In this project, we designed, built, and tested a model bridge with the measurements as
                                       stated below:




                                69cm




                                 49.2cm
                Actual measurements for our design
PROTOTYPE DESIGN AND TESTING


 DIMENSIONS

We’ve been told that the bridge should not be longer than 70cm. The width
of the bridge should be at least 5cm but not more than 10cm. The height of
the bridge should not be exceeds 20cm above or 5 cm below “ground
level”. The bridge also must span a distance of 50 cm. So, we had to think of
how we’re going to use the sticks and getting some useful information about
them.
•1 stick = 150mm
•After calculating, we knew that we will need about 187 sticks for the base
while total length of the bridge= 69cm
ANALYSIS/ SYNTHESIS/ CONCEPTUALIZATION

           We were making 2 tests to perform the bridge component strength.

Test 1 - Tension Test
Objective
The objective of the tension test is to
determine a recommended overlap distance for
two tongue depressors in tension (taking into
account strength and total span length).
Procedure
1. The test specimens were built by gluing two
tongue depressors together using different
lengths of overlap ( max. < 3/4"). We made
sure to test at least 3 specimens for a given
overlap distance to ensure more accurate
results. The hole was reinforced with extra
pieces of tongue depressor.
2. The sticks were placed in the vice on the
testing platform and the hole was reinforced at
the other end with tape.
Test 2 - Compression Test
Objective
The objective for Test 2 is to determine a
maximum length that designers should not
exceed, to ensure adequate strength from
compressions members.
Procedure
1. A ruler is used to prepare several specimens
for the compression test ranging in length from
3” to about 10”. For members greater than 6”,
two tongue depressors were glued together
with a 1” overlap length and then the ends was
cutting to the desired length. At least 2 samples
for each length are prepared to ensure some
level of accuracy.
2. To test the specimens, we were placed them
upright on the scale and pushed down as shown
in Figure 2 (using pliers may be easier on our
hands).
ALTERNATIVE DESIGNS CONCEPTUALIZATION
BRAINSTORMING IDEAS

To make the start of the project easier, some questions were asked!!
MATERIALS

•Tongue depressor sticks
•A metal hook to carry the
load at the center of the
structure
•Glue gun and glue sticks
•String/ masking tape
CONSTRUCTION METHOD
1.   Firstly, we decided on the design and laid it out on paper.
2.   Then, the sticks were measured and marked so they could be drilled for
     the pin joints.
3.   Next, we constructed the floor for the length of the bridge, or the struts
     we will apply the sides to.
4.   After that, we measured the length of the floor or struts. It is likely the
     bridge has to span a specified length.
5.   Finally, we attached each poles with ropes to the struts.
6.   Then, we constructed a number of identical poles by tied them with tiny
     rope we are going to join to the struts or floor.
TESTING PROCEDURE

The bridge has been tested to failure using the testing apparatus in the
picture since it must hold a minimum weight of 5 kg or 50 N.




         Efficiency ratio = test load/weight of model
                            = 5 KG / 7.65 KG= 6.536
DESIGN OF THE BRIDGE
CONCLUSION

           At the end, we have accomplished the
    required task. We had a lot of fun, challenge,
    tire , and memorable experience that we have
    gained. The bridge task teaches us the values of
    determination, perseverance, creativity, logic
    thinking, time management, cost effectiveness,
    initiatives, and all this values can lead us
    towards success when we are working in group.
    Although we were facing a lot of difficulties in
    decision making and getting ideas but our
    cooperated team members were very patient
    and managed to solve the problems that we had
    during the construction. We started our project
    early so that we have time to modify and
    troubleshoot the problems. Flexibility, creativity
    and perseverance are our motto.
ATTACHMENTS
THANK YOU 

Contenu connexe

Tendances

Building structure project 1 report
Building structure project 1 reportBuilding structure project 1 report
Building structure project 1 report
Adelinetingg
 
Building Structures - Fettucine Bridge
Building Structures - Fettucine BridgeBuilding Structures - Fettucine Bridge
Building Structures - Fettucine Bridge
nadiacbass
 
BUILDING STRUCTURE FETTUCINE BRIDGE
BUILDING STRUCTURE FETTUCINE BRIDGEBUILDING STRUCTURE FETTUCINE BRIDGE
BUILDING STRUCTURE FETTUCINE BRIDGE
Chuah Say Yin
 
Project 1 fettucine truss bridge
Project 1 fettucine truss bridgeProject 1 fettucine truss bridge
Project 1 fettucine truss bridge
Ah Jun
 

Tendances (20)

Cep construction of railway overbridge by abhisek panda
Cep construction of railway overbridge by abhisek pandaCep construction of railway overbridge by abhisek panda
Cep construction of railway overbridge by abhisek panda
 
Building Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeBuilding Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine Bridge
 
Building structure project 1 report
Building structure project 1 reportBuilding structure project 1 report
Building structure project 1 report
 
Building Structure Project 1
Building Structure Project 1Building Structure Project 1
Building Structure Project 1
 
Truss Bridge Report
Truss Bridge ReportTruss Bridge Report
Truss Bridge Report
 
BUILDING STRUCTURE BRIDGE TRUSS
BUILDING STRUCTURE BRIDGE TRUSSBUILDING STRUCTURE BRIDGE TRUSS
BUILDING STRUCTURE BRIDGE TRUSS
 
Building Structure Project 1
Building Structure Project 1Building Structure Project 1
Building Structure Project 1
 
Advance Prestress Bridge
Advance Prestress BridgeAdvance Prestress Bridge
Advance Prestress Bridge
 
Building Structures - Fettucine Bridge
Building Structures - Fettucine BridgeBuilding Structures - Fettucine Bridge
Building Structures - Fettucine Bridge
 
Building Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeBuilding Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine Bridge
 
BUILDING STRUCTURE FETTUCINE BRIDGE
BUILDING STRUCTURE FETTUCINE BRIDGEBUILDING STRUCTURE FETTUCINE BRIDGE
BUILDING STRUCTURE FETTUCINE BRIDGE
 
Current Long Span Bridges 15
Current Long Span Bridges 15Current Long Span Bridges 15
Current Long Span Bridges 15
 
Building Structures: Fettuccine Truss Bridge
Building Structures: Fettuccine Truss BridgeBuilding Structures: Fettuccine Truss Bridge
Building Structures: Fettuccine Truss Bridge
 
FORM WORK & SLIPFORM
FORM WORK & SLIPFORMFORM WORK & SLIPFORM
FORM WORK & SLIPFORM
 
BUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGE
BUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGEBUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGE
BUILDING STRUCTURES PROJECT 1 FETTUCCINE TRUSS BRIDGE
 
Bridge report
Bridge reportBridge report
Bridge report
 
Project 1 fettucine truss bridge
Project 1 fettucine truss bridgeProject 1 fettucine truss bridge
Project 1 fettucine truss bridge
 
Fettucine
FettucineFettucine
Fettucine
 
Bridges precast
Bridges precastBridges precast
Bridges precast
 
Fettucine Bridge Report
Fettucine Bridge ReportFettucine Bridge Report
Fettucine Bridge Report
 

En vedette

Bridge (statics analysis)
Bridge (statics analysis)Bridge (statics analysis)
Bridge (statics analysis)
Majd Khaleel
 
MegaDome DESIGN GUIDE 2015 V2
MegaDome DESIGN GUIDE 2015 V2MegaDome DESIGN GUIDE 2015 V2
MegaDome DESIGN GUIDE 2015 V2
Colin Timms
 
6 friction fe
6 friction fe6 friction fe
6 friction fe
ELIMENG
 
6161103 8.2 problems involving dry friction
6161103 8.2 problems involving dry friction6161103 8.2 problems involving dry friction
6161103 8.2 problems involving dry friction
etcenterrbru
 
L6 Causes Of Flooding
L6 Causes Of FloodingL6 Causes Of Flooding
L6 Causes Of Flooding
tudorgeog
 
J.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel paper for roads and bridges construction methods & resourcesJ.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel
 
Managing Floods
Managing FloodsManaging Floods
Managing Floods
Mrs Coles
 
Ppt Friction
Ppt FrictionPpt Friction
Ppt Friction
ffiala
 

En vedette (20)

Bridge Basics
Bridge BasicsBridge Basics
Bridge Basics
 
Bridge (statics analysis)
Bridge (statics analysis)Bridge (statics analysis)
Bridge (statics analysis)
 
ASE Conference Presentation
ASE Conference PresentationASE Conference Presentation
ASE Conference Presentation
 
MegaDome DESIGN GUIDE 2015 V2
MegaDome DESIGN GUIDE 2015 V2MegaDome DESIGN GUIDE 2015 V2
MegaDome DESIGN GUIDE 2015 V2
 
6 friction fe
6 friction fe6 friction fe
6 friction fe
 
6161103 8.2 problems involving dry friction
6161103 8.2 problems involving dry friction6161103 8.2 problems involving dry friction
6161103 8.2 problems involving dry friction
 
L6 Causes Of Flooding
L6 Causes Of FloodingL6 Causes Of Flooding
L6 Causes Of Flooding
 
J.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel paper for roads and bridges construction methods & resourcesJ.S. Daniel paper for roads and bridges construction methods & resources
J.S. Daniel paper for roads and bridges construction methods & resources
 
Science friction
Science frictionScience friction
Science friction
 
Friction
FrictionFriction
Friction
 
Design of tension members
Design of tension membersDesign of tension members
Design of tension members
 
Managing Floods
Managing FloodsManaging Floods
Managing Floods
 
Design of compression members
Design of compression membersDesign of compression members
Design of compression members
 
Friction and belt drives
Friction and belt drivesFriction and belt drives
Friction and belt drives
 
Friction, types of friction and different laws of friction
Friction, types of friction and different laws of frictionFriction, types of friction and different laws of friction
Friction, types of friction and different laws of friction
 
Friction
FrictionFriction
Friction
 
1. classification of urban roads 28 jun
1. classification of urban roads 28 jun1. classification of urban roads 28 jun
1. classification of urban roads 28 jun
 
statics
staticsstatics
statics
 
Basic Principles of Statics
Basic Principles of StaticsBasic Principles of Statics
Basic Principles of Statics
 
Ppt Friction
Ppt FrictionPpt Friction
Ppt Friction
 

Similaire à Bridge Design Presentation, Mechanics Statics

Assignment 1 bcons 2 report
Assignment 1 bcons 2 reportAssignment 1 bcons 2 report
Assignment 1 bcons 2 report
Yaseen Syed
 
Building structure analysis report
Building structure analysis report Building structure analysis report
Building structure analysis report
Soh Shing
 
Project Management
Project ManagementProject Management
Project Management
João Lima
 
Project Management
Project ManagementProject Management
Project Management
João Lima
 

Similaire à Bridge Design Presentation, Mechanics Statics (20)

Assignment 1 bcons 2 report
Assignment 1 bcons 2 reportAssignment 1 bcons 2 report
Assignment 1 bcons 2 report
 
Assignment 1 bcons report
Assignment 1 bcons reportAssignment 1 bcons report
Assignment 1 bcons report
 
B structures report
B structures reportB structures report
B structures report
 
Final
FinalFinal
Final
 
Fettuccine truss bridge report
Fettuccine truss bridge reportFettuccine truss bridge report
Fettuccine truss bridge report
 
straw bridges
straw bridgesstraw bridges
straw bridges
 
Building Construction 2 Report
Building Construction 2 ReportBuilding Construction 2 Report
Building Construction 2 Report
 
Building Structure Analysis Report
Building Structure Analysis ReportBuilding Structure Analysis Report
Building Structure Analysis Report
 
Building structure analysis report
Building structure analysis report Building structure analysis report
Building structure analysis report
 
final-file
final-filefinal-file
final-file
 
Final project mec e 3
Final project mec e 3Final project mec e 3
Final project mec e 3
 
B.con 2 report
B.con 2 reportB.con 2 report
B.con 2 report
 
Internship report
Internship report Internship report
Internship report
 
School4you Spaghetti Challenge
School4you Spaghetti ChallengeSchool4you Spaghetti Challenge
School4you Spaghetti Challenge
 
PROJECT
PROJECTPROJECT
PROJECT
 
Project Management
Project ManagementProject Management
Project Management
 
Project Management
Project ManagementProject Management
Project Management
 
Building structure [arc 2523]
Building structure [arc 2523]Building structure [arc 2523]
Building structure [arc 2523]
 
RAPID PROTOTYPING (CIVIL PROTO OF BAMBOO BED
RAPID PROTOTYPING(CIVIL PROTO OF BAMBOO BEDRAPID PROTOTYPING(CIVIL PROTO OF BAMBOO BED
RAPID PROTOTYPING (CIVIL PROTO OF BAMBOO BED
 
Project
ProjectProject
Project
 

Dernier

Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 

Dernier (20)

Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 

Bridge Design Presentation, Mechanics Statics

  • 1. MEMB123 MECHANICS STATICS SLIDES PRESENTATION By: ALIF HANIFA BIN CHE HASSAN (GL) ADIBAH BINTI HANUSI AHMAD ZUHAILI BIN ZAINAL BASRI ALBOGAMY, KHALED NAWAR M ARIF AZRAEI BIN SAHABUDIN CRISTINE HURING ANAK PATRICK KENNEDY DANIA QISYTEENA BINTI SALAHUDDIN HAFIZAH HANUN BINTI ABU BAKAR
  • 2. Bridge Design Project
  • 3. CRITERIA In this project, we designed, built, and tested a model bridge with the measurements as stated below: 69cm 49.2cm Actual measurements for our design
  • 4. PROTOTYPE DESIGN AND TESTING DIMENSIONS We’ve been told that the bridge should not be longer than 70cm. The width of the bridge should be at least 5cm but not more than 10cm. The height of the bridge should not be exceeds 20cm above or 5 cm below “ground level”. The bridge also must span a distance of 50 cm. So, we had to think of how we’re going to use the sticks and getting some useful information about them. •1 stick = 150mm •After calculating, we knew that we will need about 187 sticks for the base while total length of the bridge= 69cm
  • 5. ANALYSIS/ SYNTHESIS/ CONCEPTUALIZATION We were making 2 tests to perform the bridge component strength. Test 1 - Tension Test Objective The objective of the tension test is to determine a recommended overlap distance for two tongue depressors in tension (taking into account strength and total span length). Procedure 1. The test specimens were built by gluing two tongue depressors together using different lengths of overlap ( max. < 3/4"). We made sure to test at least 3 specimens for a given overlap distance to ensure more accurate results. The hole was reinforced with extra pieces of tongue depressor. 2. The sticks were placed in the vice on the testing platform and the hole was reinforced at the other end with tape.
  • 6. Test 2 - Compression Test Objective The objective for Test 2 is to determine a maximum length that designers should not exceed, to ensure adequate strength from compressions members. Procedure 1. A ruler is used to prepare several specimens for the compression test ranging in length from 3” to about 10”. For members greater than 6”, two tongue depressors were glued together with a 1” overlap length and then the ends was cutting to the desired length. At least 2 samples for each length are prepared to ensure some level of accuracy. 2. To test the specimens, we were placed them upright on the scale and pushed down as shown in Figure 2 (using pliers may be easier on our hands).
  • 8. BRAINSTORMING IDEAS To make the start of the project easier, some questions were asked!!
  • 9. MATERIALS •Tongue depressor sticks •A metal hook to carry the load at the center of the structure •Glue gun and glue sticks •String/ masking tape
  • 10. CONSTRUCTION METHOD 1. Firstly, we decided on the design and laid it out on paper. 2. Then, the sticks were measured and marked so they could be drilled for the pin joints. 3. Next, we constructed the floor for the length of the bridge, or the struts we will apply the sides to. 4. After that, we measured the length of the floor or struts. It is likely the bridge has to span a specified length. 5. Finally, we attached each poles with ropes to the struts. 6. Then, we constructed a number of identical poles by tied them with tiny rope we are going to join to the struts or floor.
  • 11. TESTING PROCEDURE The bridge has been tested to failure using the testing apparatus in the picture since it must hold a minimum weight of 5 kg or 50 N. Efficiency ratio = test load/weight of model = 5 KG / 7.65 KG= 6.536
  • 12. DESIGN OF THE BRIDGE
  • 13. CONCLUSION At the end, we have accomplished the required task. We had a lot of fun, challenge, tire , and memorable experience that we have gained. The bridge task teaches us the values of determination, perseverance, creativity, logic thinking, time management, cost effectiveness, initiatives, and all this values can lead us towards success when we are working in group. Although we were facing a lot of difficulties in decision making and getting ideas but our cooperated team members were very patient and managed to solve the problems that we had during the construction. We started our project early so that we have time to modify and troubleshoot the problems. Flexibility, creativity and perseverance are our motto.