AreasofPost-approvalchanges
(1) composition
(2) manufacturing
sites
(3) manufacturing
process
(4) specifications
(5) container closure
system
(6) labeling
(7) multiple related
changes
Types of Post
approval
changes
Major
Need Prior
Approval
Supplement
Moderate
CBE-30
CBE-0
Minor
General
Requirements of
the Supplement
Must include a list
of all changes
Changes Must be
detailed
Labeling changes
must include 12
copies of the final
printed labeling
Types Of Prior Approval
Supplements
Standard
PASs
• Within 6 months of
submission date if
preapproval inspection
not required.
• Within 10 months of
submission date if
preapproval
inspection required.
Priority PASs
• Within 4 months of
submission date if
preapproval inspection
not required.
• Within 8 months,
provided the applicant,
not later than 60 days
prior to the submission
of an application
• Within 10 months of
submission date if FDA
determines it does not
appear to meet the
prioritization criteria.
General information contained in the
supplement:
A detailed description of the proposed
change
The drug product(s) involved
The manufacturing site(s) or area(s)
affected
A description of the methods used and studies
performed to assess the effects of the change
and the data derived from such studies
Relevant validation protocols and S.O.P. for
Herbals and Biologics
Relevant validation protocols and S.O.P. for
sterilization process and test methodologies
related to it.
To facilitate processing, FDA recommends that the applicant provide the following
information on the first page of the submission:
A
statement
indicating
whether
the PAS is
for a new-
strength
product
A
statement
indicating
whether
the PAS is
for a
request for
proprietary
name
review.
A statement
indicating
whether the
PAS is for a
Risk
Evaluation
and
Mitigation
Strategy
(REMS) or a
REMS
modification.
A statement
indicating
whether the
submission is
an
amendment
to a PAS, and
whether it is a
major or
minor
amendment
A statement
indicating
whether the
PAS contains
any
manufacturin
g or facilities
changes
A list of the
specific review
disciplines to
review the PAS
(Chemistry,
Biopharmaceutics,
Labeling, DMF,
Bioequivalence,
Microbiology, or
Clinical)
If expedited
review is
requested, the
label Expedited
Review Request
should be placed
prominently at
the top of the
submission. The
submission
should include a
basis for the
expedited review
Any PAS to an approved ANDA should identify on the first page of the submission
that it is a PAS.
Fees For PAS
 GDUFA I established application fees (for ANDAs, PASs to ANDAs, and certain DMFs), annual facility
fees, and a one-time fee for ANDAs that were pending on October 1, 2012.
 As explained in the GDUFA II Commitment Letter, however, the Agency and industry agreed to the
elimination of PAS fees. As of October 1, 2017, ANDA applicants are no longer required to pay
application fees when they submit a PAS.
Prior Approval Supplements (PAS)
Prior Approval Supplements (PAS)

Contenu connexe

Tendances

REGULATORY REQUIREMENTS FOR ASEAN COUNTRIES
REGULATORY REQUIREMENTS FOR ASEAN COUNTRIESREGULATORY REQUIREMENTS FOR ASEAN COUNTRIES
REGULATORY REQUIREMENTS FOR ASEAN COUNTRIESVikas Rathee
 
NDA Application.pptx
NDA Application.pptxNDA Application.pptx
NDA Application.pptxVenugopal N
 
MARKETING AUTHORISATION, LICENSING AND QUALITY ASSESSMENT OF VACCINES IN INDI...
MARKETING AUTHORISATION, LICENSING AND QUALITY ASSESSMENT OF VACCINES IN INDI...MARKETING AUTHORISATION, LICENSING AND QUALITY ASSESSMENT OF VACCINES IN INDI...
MARKETING AUTHORISATION, LICENSING AND QUALITY ASSESSMENT OF VACCINES IN INDI...Swapnil Fernandes
 
FDA PreApproval Inspection - Part 1
FDA PreApproval Inspection - Part 1FDA PreApproval Inspection - Part 1
FDA PreApproval Inspection - Part 1Jorge Torres
 
International Medical Device Regulators Forum
International Medical Device Regulators ForumInternational Medical Device Regulators Forum
International Medical Device Regulators ForumSanthiNori1
 
ANVISA regulatory authority of brazil
ANVISA regulatory authority of brazilANVISA regulatory authority of brazil
ANVISA regulatory authority of brazilGaurav Kr
 
Good Automated Laboratory Practices
Good Automated Laboratory PracticesGood Automated Laboratory Practices
Good Automated Laboratory PracticesSwapnil Fernandes
 
21 cfr part 210 and 211
21 cfr part 210 and 21121 cfr part 210 and 211
21 cfr part 210 and 211Bhanu Chava
 
NSF certification, Standard for dietary supplement
NSF certification, Standard for dietary supplementNSF certification, Standard for dietary supplement
NSF certification, Standard for dietary supplementAtul Bhombe
 
Cfr code of federal regulations-1 (1)
Cfr   code of federal        regulations-1 (1)Cfr   code of federal        regulations-1 (1)
Cfr code of federal regulations-1 (1)sai sree
 
regulatory approval process of drug, cosmetic and herbals in canada
regulatory approval process of drug, cosmetic and herbals  in canada regulatory approval process of drug, cosmetic and herbals  in canada
regulatory approval process of drug, cosmetic and herbals in canada Richa Patel
 
Plasma drug file and TSE/ BSE evaluation
Plasma drug file and TSE/ BSE evaluationPlasma drug file and TSE/ BSE evaluation
Plasma drug file and TSE/ BSE evaluationShoba Elangovan
 
Post Marketing Requirements/Complaince: PMRs and PMCs
Post Marketing Requirements/Complaince: PMRs and PMCsPost Marketing Requirements/Complaince: PMRs and PMCs
Post Marketing Requirements/Complaince: PMRs and PMCsDr. Reena Malik
 
Dossier format and filing.pptx
Dossier format and filing.pptxDossier format and filing.pptx
Dossier format and filing.pptxPrachiSharma575050
 
Abriviated new drug application 505(j) filling
Abriviated new drug application 505(j) fillingAbriviated new drug application 505(j) filling
Abriviated new drug application 505(j) fillingshahnawazQuadir
 
Organizaton chart of us fda.
Organizaton chart of us fda.Organizaton chart of us fda.
Organizaton chart of us fda.Rovil Goel
 

Tendances (20)

REGULATORY REQUIREMENTS FOR ASEAN COUNTRIES
REGULATORY REQUIREMENTS FOR ASEAN COUNTRIESREGULATORY REQUIREMENTS FOR ASEAN COUNTRIES
REGULATORY REQUIREMENTS FOR ASEAN COUNTRIES
 
GHTF
GHTFGHTF
GHTF
 
NDA Application.pptx
NDA Application.pptxNDA Application.pptx
NDA Application.pptx
 
MARKETING AUTHORISATION, LICENSING AND QUALITY ASSESSMENT OF VACCINES IN INDI...
MARKETING AUTHORISATION, LICENSING AND QUALITY ASSESSMENT OF VACCINES IN INDI...MARKETING AUTHORISATION, LICENSING AND QUALITY ASSESSMENT OF VACCINES IN INDI...
MARKETING AUTHORISATION, LICENSING AND QUALITY ASSESSMENT OF VACCINES IN INDI...
 
STED
STEDSTED
STED
 
FDA PreApproval Inspection - Part 1
FDA PreApproval Inspection - Part 1FDA PreApproval Inspection - Part 1
FDA PreApproval Inspection - Part 1
 
International Medical Device Regulators Forum
International Medical Device Regulators ForumInternational Medical Device Regulators Forum
International Medical Device Regulators Forum
 
ANVISA regulatory authority of brazil
ANVISA regulatory authority of brazilANVISA regulatory authority of brazil
ANVISA regulatory authority of brazil
 
Good Automated Laboratory Practices
Good Automated Laboratory PracticesGood Automated Laboratory Practices
Good Automated Laboratory Practices
 
Ghtf study group 4
Ghtf study group 4Ghtf study group 4
Ghtf study group 4
 
21 cfr part 210 and 211
21 cfr part 210 and 21121 cfr part 210 and 211
21 cfr part 210 and 211
 
NSF certification, Standard for dietary supplement
NSF certification, Standard for dietary supplementNSF certification, Standard for dietary supplement
NSF certification, Standard for dietary supplement
 
Cfr code of federal regulations-1 (1)
Cfr   code of federal        regulations-1 (1)Cfr   code of federal        regulations-1 (1)
Cfr code of federal regulations-1 (1)
 
regulatory approval process of drug, cosmetic and herbals in canada
regulatory approval process of drug, cosmetic and herbals  in canada regulatory approval process of drug, cosmetic and herbals  in canada
regulatory approval process of drug, cosmetic and herbals in canada
 
Plasma drug file and TSE/ BSE evaluation
Plasma drug file and TSE/ BSE evaluationPlasma drug file and TSE/ BSE evaluation
Plasma drug file and TSE/ BSE evaluation
 
Post Marketing Requirements/Complaince: PMRs and PMCs
Post Marketing Requirements/Complaince: PMRs and PMCsPost Marketing Requirements/Complaince: PMRs and PMCs
Post Marketing Requirements/Complaince: PMRs and PMCs
 
Dossier format and filing.pptx
Dossier format and filing.pptxDossier format and filing.pptx
Dossier format and filing.pptx
 
NDA/BLA/PMA and 510(k)
NDA/BLA/PMA and 510(k)NDA/BLA/PMA and 510(k)
NDA/BLA/PMA and 510(k)
 
Abriviated new drug application 505(j) filling
Abriviated new drug application 505(j) fillingAbriviated new drug application 505(j) filling
Abriviated new drug application 505(j) filling
 
Organizaton chart of us fda.
Organizaton chart of us fda.Organizaton chart of us fda.
Organizaton chart of us fda.
 

Similaire à Prior Approval Supplements (PAS)

Gbenga_Okubadejo_and_Paul_Schwartz_GRxBiosims2019.pdf
Gbenga_Okubadejo_and_Paul_Schwartz_GRxBiosims2019.pdfGbenga_Okubadejo_and_Paul_Schwartz_GRxBiosims2019.pdf
Gbenga_Okubadejo_and_Paul_Schwartz_GRxBiosims2019.pdfRxJaiminGandhi
 
Cmc postapproval regulatory affairs (ppt)
Cmc postapproval regulatory affairs (ppt)Cmc postapproval regulatory affairs (ppt)
Cmc postapproval regulatory affairs (ppt)suresh gautam
 
CMC , POST APPROVAL CHANGES.pptx
CMC , POST APPROVAL CHANGES.pptxCMC , POST APPROVAL CHANGES.pptx
CMC , POST APPROVAL CHANGES.pptxSakshiSonawane6
 
Scale up and post approval changes
Scale up and post approval changesScale up and post approval changes
Scale up and post approval changesprakhar rai pk
 
Regulatory aspect of pharmaceutical change control system
Regulatory aspect of pharmaceutical  change control systemRegulatory aspect of pharmaceutical  change control system
Regulatory aspect of pharmaceutical change control systemDeveshDRA
 
CDSCO PAC Application PPT.pdf
CDSCO PAC Application PPT.pdfCDSCO PAC Application PPT.pdf
CDSCO PAC Application PPT.pdfDatta61
 
Guidance for industry changes to an approved nda or anda
Guidance for industry changes to an approved nda or andaGuidance for industry changes to an approved nda or anda
Guidance for industry changes to an approved nda or andaGaurav Sharma
 
Guidance for industry changes to an approved nda or anda
Guidance for industry changes to an approved nda or andaGuidance for industry changes to an approved nda or anda
Guidance for industry changes to an approved nda or andaGaurav Sharma
 
scaleup and post approval modification.pptx
scaleup and post approval modification.pptxscaleup and post approval modification.pptx
scaleup and post approval modification.pptxPankajSharma446574
 
Guidance for industry cmc postapproval manufacturing changes to be documented...
Guidance for industry cmc postapproval manufacturing changes to be documented...Guidance for industry cmc postapproval manufacturing changes to be documented...
Guidance for industry cmc postapproval manufacturing changes to be documented...Samir Barragán
 
SUPAC(Scale Up and Post Approval changes for RA 1st sempptx
SUPAC(Scale Up and Post Approval  changes for RA 1st sempptxSUPAC(Scale Up and Post Approval  changes for RA 1st sempptx
SUPAC(Scale Up and Post Approval changes for RA 1st sempptxCharmi13
 
Scale up and post approval changes(supac)
Scale up and post approval changes(supac)Scale up and post approval changes(supac)
Scale up and post approval changes(supac)bdvfgbdhg
 

Similaire à Prior Approval Supplements (PAS) (20)

Gbenga_Okubadejo_and_Paul_Schwartz_GRxBiosims2019.pdf
Gbenga_Okubadejo_and_Paul_Schwartz_GRxBiosims2019.pdfGbenga_Okubadejo_and_Paul_Schwartz_GRxBiosims2019.pdf
Gbenga_Okubadejo_and_Paul_Schwartz_GRxBiosims2019.pdf
 
Cmc postapproval regulatory affairs (ppt)
Cmc postapproval regulatory affairs (ppt)Cmc postapproval regulatory affairs (ppt)
Cmc postapproval regulatory affairs (ppt)
 
Post approval of drugs
Post approval of drugsPost approval of drugs
Post approval of drugs
 
CMC , POST APPROVAL CHANGES.pptx
CMC , POST APPROVAL CHANGES.pptxCMC , POST APPROVAL CHANGES.pptx
CMC , POST APPROVAL CHANGES.pptx
 
Snda
SndaSnda
Snda
 
SUPAC.pptx
SUPAC.pptxSUPAC.pptx
SUPAC.pptx
 
Snda
SndaSnda
Snda
 
Hài hòa GMP toàn cầu - Góc nhìn từ Nhật Bản
 Hài hòa GMP toàn cầu - Góc nhìn từ Nhật Bản  Hài hòa GMP toàn cầu - Góc nhìn từ Nhật Bản
Hài hòa GMP toàn cầu - Góc nhìn từ Nhật Bản
 
Scale up and post approval changes
Scale up and post approval changesScale up and post approval changes
Scale up and post approval changes
 
Regulatory aspect of pharmaceutical change control system
Regulatory aspect of pharmaceutical  change control systemRegulatory aspect of pharmaceutical  change control system
Regulatory aspect of pharmaceutical change control system
 
SUPAC-IR.ppt
SUPAC-IR.pptSUPAC-IR.ppt
SUPAC-IR.ppt
 
Product quality review
Product quality reviewProduct quality review
Product quality review
 
CDSCO PAC Application PPT.pdf
CDSCO PAC Application PPT.pdfCDSCO PAC Application PPT.pdf
CDSCO PAC Application PPT.pdf
 
Supac
SupacSupac
Supac
 
Guidance for industry changes to an approved nda or anda
Guidance for industry changes to an approved nda or andaGuidance for industry changes to an approved nda or anda
Guidance for industry changes to an approved nda or anda
 
Guidance for industry changes to an approved nda or anda
Guidance for industry changes to an approved nda or andaGuidance for industry changes to an approved nda or anda
Guidance for industry changes to an approved nda or anda
 
scaleup and post approval modification.pptx
scaleup and post approval modification.pptxscaleup and post approval modification.pptx
scaleup and post approval modification.pptx
 
Guidance for industry cmc postapproval manufacturing changes to be documented...
Guidance for industry cmc postapproval manufacturing changes to be documented...Guidance for industry cmc postapproval manufacturing changes to be documented...
Guidance for industry cmc postapproval manufacturing changes to be documented...
 
SUPAC(Scale Up and Post Approval changes for RA 1st sempptx
SUPAC(Scale Up and Post Approval  changes for RA 1st sempptxSUPAC(Scale Up and Post Approval  changes for RA 1st sempptx
SUPAC(Scale Up and Post Approval changes for RA 1st sempptx
 
Scale up and post approval changes(supac)
Scale up and post approval changes(supac)Scale up and post approval changes(supac)
Scale up and post approval changes(supac)
 

Dernier

ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...Nguyen Thanh Tu Collection
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxDr. Ravikiran H M Gowda
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 

Dernier (20)

ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 

Prior Approval Supplements (PAS)

  • 1.
  • 2. AreasofPost-approvalchanges (1) composition (2) manufacturing sites (3) manufacturing process (4) specifications (5) container closure system (6) labeling (7) multiple related changes Types of Post approval changes Major Need Prior Approval Supplement Moderate CBE-30 CBE-0 Minor
  • 3. General Requirements of the Supplement Must include a list of all changes Changes Must be detailed Labeling changes must include 12 copies of the final printed labeling
  • 4. Types Of Prior Approval Supplements Standard PASs • Within 6 months of submission date if preapproval inspection not required. • Within 10 months of submission date if preapproval inspection required. Priority PASs • Within 4 months of submission date if preapproval inspection not required. • Within 8 months, provided the applicant, not later than 60 days prior to the submission of an application • Within 10 months of submission date if FDA determines it does not appear to meet the prioritization criteria. General information contained in the supplement: A detailed description of the proposed change The drug product(s) involved The manufacturing site(s) or area(s) affected A description of the methods used and studies performed to assess the effects of the change and the data derived from such studies Relevant validation protocols and S.O.P. for Herbals and Biologics Relevant validation protocols and S.O.P. for sterilization process and test methodologies related to it.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18. To facilitate processing, FDA recommends that the applicant provide the following information on the first page of the submission: A statement indicating whether the PAS is for a new- strength product A statement indicating whether the PAS is for a request for proprietary name review. A statement indicating whether the PAS is for a Risk Evaluation and Mitigation Strategy (REMS) or a REMS modification. A statement indicating whether the submission is an amendment to a PAS, and whether it is a major or minor amendment A statement indicating whether the PAS contains any manufacturin g or facilities changes A list of the specific review disciplines to review the PAS (Chemistry, Biopharmaceutics, Labeling, DMF, Bioequivalence, Microbiology, or Clinical) If expedited review is requested, the label Expedited Review Request should be placed prominently at the top of the submission. The submission should include a basis for the expedited review Any PAS to an approved ANDA should identify on the first page of the submission that it is a PAS.
  • 19. Fees For PAS  GDUFA I established application fees (for ANDAs, PASs to ANDAs, and certain DMFs), annual facility fees, and a one-time fee for ANDAs that were pending on October 1, 2012.  As explained in the GDUFA II Commitment Letter, however, the Agency and industry agreed to the elimination of PAS fees. As of October 1, 2017, ANDA applicants are no longer required to pay application fees when they submit a PAS.