Project Quality
Project Quality
Management
Management
Project Quality
Project Quality
Management
Management
Quality is the Degree to WhichQuality is the Degree to Which
The Project Fulfill the RequirementsThe Project Fulfill the Requirements
Grade is the General Category or Classification of aGrade is the General Category or Classification of a
Deliverable or that Indicates Common Functions butDeliverable or that Indicates Common Functions but
Varying in Technical SpecificationsVarying in Technical Specifications
High accuracy, but low precisionHigh accuracy, but low precision High precision, but low accuracyHigh precision, but low accuracy
ACCURACY VS. PRECISIONACCURACY VS. PRECISION
PrecisionPrecision
Is a measure of exactness. For
example, the magnitude for each
increment on the measurement’s
number line is the interval that
determines the measurement’s
precision—the greater the number
of increments, the greater the
precision.
AccuracyAccuracy
Is an assessment of correctness.
For example, if the measured
value of an item is very close to the
true value of the characteristic
being measured, the measurement
is more accurate
MANAGE QUALITYVs. CONTROL QUALITYMANAGE QUALITYVs. CONTROL QUALITY
CONTROL QUALITYCONTROL QUALITY
Evaluating the ProjectEvaluating the Project
Deliverables against PlannedDeliverables against Planned
Metrics & StandardsMetrics & Standards
MANAGE QUALITYMANAGE QUALITY
Auditing Project WorksAuditing Project Works
Periodically as a part ofPeriodically as a part of
Executing Process to insureExecuting Process to insure
that Standards, Plans,that Standards, Plans,
Polices & Procedures arePolices & Procedures are
being Followed.being Followed.
QUALITYTHEORIESQUALITYTHEORIES
QUALITY PHILOSOPHIESQUALITY PHILOSOPHIES
ZERO DEFECTZERO DEFECT
is a concept created by Philip Crosby. Its basic foundation isis a concept created by Philip Crosby. Its basic foundation is
to do something right initially and you shouldn’t have toto do something right initially and you shouldn’t have to
repeat it.repeat it.
FITNESS FOR USEFITNESS FOR USE
The Fitness for Use concept was created by Joseph Juran. ItThe Fitness for Use concept was created by Joseph Juran. It
implies that the needs of the customers and Stakeholders areimplies that the needs of the customers and Stakeholders are
defined and then attempted to satisfy.defined and then attempted to satisfy.
CONTINOUS IMPROVEMENT (KAIZEN)CONTINOUS IMPROVEMENT (KAIZEN)
Continuous improvement takes a proactive stance toContinuous improvement takes a proactive stance to
development, one that makes improvements throughout adevelopment, one that makes improvements throughout a
process.process.
QUALITY IS NOT GOLD PLATINGQUALITY IS NOT GOLD PLATING
• Gold Plating is the practice of providing more than whatGold Plating is the practice of providing more than what
the customer requested. Per PMI®, this practice isthe customer requested. Per PMI®, this practice is
unacceptable and professionally irresponsible. The projectunacceptable and professionally irresponsible. The project
manager and team should provide only that which wasmanager and team should provide only that which was
approved.approved.
• Give your customers exactly what they ask for and whatGive your customers exactly what they ask for and what
they approve in the charter, no more or no less.they approve in the charter, no more or no less.
Other QualityTerms:TestingVs. InspectionOther QualityTerms:TestingVs. Inspection
• Inspection (Static)Inspection (Static)
– An inspection is the examination of a work product to determine if it conforms to documented
standards
– The results of an inspection generally include measurements and may be conducted at any level.
– For example, the results of a single activity can be inspected, or the final product of the project can be
inspected. Inspections may be called reviews, peer reviews, audits, or walkthroughs
– Inspections also are used to validate defect repairs
• Testing (Dynamic Operation)Testing (Dynamic Operation)
– Verifying that a Process allows to create a good product the first time.
– A Process, a Life Cycle Development has to be set up.
– Quality Gates allow to check that the process is effective.
Prevention is preferred over inspectionPrevention is preferred over inspection
• It is better to design qualitydesign quality into deliverables, rather than to find quality issuesfind quality issues
during inspection.
• The cost of preventingcost of preventing mistakes is generally much less than the cost of correcting
mistakes when they are found by inspection or during usage.
• Depending on the project and the industry area, the project team may need a working
knowledge of statistical control processes to evaluate data contained in the ControlControl
Quality outputsQuality outputs.
• The team should know the differences between the following pairs of terms:
• PreventionPrevention (keeping errors out of the process) and inspectioninspection (keeping errors out of
the hands of the customer);
• Attribute samplingAttribute sampling (the result either conforms or does not conform) and variable
sampling (the result is rated on a continuous scale that measures the degree of
conformity).
• TolerancesTolerances (specified range of acceptable results) and control limitscontrol limits (that identify the
boundaries of common variation in a statistically stable process or process
performance).
Prevention is preferred over inspectionPrevention is preferred over inspection
• COST OF QUALITYCOST OF QUALITY Organizations choose to invest in defect prevention because of
the benefits over the life of the product. Because projects are temporary, decisions about
the COQ over a product’s life cycle are often the concern of program management,
portfolio management, the PMO, or operations.
POPULATIONVs. SAMPLINGPOPULATIONVs. SAMPLING
• In populationpopulation testing every item created is tested (Ex: every airplane built).
• In sample testing you determine how much of something must be tested to ensure that
defects are caught.
• SampleSample testing would typically be done if you didn’t need to test everything, or if testing was
too costly or too destructive.
QUALITY RESPONSIBILITYQUALITY RESPONSIBILITY
RoleRole Level of ResponsibilityLevel of Responsibility ExampleExample
TeamTeam
member ormember or
workerworker
They are responsible for the
quality of their own work.
The electrician is
accountable to ensure that
work on the job is
satisfactory.
ProjectProject
ManagerManager
They are responsible for the
quality standards on the project.
The Project Manager is
responsible for the quality
on the networking project.
Senior/Senior/
ExecutiveExecutive
ManagementManagement
They are responsible for the
quality standards at the company.
The CEO and Senior
Management are responsible
for quality at the company.
Major Project Quality Management Process InterrelationsMajor Project Quality Management Process Interrelations
Plan Quality
Management
Manage
Quality
Project
Integration
Management
Control
Quality
To Other
Project
Processes
To Other
Project
ProcessesVerified Deliverables
- Quality Control
Measurements
- Work Performance
Information’s
- Test & Evaluate
Documents
- Quality Reports
- Deliverables
- Work Performance
Data
- Quality MP
- Quality Metrics Quality Reports
Quality Templates
from OPA
KEY CONCEPTS FOR PROJECT QUALITYKEY CONCEPTS FOR PROJECT QUALITY
MANAGEMENTMANAGEMENT
• Project Quality ManagementProject Quality Management addresses the management of the project and the
deliverables of the project. It applies to all projects, regardless of the nature of their
deliverables.
• Quality measures and techniquesQuality measures and techniques are specific to the type of deliverables being
produced by the project. For example, the project quality management of software
deliverables may use different approaches and measures from those used when building a
nuclear power plant. In either case, failure to meet the quality requirements can have
serious negative consequences for any or all of the project’s stakeholders. For example:
• Meeting customer requirementsMeeting customer requirements by overworking the project team may result in
decreased profits and increased levels of overall project risks, employee attrition, errors,
or rework.
• Meeting project schedule objectivesMeeting project schedule objectives by rushing planned quality inspections may
result in undetected errors, decreased profits, and increased post-implementation risks.
Tools & TechniquesTools & Techniques
Cost – Benefit AnalysisCost – Benefit Analysis
Cost Of QualityCost Of Quality
financial analysis tool used to estimate the strengths and weaknesses of
alternatives in order to determine the best alternative in terms of
benefits provided. A cost benefit analysis will help the project manager
determine if the planned quality activities are cost effective.The primary
benefits of meeting quality requirements include less rework, higher
productivity, lower costs, increased stakeholder satisfaction, and increased
profitability.A cost-benefit analysis for each quality activity compares the
cost of the quality step to the expected benefit.
Prevention costsPrevention costs. Costs related to the prevention of poor quality in
the products, deliverables, or services of the specific project.
Appraisal costsAppraisal costs. Costs related to evaluating, measuring, auditing, and
testing the products, deliverables, or services of the specific project.
Failure costs (internal/external)Failure costs (internal/external). Costs related to nonconformance
of the products, deliverables, or services to the needs or expectations of
the stakeholders.
Tools & TechniquesTools & Techniques
• Which are also referred to as process maps because they display the
sequence of steps and the branching possibilities that exist for a
process that transforms one or more inputs into one or more
outputs.
• Flowcharts show the activities, decision points, branching loops,
parallel paths, and the overall order of processing by mapping the
operational details of procedures that exist within a horizontal value
chain.
• One version of a value chain, known as a SIPOCSIPOC (suppliers, inputs,
process, outputs, and customers) model
Flowcharts
SIPOCSIPOC was in use at least as
early as the total quality
management programs of the
late 1980s and continues to
be used today in Six
Sigma, lean manufacturing,
and business process
management.
Tools & TechniquesTools & Techniques
• Are a visual representation of an organization’s data, described in
business language and independent of any specific technology.The
logical data model can be used to identify where data integrity or
other quality issues can arise.
Logical Data Model
Tools & TechniquesTools & Techniques
• Matrix diagramsMatrix diagrams help find the strength of relationships among different factors, causes, and
objectives that exist between the rows and columns that form the matrix.
• Depending on how many factors may be compared, the project manager can use different shapes of
matrix diagrams.
• For exemple, L,T,Y, X, CL,T,Y, X, C, and roof–shapedroof–shaped. In this process they facilitate identifying the key quality
metrics that are important for the success of the project.
Matrix Diagraming
• An L–shapedAn L–shaped matrix relates two groups of items to each other (or one group to itself).
• A T–shaped matrixA T–shaped matrix relates three groups of items: groups B and C are each related to A. Groups B
and C are not related to each other.
• A Y–shaped matrixA Y–shaped matrix relates three groups of items. Each group is related to the other two in a
circular fashion.
• A C–shaped matrixA C–shaped matrix relates three groups of items all together simultaneously, in 3-D.
• An X–shaped matrixAn X–shaped matrix relates four groups of items. Each group is related to two others in a circular
fashion.
• A roof–shaped matrixA roof–shaped matrix relates one group of items to itself. It is usually used along with an L – or
T–shaped matrix.
Tools & TechniquesTools & Techniques
Matrix Diagraming
Tools & TechniquesTools & Techniques
Data GatheringData Gathering
ChecklistChecklist
Decision Making
Root Cause Analysis (RCA)Root Cause Analysis (RCA)Root Cause Analysis (RCA)Root Cause Analysis (RCA)
Data AnalysisData Analysis
Alternative AnalysisAlternative Analysis
Documents AnalysisDocuments Analysis
Process AnalysisProcess Analysis
MultiCriteria Decision Analysis
Data Representation
Affinity Diagram
Cause – Effect Diagram
Flowcharts Histograms
Matrix
Diagrams
Scatter
Diagrams
AuditsAudits Designs for XDesigns for X
Problem SolvingProblem Solving
Quality Improvement MethodsQuality Improvement Methods
Root cause analysis is an analytical
technique used to determine the basic
underlying reason that causes a variance,
defect, or risk. A root cause may underlie
more than one variance, defect, or risk. It
may also be used as a technique for
identifying root causes of a problem and
solving them. When all root causes for a
problem are removed, the problem does
not recur.
Root cause analysis is an analytical
technique used to determine the basic
underlying reason that causes a variance,
defect, or risk. A root cause may underlie
more than one variance, defect, or risk. It
may also be used as a technique for
identifying root causes of a problem and
solving them. When all root causes for a
problem are removed, the problem does
not recur.
Which are also known as fishbone diagrams
or as Ishikawa diagrams. The problem
statement placed at the head of the
fishbone is used as a starting point to trace
the problem’s source back to its actionable
root cause
Flowcharts, which are also referred to as
process maps because they display the
sequence of steps and the branching
possibilities that exist for a process that
transforms one or more inputs into one or
more outputs.
Tools & TechniquesTools & Techniques
Data GatheringData Gathering
ChecklistChecklist
Decision Making
Root Cause Analysis (RCA)Root Cause Analysis (RCA)Root Cause Analysis (RCA)Root Cause Analysis (RCA)
Data AnalysisData Analysis
Alternative AnalysisAlternative Analysis
Documents AnalysisDocuments Analysis
Process AnalysisProcess Analysis
MultiCriteria Decision Analysis
Data Representation
Affinity Diagram
Cause – Effect Diagram
Flowcharts Histograms
Matrix
Diagrams
Scatter
Diagrams
AuditsAudits Designs for XDesigns for X
Problem SolvingProblem Solving
Quality Improvement MethodsQuality Improvement Methods
are a special form of bar chart and are used
to describe the central tendency,
dispersion, and shape of a statistical
distribution. Histograms show a graphical
representation of numerical data.
Histograms can show the number of defects
per deliverable, a ranking of the cause of
defects, the number of times each process
is noncompliant, or other representations
of project or product defects.
It allows the Quality team to study and
identify the possible relationship between
two variables. The direction of correlation
may be proportional (positive correlation),
inverse (negative correlation), or a pattern
of correlation may not exist (zero
correlation).
• Example: if Quality of wood changes,
so does the strength of doors
•Helps to see a correlation (or lack of)
between variables.
•The closer the output resembles a diagonal
line, the more dependent the variables are
•The less it resembles a diagonal line, the
more independent the variables are.
A set of technical guidelines that may be applied during the design of a product for the
optimization of a specific aspect of the design. DfX can control or even improve the product’s final
characteristics. The X in DfX can be different aspects of product development, such as reliability,
deployment, assembly, manufacturing, cost, service, usability, safety, and quality. Using the DfX
may result in cost reduction, quality improvement, better performance, and customer satisfaction.
A set of technical guidelines that may be applied during the design of a product for the
optimization of a specific aspect of the design. DfX can control or even improve the product’s final
characteristics. The X in DfX can be different aspects of product development, such as reliability,
deployment, assembly, manufacturing, cost, service, usability, safety, and quality. Using the DfX
may result in cost reduction, quality improvement, better performance, and customer satisfaction.
Pareto DiagramPareto DiagramTools & TechniquesTools & Techniques
The general rule with a Pareto diagram is the
80/20 rule, meaning that 80% of the problems
come from 20% of the issues.
The general rule with a Pareto diagram is the
80/20 rule, meaning that 80% of the problems
come from 20% of the issues.
• Control charts, are used to determine whether or not a process is stable or has predictable performance
– Upper and lower specification limits
– Upper and lower control limits
– The project manager and appropriate stakeholders may use the statistically calculated control limits to identify
the points at which corrective action will be taken to prevent unnatural performance.
• A process is considered out of control when:
– A data point exceeds a control limit
– Seven consecutive plot points are above the mean
– Seven consecutive plot points are below the mean
• Control charts, are used to determine whether or not a process is stable or has predictable performance
– Upper and lower specification limits
– Upper and lower control limits
– The project manager and appropriate stakeholders may use the statistically calculated control limits to identify
the points at which corrective action will be taken to prevent unnatural performance.
• A process is considered out of control when:
– A data point exceeds a control limit
– Seven consecutive plot points are above the mean
– Seven consecutive plot points are below the mean
CONTROL CHARTSCONTROL CHARTSTools & TechniquesTools & Techniques
CHECK SHEETSCHECK SHEETSTools & TechniquesTools & Techniques
• Check sheets, which are also known as tally sheets and may be used as a checklist when gathering data.
Check sheets are used to organize facts in a manner that will facilitate the effective collection of useful data
about a potential quality problem.
• Check sheets, which are also known as tally sheets and may be used as a checklist when gathering data.
Check sheets are used to organize facts in a manner that will facilitate the effective collection of useful data
about a potential quality problem.
• Histograms, are a special form of bar chart and are used to describe the central tendency, dispersion,
and shape of a statistical distribution. Unlike the control chart, the histogram does not consider the
influence of time on the variation that exists within a distribution.
• Histograms, are a special form of bar chart and are used to describe the central tendency, dispersion,
and shape of a statistical distribution. Unlike the control chart, the histogram does not consider the
influence of time on the variation that exists within a distribution.
HISTOGRAMSHISTOGRAMSTools & TechniquesTools & Techniques
Introduction to quality management

Contenu connexe

Tendances

Business Success Through VA/VE
Business Success Through VA/VEBusiness Success Through VA/VE
Business Success Through VA/VE
gojo67
 

Tendances (20)

Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management Fundamentals
 
DMAIC Vs. DMADV
DMAIC Vs. DMADVDMAIC Vs. DMADV
DMAIC Vs. DMADV
 
Agile vs Traditional Project Management
Agile vs Traditional Project ManagementAgile vs Traditional Project Management
Agile vs Traditional Project Management
 
Agile Project management
Agile Project managementAgile Project management
Agile Project management
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Project Execution
Project ExecutionProject Execution
Project Execution
 
Lean Software Development
Lean Software Development Lean Software Development
Lean Software Development
 
Project Management 4 Schedule Management
Project Management 4 Schedule ManagementProject Management 4 Schedule Management
Project Management 4 Schedule Management
 
Project Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge AreasProject Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge Areas
 
LEAN: Understanding the Process Decision Program Chart (Quality Tools Series ...
LEAN: Understanding the Process Decision Program Chart (Quality Tools Series ...LEAN: Understanding the Process Decision Program Chart (Quality Tools Series ...
LEAN: Understanding the Process Decision Program Chart (Quality Tools Series ...
 
Project Management Steps
Project Management StepsProject Management Steps
Project Management Steps
 
Project management [module 1]
Project management [module 1]Project management [module 1]
Project management [module 1]
 
Earned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project ControlEarned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project Control
 
APQP
APQPAPQP
APQP
 
Project Execution PowerPoint Presentation Slides
Project Execution PowerPoint Presentation SlidesProject Execution PowerPoint Presentation Slides
Project Execution PowerPoint Presentation Slides
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
Business Success Through VA/VE
Business Success Through VA/VEBusiness Success Through VA/VE
Business Success Through VA/VE
 
Project Scope Management - PMBOK6
Project Scope Management - PMBOK6Project Scope Management - PMBOK6
Project Scope Management - PMBOK6
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management Fundamentals
 
Meeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance StandardsMeeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance Standards
 

Similaire à Introduction to quality management

Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Management
mzedan
 
Quality Principals and its application to project management
Quality Principals and its application to project managementQuality Principals and its application to project management
Quality Principals and its application to project management
Gaurav Pathak
 

Similaire à Introduction to quality management (20)

Quality Software
Quality SoftwareQuality Software
Quality Software
 
PROJECT QUALITY KNOLEDGE AREA.ppt
PROJECT QUALITY KNOLEDGE    AREA.pptPROJECT QUALITY KNOLEDGE    AREA.ppt
PROJECT QUALITY KNOLEDGE AREA.ppt
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
JF608: Quality Control - Unit 2
JF608: Quality Control - Unit 2JF608: Quality Control - Unit 2
JF608: Quality Control - Unit 2
 
stfbegn.ppt
stfbegn.pptstfbegn.ppt
stfbegn.ppt
 
Software testing for beginners
Software testing for beginners Software testing for beginners
Software testing for beginners
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Management
 
Quality concepts
Quality conceptsQuality concepts
Quality concepts
 
Quality Assurance and Quality Control
Quality Assurance and Quality ControlQuality Assurance and Quality Control
Quality Assurance and Quality Control
 
Quality - A Priority In Service Engagements
Quality - A Priority In Service EngagementsQuality - A Priority In Service Engagements
Quality - A Priority In Service Engagements
 
5. project quality management
5. project quality management5. project quality management
5. project quality management
 
Project Quality Management powerpoint
Project Quality Management powerpointProject Quality Management powerpoint
Project Quality Management powerpoint
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Management
 
presentation on continuous process improvement,juran trilogy and strategies i...
presentation on continuous process improvement,juran trilogy and strategies i...presentation on continuous process improvement,juran trilogy and strategies i...
presentation on continuous process improvement,juran trilogy and strategies i...
 
Quality control and quality assurance
Quality control and quality assuranceQuality control and quality assurance
Quality control and quality assurance
 
Quality Management and Statistical Process Control
Quality Management and Statistical Process ControlQuality Management and Statistical Process Control
Quality Management and Statistical Process Control
 
Quality Principals and its application to project management
Quality Principals and its application to project managementQuality Principals and its application to project management
Quality Principals and its application to project management
 
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
 
4S Akademi - QAI - Software Testing Principles and Concepts
4S Akademi - QAI - Software Testing Principles and Concepts4S Akademi - QAI - Software Testing Principles and Concepts
4S Akademi - QAI - Software Testing Principles and Concepts
 

Plus de Essam Lotffy, PMP®, CCP®

Plus de Essam Lotffy, PMP®, CCP® (18)

Common contract types
Common contract typesCommon contract types
Common contract types
 
Pmp selective process data flow
Pmp selective process data flowPmp selective process data flow
Pmp selective process data flow
 
Introduction to schedule management
Introduction to schedule managementIntroduction to schedule management
Introduction to schedule management
 
PMBoK6Ed.lect1.introduction
PMBoK6Ed.lect1.introductionPMBoK6Ed.lect1.introduction
PMBoK6Ed.lect1.introduction
 
Sample cosntructability report Template
Sample cosntructability report Template Sample cosntructability report Template
Sample cosntructability report Template
 
Introduction to cost management & control in construction projects
Introduction to cost management & control in construction projectsIntroduction to cost management & control in construction projects
Introduction to cost management & control in construction projects
 
Essam lotffy this project is not in line with organizational strategic plans
Essam lotffy   this project is not in line with organizational strategic plansEssam lotffy   this project is not in line with organizational strategic plans
Essam lotffy this project is not in line with organizational strategic plans
 
Controling productivity in construction projects
Controling productivity in construction projectsControling productivity in construction projects
Controling productivity in construction projects
 
Fidic contracts management introduction
Fidic contracts management introductionFidic contracts management introduction
Fidic contracts management introduction
 
Pmp introduction
Pmp introductionPmp introduction
Pmp introduction
 
Pmp introduction
Pmp introductionPmp introduction
Pmp introduction
 
Failure in construction due to ineffective project management information.final
Failure in construction due to ineffective project management information.finalFailure in construction due to ineffective project management information.final
Failure in construction due to ineffective project management information.final
 
Eot claims due to scope change under fidic contracts
Eot claims due to scope change under fidic contractsEot claims due to scope change under fidic contracts
Eot claims due to scope change under fidic contracts
 
Labor productivity improvement in construction projects using wbs obs integra...
Labor productivity improvement in construction projects using wbs obs integra...Labor productivity improvement in construction projects using wbs obs integra...
Labor productivity improvement in construction projects using wbs obs integra...
 
Failures in construction due to ineffective project management information sy...
Failures in construction due to ineffective project management information sy...Failures in construction due to ineffective project management information sy...
Failures in construction due to ineffective project management information sy...
 
Evm.calculations.Summary sheet
Evm.calculations.Summary sheetEvm.calculations.Summary sheet
Evm.calculations.Summary sheet
 
Effect of organizational unwritten rules on pmo success
Effect of organizational unwritten rules on pmo successEffect of organizational unwritten rules on pmo success
Effect of organizational unwritten rules on pmo success
 
A simple example to calculate net present value and pay back period
A simple example to calculate net present value and pay back period A simple example to calculate net present value and pay back period
A simple example to calculate net present value and pay back period
 

Dernier

1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 

Dernier (20)

Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptx
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 

Introduction to quality management

  • 1. Project Quality Project Quality Management Management Project Quality Project Quality Management Management
  • 2. Quality is the Degree to WhichQuality is the Degree to Which The Project Fulfill the RequirementsThe Project Fulfill the Requirements Grade is the General Category or Classification of aGrade is the General Category or Classification of a Deliverable or that Indicates Common Functions butDeliverable or that Indicates Common Functions but Varying in Technical SpecificationsVarying in Technical Specifications
  • 3. High accuracy, but low precisionHigh accuracy, but low precision High precision, but low accuracyHigh precision, but low accuracy ACCURACY VS. PRECISIONACCURACY VS. PRECISION PrecisionPrecision Is a measure of exactness. For example, the magnitude for each increment on the measurement’s number line is the interval that determines the measurement’s precision—the greater the number of increments, the greater the precision. AccuracyAccuracy Is an assessment of correctness. For example, if the measured value of an item is very close to the true value of the characteristic being measured, the measurement is more accurate
  • 4. MANAGE QUALITYVs. CONTROL QUALITYMANAGE QUALITYVs. CONTROL QUALITY CONTROL QUALITYCONTROL QUALITY Evaluating the ProjectEvaluating the Project Deliverables against PlannedDeliverables against Planned Metrics & StandardsMetrics & Standards MANAGE QUALITYMANAGE QUALITY Auditing Project WorksAuditing Project Works Periodically as a part ofPeriodically as a part of Executing Process to insureExecuting Process to insure that Standards, Plans,that Standards, Plans, Polices & Procedures arePolices & Procedures are being Followed.being Followed.
  • 6. QUALITY PHILOSOPHIESQUALITY PHILOSOPHIES ZERO DEFECTZERO DEFECT is a concept created by Philip Crosby. Its basic foundation isis a concept created by Philip Crosby. Its basic foundation is to do something right initially and you shouldn’t have toto do something right initially and you shouldn’t have to repeat it.repeat it. FITNESS FOR USEFITNESS FOR USE The Fitness for Use concept was created by Joseph Juran. ItThe Fitness for Use concept was created by Joseph Juran. It implies that the needs of the customers and Stakeholders areimplies that the needs of the customers and Stakeholders are defined and then attempted to satisfy.defined and then attempted to satisfy. CONTINOUS IMPROVEMENT (KAIZEN)CONTINOUS IMPROVEMENT (KAIZEN) Continuous improvement takes a proactive stance toContinuous improvement takes a proactive stance to development, one that makes improvements throughout adevelopment, one that makes improvements throughout a process.process.
  • 7. QUALITY IS NOT GOLD PLATINGQUALITY IS NOT GOLD PLATING • Gold Plating is the practice of providing more than whatGold Plating is the practice of providing more than what the customer requested. Per PMI®, this practice isthe customer requested. Per PMI®, this practice is unacceptable and professionally irresponsible. The projectunacceptable and professionally irresponsible. The project manager and team should provide only that which wasmanager and team should provide only that which was approved.approved. • Give your customers exactly what they ask for and whatGive your customers exactly what they ask for and what they approve in the charter, no more or no less.they approve in the charter, no more or no less.
  • 8. Other QualityTerms:TestingVs. InspectionOther QualityTerms:TestingVs. Inspection • Inspection (Static)Inspection (Static) – An inspection is the examination of a work product to determine if it conforms to documented standards – The results of an inspection generally include measurements and may be conducted at any level. – For example, the results of a single activity can be inspected, or the final product of the project can be inspected. Inspections may be called reviews, peer reviews, audits, or walkthroughs – Inspections also are used to validate defect repairs • Testing (Dynamic Operation)Testing (Dynamic Operation) – Verifying that a Process allows to create a good product the first time. – A Process, a Life Cycle Development has to be set up. – Quality Gates allow to check that the process is effective.
  • 9. Prevention is preferred over inspectionPrevention is preferred over inspection • It is better to design qualitydesign quality into deliverables, rather than to find quality issuesfind quality issues during inspection. • The cost of preventingcost of preventing mistakes is generally much less than the cost of correcting mistakes when they are found by inspection or during usage. • Depending on the project and the industry area, the project team may need a working knowledge of statistical control processes to evaluate data contained in the ControlControl Quality outputsQuality outputs. • The team should know the differences between the following pairs of terms: • PreventionPrevention (keeping errors out of the process) and inspectioninspection (keeping errors out of the hands of the customer); • Attribute samplingAttribute sampling (the result either conforms or does not conform) and variable sampling (the result is rated on a continuous scale that measures the degree of conformity). • TolerancesTolerances (specified range of acceptable results) and control limitscontrol limits (that identify the boundaries of common variation in a statistically stable process or process performance).
  • 10. Prevention is preferred over inspectionPrevention is preferred over inspection • COST OF QUALITYCOST OF QUALITY Organizations choose to invest in defect prevention because of the benefits over the life of the product. Because projects are temporary, decisions about the COQ over a product’s life cycle are often the concern of program management, portfolio management, the PMO, or operations.
  • 11. POPULATIONVs. SAMPLINGPOPULATIONVs. SAMPLING • In populationpopulation testing every item created is tested (Ex: every airplane built). • In sample testing you determine how much of something must be tested to ensure that defects are caught. • SampleSample testing would typically be done if you didn’t need to test everything, or if testing was too costly or too destructive.
  • 12. QUALITY RESPONSIBILITYQUALITY RESPONSIBILITY RoleRole Level of ResponsibilityLevel of Responsibility ExampleExample TeamTeam member ormember or workerworker They are responsible for the quality of their own work. The electrician is accountable to ensure that work on the job is satisfactory. ProjectProject ManagerManager They are responsible for the quality standards on the project. The Project Manager is responsible for the quality on the networking project. Senior/Senior/ ExecutiveExecutive ManagementManagement They are responsible for the quality standards at the company. The CEO and Senior Management are responsible for quality at the company.
  • 13. Major Project Quality Management Process InterrelationsMajor Project Quality Management Process Interrelations Plan Quality Management Manage Quality Project Integration Management Control Quality To Other Project Processes To Other Project ProcessesVerified Deliverables - Quality Control Measurements - Work Performance Information’s - Test & Evaluate Documents - Quality Reports - Deliverables - Work Performance Data - Quality MP - Quality Metrics Quality Reports Quality Templates from OPA
  • 14. KEY CONCEPTS FOR PROJECT QUALITYKEY CONCEPTS FOR PROJECT QUALITY MANAGEMENTMANAGEMENT • Project Quality ManagementProject Quality Management addresses the management of the project and the deliverables of the project. It applies to all projects, regardless of the nature of their deliverables. • Quality measures and techniquesQuality measures and techniques are specific to the type of deliverables being produced by the project. For example, the project quality management of software deliverables may use different approaches and measures from those used when building a nuclear power plant. In either case, failure to meet the quality requirements can have serious negative consequences for any or all of the project’s stakeholders. For example: • Meeting customer requirementsMeeting customer requirements by overworking the project team may result in decreased profits and increased levels of overall project risks, employee attrition, errors, or rework. • Meeting project schedule objectivesMeeting project schedule objectives by rushing planned quality inspections may result in undetected errors, decreased profits, and increased post-implementation risks.
  • 15. Tools & TechniquesTools & Techniques Cost – Benefit AnalysisCost – Benefit Analysis Cost Of QualityCost Of Quality financial analysis tool used to estimate the strengths and weaknesses of alternatives in order to determine the best alternative in terms of benefits provided. A cost benefit analysis will help the project manager determine if the planned quality activities are cost effective.The primary benefits of meeting quality requirements include less rework, higher productivity, lower costs, increased stakeholder satisfaction, and increased profitability.A cost-benefit analysis for each quality activity compares the cost of the quality step to the expected benefit. Prevention costsPrevention costs. Costs related to the prevention of poor quality in the products, deliverables, or services of the specific project. Appraisal costsAppraisal costs. Costs related to evaluating, measuring, auditing, and testing the products, deliverables, or services of the specific project. Failure costs (internal/external)Failure costs (internal/external). Costs related to nonconformance of the products, deliverables, or services to the needs or expectations of the stakeholders.
  • 16. Tools & TechniquesTools & Techniques • Which are also referred to as process maps because they display the sequence of steps and the branching possibilities that exist for a process that transforms one or more inputs into one or more outputs. • Flowcharts show the activities, decision points, branching loops, parallel paths, and the overall order of processing by mapping the operational details of procedures that exist within a horizontal value chain. • One version of a value chain, known as a SIPOCSIPOC (suppliers, inputs, process, outputs, and customers) model Flowcharts SIPOCSIPOC was in use at least as early as the total quality management programs of the late 1980s and continues to be used today in Six Sigma, lean manufacturing, and business process management.
  • 17. Tools & TechniquesTools & Techniques • Are a visual representation of an organization’s data, described in business language and independent of any specific technology.The logical data model can be used to identify where data integrity or other quality issues can arise. Logical Data Model
  • 18. Tools & TechniquesTools & Techniques • Matrix diagramsMatrix diagrams help find the strength of relationships among different factors, causes, and objectives that exist between the rows and columns that form the matrix. • Depending on how many factors may be compared, the project manager can use different shapes of matrix diagrams. • For exemple, L,T,Y, X, CL,T,Y, X, C, and roof–shapedroof–shaped. In this process they facilitate identifying the key quality metrics that are important for the success of the project. Matrix Diagraming • An L–shapedAn L–shaped matrix relates two groups of items to each other (or one group to itself). • A T–shaped matrixA T–shaped matrix relates three groups of items: groups B and C are each related to A. Groups B and C are not related to each other. • A Y–shaped matrixA Y–shaped matrix relates three groups of items. Each group is related to the other two in a circular fashion. • A C–shaped matrixA C–shaped matrix relates three groups of items all together simultaneously, in 3-D. • An X–shaped matrixAn X–shaped matrix relates four groups of items. Each group is related to two others in a circular fashion. • A roof–shaped matrixA roof–shaped matrix relates one group of items to itself. It is usually used along with an L – or T–shaped matrix.
  • 19. Tools & TechniquesTools & Techniques Matrix Diagraming
  • 20. Tools & TechniquesTools & Techniques Data GatheringData Gathering ChecklistChecklist Decision Making Root Cause Analysis (RCA)Root Cause Analysis (RCA)Root Cause Analysis (RCA)Root Cause Analysis (RCA) Data AnalysisData Analysis Alternative AnalysisAlternative Analysis Documents AnalysisDocuments Analysis Process AnalysisProcess Analysis MultiCriteria Decision Analysis Data Representation Affinity Diagram Cause – Effect Diagram Flowcharts Histograms Matrix Diagrams Scatter Diagrams AuditsAudits Designs for XDesigns for X Problem SolvingProblem Solving Quality Improvement MethodsQuality Improvement Methods Root cause analysis is an analytical technique used to determine the basic underlying reason that causes a variance, defect, or risk. A root cause may underlie more than one variance, defect, or risk. It may also be used as a technique for identifying root causes of a problem and solving them. When all root causes for a problem are removed, the problem does not recur. Root cause analysis is an analytical technique used to determine the basic underlying reason that causes a variance, defect, or risk. A root cause may underlie more than one variance, defect, or risk. It may also be used as a technique for identifying root causes of a problem and solving them. When all root causes for a problem are removed, the problem does not recur. Which are also known as fishbone diagrams or as Ishikawa diagrams. The problem statement placed at the head of the fishbone is used as a starting point to trace the problem’s source back to its actionable root cause Flowcharts, which are also referred to as process maps because they display the sequence of steps and the branching possibilities that exist for a process that transforms one or more inputs into one or more outputs.
  • 21. Tools & TechniquesTools & Techniques Data GatheringData Gathering ChecklistChecklist Decision Making Root Cause Analysis (RCA)Root Cause Analysis (RCA)Root Cause Analysis (RCA)Root Cause Analysis (RCA) Data AnalysisData Analysis Alternative AnalysisAlternative Analysis Documents AnalysisDocuments Analysis Process AnalysisProcess Analysis MultiCriteria Decision Analysis Data Representation Affinity Diagram Cause – Effect Diagram Flowcharts Histograms Matrix Diagrams Scatter Diagrams AuditsAudits Designs for XDesigns for X Problem SolvingProblem Solving Quality Improvement MethodsQuality Improvement Methods are a special form of bar chart and are used to describe the central tendency, dispersion, and shape of a statistical distribution. Histograms show a graphical representation of numerical data. Histograms can show the number of defects per deliverable, a ranking of the cause of defects, the number of times each process is noncompliant, or other representations of project or product defects. It allows the Quality team to study and identify the possible relationship between two variables. The direction of correlation may be proportional (positive correlation), inverse (negative correlation), or a pattern of correlation may not exist (zero correlation). • Example: if Quality of wood changes, so does the strength of doors •Helps to see a correlation (or lack of) between variables. •The closer the output resembles a diagonal line, the more dependent the variables are •The less it resembles a diagonal line, the more independent the variables are. A set of technical guidelines that may be applied during the design of a product for the optimization of a specific aspect of the design. DfX can control or even improve the product’s final characteristics. The X in DfX can be different aspects of product development, such as reliability, deployment, assembly, manufacturing, cost, service, usability, safety, and quality. Using the DfX may result in cost reduction, quality improvement, better performance, and customer satisfaction. A set of technical guidelines that may be applied during the design of a product for the optimization of a specific aspect of the design. DfX can control or even improve the product’s final characteristics. The X in DfX can be different aspects of product development, such as reliability, deployment, assembly, manufacturing, cost, service, usability, safety, and quality. Using the DfX may result in cost reduction, quality improvement, better performance, and customer satisfaction.
  • 22. Pareto DiagramPareto DiagramTools & TechniquesTools & Techniques The general rule with a Pareto diagram is the 80/20 rule, meaning that 80% of the problems come from 20% of the issues. The general rule with a Pareto diagram is the 80/20 rule, meaning that 80% of the problems come from 20% of the issues.
  • 23. • Control charts, are used to determine whether or not a process is stable or has predictable performance – Upper and lower specification limits – Upper and lower control limits – The project manager and appropriate stakeholders may use the statistically calculated control limits to identify the points at which corrective action will be taken to prevent unnatural performance. • A process is considered out of control when: – A data point exceeds a control limit – Seven consecutive plot points are above the mean – Seven consecutive plot points are below the mean • Control charts, are used to determine whether or not a process is stable or has predictable performance – Upper and lower specification limits – Upper and lower control limits – The project manager and appropriate stakeholders may use the statistically calculated control limits to identify the points at which corrective action will be taken to prevent unnatural performance. • A process is considered out of control when: – A data point exceeds a control limit – Seven consecutive plot points are above the mean – Seven consecutive plot points are below the mean CONTROL CHARTSCONTROL CHARTSTools & TechniquesTools & Techniques
  • 24. CHECK SHEETSCHECK SHEETSTools & TechniquesTools & Techniques • Check sheets, which are also known as tally sheets and may be used as a checklist when gathering data. Check sheets are used to organize facts in a manner that will facilitate the effective collection of useful data about a potential quality problem. • Check sheets, which are also known as tally sheets and may be used as a checklist when gathering data. Check sheets are used to organize facts in a manner that will facilitate the effective collection of useful data about a potential quality problem.
  • 25. • Histograms, are a special form of bar chart and are used to describe the central tendency, dispersion, and shape of a statistical distribution. Unlike the control chart, the histogram does not consider the influence of time on the variation that exists within a distribution. • Histograms, are a special form of bar chart and are used to describe the central tendency, dispersion, and shape of a statistical distribution. Unlike the control chart, the histogram does not consider the influence of time on the variation that exists within a distribution. HISTOGRAMSHISTOGRAMSTools & TechniquesTools & Techniques