11. 6 mm ring frame
Welding machine
Hacksaw ra^D
saaMgaaD
a saacaa8mm torshan bar Rod size ra^D saaMgaaDa ra^D saaM
Cutting Welding zovaNao
R.C.C.
column
Taklao
saacaa
curing
R.C.C.
column
kaZNao
R.C.C.
colum
n
R.C.C.
column
curing
Wet Gunny bag cloth 2 hrs.water Concrete
water
kaorDo imaE
Cement
Sand
gravel
Flow Chart -
12. Precautions :
1. Tor iron bar should be 10-15 cm. long than
column height.
2. Square frame should be joined at an interval of
25mm. (1”)
3. Square frame must be rectangular and must
be connected from outside of all 4 rod.
4. Make all concrete required in one batch.
5. Put some concrete in mould (wooden plates
connected in right angles to each other ).
6. Weight for at least 2 hrs. start curing .