SlideShare une entreprise Scribd logo
1  sur  2
REM Process T.Codes
Repetative manufacturing is period based planning and not based on
orders. Normally same products will be manufactured over longer period of
time..products will not change frequently. Confirmation is from backflushing and
settlement is through from product cost collector for the period. Confirmaton will
be without ref to planned orders. Planned orders are sufficient to carry out shop
floor activity. In master data production versions and cost collector is must where
this is not mandatory in discreate.
You do these steps for rem production:
mm01 : Material Master
- MRP - 4 view you click rem
cs01 : Create Bom
cr01 : Create Work Center
ca21 : Create Rate Routing
mm02 : Prodn Version
md61 : Create PIR
mc74 : Transfer PIR to Demand
kkf6n : Create Product Cost Collector
mb1c : Create Stock
md02 : MRP run
mfbf : Rem Back Flush
The detailed sequence of T.Codes for REM including Std cost estimate.
Material master - MM01
BOM - CS01
Price Planning - KP26
Work Center - CR01
Rate Routing - CA21
Material Master Change, enter production version - MM02 (MRP 4 View)
REM Process T.Codes
Product Cost Collector - KKF6N
Costing - CK40N
Backflushing - MFBF

Contenu connexe

Tendances

How to apply surcharges to the sales orders surcharges to the sales orders
How to apply surcharges to the sales orders surcharges to the sales ordersHow to apply surcharges to the sales orders surcharges to the sales orders
How to apply surcharges to the sales orders surcharges to the sales ordersSubramanyam Yadav
 
E2E - ERP integrated planning for Pay costs
E2E - ERP integrated planning for Pay costsE2E - ERP integrated planning for Pay costs
E2E - ERP integrated planning for Pay costsAnatoly Ryabukha
 
CK40N-Automation of Standard Cost Estimate
CK40N-Automation of Standard Cost EstimateCK40N-Automation of Standard Cost Estimate
CK40N-Automation of Standard Cost EstimateJeff Lu
 
CO PC actual price with parallel valuation (fragment for Depr)
CO PC actual price with parallel valuation (fragment for Depr)CO PC actual price with parallel valuation (fragment for Depr)
CO PC actual price with parallel valuation (fragment for Depr)Anatoly Ryabukha
 
Elad Amit - Examples of Lean Reports and Visibility
Elad Amit - Examples of Lean Reports and VisibilityElad Amit - Examples of Lean Reports and Visibility
Elad Amit - Examples of Lean Reports and VisibilityAgileSparks
 
Examples of lean reports and visibility
Examples of lean reports and visibilityExamples of lean reports and visibility
Examples of lean reports and visibilityElad Amit
 
Final Product Shots For Client
Final Product Shots For ClientFinal Product Shots For Client
Final Product Shots For Clienthannahwoollaston
 

Tendances (9)

How to apply surcharges to the sales orders surcharges to the sales orders
How to apply surcharges to the sales orders surcharges to the sales ordersHow to apply surcharges to the sales orders surcharges to the sales orders
How to apply surcharges to the sales orders surcharges to the sales orders
 
E2E - ERP integrated planning for Pay costs
E2E - ERP integrated planning for Pay costsE2E - ERP integrated planning for Pay costs
E2E - ERP integrated planning for Pay costs
 
CO Planning Overview
CO Planning OverviewCO Planning Overview
CO Planning Overview
 
EVMS Gold Card
EVMS Gold CardEVMS Gold Card
EVMS Gold Card
 
CK40N-Automation of Standard Cost Estimate
CK40N-Automation of Standard Cost EstimateCK40N-Automation of Standard Cost Estimate
CK40N-Automation of Standard Cost Estimate
 
CO PC actual price with parallel valuation (fragment for Depr)
CO PC actual price with parallel valuation (fragment for Depr)CO PC actual price with parallel valuation (fragment for Depr)
CO PC actual price with parallel valuation (fragment for Depr)
 
Elad Amit - Examples of Lean Reports and Visibility
Elad Amit - Examples of Lean Reports and VisibilityElad Amit - Examples of Lean Reports and Visibility
Elad Amit - Examples of Lean Reports and Visibility
 
Examples of lean reports and visibility
Examples of lean reports and visibilityExamples of lean reports and visibility
Examples of lean reports and visibility
 
Final Product Shots For Client
Final Product Shots For ClientFinal Product Shots For Client
Final Product Shots For Client
 

Similaire à Rem t.codes

SAP S4 Hana transformation benefits
SAP S4 Hana transformation benefitsSAP S4 Hana transformation benefits
SAP S4 Hana transformation benefitsNithin PM
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)Mostafa Ewees
 
Manufacturing - User Manual v1
Manufacturing - User Manual v1Manufacturing - User Manual v1
Manufacturing - User Manual v1Rohan Thushara
 
Sample sap mm pp course material
Sample sap mm pp course materialSample sap mm pp course material
Sample sap mm pp course materialmgr1331
 
Sample sap mm pp course material
Sample sap mm pp course materialSample sap mm pp course material
Sample sap mm pp course materialmgr1331
 
6714600 sap-production-planning-table
6714600 sap-production-planning-table 6714600 sap-production-planning-table
6714600 sap-production-planning-table Sanjeev Malik
 
6714600 sap-production-planning-table
6714600 sap-production-planning-table6714600 sap-production-planning-table
6714600 sap-production-planning-tableSanjeev Malik
 
Air & Refrigeration Compressors – sizing & selection software
Air & Refrigeration Compressors – sizing & selection softwareAir & Refrigeration Compressors – sizing & selection software
Air & Refrigeration Compressors – sizing & selection softwareSanjeev Nadkarni
 
Co product costing master data
Co product costing master dataCo product costing master data
Co product costing master dataRanjan Srivastava
 
SAP Production Planning and Execution presentation
SAP Production Planning and Execution presentationSAP Production Planning and Execution presentation
SAP Production Planning and Execution presentationAnkur Aggarwal
 
Material requirement planning in SAP MM.pdf
Material requirement planning in SAP MM.pdfMaterial requirement planning in SAP MM.pdf
Material requirement planning in SAP MM.pdfAbdellatif El KHALDY
 
Kcf bp-project-module
Kcf bp-project-moduleKcf bp-project-module
Kcf bp-project-moduleEsh_Crystal
 
201124772 sap-pp-pi-process-flow-docs
201124772 sap-pp-pi-process-flow-docs201124772 sap-pp-pi-process-flow-docs
201124772 sap-pp-pi-process-flow-docsAbhishek Sarkar
 
Automotive Supply Chain Management-A2Z by Rahul Guhathakurta
Automotive Supply Chain Management-A2Z by Rahul GuhathakurtaAutomotive Supply Chain Management-A2Z by Rahul Guhathakurta
Automotive Supply Chain Management-A2Z by Rahul GuhathakurtaRahul Guhathakurta
 
Sap co profit center accounting
Sap co   profit center accountingSap co   profit center accounting
Sap co profit center accountingCapgemini
 
Co product costing master data
Co product costing master dataCo product costing master data
Co product costing master dataHema Latha
 
Material Requirement Planning (MRP)
Material Requirement Planning (MRP)Material Requirement Planning (MRP)
Material Requirement Planning (MRP) Konok Mondal
 

Similaire à Rem t.codes (20)

SAP S4 Hana transformation benefits
SAP S4 Hana transformation benefitsSAP S4 Hana transformation benefits
SAP S4 Hana transformation benefits
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)
 
Hand shake points.ppt
Hand  shake points.pptHand  shake points.ppt
Hand shake points.ppt
 
Manufacturing - User Manual v1
Manufacturing - User Manual v1Manufacturing - User Manual v1
Manufacturing - User Manual v1
 
Sample sap mm pp course material
Sample sap mm pp course materialSample sap mm pp course material
Sample sap mm pp course material
 
Sample sap mm pp course material
Sample sap mm pp course materialSample sap mm pp course material
Sample sap mm pp course material
 
6714600 sap-production-planning-table
6714600 sap-production-planning-table 6714600 sap-production-planning-table
6714600 sap-production-planning-table
 
6714600 sap-production-planning-table
6714600 sap-production-planning-table6714600 sap-production-planning-table
6714600 sap-production-planning-table
 
Air & Refrigeration Compressors – sizing & selection software
Air & Refrigeration Compressors – sizing & selection softwareAir & Refrigeration Compressors – sizing & selection software
Air & Refrigeration Compressors – sizing & selection software
 
Co product costing master data
Co product costing master dataCo product costing master data
Co product costing master data
 
SAP Production Planning and Execution presentation
SAP Production Planning and Execution presentationSAP Production Planning and Execution presentation
SAP Production Planning and Execution presentation
 
Material requirement planning in SAP MM.pdf
Material requirement planning in SAP MM.pdfMaterial requirement planning in SAP MM.pdf
Material requirement planning in SAP MM.pdf
 
Kcf bp-project-module
Kcf bp-project-moduleKcf bp-project-module
Kcf bp-project-module
 
201124772 sap-pp-pi-process-flow-docs
201124772 sap-pp-pi-process-flow-docs201124772 sap-pp-pi-process-flow-docs
201124772 sap-pp-pi-process-flow-docs
 
Automotive Supply Chain Management-A2Z by Rahul Guhathakurta
Automotive Supply Chain Management-A2Z by Rahul GuhathakurtaAutomotive Supply Chain Management-A2Z by Rahul Guhathakurta
Automotive Supply Chain Management-A2Z by Rahul Guhathakurta
 
Sap co profit center accounting
Sap co   profit center accountingSap co   profit center accounting
Sap co profit center accounting
 
1690512145601.pdf
1690512145601.pdf1690512145601.pdf
1690512145601.pdf
 
Co product costing master data
Co product costing master dataCo product costing master data
Co product costing master data
 
Material Requirement Planning (MRP)
Material Requirement Planning (MRP)Material Requirement Planning (MRP)
Material Requirement Planning (MRP)
 
Mrp 1
Mrp 1Mrp 1
Mrp 1
 

Dernier

What Goes Wrong with Language Definitions and How to Improve the Situation
What Goes Wrong with Language Definitions and How to Improve the SituationWhat Goes Wrong with Language Definitions and How to Improve the Situation
What Goes Wrong with Language Definitions and How to Improve the SituationJuha-Pekka Tolvanen
 
%in Midrand+277-882-255-28 abortion pills for sale in midrand
%in Midrand+277-882-255-28 abortion pills for sale in midrand%in Midrand+277-882-255-28 abortion pills for sale in midrand
%in Midrand+277-882-255-28 abortion pills for sale in midrandmasabamasaba
 
%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...masabamasaba
 
WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...
WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...
WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...WSO2
 
WSO2CON 2024 - Does Open Source Still Matter?
WSO2CON 2024 - Does Open Source Still Matter?WSO2CON 2024 - Does Open Source Still Matter?
WSO2CON 2024 - Does Open Source Still Matter?WSO2
 
WSO2CON 2024 - Navigating API Complexity: REST, GraphQL, gRPC, Websocket, Web...
WSO2CON 2024 - Navigating API Complexity: REST, GraphQL, gRPC, Websocket, Web...WSO2CON 2024 - Navigating API Complexity: REST, GraphQL, gRPC, Websocket, Web...
WSO2CON 2024 - Navigating API Complexity: REST, GraphQL, gRPC, Websocket, Web...WSO2
 
WSO2CON 2024 Slides - Open Source to SaaS
WSO2CON 2024 Slides - Open Source to SaaSWSO2CON 2024 Slides - Open Source to SaaS
WSO2CON 2024 Slides - Open Source to SaaSWSO2
 
WSO2Con2024 - From Blueprint to Brilliance: WSO2's Guide to API-First Enginee...
WSO2Con2024 - From Blueprint to Brilliance: WSO2's Guide to API-First Enginee...WSO2Con2024 - From Blueprint to Brilliance: WSO2's Guide to API-First Enginee...
WSO2Con2024 - From Blueprint to Brilliance: WSO2's Guide to API-First Enginee...WSO2
 
WSO2Con2024 - GitOps in Action: Navigating Application Deployment in the Plat...
WSO2Con2024 - GitOps in Action: Navigating Application Deployment in the Plat...WSO2Con2024 - GitOps in Action: Navigating Application Deployment in the Plat...
WSO2Con2024 - GitOps in Action: Navigating Application Deployment in the Plat...WSO2
 
WSO2CON 2024 - How to Run a Security Program
WSO2CON 2024 - How to Run a Security ProgramWSO2CON 2024 - How to Run a Security Program
WSO2CON 2024 - How to Run a Security ProgramWSO2
 
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024VictoriaMetrics
 
WSO2Con2024 - Hello Choreo Presentation - Kanchana
WSO2Con2024 - Hello Choreo Presentation - KanchanaWSO2Con2024 - Hello Choreo Presentation - Kanchana
WSO2Con2024 - Hello Choreo Presentation - KanchanaWSO2
 
%in Soweto+277-882-255-28 abortion pills for sale in soweto
%in Soweto+277-882-255-28 abortion pills for sale in soweto%in Soweto+277-882-255-28 abortion pills for sale in soweto
%in Soweto+277-882-255-28 abortion pills for sale in sowetomasabamasaba
 
%in ivory park+277-882-255-28 abortion pills for sale in ivory park
%in ivory park+277-882-255-28 abortion pills for sale in ivory park %in ivory park+277-882-255-28 abortion pills for sale in ivory park
%in ivory park+277-882-255-28 abortion pills for sale in ivory park masabamasaba
 
WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...
WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...
WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...WSO2
 
Announcing Codolex 2.0 from GDK Software
Announcing Codolex 2.0 from GDK SoftwareAnnouncing Codolex 2.0 from GDK Software
Announcing Codolex 2.0 from GDK SoftwareJim McKeeth
 
tonesoftg
tonesoftgtonesoftg
tonesoftglanshi9
 
%in kempton park+277-882-255-28 abortion pills for sale in kempton park
%in kempton park+277-882-255-28 abortion pills for sale in kempton park %in kempton park+277-882-255-28 abortion pills for sale in kempton park
%in kempton park+277-882-255-28 abortion pills for sale in kempton park masabamasaba
 
Artyushina_Guest lecture_YorkU CS May 2024.pptx
Artyushina_Guest lecture_YorkU CS May 2024.pptxArtyushina_Guest lecture_YorkU CS May 2024.pptx
Artyushina_Guest lecture_YorkU CS May 2024.pptxAnnaArtyushina1
 
%in Rustenburg+277-882-255-28 abortion pills for sale in Rustenburg
%in Rustenburg+277-882-255-28 abortion pills for sale in Rustenburg%in Rustenburg+277-882-255-28 abortion pills for sale in Rustenburg
%in Rustenburg+277-882-255-28 abortion pills for sale in Rustenburgmasabamasaba
 

Dernier (20)

What Goes Wrong with Language Definitions and How to Improve the Situation
What Goes Wrong with Language Definitions and How to Improve the SituationWhat Goes Wrong with Language Definitions and How to Improve the Situation
What Goes Wrong with Language Definitions and How to Improve the Situation
 
%in Midrand+277-882-255-28 abortion pills for sale in midrand
%in Midrand+277-882-255-28 abortion pills for sale in midrand%in Midrand+277-882-255-28 abortion pills for sale in midrand
%in Midrand+277-882-255-28 abortion pills for sale in midrand
 
%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Atlanta Psychic Readings, Attraction spells,Brin...
 
WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...
WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...
WSO2CON 2024 - Building the API First Enterprise – Running an API Program, fr...
 
WSO2CON 2024 - Does Open Source Still Matter?
WSO2CON 2024 - Does Open Source Still Matter?WSO2CON 2024 - Does Open Source Still Matter?
WSO2CON 2024 - Does Open Source Still Matter?
 
WSO2CON 2024 - Navigating API Complexity: REST, GraphQL, gRPC, Websocket, Web...
WSO2CON 2024 - Navigating API Complexity: REST, GraphQL, gRPC, Websocket, Web...WSO2CON 2024 - Navigating API Complexity: REST, GraphQL, gRPC, Websocket, Web...
WSO2CON 2024 - Navigating API Complexity: REST, GraphQL, gRPC, Websocket, Web...
 
WSO2CON 2024 Slides - Open Source to SaaS
WSO2CON 2024 Slides - Open Source to SaaSWSO2CON 2024 Slides - Open Source to SaaS
WSO2CON 2024 Slides - Open Source to SaaS
 
WSO2Con2024 - From Blueprint to Brilliance: WSO2's Guide to API-First Enginee...
WSO2Con2024 - From Blueprint to Brilliance: WSO2's Guide to API-First Enginee...WSO2Con2024 - From Blueprint to Brilliance: WSO2's Guide to API-First Enginee...
WSO2Con2024 - From Blueprint to Brilliance: WSO2's Guide to API-First Enginee...
 
WSO2Con2024 - GitOps in Action: Navigating Application Deployment in the Plat...
WSO2Con2024 - GitOps in Action: Navigating Application Deployment in the Plat...WSO2Con2024 - GitOps in Action: Navigating Application Deployment in the Plat...
WSO2Con2024 - GitOps in Action: Navigating Application Deployment in the Plat...
 
WSO2CON 2024 - How to Run a Security Program
WSO2CON 2024 - How to Run a Security ProgramWSO2CON 2024 - How to Run a Security Program
WSO2CON 2024 - How to Run a Security Program
 
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
 
WSO2Con2024 - Hello Choreo Presentation - Kanchana
WSO2Con2024 - Hello Choreo Presentation - KanchanaWSO2Con2024 - Hello Choreo Presentation - Kanchana
WSO2Con2024 - Hello Choreo Presentation - Kanchana
 
%in Soweto+277-882-255-28 abortion pills for sale in soweto
%in Soweto+277-882-255-28 abortion pills for sale in soweto%in Soweto+277-882-255-28 abortion pills for sale in soweto
%in Soweto+277-882-255-28 abortion pills for sale in soweto
 
%in ivory park+277-882-255-28 abortion pills for sale in ivory park
%in ivory park+277-882-255-28 abortion pills for sale in ivory park %in ivory park+277-882-255-28 abortion pills for sale in ivory park
%in ivory park+277-882-255-28 abortion pills for sale in ivory park
 
WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...
WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...
WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...
 
Announcing Codolex 2.0 from GDK Software
Announcing Codolex 2.0 from GDK SoftwareAnnouncing Codolex 2.0 from GDK Software
Announcing Codolex 2.0 from GDK Software
 
tonesoftg
tonesoftgtonesoftg
tonesoftg
 
%in kempton park+277-882-255-28 abortion pills for sale in kempton park
%in kempton park+277-882-255-28 abortion pills for sale in kempton park %in kempton park+277-882-255-28 abortion pills for sale in kempton park
%in kempton park+277-882-255-28 abortion pills for sale in kempton park
 
Artyushina_Guest lecture_YorkU CS May 2024.pptx
Artyushina_Guest lecture_YorkU CS May 2024.pptxArtyushina_Guest lecture_YorkU CS May 2024.pptx
Artyushina_Guest lecture_YorkU CS May 2024.pptx
 
%in Rustenburg+277-882-255-28 abortion pills for sale in Rustenburg
%in Rustenburg+277-882-255-28 abortion pills for sale in Rustenburg%in Rustenburg+277-882-255-28 abortion pills for sale in Rustenburg
%in Rustenburg+277-882-255-28 abortion pills for sale in Rustenburg
 

Rem t.codes

  • 1. REM Process T.Codes Repetative manufacturing is period based planning and not based on orders. Normally same products will be manufactured over longer period of time..products will not change frequently. Confirmation is from backflushing and settlement is through from product cost collector for the period. Confirmaton will be without ref to planned orders. Planned orders are sufficient to carry out shop floor activity. In master data production versions and cost collector is must where this is not mandatory in discreate. You do these steps for rem production: mm01 : Material Master - MRP - 4 view you click rem cs01 : Create Bom cr01 : Create Work Center ca21 : Create Rate Routing mm02 : Prodn Version md61 : Create PIR mc74 : Transfer PIR to Demand kkf6n : Create Product Cost Collector mb1c : Create Stock md02 : MRP run mfbf : Rem Back Flush The detailed sequence of T.Codes for REM including Std cost estimate. Material master - MM01 BOM - CS01 Price Planning - KP26 Work Center - CR01 Rate Routing - CA21 Material Master Change, enter production version - MM02 (MRP 4 View)
  • 2. REM Process T.Codes Product Cost Collector - KKF6N Costing - CK40N Backflushing - MFBF