Inmet’s Balboa Copper Gold Discovery
        June 1st, 2011 Webcast

“Balboa grades and copper gold ratios are
  getting significantly better at depth”
2
Colina
 Cobre Panama Resources 2010                                                                        Botija



                        Measured and Indicated
                        Resources*

                        Inferred
                        Resources*
            * from 2010 FEED report

                                                            Valle Grande

                                million      Cu      Au          Ag        Mo    Cu Eq      Cu           Au       Cu Eq
                                tonnes       (%)    (g/t)       (g/t)      (%)   (%)(a)   (b lbs)      (m ozs)   (b lbs)(a)
       Proven                    245         0.59   0.14        1.61    0.010    0.70      3.2           1.1        3.8
       Probable                  1,897       0.39   0.06        1.41    0.007    0.46      16.3          3.7       19.1
 Proven and probable*            2,143       0.41   0.07        1.43    0.008    0.49      19.5          4.8       23.1

                                million      Cu      Au          Ag        Mo    Cu Eq      Cu           Au       Cu Eq
                                tonnes       (%)    (g/t)       (g/t)      (%)    (%)     (b lbs)      (m ozs)    (b lbs)
      Measured                   261         0.56   0.13        1.5     0.009     0.67     3.2           1.1        3.8
       Indicated                 3,010       0.34   0.06        1.2     0.006     0.40     22.6          5.8       26.6
Measured and indicated           3,271       0.36   0.06        1.3     0.007     0.43     25.8          6.9       30.7
       Inferred                  3,194       0.24   0.04        1.0     0.005     0.29     16.9          4.1       20.2
Cu P+P Reserves   Cu Eq P+P Reserves


                                       4
5
Measured &




  BALBOA
DISCOVERY



            Second Crusher Site   Plant Site
                                               Botija Crusher Site




                                                                             6
Holes previously reported

                             New holes



0.95 % Cu and 0.43 g/t Au (1.3 % CuEq)(b)
over 200 m




2.32 % Cu and 2.28 g/t Au (3.9 % CuEq)(b)
over 124 m


                                                         7
W                                                                             0.39% Cu
                                                                              0.11 g/t Au
                                                                                                     0.26% Cu
                                                                                                     0.07 g/t Au
                                                                                                      -------------
                                                                                                                                    E
                                                                                                        221 m
                                                                               -------------
                                                                                 317 m

                                                            0.55% Cu
                                                            0.19 g/t Au
                     0.41% Cu              0.49% Cu          -------------                                            0.63% Cu
                     0.06 g/t Au           0.14 g/t Au         277 m                                                  0.24g/t Au
                      -------------         -------------                                         0.85% Cu               37 m
                        317 m                 313 m                                              0.26 g/t Au
                                                                                                    36 m


                                                                              0.92% Cu
1.41% Cu                                                                     0.40 g/t Au
1.29 g/t Au                                                                     113 m
 -------------
   222 m
                                       0.61% Cu
                                                             0.67% Cu
                                      0.11 g/t Au
                                                            0.21 g/t Au
                                         108 m
                                                               196m


                  2.32% Cu
                 2.28 g/t Au
                    124 m                                                                                                          > 0.50% Cu


                                              0                      200                       400                                 > 0.15% Cu

                                                                  metres

                                                                                                                                         8
S                                                                                                              N
                          0.45% Cu
                          0.04 g/t Au
                           -------------
    0.41% Cu                 455 m
    0.06 g/t Au                                          0.65% Cu
     -------------                                       0.26 g/t Au
       317 m                                              -------------
                                                            364 m
                                                                           0.30% Cu
                                                                           0.04 g/t Au
                                                                            -------------
                                                                              320 m
                                           0.58% Cu
                                           0.05 g/t Au
                     0.61% Cu                239 m
                     0.11 g/t Au
                       108 m




                                                                          0.95% Cu
                                                                          0.43 g/t Au
                                                                            200 m


                                                                                            0.54% Cu
                                                                                            0.09 g/t Au
                                                                                               32 m

                0               200                400                                                    > 0.50% Cu

                            metres                                                                        > 0.15% Cu
                                                                                                                   9
Intense stockworks




Classic A veins in porphyry   Bornite
                                        10
Contained      Contained      Contained
                Tonnes                                           (1)
Cu % Cutoff                    Cu %         Au g/t     Cu Eq %                Cu            Au            CuEq
               (millions)
                                                                       (billions lbs) (millions ozs) (billions lbs)
greater than
               500 to 600   0.40 to 0.50 0.15 to 0.19 0.50 to 0.60      4.4 to 6.6     2.4 to 3.6      5.5 to 8.2
    0.15

greater than
               300 to 360   0.55 to 0.65 0.20 to 0.30 0.70 to 0.85      3.6 to 5.4     2.1 to 3.2      4.5 to 6.7
    0.30

greater than
               130 to 170   0.80 to 1.00 0.40 to 0.50 1.00 to 1.30      2.4 to 3.6     1.8 to 2.7      3.0 to 5.0
    0.50



(1) Copper
         Equivalent calculated using US $2.25/lb Cu, US $1000/oz Au, US $13.50/lb Mo and US
$15.00/oz Ag and is not adjusted for metallurgical recoveries as these remain uncertain. The
formula used is as follows Cu Eq = Cu %+ (Au g/t x 0.65) + (Mo ppm / 1667) + (Ag g/t x 0.01)
(2) UnderNational Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-
101), these potential tonnage and grade estimates are conceptual in nature, as there has
been insufficient exploration to define a mineral resource, and it is uncertain if further
exploration will result in the targeted deposit being delineated as a mineral resource.
                                                                                                               11
Balboa Contour Plan Map
0.15% Cu cut-off
CuEq grade X thickness metres
                                12
Oyu Tolgoi                                   1.5
100 B lbs CuEq(c)                                km




Cobre Panama
  50+ B lbs
   CuEq(d)                                      1.5
Not including                                    km
                                   11 km
   Balboa

                    Hole CC11-10
     Pebble
160 B lbs CuEq(e)                               1.5
                                                 km



                                           13
14
Cu      Au
                                                  %       g/t

   First 10 year Feed in Current Mine Plan       0.55    0.11

0.30% Cu Cutoff Potential Mineralization Grade   0.60    0.25

                 Difference                      1.1 X   2.3 X




                                                                 15
16
17
18

Contenu connexe

Plus de Dogger2000

Plus de Dogger2000 (7)

Cobre Panama Basic Engineering & Financing Plan
Cobre Panama Basic Engineering & Financing PlanCobre Panama Basic Engineering & Financing Plan
Cobre Panama Basic Engineering & Financing Plan
 
Cobre Panama Basic Engineering Summary Report
Cobre Panama Basic Engineering Summary ReportCobre Panama Basic Engineering Summary Report
Cobre Panama Basic Engineering Summary Report
 
2012 Inmet Presentation
2012 Inmet Presentation2012 Inmet Presentation
2012 Inmet Presentation
 
Cobre Panama CR Commitment
Cobre Panama CR CommitmentCobre Panama CR Commitment
Cobre Panama CR Commitment
 
Inmet Presentation
Inmet PresentationInmet Presentation
Inmet Presentation
 
Proyecto Cobre Panama
Proyecto Cobre PanamaProyecto Cobre Panama
Proyecto Cobre Panama
 
2010 Feed Study - Cobre Panama Project
2010 Feed Study - Cobre Panama Project2010 Feed Study - Cobre Panama Project
2010 Feed Study - Cobre Panama Project
 

Dernier

MSc Ag Genetics & Plant Breeding: Insights from Previous Year JNKVV Entrance ...
MSc Ag Genetics & Plant Breeding: Insights from Previous Year JNKVV Entrance ...MSc Ag Genetics & Plant Breeding: Insights from Previous Year JNKVV Entrance ...
MSc Ag Genetics & Plant Breeding: Insights from Previous Year JNKVV Entrance ...
Krashi Coaching
 
The basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptxThe basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptx
heathfieldcps1
 

Dernier (20)

How To Create Editable Tree View in Odoo 17
How To Create Editable Tree View in Odoo 17How To Create Editable Tree View in Odoo 17
How To Create Editable Tree View in Odoo 17
 
Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...
 
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxAnalyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
 
MSc Ag Genetics & Plant Breeding: Insights from Previous Year JNKVV Entrance ...
MSc Ag Genetics & Plant Breeding: Insights from Previous Year JNKVV Entrance ...MSc Ag Genetics & Plant Breeding: Insights from Previous Year JNKVV Entrance ...
MSc Ag Genetics & Plant Breeding: Insights from Previous Year JNKVV Entrance ...
 
The Liver & Gallbladder (Anatomy & Physiology).pptx
The Liver &  Gallbladder (Anatomy & Physiology).pptxThe Liver &  Gallbladder (Anatomy & Physiology).pptx
The Liver & Gallbladder (Anatomy & Physiology).pptx
 
Graduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptxGraduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptx
 
demyelinated disorder: multiple sclerosis.pptx
demyelinated disorder: multiple sclerosis.pptxdemyelinated disorder: multiple sclerosis.pptx
demyelinated disorder: multiple sclerosis.pptx
 
Major project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategiesMajor project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategies
 
Mattingly "AI & Prompt Design: Named Entity Recognition"
Mattingly "AI & Prompt Design: Named Entity Recognition"Mattingly "AI & Prompt Design: Named Entity Recognition"
Mattingly "AI & Prompt Design: Named Entity Recognition"
 
An Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge AppAn Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge App
 
DEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUM
DEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUMDEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUM
DEMONSTRATION LESSON IN ENGLISH 4 MATATAG CURRICULUM
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
 
Đề tieng anh thpt 2024 danh cho cac ban hoc sinh
Đề tieng anh thpt 2024 danh cho cac ban hoc sinhĐề tieng anh thpt 2024 danh cho cac ban hoc sinh
Đề tieng anh thpt 2024 danh cho cac ban hoc sinh
 
Basic Civil Engineering notes on Transportation Engineering, Modes of Transpo...
Basic Civil Engineering notes on Transportation Engineering, Modes of Transpo...Basic Civil Engineering notes on Transportation Engineering, Modes of Transpo...
Basic Civil Engineering notes on Transportation Engineering, Modes of Transpo...
 
Including Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdfIncluding Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdf
 
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community PartnershipsSpring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
 
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
 
“O BEIJO” EM ARTE .
“O BEIJO” EM ARTE                       .“O BEIJO” EM ARTE                       .
“O BEIJO” EM ARTE .
 
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
 
The basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptxThe basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptx
 

Balboa Copper Gold Discovery in Panama - June 2011

  • 1. Inmet’s Balboa Copper Gold Discovery June 1st, 2011 Webcast “Balboa grades and copper gold ratios are getting significantly better at depth”
  • 2. 2
  • 3. Colina Cobre Panama Resources 2010 Botija Measured and Indicated Resources* Inferred Resources* * from 2010 FEED report Valle Grande million Cu Au Ag Mo Cu Eq Cu Au Cu Eq tonnes (%) (g/t) (g/t) (%) (%)(a) (b lbs) (m ozs) (b lbs)(a) Proven 245 0.59 0.14 1.61 0.010 0.70 3.2 1.1 3.8 Probable 1,897 0.39 0.06 1.41 0.007 0.46 16.3 3.7 19.1 Proven and probable* 2,143 0.41 0.07 1.43 0.008 0.49 19.5 4.8 23.1 million Cu Au Ag Mo Cu Eq Cu Au Cu Eq tonnes (%) (g/t) (g/t) (%) (%) (b lbs) (m ozs) (b lbs) Measured 261 0.56 0.13 1.5 0.009 0.67 3.2 1.1 3.8 Indicated 3,010 0.34 0.06 1.2 0.006 0.40 22.6 5.8 26.6 Measured and indicated 3,271 0.36 0.06 1.3 0.007 0.43 25.8 6.9 30.7 Inferred 3,194 0.24 0.04 1.0 0.005 0.29 16.9 4.1 20.2
  • 4. Cu P+P Reserves Cu Eq P+P Reserves 4
  • 5. 5
  • 6. Measured & BALBOA DISCOVERY Second Crusher Site Plant Site Botija Crusher Site 6
  • 7. Holes previously reported New holes 0.95 % Cu and 0.43 g/t Au (1.3 % CuEq)(b) over 200 m 2.32 % Cu and 2.28 g/t Au (3.9 % CuEq)(b) over 124 m 7
  • 8. W 0.39% Cu 0.11 g/t Au 0.26% Cu 0.07 g/t Au ------------- E 221 m ------------- 317 m 0.55% Cu 0.19 g/t Au 0.41% Cu 0.49% Cu ------------- 0.63% Cu 0.06 g/t Au 0.14 g/t Au 277 m 0.24g/t Au ------------- ------------- 0.85% Cu 37 m 317 m 313 m 0.26 g/t Au 36 m 0.92% Cu 1.41% Cu 0.40 g/t Au 1.29 g/t Au 113 m ------------- 222 m 0.61% Cu 0.67% Cu 0.11 g/t Au 0.21 g/t Au 108 m 196m 2.32% Cu 2.28 g/t Au 124 m > 0.50% Cu 0 200 400 > 0.15% Cu metres 8
  • 9. S N 0.45% Cu 0.04 g/t Au ------------- 0.41% Cu 455 m 0.06 g/t Au 0.65% Cu ------------- 0.26 g/t Au 317 m ------------- 364 m 0.30% Cu 0.04 g/t Au ------------- 320 m 0.58% Cu 0.05 g/t Au 0.61% Cu 239 m 0.11 g/t Au 108 m 0.95% Cu 0.43 g/t Au 200 m 0.54% Cu 0.09 g/t Au 32 m 0 200 400 > 0.50% Cu metres > 0.15% Cu 9
  • 10. Intense stockworks Classic A veins in porphyry Bornite 10
  • 11. Contained Contained Contained Tonnes (1) Cu % Cutoff Cu % Au g/t Cu Eq % Cu Au CuEq (millions) (billions lbs) (millions ozs) (billions lbs) greater than 500 to 600 0.40 to 0.50 0.15 to 0.19 0.50 to 0.60 4.4 to 6.6 2.4 to 3.6 5.5 to 8.2 0.15 greater than 300 to 360 0.55 to 0.65 0.20 to 0.30 0.70 to 0.85 3.6 to 5.4 2.1 to 3.2 4.5 to 6.7 0.30 greater than 130 to 170 0.80 to 1.00 0.40 to 0.50 1.00 to 1.30 2.4 to 3.6 1.8 to 2.7 3.0 to 5.0 0.50 (1) Copper Equivalent calculated using US $2.25/lb Cu, US $1000/oz Au, US $13.50/lb Mo and US $15.00/oz Ag and is not adjusted for metallurgical recoveries as these remain uncertain. The formula used is as follows Cu Eq = Cu %+ (Au g/t x 0.65) + (Mo ppm / 1667) + (Ag g/t x 0.01) (2) UnderNational Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43- 101), these potential tonnage and grade estimates are conceptual in nature, as there has been insufficient exploration to define a mineral resource, and it is uncertain if further exploration will result in the targeted deposit being delineated as a mineral resource. 11
  • 12. Balboa Contour Plan Map 0.15% Cu cut-off CuEq grade X thickness metres 12
  • 13. Oyu Tolgoi 1.5 100 B lbs CuEq(c) km Cobre Panama 50+ B lbs CuEq(d) 1.5 Not including km 11 km Balboa Hole CC11-10 Pebble 160 B lbs CuEq(e) 1.5 km 13
  • 14. 14
  • 15. Cu Au % g/t First 10 year Feed in Current Mine Plan 0.55 0.11 0.30% Cu Cutoff Potential Mineralization Grade 0.60 0.25 Difference 1.1 X 2.3 X 15
  • 16. 16
  • 17. 17
  • 18. 18