.pptx for the course project managementChapterPM_1.pptx for the course project management
ChapterPM_1.pptx for the course project management
 
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...
 
On the Road to 6D Challenges and Responsibilities in all Stages of the Projec...
On the Road to 6D Challenges and Responsibilities in all Stages of the Projec...On the Road to 6D Challenges and Responsibilities in all Stages of the Projec...
On the Road to 6D Challenges and Responsibilities in all Stages of the Projec...
 
Question 17 The internal and external environmental factors that su.pdf
Question 17 The internal and external environmental factors that su.pdfQuestion 17 The internal and external environmental factors that su.pdf
Question 17 The internal and external environmental factors that su.pdf
 
Project Management Fundamentals Course Preview
Project Management Fundamentals Course PreviewProject Management Fundamentals Course Preview
Project Management Fundamentals Course Preview
 
Rice Global Forum_IM_CE_Rick Khadimally PMP_9-Jan-2015
Rice Global Forum_IM_CE_Rick Khadimally PMP_9-Jan-2015Rice Global Forum_IM_CE_Rick Khadimally PMP_9-Jan-2015
Rice Global Forum_IM_CE_Rick Khadimally PMP_9-Jan-2015
 
ADV-PM-Part-01.pptx
ADV-PM-Part-01.pptxADV-PM-Part-01.pptx
ADV-PM-Part-01.pptx
 
ADV-PM-Part-01.pptx
ADV-PM-Part-01.pptxADV-PM-Part-01.pptx
ADV-PM-Part-01.pptx
 
PMBoK6Ed.lect1.introduction
PMBoK6Ed.lect1.introductionPMBoK6Ed.lect1.introduction
PMBoK6Ed.lect1.introduction
 
project analysis and management for the masters students.
project analysis and management for the masters students.project analysis and management for the masters students.
project analysis and management for the masters students.
 
Lecture 1 23-01-2020 - Compatibility Mode.pdf
Lecture 1 23-01-2020  -  Compatibility Mode.pdfLecture 1 23-01-2020  -  Compatibility Mode.pdf
Lecture 1 23-01-2020 - Compatibility Mode.pdf
 
project_management_notes_based_on_ioe_syllabus.pdf
project_management_notes_based_on_ioe_syllabus.pdfproject_management_notes_based_on_ioe_syllabus.pdf
project_management_notes_based_on_ioe_syllabus.pdf
 
Basics in Project Management
Basics in Project ManagementBasics in Project Management
Basics in Project Management
 
Product-oriented construction management
Product-oriented construction managementProduct-oriented construction management
Product-oriented construction management
 
SDLC Methodologies
SDLC MethodologiesSDLC Methodologies
SDLC Methodologies
 
The Impact of Project Management Practices on Project Success
The Impact of Project Management Practices on Project SuccessThe Impact of Project Management Practices on Project Success
The Impact of Project Management Practices on Project Success
 

Plus de SUKAD Group - Project Management Solutions (9)

Project management reports slides only
Project management reports slides onlyProject management reports slides only
Project management reports slides only
 
Project stakeholders
Project stakeholdersProject stakeholders
Project stakeholders
 
Integrating project life cycle with process groups
Integrating project life cycle with process groupsIntegrating project life cycle with process groups
Integrating project life cycle with process groups
 
PMO Challenges and Opportunities; DIPMF Presentation
PMO Challenges and Opportunities; DIPMF PresentationPMO Challenges and Opportunities; DIPMF Presentation
PMO Challenges and Opportunities; DIPMF Presentation
 
Organizational Project Management; short workshop
Organizational Project Management; short workshopOrganizational Project Management; short workshop
Organizational Project Management; short workshop
 
Project Management Certifications
Project Management CertificationsProject Management Certifications
Project Management Certifications
 
Strategic Value of Project Management - Arabic
Strategic Value of Project Management - ArabicStrategic Value of Project Management - Arabic
Strategic Value of Project Management - Arabic
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
SUKAD Group - General Information
SUKAD Group - General InformationSUKAD Group - General Information
SUKAD Group - General Information
 

Dernier

Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 

Dernier (20)

Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 

Overview of project management in engineering environment

  • 1. Overview of project management in the engineering & construction environment Project Management
  • 2. The main topics Overview of Project Management in Engineering & Construction Environment 2 Setting the scene - Definitions Project management methodology Life cycles – various perspectives Project management functions and processes Project success Case Studies
  • 3. Setting the Scene Overview of Project Management in Engineering & Construction Environment 3
  • 4. Operations and Projects Overview of Project Management in Engineering & Construction Environment 4 Business-as-usual Business change
  • 5. Another View Overview of Project Management in Engineering & Construction Environment 5 From PMI Publication
  • 6. Project Owner vs. Service Provider Overview of Project Management in Engineering & Construction Environment 6
  • 7. Careers Perspective Overview of Project Management in Engineering & Construction Environment 7 Something to think about: where do you see yourself?
  • 8. What is a project? (PMBOK® Guide) Overview of Project Management in Engineering & Construction Environment 8 “A project is a temporary endeavor undertaken to create a unique product, service, or results” The focus here is on the output for a project Material from the PMBOK® Guide has been reproduced with the permission of PMI
  • 9. What is a project? (SUKAD) Overview of Project Management in Engineering & Construction Environment 9 We add to the PMI definition: A project is anything we create from scratch or a major change to an existing system, That requires (major) effort in terms of planning and delivery, and It creates value to the organization, realizing the benefits expected when authorizing the project
  • 10. Definition: Project Management Overview of Project Management in Engineering & Construction Environment 10 “Project management is the application of knowledge, skills, tools, and techniques to project activities to meet project requirements” PMBOK® Guide, Chapter 1
  • 11. Project Management Methodology Overview of Project Management in Engineering & Construction Environment 11
  • 12. Product Life Cycle Overview of Project Management in Engineering & Construction Environment 12
  • 13. Project Life Cycle Overview of Project Management in Engineering & Construction Environment 13 Project If this box represents a project? Then, a project life cycle represents how to transform an idea (concept, vision, goal) into reality, producing benefits! Idea Closure
  • 14. Phases and Stages Overview of Project Management in Engineering & Construction Environment 14 Project Life Cycle Phase 1 Phase 3Phase 2 Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 Stage 7 Stage 8
  • 15. Deliverables and Gates Overview of Project Management in Engineering & Construction Environment 15 A Deliverable is the output of a given stage A Gate is stage/phase Exit: decision point
  • 16. The Overview of Project Management in Engineering & Construction Environment 16
  • 17. Customized: Construction Project Overview of Project Management in Engineering & Construction Environment 17
  • 18. Service Provider Perspective Overview of Project Management in Engineering & Construction Environment 18
  • 19. Project Management Functions and Processes Overview of Project Management in Engineering & Construction Environment 19
  • 20. A process Overview of Project Management in Engineering & Construction Environment 20 A process is a series of actions (using tools and techniques) to bring about a result Input is what we need before we start … Output is what we get when done To achieve output, we use tools and follow certain techniques Tools and Techniques Input Output
  • 21. P-D-C-A Overview of Project Management in Engineering & Construction Environment 21
  • 22. P-D-C-A – 2 Overview of Project Management in Engineering & Construction Environment 22
  • 23. PM process groups within a phase Overview of Project Management in Engineering & Construction Environment 23 PMBOK Guide
  • 24. The knowledge areas Overview of Project Management in Engineering & Construction Environment 24 Integration Scope Time Cost Quality HR Communication Risk Procurement Stakeholders
  • 25. Process groups repeating along PLC Overview of Project Management in Engineering & Construction Environment 25
  • 26. PMBOK® Guide versus CAM2P™ Overview of Project Management in Engineering & Construction Environment 26
  • 27. Small & simple projects Overview of Project Management in Engineering & Construction Environment 27 Use the standard model; and modify as necessary Or, the modified process groups
  • 28. Medium & moderate projects Overview of Project Management in Engineering & Construction Environment 28
  • 29. Large & complex projects Overview of Project Management in Engineering & Construction Environment 29
  • 30. Overview of Planning and Control Overview of Project Management in Engineering & Construction Environment 30
  • 31. WBS: a critical initial step Overview of Project Management in Engineering & Construction Environment 31 WBS Q/SHE Time (Schedule) Cost (CBS) People (RBS) Commu nication Risk (RBS) Procure rement
  • 32. Trip France Paris Tour Eiffel Louvre Arc de Triumph Nice Italy Rome Coliseum Venice Spain Another sample WBS: trip project Overview of Project Management in Engineering & Construction Environment 32
  • 33. Project Success Overview of Project Management in Engineering & Construction Environment 33
  • 34. SUKAD four dimensions of success Overview of Project Management in Engineering & Construction Environment 34
  • 35. This first dimension focus on the product of the project. We measure success at the time of handover and final acceptance. We measure it in comparison to project plan (design, specifications, standards, etc.) The first dimension Overview of Project Management in Engineering & Construction Environment 35 Close (COR) Initial Ops Idea Concept/ Feasibility Project Definition (Detailed Plan) Project Plan Handover Charter Accept. PM PlanningPMPlan 1 2 3 4 Implementation 5 6 D1: Success of the Product
  • 36. This second dimension focus on project management. We measure at the time project close out. We measure it in comparison to the project management plan (time, cost, etc.) The second dimension Overview of Project Management in Engineering & Construction Environment 36 D2: Success of Project Management Close (COR) Initial Ops Idea Concept/ Feasibility Project Definition (Detailed Plan) Project Plan Handover Charter Accept. PM Planning PMPlan 1 2 3 4 Implementation 5 6
  • 37. The third dimension Overview of Project Management in Engineering & Construction Environment 37 D3: Success of Project Close (COR) Initial Ops Idea Concept/ Feasibility Project Definition (Detailed Plan) Project Plan Handover Charter Accept. PM Planning PMPlan 1 2 3 4 Implementation 5 6 This third dimension focus on project delivery. We might be able to measure at acceptance but often not possible until later. We measure it in comparison to the project authorization (charter).
  • 38. This fourth dimension focus on the project business case and objectives. Most likely we cannot measure this at acceptance We can only measure after completion; possibly months or years later. We measure it in comparison to the Idea Statement (Business Case/Feasibility). The fourth dimension Overview of Project Management in Engineering & Construction Environment 38 Close (COR) Initial Ops Idea Concept/ Feasibility Project Definition (Detailed Plan) ProjectPlan Handover Charter Accept. PM PlanningPMPlan 1 2 3 4 Implementation 5 6 D4: Success of The Idea – Business Objective
  • 39. Case Studies Overview of Project Management in Engineering & Construction Environment 39
  • 40. Case Study: Project Success Overview of Project Management in Engineering & Construction Environment 40 Pipe and valve vendors Wanted to build a gym in warehouse facility What would you do if you are the PM? Most PM will build a gym So if we build the gym, per specification, can say we have achieved success? How about completion per time and cost parameters, is this success?
  • 41. Case study, continued Overview of Project Management in Engineering & Construction Environment 41 We asked the question: “Why are we building a gym?” The answer is: “We are building a gym to improve employees health” Is the project different? If yes – how? Would you do anything different in term of deliverables of the project? From project success perspective, would that make a difference to how to deliver project?
  • 42. Case Study 2: “Building” Project Overview of Project Management in Engineering & Construction Environment 42 Project was to build a certain “building” Project completed Significantly over budget (x10), 6 years later than planned Is this project successful? What could help us decide?
  • 43. Case Study 2, continued Overview of Project Management in Engineering & Construction Environment 43 How about this: “The ----- is a great architectural work of the 20th century that brings together multiple strands of creativity and innovation in both architectural form and structural design.” “Outstanding Universal Value “ ----- is positioned as a world-famous icon of architecture. The building is a great artistic monument and an icon, accessible to society at large. Is this project successful? Ref. UNESCO Website
  • 44. Dimensions of success – CS2 Overview of Project Management in Engineering & Construction Environment 44
  • 45. Case Study: Geotechnical Overview of Project Management in Engineering & Construction Environment 45 Major project in Dubai – housing community Preliminary sub-surface investigation Consultant requested more – client refused Result: 40+ villas are useless due to differential settlement – causing cracks and other damage Similar project in Abu Dhabi Houses were sinking Discovered underground voids collapsing with time
  • 46. Case Study: Design Errors Overview of Project Management in Engineering & Construction Environment 46 Building to house doctors clinics Engineering did not fully understand purpose Today, one can perform outpatient surgery in clinics Results Normal corridors and elevators • Cannot bring in patient on stretchers No UPS facilities
  • 47. Two Mega Projects Overview of Project Management in Engineering & Construction Environment 47
  • 48. Projects’ Common Factors Overview of Project Management in Engineering & Construction Environment 48 Both projects were about equal in value Both ~ US$ 2 – 4 billion in today market Both projects were joint/triple ventures Both projects parts of larger programs Included: major grass root facilities Included: modifications within existing refineries owned by one of the partners
  • 49. Material Procurement & Sourcing Overview of Project Management in Engineering & Construction Environment 49
  • 50. Projects’ Differentiation Factors – 1 Overview of Project Management in Engineering & Construction Environment 50 Contract: commercial aspects AP: reimbursable cost/cost plus incentive • Incentive for Cost, Safety, and Schedule UP: fixed price (initially open book) Contract: execution approach AP: EPCM + multiple construction contracts • Engineering: UK // Construction: SE Asia UP: EPCM + 1 general contractor EPCM: Engineering, Procurement, and Construction Management
  • 51. Projects’ Differentiation Factors - 2 Overview of Project Management in Engineering & Construction Environment 51 AP: was on a small island About 60% of area reclaimed from sea Engineering in Europe UP: was inland No major logistical challenges Engineering office 2 hours away by car
  • 52. Overview of Project Management in Engineering & Construction Environment 52
  • 53. 53 The USA Project Overview of Project Management in Engineering & Construction Environment
  • 54. Capital Investment Risk Continuum (Contract Types Versus Risk) Overview of Project Management in Engineering & Construction Environment 54 Figure not by the author – download from internet and source is lost AP UP
  • 55. Which project was a success Overview of Project Management in Engineering & Construction Environment 55
  • 56. What made the difference? Overview of Project Management in Engineering & Construction Environment 56 PM maturity: major contributing factor Team size & experience: significant Senior stakeholders involvement: crucial Proper pre-planning; impact on change Communication For AP a major focus For UP monthly reports an email
  • 57. Once again: careers perspective Overview of Project Management in Engineering & Construction Environment 57 Something to think about: where do you see yourself?
  • 58. Thank you Overview of Project Management in Engineering & Construction Environment 58 @mounirajam @SUKADgroup