How does the river flow? The Mphanda Nkuwa dam project and China's impact in Southern Africa Daniel Alvarenga Analyst Centre for Chinese Studies University of Stellenbosch (South Africa) [email_address] 2 nd  October 2008 – CEAUP  Water in Africa Conference
China’s involvement in Dam construction in Africa  Adapted from: International Rivers Network 2008  The New Great Walls  - A guide to China’s overseas dam industry Algeria 2 Boukourdane Dam Boukourdane River, CWE Gambia Sambangalou Dam;  Gambia River, Sinohydro Guinea Souapiti Dam;Konkoure River (508 MW, $1 billion), China Exim Bank, Sinohydro;  Kaleta Dam Konkoure River (238 MW, $257 million), Sinohydro Ghana Bui Dam Black River (400 MW, $700 million), China Exim Bank, Sinohydro Togo (and Benin) Adjarala Dam  Mono River (96 MW, $36.5 million);  China Exim Bank Nigeria Mambila Hydropower Dam Benue River (2,600 MW, $1 billion), China Exim Bank, China Geo-engineering Corporation, Gezhouba; Zungeru Dam  Kaduna River (950 MW, $2 billion),  China Exim Bank, Sinohydro Cameroon Lagdo Hydropower Station;Benoue River (4.18 MW), CWE Gabon Grand Poubara Power Station; Ogooue River (320 MW, $83 million), China Exim Bank, Sinohydro; Belinga Dam;  Ivindo River ($3.5 million), CMEC,  China Exim Bank Central African Republic Mbali Dam; Mbali Lim River, CWE Republic of Congo Imboulou  Lefini River (120 MW, $280 million), China  Exim Bank, CMEC; Moukoukou Dam (repairs: $4.6 million), China Exim Bank, CMEC Sudan Merowe Dam Nile River (1,250 MW, $1.2 billion), China Exim Bank, CWE, Sinohydro Ethiopia Neshi River Hydroelectric Dam; Neshi River (100 MW), Gezhouba; Tekeze Hydroelectric Dam Nile River (25 MW, $224 million), Sinohydro, Gezhouba, Yangtze River Commission Uganda Ayago North and South Hydropower Dams Nile River (530 MW, $900 million), China Development Bank, CITIC and Gezhouba Burundi Mugere Hydropower Station; Mugere River (8 MW), CWE, Guangxi Water and Electric Power Construction Group Congo, Democratic Republic of Grand Inga (Inga 3);  Congo River (39,000 MW - total combined 3 dams, $80 billion), Sinohydro Zambia Lower Kafue Gorge Power Station Kafue River (750 MW, $1 billion +),  Sinohydro;  Kariba North Bank Hydropower Station (extension) Zambezi River (360 MW, $243 million), Sinohydro Botswana Dikgatlhong Dam; Shashe and Tati Rivers ($203 million); Sinohydro Mozambique Mphanda Nkuwa Dam,  Zambezi River (1,500 MW, $3.2 million), China  Exim Bank (MOU signed with government); Moamba Major Project  Incomati River ($360 million), China Exim Bank  (MOU signed with government)
Site of Mphanda Nkuwa Dam in Mozambique (Tete Province) Source: UTIP , Unidade Técnica de Implementação dos Projectos Hidroeléctricos ( www.utip.org.mz )
[object Object],[object Object],[object Object],[object Object],[object Object],Why is China interested in Africa’s Water resources?
[object Object],[object Object],[object Object],Evidence from Mphanda Nkuwa Dam
[object Object],[object Object],[object Object],Recommendations

Contenu connexe

Similaire à Daniel Alvarenga Ppt

Tuul-Songino Project Overview 22.05.2015
Tuul-Songino Project Overview  22.05.2015Tuul-Songino Project Overview  22.05.2015
Tuul-Songino Project Overview 22.05.2015
Ivaylo Velikov
 

Similaire à Daniel Alvarenga Ppt (20)

10th Roundtable on Financing Water–PPT Side Event 1-Eng Okirya
10th Roundtable on Financing Water–PPT Side Event 1-Eng Okirya10th Roundtable on Financing Water–PPT Side Event 1-Eng Okirya
10th Roundtable on Financing Water–PPT Side Event 1-Eng Okirya
 
ALL ABOUT YEYWA DAM PROJECT COLLECTION
ALL ABOUT YEYWA DAM PROJECT COLLECTIONALL ABOUT YEYWA DAM PROJECT COLLECTION
ALL ABOUT YEYWA DAM PROJECT COLLECTION
 
Small Hydro Power for Rural Development
Small Hydro Power for Rural DevelopmentSmall Hydro Power for Rural Development
Small Hydro Power for Rural Development
 
Hydropower Potential of Nigeria
Hydropower Potential of NigeriaHydropower Potential of Nigeria
Hydropower Potential of Nigeria
 
Potential & experience of dams in ethiopia
Potential & experience of dams in ethiopiaPotential & experience of dams in ethiopia
Potential & experience of dams in ethiopia
 
Power plant
Power plantPower plant
Power plant
 
Tuul-Songino Project Overview 22.05.2015
Tuul-Songino Project Overview  22.05.2015Tuul-Songino Project Overview  22.05.2015
Tuul-Songino Project Overview 22.05.2015
 
Federal ministry of water resources
Federal ministry of water resourcesFederal ministry of water resources
Federal ministry of water resources
 
Implications of climate change on existing and planned water resource develop...
Implications of climate change on existing and planned water resource develop...Implications of climate change on existing and planned water resource develop...
Implications of climate change on existing and planned water resource develop...
 
Presentation of Ministry of Energy and Mines
Presentation of Ministry of Energy and MinesPresentation of Ministry of Energy and Mines
Presentation of Ministry of Energy and Mines
 
How China delivers rural development assistance to Africa
How China delivers rural development assistance to AfricaHow China delivers rural development assistance to Africa
How China delivers rural development assistance to Africa
 
Sustainable Hydropower Development Alternatives for the Mekong
Sustainable Hydropower Development Alternatives for the MekongSustainable Hydropower Development Alternatives for the Mekong
Sustainable Hydropower Development Alternatives for the Mekong
 
Transboundary fresh water systems of west africa
Transboundary fresh water systems of west africaTransboundary fresh water systems of west africa
Transboundary fresh water systems of west africa
 
Akosombo dam by zdh
Akosombo dam by zdhAkosombo dam by zdh
Akosombo dam by zdh
 
H04534853
H04534853H04534853
H04534853
 
Sihwa tidal power
Sihwa tidal powerSihwa tidal power
Sihwa tidal power
 
Ghana solar pumping_project1
Ghana solar pumping_project1Ghana solar pumping_project1
Ghana solar pumping_project1
 
Uganda investment benefits from the nile basin cooperation
Uganda investment benefits from the nile basin cooperationUganda investment benefits from the nile basin cooperation
Uganda investment benefits from the nile basin cooperation
 
Tidal energy
Tidal energyTidal energy
Tidal energy
 
Tidal Energy
Tidal EnergyTidal Energy
Tidal Energy
 

Plus de WATER IN AFRICA: HYDRO-PESSIMISM OR HYDRO-OPTIMISM?

Plus de WATER IN AFRICA: HYDRO-PESSIMISM OR HYDRO-OPTIMISM? (20)

Cascao hh6 session2_chh_on_ground_nile
Cascao hh6 session2_chh_on_ground_nileCascao hh6 session2_chh_on_ground_nile
Cascao hh6 session2_chh_on_ground_nile
 
HH6 How the construction of large-scale dams is changing the hydropolitical r...
HH6 How the construction of large-scale dams is changing the hydropolitical r...HH6 How the construction of large-scale dams is changing the hydropolitical r...
HH6 How the construction of large-scale dams is changing the hydropolitical r...
 
HH6 Counter-hydro-hegemony in the Nile Basin
HH6 Counter-hydro-hegemony in the Nile BasinHH6 Counter-hydro-hegemony in the Nile Basin
HH6 Counter-hydro-hegemony in the Nile Basin
 
Breaking Waters, the Birth of a New Nile State
Breaking Waters, the Birth of a New Nile StateBreaking Waters, the Birth of a New Nile State
Breaking Waters, the Birth of a New Nile State
 
Closing Session 9. Water And Participation (Carlos Garrido)
Closing Session 9. Water And Participation (Carlos Garrido)Closing Session 9. Water And Participation (Carlos Garrido)
Closing Session 9. Water And Participation (Carlos Garrido)
 
Closing Session 8. Water Decentralisation (Ibrahima Anne)
Closing Session 8. Water Decentralisation (Ibrahima Anne)Closing Session 8. Water Decentralisation (Ibrahima Anne)
Closing Session 8. Water Decentralisation (Ibrahima Anne)
 
Closing Session 7. Water And Climate Change (Maria Leonor Fidalgo)
Closing Session 7. Water And Climate Change (Maria Leonor Fidalgo)Closing Session 7. Water And Climate Change (Maria Leonor Fidalgo)
Closing Session 7. Water And Climate Change (Maria Leonor Fidalgo)
 
Closing Session 6. Large Dams In Africa (Alan Nicol)
Closing Session 6. Large Dams In Africa (Alan Nicol)Closing Session 6. Large Dams In Africa (Alan Nicol)
Closing Session 6. Large Dams In Africa (Alan Nicol)
 
Closing Session 5. Water Governance And Institutional Issues (Susana Neto & A...
Closing Session 5. Water Governance And Institutional Issues (Susana Neto & A...Closing Session 5. Water Governance And Institutional Issues (Susana Neto & A...
Closing Session 5. Water Governance And Institutional Issues (Susana Neto & A...
 
Closing Session 4. Water And Agriculture (Els Lecoutere)
Closing Session 4. Water And Agriculture (Els Lecoutere)Closing Session 4. Water And Agriculture (Els Lecoutere)
Closing Session 4. Water And Agriculture (Els Lecoutere)
 
Closing Session 3. Water As Human Right (David Blanchon)
Closing Session 3. Water As Human Right (David Blanchon)Closing Session 3. Water As Human Right (David Blanchon)
Closing Session 3. Water As Human Right (David Blanchon)
 
Closing Session 2. Water Supply And Sanitation (Alan Nicol)
Closing Session 2. Water Supply And Sanitation (Alan Nicol)Closing Session 2. Water Supply And Sanitation (Alan Nicol)
Closing Session 2. Water Supply And Sanitation (Alan Nicol)
 
Closing Session 1. Transboundary Water Politics (Ibrahim Anne)
Closing Session 1. Transboundary Water Politics (Ibrahim Anne)Closing Session 1. Transboundary Water Politics (Ibrahim Anne)
Closing Session 1. Transboundary Water Politics (Ibrahim Anne)
 
Water Decentralisation And Regionalisation Debate
Water Decentralisation And Regionalisation DebateWater Decentralisation And Regionalisation Debate
Water Decentralisation And Regionalisation Debate
 
Water Governance And Institutional Issues Ii Debate
Water Governance And Institutional Issues Ii DebateWater Governance And Institutional Issues Ii Debate
Water Governance And Institutional Issues Ii Debate
 
Water Governance And Institutional Issues I Debate
Water Governance And Institutional Issues I DebateWater Governance And Institutional Issues I Debate
Water Governance And Institutional Issues I Debate
 
Water As Human Right Debate
Water As Human Right DebateWater As Human Right Debate
Water As Human Right Debate
 
Transboundary Water Politics Debate
Transboundary Water Politics DebateTransboundary Water Politics Debate
Transboundary Water Politics Debate
 
Opening Session Debate
Opening Session DebateOpening Session Debate
Opening Session Debate
 
Water In Africa Final Programme
Water In Africa Final ProgrammeWater In Africa Final Programme
Water In Africa Final Programme
 

Dernier

Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
ssuserdda66b
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Dernier (20)

Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 

Daniel Alvarenga Ppt

  • 1. How does the river flow? The Mphanda Nkuwa dam project and China's impact in Southern Africa Daniel Alvarenga Analyst Centre for Chinese Studies University of Stellenbosch (South Africa) [email_address] 2 nd October 2008 – CEAUP Water in Africa Conference
  • 2. China’s involvement in Dam construction in Africa Adapted from: International Rivers Network 2008 The New Great Walls - A guide to China’s overseas dam industry Algeria 2 Boukourdane Dam Boukourdane River, CWE Gambia Sambangalou Dam; Gambia River, Sinohydro Guinea Souapiti Dam;Konkoure River (508 MW, $1 billion), China Exim Bank, Sinohydro; Kaleta Dam Konkoure River (238 MW, $257 million), Sinohydro Ghana Bui Dam Black River (400 MW, $700 million), China Exim Bank, Sinohydro Togo (and Benin) Adjarala Dam Mono River (96 MW, $36.5 million); China Exim Bank Nigeria Mambila Hydropower Dam Benue River (2,600 MW, $1 billion), China Exim Bank, China Geo-engineering Corporation, Gezhouba; Zungeru Dam Kaduna River (950 MW, $2 billion), China Exim Bank, Sinohydro Cameroon Lagdo Hydropower Station;Benoue River (4.18 MW), CWE Gabon Grand Poubara Power Station; Ogooue River (320 MW, $83 million), China Exim Bank, Sinohydro; Belinga Dam; Ivindo River ($3.5 million), CMEC, China Exim Bank Central African Republic Mbali Dam; Mbali Lim River, CWE Republic of Congo Imboulou Lefini River (120 MW, $280 million), China Exim Bank, CMEC; Moukoukou Dam (repairs: $4.6 million), China Exim Bank, CMEC Sudan Merowe Dam Nile River (1,250 MW, $1.2 billion), China Exim Bank, CWE, Sinohydro Ethiopia Neshi River Hydroelectric Dam; Neshi River (100 MW), Gezhouba; Tekeze Hydroelectric Dam Nile River (25 MW, $224 million), Sinohydro, Gezhouba, Yangtze River Commission Uganda Ayago North and South Hydropower Dams Nile River (530 MW, $900 million), China Development Bank, CITIC and Gezhouba Burundi Mugere Hydropower Station; Mugere River (8 MW), CWE, Guangxi Water and Electric Power Construction Group Congo, Democratic Republic of Grand Inga (Inga 3); Congo River (39,000 MW - total combined 3 dams, $80 billion), Sinohydro Zambia Lower Kafue Gorge Power Station Kafue River (750 MW, $1 billion +), Sinohydro; Kariba North Bank Hydropower Station (extension) Zambezi River (360 MW, $243 million), Sinohydro Botswana Dikgatlhong Dam; Shashe and Tati Rivers ($203 million); Sinohydro Mozambique Mphanda Nkuwa Dam, Zambezi River (1,500 MW, $3.2 million), China Exim Bank (MOU signed with government); Moamba Major Project Incomati River ($360 million), China Exim Bank (MOU signed with government)
  • 3. Site of Mphanda Nkuwa Dam in Mozambique (Tete Province) Source: UTIP , Unidade Técnica de Implementação dos Projectos Hidroeléctricos ( www.utip.org.mz )
  • 4.