SlideShare une entreprise Scribd logo
1  sur  32
Why projects fail?
July 26, 2014
Why projects fail?
2
3
Project success factors
1. Meet an agreed budget (Cost)
2. Deliver on time (Time)
3. Meet quality requirements (Quality)
4. Meet the project's objectives/requirements (Scope)
4
What projects are considered successful?
Long story short – successful project is the one meeting stakeholder’ expectations
5
Reason 1: Insufficient stakeholders management
Common mistakes:
1. Not all the project stakeholders are identified
2. Stakeholders are not analyzed from the perspective of their influence and interest in the
project
3. Failure to view the project through the eyes of the project stakeholders, as the result no
accurate understanding how the project will impact the stakeholders or how they will
react to the project’s results
4. Failure to identify and meet the needs of all stakeholders, allowing one stakeholder
group to dominate the project while completely ignoring the needs of other groups
5. Failure to establish effective communication channels between different stakeholders
6
Who are your stakeholders?
7
Stakeholders Management
1. Identify Stakeholders – identifying everyone affected by the work or its outcomes
2. Plan Stakeholder Management – deciding how you will engage with the stakeholders
3. Manage Stakeholder Engagement – communicating with stakeholders and ensuring
appropriate stakeholder engagement
4. Control Stakeholder Engagement – monitoring the overall relationships and adjusting
your strategies and plans as needed
8
Stakeholders influence on the project
9
Reason 2: Inefficient communication
10
Common mistakes:
1. No time is spent on development of a communication plan
2. No identified and approved escalation boundaries and related rules (when and to whom
to escalate issues)
3. Roles and responsibilities are not identified or are not clearly communicated to all the
stakeholders
4. Priorities of different communication channels are not identified (when to email, to call, to
use Skype, etc.)
5. No records for oral communication (no meeting minutes)
6. National specifics and corporate culture are not taken into account (when to CC
management, whether it is appropriate to CC senior management, whether Manager in
CC is treated as an escalation or you just want to keep other stakeholders informed, etc.)
7. Manager blocks direct effective communication between technical specialists
8. Bad news are glossed over when being presented to customers, managers and
stakeholders
9. Too much meetings, unnecessary people are invited to the meetings
10. Meetings are not effective (no goal set, no agenda, etc.) 11
Common communication mistakes
12
Reason 3: No sufficient project initiation and planning
phases
Common mistakes:
1. No project initiation and/or planning phases at all
2. Working under constant schedule pressure, not spending enough time and efforts to plan
the project
3. Assuming effort estimates can be directly equated to elapsed task durations without any
buffers or room for non-productive time, unforeseen tasks, etc.
4. Planning is done based on 8 h/day team availability for planned tasks
5. Planning is seen as the project manager’s responsibility rather than a team activity
6. Failure to break a large scale master plan into more manageable pieces that can be
delivered incrementally
7. No milestones and deadlines are set
8. Unclear roles and responsibilities led to confusion and gaps
9. Un-prioritized requirements resulting in team focusing energies on lower priority items
instead of high priority work
10.Change requests are handled informally without analysis and management of their
implication to the project plan 13
Reason 4: Project constraints are not identified
Common mistakes:
1. Project constraints (Scope, Time, Budget, Quality) are not identified and discussed with
the client
2. Project constraints are not taken into consideration during the project initiation and
planning phases
3. Project constraints matrix is not created and not discussed with the stakeholders
14
Constraints Matrix
15
Reason 5: Poor product requirements
Common mistakes:
1. Product development starts without requirements  It happens!
2. Requirements are not Unitary, Complete, Consistent, Current, Verifiable, Unambiguous,
Traceable, Prioritized
3. Requirements are not tested
4. Lack of formality in the scope definition results in different people having different
understanding of what is in and what is out of scope
5. Open ended requirements (such that end with “etc.”)
6. Failure to fully understand the “big picture” - the operational context in which the product
being produced needs to function once the project is over
7. No or lack involvement of those who will eventually use the product during the
requirements development
8. Individual requirements are never checked against the project’s overall objectives to
ensure each requirement supports the project’s objective
9. The project requirements are written based on the assumptions
16
17
18
Why projects fail according to Gartner research
Source: Gartner Survey, Analyst : Lars Mieritz. Published: 1 June 2012 ID:G00231952
19
Reason 6: Inaccurate estimates
Common mistakes:
1. Failure to not involve those who will actually perform the work to the estimating process
2. Forcing the team to provide estimate without a defined scope
3. Forcing the team to cut the estimate in order to secure a contract or make a project more
attractive
4. Estimation is done based on insufficient information or analysis
5. The assumptions used for estimation preparation are not documented, discussed or
validated
6. Big items are estimated, but because they are less visible, the smaller scale activities are
omitted
7. Estimation is done without analysis of the historical data collected from previous similar
projects or phases of the existing project
20
Reason 7: No streamlined software development
process
Common mistakes:
1. No methodology is used (as is or tailored to project specifics)
2. The project plan is published but there is no follow up or tracking to allow issues to be
surfaced and addressed early
3. Believing that although the team is behind schedule, they will catch up later
4. Schedule and budget become the driving force
5. Project is tracked based on large work items rather than smaller increments
6. Failure to monitor team performance on a regular basis
7. Believing that a task reported by a team member as 90% done really is 90% done 
8. Believing that because a person was told something once (weeks or months ago), they
will remember what they were asked to do and when they were supposed to do it
9. No recurring review and demonstration of the work done
10. No value increment is added on recurring basis
11. No retrospective of the process and no analysis of its gaps and required improvements
21
How often do PMs use a project management methodology on
successful and failed projects?
Source: KPMG Project Management Survey 2013
22
23
24
Reason 8: No risk management
Common mistakes:
1. Failure to think ahead and to foresee and address potential problems
2. Risk management is seen as an independent activity rather than an integral part of the
planning process and execution process
3. Risk, problems and issues become confused as a result team isn’t really doing risk
management
25
26
Reason 9: Insufficient quality assurance (not to be
mixed up with software testing)
1. No quality assurance activities are planned, only software testing activities are performed
2. No systematic activities are performed to evaluate quality of the development process used to
produce a product
3. Failure to plan into the project appropriate reviews, tests or checkpoints at which quality can be
verified
4. Quality requirements are never discussed, thereby allowing different people to have different
expectations of what is being produced and the quality standards to be achieved
5. Quality is viewed simply in terms of testing rather than a culture of working
6. The team developing the project’s deliverables sees quality as the responsibility of the Quality
Assurance group rather than a shared responsibility
7. Testing in a test environment that is configured differently from the target production, or
operational environment in which the project’s deliverables will be used
8. Testing with a test data only
9. No proactive measures to prevent bugs from occurring in a product being developed, only
reactive measures to address found issues
27
Reason 10: Decision making problems
1. Decision makers and areas of responsibility are not identified
2. Key decisions are made by people who lack the subject matter expertise to be making the
decision
3. Expert advice is not requested when making key project decisions
4. Lack of situational awareness results in ineffective decisions being made
5. Failure to bring closure to a critical decision results in delays, unused time, team demotivation
6. Team avoids the difficult decisions because some stakeholders maybe unhappy with the
outcome
7. Team is not involved into the decision making process (when appropriate)
8. Key decisions are made without identifying or considering alternatives
9. Decision fragments are left unanswered (what to be done, how to be done, when to be done,
who are performers, who IS responsible for the outcome, etc.)
10. Failure to establish clear ownership of decisions and responsible people
28
10 reasons why projects fail?
1. Insufficient stakeholders management
2. Inefficient communication
3. No sufficient project initiation and planning phases
4. Project constraints are not identified
5. Poor product requirements
6. Inaccurate estimates
7. No streamlined software development process
8. No risk management
9. Insufficient quality assurance (not to be mixed up with software testing)
10. Decision making problems
29
10 rules to make your projects succeed!
1. Identify and manage project stakeholders and their expectations
2. Setup effective communication channels and escalation boundaries, run effective
meetings, always keep records
3. Do spend time on the project initiation and planning phases
4. Identify project constraints with stakeholders and document those, always keep them in
mind through the project length
5. Do no start software development with poor product requirements and not defined scope
6. Learn how to improve accuracy of estimates, collect and analyze historical data and
previous experience
7. Follow software development methodology – tailor the existing one or develop you own.
The process should be defined and streamlined to be controlled!
8. Do risk management, foresee problems and address potential problems
9. Software testing is not enough, do quality assurance activities and make quality a
working culture
10. Make decisions fast and smart
30
… and a piece of advice 
1. Any experience, including failures and mistakes, is your chance to learn and self-develop
2. When you enjoy what you are doing you are way more effective and productive
3. Something interesting and challenging can be found in any assignment if you keep being
positive, open-minded and creative
4. Thinking out of the box helps to find good and new solutions
5. When you are working hard and doing your best, people around respect you and
appreciate what you are doing
6. Positive attitude always help to find the right solution
7. People are over process  - respect yourself, your colleagues and clients
31
Thank you!
Dev-Pro.net 7260 W. Azure Dr Suite 140-829, Las Vegas, NV 89130 USA
©2014 Dev-Pro.net, Inc. All Rights Reserved
32

Contenu connexe

Tendances

Smart project management - Best Practices to Manage Project effectively
Smart project management - Best Practices to Manage Project effectivelySmart project management - Best Practices to Manage Project effectively
Smart project management - Best Practices to Manage Project effectivelyChetan Khanzode
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasMazen Zbib
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycleSAJID ALI RUK
 
Project execution and implementation
Project execution and implementationProject execution and implementation
Project execution and implementationDr. Saima Baig
 
Project Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsProject Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsThink For A Change
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project managementMohamed Amin
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration ManagementBhuWan Khadka
 
Project Management
Project ManagementProject Management
Project ManagementMark Roman
 
Project management
Project managementProject management
Project managementJay Raval
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniquesTata Dinyuy
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management FundamentalsOxfordCambridge
 
Elements of Project Management
Elements of Project ManagementElements of Project Management
Elements of Project ManagementKevin Thomas
 
Project governance
Project governanceProject governance
Project governanceGlen Alleman
 
Project Management Summary 2012
Project Management Summary 2012Project Management Summary 2012
Project Management Summary 2012CPA Australia
 

Tendances (20)

Smart project management - Best Practices to Manage Project effectively
Smart project management - Best Practices to Manage Project effectivelySmart project management - Best Practices to Manage Project effectively
Smart project management - Best Practices to Manage Project effectively
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areas
 
Project audit & closure
Project audit & closureProject audit & closure
Project audit & closure
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycle
 
Project execution and implementation
Project execution and implementationProject execution and implementation
Project execution and implementation
 
Project Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsProject Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management Concepts
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project management
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration Management
 
Project Management
Project ManagementProject Management
Project Management
 
Project management
Project managementProject management
Project management
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniques
 
Project management
Project managementProject management
Project management
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management Fundamentals
 
Elements of Project Management
Elements of Project ManagementElements of Project Management
Elements of Project Management
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
Project Management Steps
Project Management StepsProject Management Steps
Project Management Steps
 
project management
project managementproject management
project management
 
Project Management
Project ManagementProject Management
Project Management
 
Project governance
Project governanceProject governance
Project governance
 
Project Management Summary 2012
Project Management Summary 2012Project Management Summary 2012
Project Management Summary 2012
 

En vedette

Project Management (PMP Material)
Project Management (PMP Material)Project Management (PMP Material)
Project Management (PMP Material)VR M
 
Project Success/Failure
Project Success/FailureProject Success/Failure
Project Success/FailurePeter Salmon
 
Factors for Successful Projects
Factors for Successful ProjectsFactors for Successful Projects
Factors for Successful ProjectsTrevor Roberts
 
The Project Management Process - Week 6 Leadership
The Project Management Process - Week 6   LeadershipThe Project Management Process - Week 6   Leadership
The Project Management Process - Week 6 LeadershipCraig Brown
 
Standish Chaos Report - Cercle de Discussion - PMI Branche Midi-Pyrénées (Vi...
Standish Chaos Report  - Cercle de Discussion - PMI Branche Midi-Pyrénées (Vi...Standish Chaos Report  - Cercle de Discussion - PMI Branche Midi-Pyrénées (Vi...
Standish Chaos Report - Cercle de Discussion - PMI Branche Midi-Pyrénées (Vi...Vincent Dumain
 
Challenges of Project Management “Communication & Collaboration-VSR
Challenges of Project Management “Communication & Collaboration-VSRChallenges of Project Management “Communication & Collaboration-VSR
Challenges of Project Management “Communication & Collaboration-VSRVSR *
 
Successful Project Presentation
Successful Project PresentationSuccessful Project Presentation
Successful Project PresentationColin Sullivan
 
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...systred
 
Pmi - Project Management Professional (Pmp) Certification Study Guide
Pmi - Project Management Professional (Pmp)   Certification Study GuidePmi - Project Management Professional (Pmp)   Certification Study Guide
Pmi - Project Management Professional (Pmp) Certification Study Guiderobsonnasc
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1Craig Brown
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project ManagementRodolfo Siles
 
Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)Jeremy Jay Lim
 

En vedette (12)

Project Management (PMP Material)
Project Management (PMP Material)Project Management (PMP Material)
Project Management (PMP Material)
 
Project Success/Failure
Project Success/FailureProject Success/Failure
Project Success/Failure
 
Factors for Successful Projects
Factors for Successful ProjectsFactors for Successful Projects
Factors for Successful Projects
 
The Project Management Process - Week 6 Leadership
The Project Management Process - Week 6   LeadershipThe Project Management Process - Week 6   Leadership
The Project Management Process - Week 6 Leadership
 
Standish Chaos Report - Cercle de Discussion - PMI Branche Midi-Pyrénées (Vi...
Standish Chaos Report  - Cercle de Discussion - PMI Branche Midi-Pyrénées (Vi...Standish Chaos Report  - Cercle de Discussion - PMI Branche Midi-Pyrénées (Vi...
Standish Chaos Report - Cercle de Discussion - PMI Branche Midi-Pyrénées (Vi...
 
Challenges of Project Management “Communication & Collaboration-VSR
Challenges of Project Management “Communication & Collaboration-VSRChallenges of Project Management “Communication & Collaboration-VSR
Challenges of Project Management “Communication & Collaboration-VSR
 
Successful Project Presentation
Successful Project PresentationSuccessful Project Presentation
Successful Project Presentation
 
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
Critical Success Factors Affecting Project Performance in Turkish IT Sector -...
 
Pmi - Project Management Professional (Pmp) Certification Study Guide
Pmi - Project Management Professional (Pmp)   Certification Study GuidePmi - Project Management Professional (Pmp)   Certification Study Guide
Pmi - Project Management Professional (Pmp) Certification Study Guide
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)Project Management Concepts (from PMBOK 5th Ed)
Project Management Concepts (from PMBOK 5th Ed)
 

Similaire à 10 reasons why projects fail or common mistakes to avoid

project management 1.docx
project management 1.docxproject management 1.docx
project management 1.docxMARYJULDULAGAN
 
Top 10 project mgt. problems
Top 10 project mgt. problemsTop 10 project mgt. problems
Top 10 project mgt. problemsMaksudul Munna
 
Are you making any of these 10 project management mistakes
Are you making any of these 10 project management mistakesAre you making any of these 10 project management mistakes
Are you making any of these 10 project management mistakesOrangescrum
 
A fresh look on projects: An introductory overview of project circle planning...
A fresh look on projects: An introductory overview of project circle planning...A fresh look on projects: An introductory overview of project circle planning...
A fresh look on projects: An introductory overview of project circle planning...ramsey20
 
Many organizations invest substantial resources in creating their ow.pdf
Many organizations invest substantial resources in creating their ow.pdfMany organizations invest substantial resources in creating their ow.pdf
Many organizations invest substantial resources in creating their ow.pdffederaleyecare
 
10 Project Management Mistakes
10 Project Management Mistakes10 Project Management Mistakes
10 Project Management MistakesOrangescrum
 
Shot note about project management
Shot note about project managementShot note about project management
Shot note about project managementAHM Pervej Kabir
 
Project audit and closure
Project audit and closureProject audit and closure
Project audit and closureVelita Furtado
 
MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMdAliMujawar1
 
2 project management-level 1
2 project management-level 12 project management-level 1
2 project management-level 1Juwad AlOmari
 
Project Management-Concept & Case Study.pptx
Project Management-Concept & Case Study.pptxProject Management-Concept & Case Study.pptx
Project Management-Concept & Case Study.pptxamit229530
 
3.7 developing ict solutions
3.7 developing ict solutions3.7 developing ict solutions
3.7 developing ict solutionsmrmwood
 
questions-just-that.pdf.civil engineering
questions-just-that.pdf.civil engineeringquestions-just-that.pdf.civil engineering
questions-just-that.pdf.civil engineeringmocr84810
 
Project management for technologies MGT410
Project management for technologies   MGT410Project management for technologies   MGT410
Project management for technologies MGT410Saqib Imran
 
Critical success factors in effective project implementation
Critical success factors in effective project implementationCritical success factors in effective project implementation
Critical success factors in effective project implementationSk. Mohtasim Billah
 
Project management slide show
Project management slide showProject management slide show
Project management slide showTanvir Anwar
 

Similaire à 10 reasons why projects fail or common mistakes to avoid (20)

project management 1.docx
project management 1.docxproject management 1.docx
project management 1.docx
 
Top 10 project mgt. problems
Top 10 project mgt. problemsTop 10 project mgt. problems
Top 10 project mgt. problems
 
Are you making any of these 10 project management mistakes
Are you making any of these 10 project management mistakesAre you making any of these 10 project management mistakes
Are you making any of these 10 project management mistakes
 
A fresh look on projects: An introductory overview of project circle planning...
A fresh look on projects: An introductory overview of project circle planning...A fresh look on projects: An introductory overview of project circle planning...
A fresh look on projects: An introductory overview of project circle planning...
 
Many organizations invest substantial resources in creating their ow.pdf
Many organizations invest substantial resources in creating their ow.pdfMany organizations invest substantial resources in creating their ow.pdf
Many organizations invest substantial resources in creating their ow.pdf
 
10 Project Management Mistakes
10 Project Management Mistakes10 Project Management Mistakes
10 Project Management Mistakes
 
Project Outcomes
Project OutcomesProject Outcomes
Project Outcomes
 
Shot note about project management
Shot note about project managementShot note about project management
Shot note about project management
 
Project audit and closure
Project audit and closureProject audit and closure
Project audit and closure
 
Successful pm
Successful pmSuccessful pm
Successful pm
 
MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptx
 
2 project management-level 1
2 project management-level 12 project management-level 1
2 project management-level 1
 
PRESTO @ SUPSI
PRESTO @ SUPSIPRESTO @ SUPSI
PRESTO @ SUPSI
 
Project Management-Concept & Case Study.pptx
Project Management-Concept & Case Study.pptxProject Management-Concept & Case Study.pptx
Project Management-Concept & Case Study.pptx
 
3.7 developing ict solutions
3.7 developing ict solutions3.7 developing ict solutions
3.7 developing ict solutions
 
questions-just-that.pdf.civil engineering
questions-just-that.pdf.civil engineeringquestions-just-that.pdf.civil engineering
questions-just-that.pdf.civil engineering
 
Project Management Toolkit
Project Management ToolkitProject Management Toolkit
Project Management Toolkit
 
Project management for technologies MGT410
Project management for technologies   MGT410Project management for technologies   MGT410
Project management for technologies MGT410
 
Critical success factors in effective project implementation
Critical success factors in effective project implementationCritical success factors in effective project implementation
Critical success factors in effective project implementation
 
Project management slide show
Project management slide showProject management slide show
Project management slide show
 

Dernier

internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
Continuous Improvement Posters for Learning
Continuous Improvement Posters for LearningContinuous Improvement Posters for Learning
Continuous Improvement Posters for LearningCIToolkit
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Alex Marques
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Smisbafathima9940
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Hedda Bird
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningCIToolkit
 

Dernier (20)

LoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner CircleLoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner Circle
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg PartnershipUnlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
 
Continuous Improvement Posters for Learning
Continuous Improvement Posters for LearningContinuous Improvement Posters for Learning
Continuous Improvement Posters for Learning
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Discover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdfDiscover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdf
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima S
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Empowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdfEmpowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdf
 
Peak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian DugmorePeak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian Dugmore
 
Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for Learning
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 

10 reasons why projects fail or common mistakes to avoid

  • 3. 3
  • 4. Project success factors 1. Meet an agreed budget (Cost) 2. Deliver on time (Time) 3. Meet quality requirements (Quality) 4. Meet the project's objectives/requirements (Scope) 4
  • 5. What projects are considered successful? Long story short – successful project is the one meeting stakeholder’ expectations 5
  • 6. Reason 1: Insufficient stakeholders management Common mistakes: 1. Not all the project stakeholders are identified 2. Stakeholders are not analyzed from the perspective of their influence and interest in the project 3. Failure to view the project through the eyes of the project stakeholders, as the result no accurate understanding how the project will impact the stakeholders or how they will react to the project’s results 4. Failure to identify and meet the needs of all stakeholders, allowing one stakeholder group to dominate the project while completely ignoring the needs of other groups 5. Failure to establish effective communication channels between different stakeholders 6
  • 7. Who are your stakeholders? 7
  • 8. Stakeholders Management 1. Identify Stakeholders – identifying everyone affected by the work or its outcomes 2. Plan Stakeholder Management – deciding how you will engage with the stakeholders 3. Manage Stakeholder Engagement – communicating with stakeholders and ensuring appropriate stakeholder engagement 4. Control Stakeholder Engagement – monitoring the overall relationships and adjusting your strategies and plans as needed 8
  • 10. Reason 2: Inefficient communication 10
  • 11. Common mistakes: 1. No time is spent on development of a communication plan 2. No identified and approved escalation boundaries and related rules (when and to whom to escalate issues) 3. Roles and responsibilities are not identified or are not clearly communicated to all the stakeholders 4. Priorities of different communication channels are not identified (when to email, to call, to use Skype, etc.) 5. No records for oral communication (no meeting minutes) 6. National specifics and corporate culture are not taken into account (when to CC management, whether it is appropriate to CC senior management, whether Manager in CC is treated as an escalation or you just want to keep other stakeholders informed, etc.) 7. Manager blocks direct effective communication between technical specialists 8. Bad news are glossed over when being presented to customers, managers and stakeholders 9. Too much meetings, unnecessary people are invited to the meetings 10. Meetings are not effective (no goal set, no agenda, etc.) 11 Common communication mistakes
  • 12. 12
  • 13. Reason 3: No sufficient project initiation and planning phases Common mistakes: 1. No project initiation and/or planning phases at all 2. Working under constant schedule pressure, not spending enough time and efforts to plan the project 3. Assuming effort estimates can be directly equated to elapsed task durations without any buffers or room for non-productive time, unforeseen tasks, etc. 4. Planning is done based on 8 h/day team availability for planned tasks 5. Planning is seen as the project manager’s responsibility rather than a team activity 6. Failure to break a large scale master plan into more manageable pieces that can be delivered incrementally 7. No milestones and deadlines are set 8. Unclear roles and responsibilities led to confusion and gaps 9. Un-prioritized requirements resulting in team focusing energies on lower priority items instead of high priority work 10.Change requests are handled informally without analysis and management of their implication to the project plan 13
  • 14. Reason 4: Project constraints are not identified Common mistakes: 1. Project constraints (Scope, Time, Budget, Quality) are not identified and discussed with the client 2. Project constraints are not taken into consideration during the project initiation and planning phases 3. Project constraints matrix is not created and not discussed with the stakeholders 14
  • 16. Reason 5: Poor product requirements Common mistakes: 1. Product development starts without requirements  It happens! 2. Requirements are not Unitary, Complete, Consistent, Current, Verifiable, Unambiguous, Traceable, Prioritized 3. Requirements are not tested 4. Lack of formality in the scope definition results in different people having different understanding of what is in and what is out of scope 5. Open ended requirements (such that end with “etc.”) 6. Failure to fully understand the “big picture” - the operational context in which the product being produced needs to function once the project is over 7. No or lack involvement of those who will eventually use the product during the requirements development 8. Individual requirements are never checked against the project’s overall objectives to ensure each requirement supports the project’s objective 9. The project requirements are written based on the assumptions 16
  • 17. 17
  • 18. 18
  • 19. Why projects fail according to Gartner research Source: Gartner Survey, Analyst : Lars Mieritz. Published: 1 June 2012 ID:G00231952 19
  • 20. Reason 6: Inaccurate estimates Common mistakes: 1. Failure to not involve those who will actually perform the work to the estimating process 2. Forcing the team to provide estimate without a defined scope 3. Forcing the team to cut the estimate in order to secure a contract or make a project more attractive 4. Estimation is done based on insufficient information or analysis 5. The assumptions used for estimation preparation are not documented, discussed or validated 6. Big items are estimated, but because they are less visible, the smaller scale activities are omitted 7. Estimation is done without analysis of the historical data collected from previous similar projects or phases of the existing project 20
  • 21. Reason 7: No streamlined software development process Common mistakes: 1. No methodology is used (as is or tailored to project specifics) 2. The project plan is published but there is no follow up or tracking to allow issues to be surfaced and addressed early 3. Believing that although the team is behind schedule, they will catch up later 4. Schedule and budget become the driving force 5. Project is tracked based on large work items rather than smaller increments 6. Failure to monitor team performance on a regular basis 7. Believing that a task reported by a team member as 90% done really is 90% done  8. Believing that because a person was told something once (weeks or months ago), they will remember what they were asked to do and when they were supposed to do it 9. No recurring review and demonstration of the work done 10. No value increment is added on recurring basis 11. No retrospective of the process and no analysis of its gaps and required improvements 21
  • 22. How often do PMs use a project management methodology on successful and failed projects? Source: KPMG Project Management Survey 2013 22
  • 23. 23
  • 24. 24
  • 25. Reason 8: No risk management Common mistakes: 1. Failure to think ahead and to foresee and address potential problems 2. Risk management is seen as an independent activity rather than an integral part of the planning process and execution process 3. Risk, problems and issues become confused as a result team isn’t really doing risk management 25
  • 26. 26
  • 27. Reason 9: Insufficient quality assurance (not to be mixed up with software testing) 1. No quality assurance activities are planned, only software testing activities are performed 2. No systematic activities are performed to evaluate quality of the development process used to produce a product 3. Failure to plan into the project appropriate reviews, tests or checkpoints at which quality can be verified 4. Quality requirements are never discussed, thereby allowing different people to have different expectations of what is being produced and the quality standards to be achieved 5. Quality is viewed simply in terms of testing rather than a culture of working 6. The team developing the project’s deliverables sees quality as the responsibility of the Quality Assurance group rather than a shared responsibility 7. Testing in a test environment that is configured differently from the target production, or operational environment in which the project’s deliverables will be used 8. Testing with a test data only 9. No proactive measures to prevent bugs from occurring in a product being developed, only reactive measures to address found issues 27
  • 28. Reason 10: Decision making problems 1. Decision makers and areas of responsibility are not identified 2. Key decisions are made by people who lack the subject matter expertise to be making the decision 3. Expert advice is not requested when making key project decisions 4. Lack of situational awareness results in ineffective decisions being made 5. Failure to bring closure to a critical decision results in delays, unused time, team demotivation 6. Team avoids the difficult decisions because some stakeholders maybe unhappy with the outcome 7. Team is not involved into the decision making process (when appropriate) 8. Key decisions are made without identifying or considering alternatives 9. Decision fragments are left unanswered (what to be done, how to be done, when to be done, who are performers, who IS responsible for the outcome, etc.) 10. Failure to establish clear ownership of decisions and responsible people 28
  • 29. 10 reasons why projects fail? 1. Insufficient stakeholders management 2. Inefficient communication 3. No sufficient project initiation and planning phases 4. Project constraints are not identified 5. Poor product requirements 6. Inaccurate estimates 7. No streamlined software development process 8. No risk management 9. Insufficient quality assurance (not to be mixed up with software testing) 10. Decision making problems 29
  • 30. 10 rules to make your projects succeed! 1. Identify and manage project stakeholders and their expectations 2. Setup effective communication channels and escalation boundaries, run effective meetings, always keep records 3. Do spend time on the project initiation and planning phases 4. Identify project constraints with stakeholders and document those, always keep them in mind through the project length 5. Do no start software development with poor product requirements and not defined scope 6. Learn how to improve accuracy of estimates, collect and analyze historical data and previous experience 7. Follow software development methodology – tailor the existing one or develop you own. The process should be defined and streamlined to be controlled! 8. Do risk management, foresee problems and address potential problems 9. Software testing is not enough, do quality assurance activities and make quality a working culture 10. Make decisions fast and smart 30
  • 31. … and a piece of advice  1. Any experience, including failures and mistakes, is your chance to learn and self-develop 2. When you enjoy what you are doing you are way more effective and productive 3. Something interesting and challenging can be found in any assignment if you keep being positive, open-minded and creative 4. Thinking out of the box helps to find good and new solutions 5. When you are working hard and doing your best, people around respect you and appreciate what you are doing 6. Positive attitude always help to find the right solution 7. People are over process  - respect yourself, your colleagues and clients 31
  • 32. Thank you! Dev-Pro.net 7260 W. Azure Dr Suite 140-829, Las Vegas, NV 89130 USA ©2014 Dev-Pro.net, Inc. All Rights Reserved 32