13. Jotejanaki Colliery – 1913 Inundation on 28.06.1913. Incline was much above the HFL of jore. A bridge constructed 4 years ago was narrow. Water during highflood could not pass through the bride and thereby inundated the mine.
14. Newton Chikli Colliery – 1954 Inundation on 10.12.1954. Rising drift without dewatering old workings.
18. Chasnalla Colliery – 1975 Inundation on 27.12.1975. Plan of old mine (3 & 4 inclines) showed that workings in 13/14 combined seam stopped at K level. Actually No. 3 & 4 Inclines had gone down to an inclined distance of 6m & 49m respectively below K level. Ventilation X-cut from hanging wall connected with 4 Incline.
19. Central Saunda Colliery – 1976 Inundation on 16.9.1976. Nallah was not shown on mine plan. Development below nallah done without permission. Nallah not shown on plan submitted for depillaring permission. During highflood in Damodar, Nakari could not discharge its water and it back-flew into the nallah and inundated the mine.
20. Mahabir Colliery – 1989 Inundation on 13.11.1989. Simplified section shwoing abandoned waterlogged workings in Ninga Seam. Development workings in Narainkuri seam connected and old shaft depth of which was not shown on plan.
21. Gaslitand Colliery – 1995 Inundation on 26/27.09.1995. Embankment against Katri river gave away. Water entered old quarry. Brickwall collapsed. Water then entered XIII & XIV seam old quarry and inundated belowground workings through the galleries leading from quarry.
22. Ledo Colliery – 1997 Inundation on 06-07-1997. Overburden being dumped towards the river and thereby it was rolling onto the river bed. Flow of water during high flood was restricted. Mine got inundated even though the incline was much above the HFL. Officials traveling daily to mine along the road by the side of river failed to apprehend danger.
29. The following steps have been taken after GDK.7 LEP inundation disaster to avoid such type of accidents. 1. Audit teams have inspected the mines and submitted the deviations in respect of inundation and fires. Regular feed back is being obtained for rectification's of the deviations. 2. Chief Surveyor thoroughly scrutinised the plans. 3. Technical guidelines were issued regarding stowing districts vis- à -vis inundation. 4. CGM(Safety) had taken up safety awareness programmes at all the areas on GDK.7 LEP disaster. Steps taken after 7LEP Accident
30. More attention is required for the following mines. As they are located nearer to the Godavari river. Attention required for… SN Mine Area 1 PK-2 Inc Manuguru 2 GDK-1 Inc RG-I 3 GDK-3 Inc RG-I 4 Medapalli OCP RG-III 5 IK-1 Srirampur 6 IK-1A Srirampur 7 SMG-1 Inc Mandamarri