Framework Delivery
Pat Condon – Head of Procurement
Objectives
• To understand how a framework is constructed and delivered from
inception through to launch
• To understand what happens once a framework is launched
Framework Delivery
• Starts with stakeholder engagement which includes:
• PAG
• CPC Members
• DfE
• Tenet Educational Services
• Joint Contracting Group
Framework Delivery – Stakeholder Engagement
• PAG Input
• All Regional PAG meetings feed directly into the quarterly National PAG teleconference
where CPC participate
• The minutes of the National PAG meeting inform the CPC Board and CPC SMT
• CPC Members
• CPC receives requests from members asking for commodity areas to be considered for
frameworks. Where these align to other stakeholders, they are considered
• DfE
• DfE are consulted on all new framework including input on specifications from their
Academies and Schools Focus Group
Framework Delivery Stakeholder Engagement
• Tenet Educational Services
• Tenet operate in 30+ Colleges across the UK
• Tenet undertake numerous procurement exercises annually
• Tenet feed into CPC on their client requirements
• Joint Contracting Group
• Consists of all HE regional consortia, TUCO, TEC, JISC and CPC
• Where commodities align, one JCG member will deliver a framework for all members
• Presently 28 CPC Frameworks are JCG led
Framework Delivery Pre-Market Engagement
• Pre-market engagement commences concurrently as
stakeholder opinions and views are captured
• Stage 1: Issue Prior Information Notice (PIN) if required
• Informs the supply market of this forthcoming opportunity
• Seeks to engage with the supply base to aid specification development
• Informs CPC as to developments in the marketplace
Framework Delivery Pre-market Engagement
• Stage Two: Engage stakeholders
• What do members want the framework to deliver?
• What are members core requirements?
• What quality requirements are necessary?
• How do we build Social Value into the framework?
• How important is cost to the member?
• Encourage members to contribute to specification development
• Identify challenges and difficulties that members may have in that area
• Include other consortia input if relevant and appropriate
Framework Delivery Specification Development
• Stage 3: Specification Development
• After all stakeholder input begin to draft specification
• Consider Selection and award criteria based upon member and
stakeholder requirements
• Consider lotting structure
• Split between Schools/Academies and FE/HE
• Split across UK regions
• Number of suppliers per lot
• Share specification with all stakeholders for revision and fine tuning
• Once review completed the ITT can be finalised
Framework Delivery Contracting Process
• Stage 4: Specification and ITT signed off
• Stage 5: Contract Notice placed on TED and ITT issued to the
marketplace via Sourcing Cloud using Open Procedure
• During ITT respond to clarification request maintaining a register of all requests
made
• Following closure of ITT assess supplier responses and finalise assessment
• Complete Award Letters and commence Standstill Period
• Complete any supplier checks on documentation referred to within bid e.g.
insurances, quality accreditations etc
• Ensure that all contractual documentation has been signed correctly
Framework Delivery Award Process
• Stage 6: Once Standstill completed launch framework
• Framework set up on CPC website and Sourcing Cloud
• User Guide drafted to include:
• Full details on the ITT and award criteria
• A further competition template document
• Full advice and guidance on using the framework
• Framework launched to members and marketing commences through:
• Newsletters
• Social Media
• Blogs
• Partners
Framework Delivery Award Process
• Stage 7: Conduct Supplier Inductions
• Suppliers informed about responding to member RFQs and ITTs
• Suppliers informed about marketing and engagement
• Commence contract management with suppliers
• Commence member support through
• Regional Procurement Advisors
• Contract Managers
• Helpdesk
Process Template
• Process Spreadsheet embedded below

Contenu connexe

Similaire à Framework delivery from inception to launch. nov 2019

Innovate UK's monitoring services procurement - engagement event slides
Innovate UK's monitoring services procurement - engagement event slidesInnovate UK's monitoring services procurement - engagement event slides
Innovate UK's monitoring services procurement - engagement event slidesInnovate UK
 
Mathew Sansam from Innovate UK & IC Tomorrow
Mathew Sansam from Innovate UK & IC TomorrowMathew Sansam from Innovate UK & IC Tomorrow
Mathew Sansam from Innovate UK & IC Tomorrowwired_sussex
 
Capacity Building for PPP projects
Capacity Building for PPP projects Capacity Building for PPP projects
Capacity Building for PPP projects admin-cip
 
Public procurement roadshow presentation
Public procurement roadshow presentationPublic procurement roadshow presentation
Public procurement roadshow presentationBlake Morgan LLP
 
Mn dot bidding and estimating 4 16-13
Mn dot bidding and estimating 4 16-13Mn dot bidding and estimating 4 16-13
Mn dot bidding and estimating 4 16-13jpeabody
 
Capacity building for PPP projects
Capacity building for PPP projectsCapacity building for PPP projects
Capacity building for PPP projectsgeoffrey-cip
 
2015 Call Key Action 2 VET, adult ed and youth Start Up Seminar presentation
2015 Call Key Action 2 VET, adult ed and youth Start Up Seminar presentation2015 Call Key Action 2 VET, adult ed and youth Start Up Seminar presentation
2015 Call Key Action 2 VET, adult ed and youth Start Up Seminar presentationErasmus+ UK National Agency
 
Making sense of the new procurement rules - Reading - 18 03 2015 - Afternoon ...
Making sense of the new procurement rules - Reading - 18 03 2015 - Afternoon ...Making sense of the new procurement rules - Reading - 18 03 2015 - Afternoon ...
Making sense of the new procurement rules - Reading - 18 03 2015 - Afternoon ...Blake Morgan LLP
 
Def presentatie procday sofia 220515
Def presentatie procday sofia 220515Def presentatie procday sofia 220515
Def presentatie procday sofia 220515Martijn Duijts
 
3. Project Procurement Planning..pptx
3. Project Procurement Planning..pptx3. Project Procurement Planning..pptx
3. Project Procurement Planning..pptxDoctorOkelloBen
 
Overview Presentation - Procurement Directive, December 2021.pptx
Overview Presentation - Procurement Directive, December 2021.pptxOverview Presentation - Procurement Directive, December 2021.pptx
Overview Presentation - Procurement Directive, December 2021.pptxabiytk
 
00. Presentation QS0005.pptx
00. Presentation QS0005.pptx00. Presentation QS0005.pptx
00. Presentation QS0005.pptxBimsaraRotaract
 
Planning Performance Agreements use in Islington Council
Planning Performance Agreements use in Islington CouncilPlanning Performance Agreements use in Islington Council
Planning Performance Agreements use in Islington CouncilPAS_Team
 
PURCHASING - CONSOLIDATED.ppt
PURCHASING - CONSOLIDATED.pptPURCHASING - CONSOLIDATED.ppt
PURCHASING - CONSOLIDATED.pptssusera24f84
 

Similaire à Framework delivery from inception to launch. nov 2019 (20)

Innovate UK's monitoring services procurement - engagement event slides
Innovate UK's monitoring services procurement - engagement event slidesInnovate UK's monitoring services procurement - engagement event slides
Innovate UK's monitoring services procurement - engagement event slides
 
Mathew Sansam from Innovate UK & IC Tomorrow
Mathew Sansam from Innovate UK & IC TomorrowMathew Sansam from Innovate UK & IC Tomorrow
Mathew Sansam from Innovate UK & IC Tomorrow
 
Capacity Building for PPP projects
Capacity Building for PPP projects Capacity Building for PPP projects
Capacity Building for PPP projects
 
Public procurement roadshow presentation
Public procurement roadshow presentationPublic procurement roadshow presentation
Public procurement roadshow presentation
 
Mn dot bidding and estimating 4 16-13
Mn dot bidding and estimating 4 16-13Mn dot bidding and estimating 4 16-13
Mn dot bidding and estimating 4 16-13
 
Capacity building for PPP projects
Capacity building for PPP projectsCapacity building for PPP projects
Capacity building for PPP projects
 
2015 Call Key Action 2 VET, adult ed and youth Start Up Seminar presentation
2015 Call Key Action 2 VET, adult ed and youth Start Up Seminar presentation2015 Call Key Action 2 VET, adult ed and youth Start Up Seminar presentation
2015 Call Key Action 2 VET, adult ed and youth Start Up Seminar presentation
 
Presentation, SIGMA workshop on tendering of PPP projects and contract signat...
Presentation, SIGMA workshop on tendering of PPP projects and contract signat...Presentation, SIGMA workshop on tendering of PPP projects and contract signat...
Presentation, SIGMA workshop on tendering of PPP projects and contract signat...
 
Making sense of the new procurement rules - Reading - 18 03 2015 - Afternoon ...
Making sense of the new procurement rules - Reading - 18 03 2015 - Afternoon ...Making sense of the new procurement rules - Reading - 18 03 2015 - Afternoon ...
Making sense of the new procurement rules - Reading - 18 03 2015 - Afternoon ...
 
CBO Peer Learning Event: Employment, housing & crime: Submitting a Developmen...
CBO Peer Learning Event: Employment, housing & crime: Submitting a Developmen...CBO Peer Learning Event: Employment, housing & crime: Submitting a Developmen...
CBO Peer Learning Event: Employment, housing & crime: Submitting a Developmen...
 
Procurement presentation Ace workshop - Cotonou
Procurement presentation Ace workshop - CotonouProcurement presentation Ace workshop - Cotonou
Procurement presentation Ace workshop - Cotonou
 
Conducting a Vendor Search
Conducting a Vendor SearchConducting a Vendor Search
Conducting a Vendor Search
 
Def presentatie procday sofia 220515
Def presentatie procday sofia 220515Def presentatie procday sofia 220515
Def presentatie procday sofia 220515
 
The future of quality assessment
The future of quality assessmentThe future of quality assessment
The future of quality assessment
 
3. Project Procurement Planning..pptx
3. Project Procurement Planning..pptx3. Project Procurement Planning..pptx
3. Project Procurement Planning..pptx
 
Overview Presentation - Procurement Directive, December 2021.pptx
Overview Presentation - Procurement Directive, December 2021.pptxOverview Presentation - Procurement Directive, December 2021.pptx
Overview Presentation - Procurement Directive, December 2021.pptx
 
00. Presentation QS0005.pptx
00. Presentation QS0005.pptx00. Presentation QS0005.pptx
00. Presentation QS0005.pptx
 
The Conflict-Free Sourcing Initiative - 7th Multi-Stakeholder Forum on Respon...
The Conflict-Free Sourcing Initiative - 7th Multi-Stakeholder Forum on Respon...The Conflict-Free Sourcing Initiative - 7th Multi-Stakeholder Forum on Respon...
The Conflict-Free Sourcing Initiative - 7th Multi-Stakeholder Forum on Respon...
 
Planning Performance Agreements use in Islington Council
Planning Performance Agreements use in Islington CouncilPlanning Performance Agreements use in Islington Council
Planning Performance Agreements use in Islington Council
 
PURCHASING - CONSOLIDATED.ppt
PURCHASING - CONSOLIDATED.pptPURCHASING - CONSOLIDATED.ppt
PURCHASING - CONSOLIDATED.ppt
 

Dernier

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesShubhangi Sonawane
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 

Dernier (20)

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 

Framework delivery from inception to launch. nov 2019

  • 1. Framework Delivery Pat Condon – Head of Procurement
  • 2. Objectives • To understand how a framework is constructed and delivered from inception through to launch • To understand what happens once a framework is launched
  • 3. Framework Delivery • Starts with stakeholder engagement which includes: • PAG • CPC Members • DfE • Tenet Educational Services • Joint Contracting Group
  • 4. Framework Delivery – Stakeholder Engagement • PAG Input • All Regional PAG meetings feed directly into the quarterly National PAG teleconference where CPC participate • The minutes of the National PAG meeting inform the CPC Board and CPC SMT • CPC Members • CPC receives requests from members asking for commodity areas to be considered for frameworks. Where these align to other stakeholders, they are considered • DfE • DfE are consulted on all new framework including input on specifications from their Academies and Schools Focus Group
  • 5. Framework Delivery Stakeholder Engagement • Tenet Educational Services • Tenet operate in 30+ Colleges across the UK • Tenet undertake numerous procurement exercises annually • Tenet feed into CPC on their client requirements • Joint Contracting Group • Consists of all HE regional consortia, TUCO, TEC, JISC and CPC • Where commodities align, one JCG member will deliver a framework for all members • Presently 28 CPC Frameworks are JCG led
  • 6. Framework Delivery Pre-Market Engagement • Pre-market engagement commences concurrently as stakeholder opinions and views are captured • Stage 1: Issue Prior Information Notice (PIN) if required • Informs the supply market of this forthcoming opportunity • Seeks to engage with the supply base to aid specification development • Informs CPC as to developments in the marketplace
  • 7. Framework Delivery Pre-market Engagement • Stage Two: Engage stakeholders • What do members want the framework to deliver? • What are members core requirements? • What quality requirements are necessary? • How do we build Social Value into the framework? • How important is cost to the member? • Encourage members to contribute to specification development • Identify challenges and difficulties that members may have in that area • Include other consortia input if relevant and appropriate
  • 8. Framework Delivery Specification Development • Stage 3: Specification Development • After all stakeholder input begin to draft specification • Consider Selection and award criteria based upon member and stakeholder requirements • Consider lotting structure • Split between Schools/Academies and FE/HE • Split across UK regions • Number of suppliers per lot • Share specification with all stakeholders for revision and fine tuning • Once review completed the ITT can be finalised
  • 9. Framework Delivery Contracting Process • Stage 4: Specification and ITT signed off • Stage 5: Contract Notice placed on TED and ITT issued to the marketplace via Sourcing Cloud using Open Procedure • During ITT respond to clarification request maintaining a register of all requests made • Following closure of ITT assess supplier responses and finalise assessment • Complete Award Letters and commence Standstill Period • Complete any supplier checks on documentation referred to within bid e.g. insurances, quality accreditations etc • Ensure that all contractual documentation has been signed correctly
  • 10. Framework Delivery Award Process • Stage 6: Once Standstill completed launch framework • Framework set up on CPC website and Sourcing Cloud • User Guide drafted to include: • Full details on the ITT and award criteria • A further competition template document • Full advice and guidance on using the framework • Framework launched to members and marketing commences through: • Newsletters • Social Media • Blogs • Partners
  • 11. Framework Delivery Award Process • Stage 7: Conduct Supplier Inductions • Suppliers informed about responding to member RFQs and ITTs • Suppliers informed about marketing and engagement • Commence contract management with suppliers • Commence member support through • Regional Procurement Advisors • Contract Managers • Helpdesk
  • 12. Process Template • Process Spreadsheet embedded below