SlideShare une entreprise Scribd logo
1  sur  4
DEVRY ECET 105 Week 2 iLab Soldering Techniques and the
Electronic Die Kit NEW
Check this A+ tutorial guideline at
http://www.homeworkrank.com/ecet-105-devry/ecet-
105-week-2-ilab-soldering-techniques-and-the-electronic-
die-kit-updated
For more classes visit
http://homeworkrank.com/
I. OBJECTIVES
1. To learn the basics of soldering.
2. To produce mechanically and electrically sound solder joints.
3. To assemble the Electronic Die Kit.
II. PARTS LIST
Equipment:
Digital Die Kit
Tools:
1 – Soldering Iron
1 – Pair Long-Nose Pliers
1 – Diagonal cutter
1 – Solder and hookup wire
1 – Wire stripper
III. PROCEDURE
1. Preparation
2. Prepare a well-ventilated and clear workspace with ample lighting.
3. Ensure that the workspace includes a mat to work on in order to prevent the
burning of the table or materials during the process.
4. Use a tray, egg crate, or vegetable/fruit tray for all (but especially the small) parts
to avoid losing them. Attach the tray with double-sided tape to your bench or
desktop.
5. Have a waste basket or desktop trash receptacle handy.
6. Ensure that the sponge that accompanies the soldering iron is sufficiently damp.
The level of dampness needed is judged by wetting the sponge and then squeezing
out the excess water until the sponge can be held in the hand with no noticeable
water dripping from it.
CAUTION:
In order to avoid injury to the eyes, goggles or other eye protection must be worn AT
ALL TIMES during the circuit assembly and soldering process.
A soldering iron at temperature is very hot. It is a fire hazard. It is a health hazard.
Caution must be taken at all times to ensure that contact with the skin does not
occur.
6. Plug in the soldering iron and wait approximately five minutes for the iron to heat
to a proper temperature. The temperature of the iron may be tested by lightly
rubbing the tip of the iron against the moist sponge. If a majority of water is
evaporated, then the iron is ready for use. The tip should be kept clean and tinned
for soldering. The sponge is used to wipe away excess solder and materials. Tinning
means that there is always a thin layer of solder on the tip.
7. Procure and prepare the dice kit for soldering. Inventory the parts and materials
and ensure that each part fits the circuit board correctly by checking the parts on the
board WITHOUT soldering them to the board. Put them in the tray until ready to
install.
8. Prepare the tools that you will need: soldering iron, rosin core solder, desolder
wick, safety glasses, long-nose pliers, and wire cutters.
1. Assembling the Electronic Die Kit
2. Start with the seven 220 ohm resistors. Note that the color bands are red-red-
brown-gold.
2. With your long-nose pliers, bend the legs of all seven of the resistors so that they
form 90-degree angles.
3. Insert the 220 ohm resistors into R1, R2, R3, R4, R5, R6, and R7 of your printed
circuit board through the side where you see the labels. Bend the lead on the side
away from the component part, not next to the resistor body, but on the other side of
the pliers. Otherwise, you may break the connection inside the resistor. Ensure that
all components, with the exception of the IC socket, are not fully inserted in the
board, but have small gaps between them and the circuit board to avoid excessive
heating.
4. Prepare to solder the legs of the resistors to the bottom side of the printed circuit
board. Turn the board upside down. Caution must be taken to ensure that the
“eyelet” solder pads on the board are not stressed with either hands or the tip of the
iron during the heating process. The eyelets are easily dislodged and, if damaged,
may result in irreparable damage to the circuit board.
In soldering, firmly touch the tip of the iron to the pad AND the lead you want to
solder. Ensure that only one wire and one pad (one connection) is heated at a time.
When the connection has been heated sufficiently (it should take only a few
seconds), touch the solder to the pad, opposite from the tip of the iron, and allow a
small amount of solder to flow onto the connection. The parts should not move while
you are heating them or they will not form a good joint. Sloppy or careless heating
may cause multiple connections to be soldered together, causing damage to the
circuit board.
5. Care must be taken as to not apply too much solder because this will result in a
convex-shaped connection and, possibly, a cold solder joint. Ideally, the solder
should be melted by the connection, not the iron.
6. Remove the iron after ensuring that the solder has spread over the pad and that
the lead is sufficiently secured. A resulting concave shape should be observed at the
connection. Have your team member or instructor verify proper connection.
7. Trim the excess leads, pointing into a paper or plastic waste bag or basket. Metal
clippings may fly far, fall into computer keyboards, or otherwise pose as a shorting
hazard.
8. Insert the two, 0.1μF ceramic capacitors into C1 and C2.
9. Solder the legs of the capacitors to the bottom side of the printed circuit board and
carefully cut off the excess leads.
1. Insert the 7805, 5-volt regulator into U1 following the drawing on the printed
circuit board. Push the component down carefully until it is fully set. DO NOT force
the IC all the way onto the board. Push the part partially down and allow the leads to
spread out. The result should be that the part stands off the board as shown. Solder
and carefully cut excess leads.
2. Insert the 8-pin, IC socket into U2 following the drawing on the printed circuit
board. Solder two pins on diagonally opposite corners. (Hold one pin with the heat
sink clip or paper clip while soldering the other.) Inspect and confirm that all pins
are in the correct holes in the PCB and the socket is seated on the board. Solder each
pin and repair any bridging before continuing.
2. Insert the momentary switch into S1 following the drawing on the printed circuit
board and solder the two contact pins.
3. Insert the seven red LEDs into D1, D2, D3, D4, D5, D6, and D7 following the
drawing on the printed circuit board. PLEASE NOTE that the longer lead of the LEDs
is the anode and should go into the hole marked with a + sign.
4. Insert the 9V battery connector into P1 and solder. You may insert the battery
leads from the bottom. This will make a neater assembly should you decide to put
the Dice in a case. It is VERY IMPORTANT that the red wire is soldered into V+ and
the black wire is soldered into V-.
5. Have a team member or your instructor inspect your board when you have
finished.
6. Completing and Testing the Kit
7. Inspect the Atmel ATTINY85-20PU microcontroller. Straighten any severely bent
pins, very slowly; otherwise, they could break. Align the IC on your breadboard so
that the dot in the top lefthand corner of the IC is at the same end as the notch in the
IC socket.
Insert the pins on one side, but do not press in, making sure that each pin is started
in its socket. Gently press the IC from the other side against the pins started until the
pins on the other side easily start in their sockets. Double check that no pin is bent
under or is outside of its intended socket location. Press the IC into the socket, firmly
but gently.
2. Attach the 9V battery firmly to the battery connector.
3. The die kit should resemble Figure 4.1 when assembly is completed. The Atmel
ATTINY85-20PU has been shipped with a program already stored so that the die may
be tested by connecting the 9V battery to the connector, then pressing and holding
the momentary switch and releasing it. While the switch is pressed, the LEDs will
blink in a random pattern. When the switch is released, a randomly generated
number between 1 and 6 will be displayed on the LED die. Note any performance
issues.
Hints:
If the die is not working on the first try, turn it off by unplugging the battery. Check
for warm/hot components.
If the regulator U1 is hot, you have a short somewhere. Look for solder shorts,
incorrectly inserted components, and leads that may be touching adjacent leads.
Remove the shorting connection and try again.

Contenu connexe

Similaire à Devry ecet 105 week 2 i lab soldering techniques and the electronic die kit new

Us 100 crct diagram
Us 100 crct diagramUs 100 crct diagram
Us 100 crct diagramL7lgbB9220
 
Chapter 1 soldering technique
Chapter 1 soldering techniqueChapter 1 soldering technique
Chapter 1 soldering techniqueMichael Recolito
 
Quarter 1 – Module 6.pptx with hyperlink
Quarter 1 – Module 6.pptx with hyperlinkQuarter 1 – Module 6.pptx with hyperlink
Quarter 1 – Module 6.pptx with hyperlinkaiyaosobi
 
Insructables fm listening bug
Insructables   fm listening bugInsructables   fm listening bug
Insructables fm listening bugzubeditufail
 
Como adaptar brinquedos para utilização de um switch
Como adaptar brinquedos para utilização de um switchComo adaptar brinquedos para utilização de um switch
Como adaptar brinquedos para utilização de um switch23palmela
 
ECET 105 Entire Course NEW
ECET 105 Entire Course NEWECET 105 Entire Course NEW
ECET 105 Entire Course NEWshyamuopfive
 
How To Solder V3.5
How To Solder V3.5How To Solder V3.5
How To Solder V3.5JasonDeMoe
 
COMPUTER MAINTENANCE TECHNOLOGY ppt.pptx
COMPUTER MAINTENANCE TECHNOLOGY ppt.pptxCOMPUTER MAINTENANCE TECHNOLOGY ppt.pptx
COMPUTER MAINTENANCE TECHNOLOGY ppt.pptxNioLemuelLazatinConc
 
COMPUTER MAINTENANCE TECHNOLOGY ppt.pptx
COMPUTER MAINTENANCE TECHNOLOGY ppt.pptxCOMPUTER MAINTENANCE TECHNOLOGY ppt.pptx
COMPUTER MAINTENANCE TECHNOLOGY ppt.pptxNioLemuelLazatinConc
 
(Service Manual Di470) Manual de Mantenimiento para Maquinas Fotocopiadoras M...
(Service Manual Di470) Manual de Mantenimiento para Maquinas Fotocopiadoras M...(Service Manual Di470) Manual de Mantenimiento para Maquinas Fotocopiadoras M...
(Service Manual Di470) Manual de Mantenimiento para Maquinas Fotocopiadoras M...Kevin Lazkanu
 
ESD-6949-2/16 RAYCHEM TYCO| AKBAR TRADING EST| mail@akbartrading.com
ESD-6949-2/16 RAYCHEM TYCO| AKBAR TRADING EST| mail@akbartrading.comESD-6949-2/16 RAYCHEM TYCO| AKBAR TRADING EST| mail@akbartrading.com
ESD-6949-2/16 RAYCHEM TYCO| AKBAR TRADING EST| mail@akbartrading.comAKBAR TRADING
 
Replacing lightship battery
Replacing lightship batteryReplacing lightship battery
Replacing lightship batterysollightsolar
 
How To Circuit Bend A Casio Vl Tone
How To Circuit Bend A Casio Vl ToneHow To Circuit Bend A Casio Vl Tone
How To Circuit Bend A Casio Vl ToneDan Wilson
 
Catalog FR-A700 Instruction manual (basic)-Beeteco.com
Catalog FR-A700 Instruction manual (basic)-Beeteco.comCatalog FR-A700 Instruction manual (basic)-Beeteco.com
Catalog FR-A700 Instruction manual (basic)-Beeteco.comBeeteco
 
pioneer_cdj-900_sm.pdf
pioneer_cdj-900_sm.pdfpioneer_cdj-900_sm.pdf
pioneer_cdj-900_sm.pdfssuser4e6376
 

Similaire à Devry ecet 105 week 2 i lab soldering techniques and the electronic die kit new (20)

Us 100 crct diagram
Us 100 crct diagramUs 100 crct diagram
Us 100 crct diagram
 
Chapter 1 soldering technique
Chapter 1 soldering techniqueChapter 1 soldering technique
Chapter 1 soldering technique
 
Build-It: Dimmable LED lantern
Build-It: Dimmable LED lanternBuild-It: Dimmable LED lantern
Build-It: Dimmable LED lantern
 
Quarter 1 – Module 6.pptx with hyperlink
Quarter 1 – Module 6.pptx with hyperlinkQuarter 1 – Module 6.pptx with hyperlink
Quarter 1 – Module 6.pptx with hyperlink
 
Insructables fm listening bug
Insructables   fm listening bugInsructables   fm listening bug
Insructables fm listening bug
 
Como adaptar brinquedos para utilização de um switch
Como adaptar brinquedos para utilização de um switchComo adaptar brinquedos para utilização de um switch
Como adaptar brinquedos para utilização de um switch
 
ECET 105 Entire Course NEW
ECET 105 Entire Course NEWECET 105 Entire Course NEW
ECET 105 Entire Course NEW
 
Desktop assembly
Desktop assemblyDesktop assembly
Desktop assembly
 
ElectricalClass
ElectricalClassElectricalClass
ElectricalClass
 
How To Solder V3.5
How To Solder V3.5How To Solder V3.5
How To Solder V3.5
 
SOLDERING TQ.pptx
SOLDERING TQ.pptxSOLDERING TQ.pptx
SOLDERING TQ.pptx
 
How to wire a plug
How to wire a plugHow to wire a plug
How to wire a plug
 
COMPUTER MAINTENANCE TECHNOLOGY ppt.pptx
COMPUTER MAINTENANCE TECHNOLOGY ppt.pptxCOMPUTER MAINTENANCE TECHNOLOGY ppt.pptx
COMPUTER MAINTENANCE TECHNOLOGY ppt.pptx
 
COMPUTER MAINTENANCE TECHNOLOGY ppt.pptx
COMPUTER MAINTENANCE TECHNOLOGY ppt.pptxCOMPUTER MAINTENANCE TECHNOLOGY ppt.pptx
COMPUTER MAINTENANCE TECHNOLOGY ppt.pptx
 
(Service Manual Di470) Manual de Mantenimiento para Maquinas Fotocopiadoras M...
(Service Manual Di470) Manual de Mantenimiento para Maquinas Fotocopiadoras M...(Service Manual Di470) Manual de Mantenimiento para Maquinas Fotocopiadoras M...
(Service Manual Di470) Manual de Mantenimiento para Maquinas Fotocopiadoras M...
 
ESD-6949-2/16 RAYCHEM TYCO| AKBAR TRADING EST| mail@akbartrading.com
ESD-6949-2/16 RAYCHEM TYCO| AKBAR TRADING EST| mail@akbartrading.comESD-6949-2/16 RAYCHEM TYCO| AKBAR TRADING EST| mail@akbartrading.com
ESD-6949-2/16 RAYCHEM TYCO| AKBAR TRADING EST| mail@akbartrading.com
 
Replacing lightship battery
Replacing lightship batteryReplacing lightship battery
Replacing lightship battery
 
How To Circuit Bend A Casio Vl Tone
How To Circuit Bend A Casio Vl ToneHow To Circuit Bend A Casio Vl Tone
How To Circuit Bend A Casio Vl Tone
 
Catalog FR-A700 Instruction manual (basic)-Beeteco.com
Catalog FR-A700 Instruction manual (basic)-Beeteco.comCatalog FR-A700 Instruction manual (basic)-Beeteco.com
Catalog FR-A700 Instruction manual (basic)-Beeteco.com
 
pioneer_cdj-900_sm.pdf
pioneer_cdj-900_sm.pdfpioneer_cdj-900_sm.pdf
pioneer_cdj-900_sm.pdf
 

Plus de Bartholomee

Strayer hsa 535 week 11 final exam part 1 new
Strayer hsa 535 week 11 final exam part 1 newStrayer hsa 535 week 11 final exam part 1 new
Strayer hsa 535 week 11 final exam part 1 newBartholomee
 
Strayer hsa 535 week 10 assignment 3 social, behavioral, and psychosocial cau...
Strayer hsa 535 week 10 assignment 3 social, behavioral, and psychosocial cau...Strayer hsa 535 week 10 assignment 3 social, behavioral, and psychosocial cau...
Strayer hsa 535 week 10 assignment 3 social, behavioral, and psychosocial cau...Bartholomee
 
Strayer hsa 535 week 3 assignment 1 applications of epidemiology a case study...
Strayer hsa 535 week 3 assignment 1 applications of epidemiology a case study...Strayer hsa 535 week 3 assignment 1 applications of epidemiology a case study...
Strayer hsa 535 week 3 assignment 1 applications of epidemiology a case study...Bartholomee
 
Strayer hsa 535 week 3 applications of epidemiology
Strayer hsa 535 week 3 applications of epidemiologyStrayer hsa 535 week 3 applications of epidemiology
Strayer hsa 535 week 3 applications of epidemiologyBartholomee
 
Uop hsa 530 week 10 assignment 3 human resources planning and employee relations
Uop hsa 530 week 10 assignment 3 human resources planning and employee relationsUop hsa 530 week 10 assignment 3 human resources planning and employee relations
Uop hsa 530 week 10 assignment 3 human resources planning and employee relationsBartholomee
 
Uop fin 486 week 2 team assignment
Uop fin 486 week 2 team assignmentUop fin 486 week 2 team assignment
Uop fin 486 week 2 team assignmentBartholomee
 
Uop fin 486 week 2 individual assignment new
Uop fin 486 week 2 individual assignment newUop fin 486 week 2 individual assignment new
Uop fin 486 week 2 individual assignment newBartholomee
 
Ash eng 225 week 5 film critique final paper new
Ash eng 225 week 5 film critique final paper newAsh eng 225 week 5 film critique final paper new
Ash eng 225 week 5 film critique final paper newBartholomee
 
Uop eng 223 week 4 individual assignment resume, cover, and follow up letter new
Uop eng 223 week 4 individual assignment resume, cover, and follow up letter newUop eng 223 week 4 individual assignment resume, cover, and follow up letter new
Uop eng 223 week 4 individual assignment resume, cover, and follow up letter newBartholomee
 
Uop eng 223 week 2 individual assignment formal messaging new
Uop eng 223 week 2 individual assignment formal messaging newUop eng 223 week 2 individual assignment formal messaging new
Uop eng 223 week 2 individual assignment formal messaging newBartholomee
 
Jacksonville state university em 565 finance strategy for renewable energy new
Jacksonville state university em 565 finance strategy for renewable energy newJacksonville state university em 565 finance strategy for renewable energy new
Jacksonville state university em 565 finance strategy for renewable energy newBartholomee
 
Ashford edu 692 week 6 final project creative teaching designing culturally r...
Ashford edu 692 week 6 final project creative teaching designing culturally r...Ashford edu 692 week 6 final project creative teaching designing culturally r...
Ashford edu 692 week 6 final project creative teaching designing culturally r...Bartholomee
 
Ashford edu 692 week 6 discussion creativity
Ashford edu 692 week 6 discussion creativityAshford edu 692 week 6 discussion creativity
Ashford edu 692 week 6 discussion creativityBartholomee
 
Ashford edu 692 week 5 discussion 1 decisions
Ashford edu 692 week 5 discussion 1 decisionsAshford edu 692 week 5 discussion 1 decisions
Ashford edu 692 week 5 discussion 1 decisionsBartholomee
 
Ashford edu 692 week 5 assignment a case for problem
Ashford edu 692 week 5 assignment a case for problemAshford edu 692 week 5 assignment a case for problem
Ashford edu 692 week 5 assignment a case for problemBartholomee
 
Uop eco 372 week 2 knowledge check new
Uop eco 372 week 2 knowledge check newUop eco 372 week 2 knowledge check new
Uop eco 372 week 2 knowledge check newBartholomee
 
Devry ecet 380 week 2 i lab new
Devry ecet 380 week 2 i lab newDevry ecet 380 week 2 i lab new
Devry ecet 380 week 2 i lab newBartholomee
 
Devry ecet 105 week 7 i lab add
Devry ecet 105 week 7 i lab addDevry ecet 105 week 7 i lab add
Devry ecet 105 week 7 i lab addBartholomee
 
Devry ecet 105 week 7 homework new
Devry ecet 105 week 7 homework newDevry ecet 105 week 7 homework new
Devry ecet 105 week 7 homework newBartholomee
 
Devry ecet 105 week 6 homework new
Devry ecet 105 week 6 homework newDevry ecet 105 week 6 homework new
Devry ecet 105 week 6 homework newBartholomee
 

Plus de Bartholomee (20)

Strayer hsa 535 week 11 final exam part 1 new
Strayer hsa 535 week 11 final exam part 1 newStrayer hsa 535 week 11 final exam part 1 new
Strayer hsa 535 week 11 final exam part 1 new
 
Strayer hsa 535 week 10 assignment 3 social, behavioral, and psychosocial cau...
Strayer hsa 535 week 10 assignment 3 social, behavioral, and psychosocial cau...Strayer hsa 535 week 10 assignment 3 social, behavioral, and psychosocial cau...
Strayer hsa 535 week 10 assignment 3 social, behavioral, and psychosocial cau...
 
Strayer hsa 535 week 3 assignment 1 applications of epidemiology a case study...
Strayer hsa 535 week 3 assignment 1 applications of epidemiology a case study...Strayer hsa 535 week 3 assignment 1 applications of epidemiology a case study...
Strayer hsa 535 week 3 assignment 1 applications of epidemiology a case study...
 
Strayer hsa 535 week 3 applications of epidemiology
Strayer hsa 535 week 3 applications of epidemiologyStrayer hsa 535 week 3 applications of epidemiology
Strayer hsa 535 week 3 applications of epidemiology
 
Uop hsa 530 week 10 assignment 3 human resources planning and employee relations
Uop hsa 530 week 10 assignment 3 human resources planning and employee relationsUop hsa 530 week 10 assignment 3 human resources planning and employee relations
Uop hsa 530 week 10 assignment 3 human resources planning and employee relations
 
Uop fin 486 week 2 team assignment
Uop fin 486 week 2 team assignmentUop fin 486 week 2 team assignment
Uop fin 486 week 2 team assignment
 
Uop fin 486 week 2 individual assignment new
Uop fin 486 week 2 individual assignment newUop fin 486 week 2 individual assignment new
Uop fin 486 week 2 individual assignment new
 
Ash eng 225 week 5 film critique final paper new
Ash eng 225 week 5 film critique final paper newAsh eng 225 week 5 film critique final paper new
Ash eng 225 week 5 film critique final paper new
 
Uop eng 223 week 4 individual assignment resume, cover, and follow up letter new
Uop eng 223 week 4 individual assignment resume, cover, and follow up letter newUop eng 223 week 4 individual assignment resume, cover, and follow up letter new
Uop eng 223 week 4 individual assignment resume, cover, and follow up letter new
 
Uop eng 223 week 2 individual assignment formal messaging new
Uop eng 223 week 2 individual assignment formal messaging newUop eng 223 week 2 individual assignment formal messaging new
Uop eng 223 week 2 individual assignment formal messaging new
 
Jacksonville state university em 565 finance strategy for renewable energy new
Jacksonville state university em 565 finance strategy for renewable energy newJacksonville state university em 565 finance strategy for renewable energy new
Jacksonville state university em 565 finance strategy for renewable energy new
 
Ashford edu 692 week 6 final project creative teaching designing culturally r...
Ashford edu 692 week 6 final project creative teaching designing culturally r...Ashford edu 692 week 6 final project creative teaching designing culturally r...
Ashford edu 692 week 6 final project creative teaching designing culturally r...
 
Ashford edu 692 week 6 discussion creativity
Ashford edu 692 week 6 discussion creativityAshford edu 692 week 6 discussion creativity
Ashford edu 692 week 6 discussion creativity
 
Ashford edu 692 week 5 discussion 1 decisions
Ashford edu 692 week 5 discussion 1 decisionsAshford edu 692 week 5 discussion 1 decisions
Ashford edu 692 week 5 discussion 1 decisions
 
Ashford edu 692 week 5 assignment a case for problem
Ashford edu 692 week 5 assignment a case for problemAshford edu 692 week 5 assignment a case for problem
Ashford edu 692 week 5 assignment a case for problem
 
Uop eco 372 week 2 knowledge check new
Uop eco 372 week 2 knowledge check newUop eco 372 week 2 knowledge check new
Uop eco 372 week 2 knowledge check new
 
Devry ecet 380 week 2 i lab new
Devry ecet 380 week 2 i lab newDevry ecet 380 week 2 i lab new
Devry ecet 380 week 2 i lab new
 
Devry ecet 105 week 7 i lab add
Devry ecet 105 week 7 i lab addDevry ecet 105 week 7 i lab add
Devry ecet 105 week 7 i lab add
 
Devry ecet 105 week 7 homework new
Devry ecet 105 week 7 homework newDevry ecet 105 week 7 homework new
Devry ecet 105 week 7 homework new
 
Devry ecet 105 week 6 homework new
Devry ecet 105 week 6 homework newDevry ecet 105 week 6 homework new
Devry ecet 105 week 6 homework new
 

Dernier

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.MateoGardella
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfSanaAli374401
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterMateoGardella
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...KokoStevan
 

Dernier (20)

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 

Devry ecet 105 week 2 i lab soldering techniques and the electronic die kit new

  • 1. DEVRY ECET 105 Week 2 iLab Soldering Techniques and the Electronic Die Kit NEW Check this A+ tutorial guideline at http://www.homeworkrank.com/ecet-105-devry/ecet- 105-week-2-ilab-soldering-techniques-and-the-electronic- die-kit-updated For more classes visit http://homeworkrank.com/ I. OBJECTIVES 1. To learn the basics of soldering. 2. To produce mechanically and electrically sound solder joints. 3. To assemble the Electronic Die Kit. II. PARTS LIST Equipment: Digital Die Kit Tools: 1 – Soldering Iron 1 – Pair Long-Nose Pliers 1 – Diagonal cutter 1 – Solder and hookup wire 1 – Wire stripper III. PROCEDURE 1. Preparation 2. Prepare a well-ventilated and clear workspace with ample lighting. 3. Ensure that the workspace includes a mat to work on in order to prevent the burning of the table or materials during the process. 4. Use a tray, egg crate, or vegetable/fruit tray for all (but especially the small) parts to avoid losing them. Attach the tray with double-sided tape to your bench or desktop. 5. Have a waste basket or desktop trash receptacle handy. 6. Ensure that the sponge that accompanies the soldering iron is sufficiently damp. The level of dampness needed is judged by wetting the sponge and then squeezing out the excess water until the sponge can be held in the hand with no noticeable
  • 2. water dripping from it. CAUTION: In order to avoid injury to the eyes, goggles or other eye protection must be worn AT ALL TIMES during the circuit assembly and soldering process. A soldering iron at temperature is very hot. It is a fire hazard. It is a health hazard. Caution must be taken at all times to ensure that contact with the skin does not occur. 6. Plug in the soldering iron and wait approximately five minutes for the iron to heat to a proper temperature. The temperature of the iron may be tested by lightly rubbing the tip of the iron against the moist sponge. If a majority of water is evaporated, then the iron is ready for use. The tip should be kept clean and tinned for soldering. The sponge is used to wipe away excess solder and materials. Tinning means that there is always a thin layer of solder on the tip. 7. Procure and prepare the dice kit for soldering. Inventory the parts and materials and ensure that each part fits the circuit board correctly by checking the parts on the board WITHOUT soldering them to the board. Put them in the tray until ready to install. 8. Prepare the tools that you will need: soldering iron, rosin core solder, desolder wick, safety glasses, long-nose pliers, and wire cutters. 1. Assembling the Electronic Die Kit 2. Start with the seven 220 ohm resistors. Note that the color bands are red-red- brown-gold. 2. With your long-nose pliers, bend the legs of all seven of the resistors so that they form 90-degree angles. 3. Insert the 220 ohm resistors into R1, R2, R3, R4, R5, R6, and R7 of your printed circuit board through the side where you see the labels. Bend the lead on the side away from the component part, not next to the resistor body, but on the other side of the pliers. Otherwise, you may break the connection inside the resistor. Ensure that all components, with the exception of the IC socket, are not fully inserted in the board, but have small gaps between them and the circuit board to avoid excessive heating. 4. Prepare to solder the legs of the resistors to the bottom side of the printed circuit board. Turn the board upside down. Caution must be taken to ensure that the “eyelet” solder pads on the board are not stressed with either hands or the tip of the iron during the heating process. The eyelets are easily dislodged and, if damaged, may result in irreparable damage to the circuit board. In soldering, firmly touch the tip of the iron to the pad AND the lead you want to solder. Ensure that only one wire and one pad (one connection) is heated at a time. When the connection has been heated sufficiently (it should take only a few seconds), touch the solder to the pad, opposite from the tip of the iron, and allow a
  • 3. small amount of solder to flow onto the connection. The parts should not move while you are heating them or they will not form a good joint. Sloppy or careless heating may cause multiple connections to be soldered together, causing damage to the circuit board. 5. Care must be taken as to not apply too much solder because this will result in a convex-shaped connection and, possibly, a cold solder joint. Ideally, the solder should be melted by the connection, not the iron. 6. Remove the iron after ensuring that the solder has spread over the pad and that the lead is sufficiently secured. A resulting concave shape should be observed at the connection. Have your team member or instructor verify proper connection. 7. Trim the excess leads, pointing into a paper or plastic waste bag or basket. Metal clippings may fly far, fall into computer keyboards, or otherwise pose as a shorting hazard. 8. Insert the two, 0.1μF ceramic capacitors into C1 and C2. 9. Solder the legs of the capacitors to the bottom side of the printed circuit board and carefully cut off the excess leads. 1. Insert the 7805, 5-volt regulator into U1 following the drawing on the printed circuit board. Push the component down carefully until it is fully set. DO NOT force the IC all the way onto the board. Push the part partially down and allow the leads to spread out. The result should be that the part stands off the board as shown. Solder and carefully cut excess leads. 2. Insert the 8-pin, IC socket into U2 following the drawing on the printed circuit board. Solder two pins on diagonally opposite corners. (Hold one pin with the heat sink clip or paper clip while soldering the other.) Inspect and confirm that all pins are in the correct holes in the PCB and the socket is seated on the board. Solder each pin and repair any bridging before continuing. 2. Insert the momentary switch into S1 following the drawing on the printed circuit board and solder the two contact pins. 3. Insert the seven red LEDs into D1, D2, D3, D4, D5, D6, and D7 following the drawing on the printed circuit board. PLEASE NOTE that the longer lead of the LEDs is the anode and should go into the hole marked with a + sign. 4. Insert the 9V battery connector into P1 and solder. You may insert the battery leads from the bottom. This will make a neater assembly should you decide to put the Dice in a case. It is VERY IMPORTANT that the red wire is soldered into V+ and the black wire is soldered into V-. 5. Have a team member or your instructor inspect your board when you have finished. 6. Completing and Testing the Kit 7. Inspect the Atmel ATTINY85-20PU microcontroller. Straighten any severely bent pins, very slowly; otherwise, they could break. Align the IC on your breadboard so that the dot in the top lefthand corner of the IC is at the same end as the notch in the IC socket. Insert the pins on one side, but do not press in, making sure that each pin is started in its socket. Gently press the IC from the other side against the pins started until the
  • 4. pins on the other side easily start in their sockets. Double check that no pin is bent under or is outside of its intended socket location. Press the IC into the socket, firmly but gently. 2. Attach the 9V battery firmly to the battery connector. 3. The die kit should resemble Figure 4.1 when assembly is completed. The Atmel ATTINY85-20PU has been shipped with a program already stored so that the die may be tested by connecting the 9V battery to the connector, then pressing and holding the momentary switch and releasing it. While the switch is pressed, the LEDs will blink in a random pattern. When the switch is released, a randomly generated number between 1 and 6 will be displayed on the LED die. Note any performance issues. Hints: If the die is not working on the first try, turn it off by unplugging the battery. Check for warm/hot components. If the regulator U1 is hot, you have a short somewhere. Look for solder shorts, incorrectly inserted components, and leads that may be touching adjacent leads. Remove the shorting connection and try again.