SlideShare une entreprise Scribd logo
1  sur  13
Télécharger pour lire hors ligne
www.oeko.de

Nuclear Decommissioning –
Costs and risks
Presentation of the applied methodology and the results

Gerhard Schmidt, Veronika Ustohalova, Anne Minhans
Presentation to the EP Budgetary Commission
Brussels, 17.12.2013
www.oeko.de

Task of the study

1.

To identify, describe and characterise best practice examples
for decommissioning in Europe

2.

To understand, describe and compare the decommissioning
projects in Bulgaria, Lithuania and Slovakia with these best
practice examples, and

3.

To derive recommendations for improvements in these
decommissioning projects.

Decommissioning│G.Schmidt/V.Ustohalova/A.Minhans│Brussels│17.12.2013

2
www.oeko.de

1. Best practices in decommissioning
Analysis showed that
•

Most of the 88 decommissioning projects in Europe are located
in France, Germany and the UK.

•

A large variety of reactor types, power categories, operational
ages are under decommissioning.

•

Of the 88 projects only 8 have already finalised
decommissioning (most of them located in Germany).

Identification of three examples:
•

Electricité de France (EDF): stock company, but majorly state
owned, nine reactors under decommissioning

•

Energiewerke Nord (EWN): federally owned company, six
reactors under decommissioning

•

Sellafield Ltd.: set up under control of a national agency (NDA),
large complex with a variety of installations to decommission
Decommissioning│G.Schmidt/V.Ustohalova/A.Minhans│Brussels│17.12.2013

3
www.oeko.de

1. Best practices in decommissioning
Best practices that were identified:
1.

To completely re-structure and build-up designated
organisations which are optimised for decommissioning,
have undivided responsibility assigned and clear management
structures (EDF, EWN).

2.

To closely control strategic management decisions by a
strong institution, leaving operational decisions with the
management but providing a continuous and well-informed
assessment counterpart for the management (e.g. EWN:
Federal Ministry of Finance).

3.

To create, install and continuously work with a comprehensive
project management tool that provides all necessary
information for work planning, as knowledge base, for
estimates, etc.

Decommissioning│G.Schmidt/V.Ustohalova/A.Minhans│Brussels│17.12.2013

4
www.oeko.de

1. Best practices in decommissioning
4.

To preserve and use internal workforce‘s knowledge and
experience with the facility, but also to re-qualify the
workforce for the new task of decommissioning.

Decommissioning│G.Schmidt/V.Ustohalova/A.Minhans│Brussels│17.12.2013

5
www.oeko.de

2. Results of the comparison
Quantitative representation of the comparison results
National
framework
5
4

Workforce

3
2

Management
organization
BG

1

LT
0

SK

Ideal

Project and
risk
management

Cost estimates

Regulatory
approach
Decommissioning│G.Schmidt/V.Ustohalova/A.Minhans│Brussels│17.12.2013

6
www.oeko.de

2. Results of the comparison
We identified
•

that the national framework which should be able to set up,
organise and control the responsible decommissioning
organisation is not highly developed in Bulgaria, Lithuania and
Slovakia and could be better understood as a national task,

•

that the national organisations, which should be held fully
responsible for decommissioning, are not optimally organised to
fulfil their task in the necessary manner,

•

that project management can be largely improved in most of the
decommissioning projects.

Decommissioning│G.Schmidt/V.Ustohalova/A.Minhans│Brussels│17.12.2013

7
www.oeko.de

3. Derived recommendations
Eight recommendations were derived from the findings. These
concern:
1.

Improving national control conditions

2.

Towards co-shared financing

3.

Improving responsibility of the managing organisation

4.

Improving project and risk management

5.

Continuation of the good practice in licensing

6.

Improving cost estimates

7.

Improving effectiveness of the workforce

8.

Achieving clear responsibility attributions

Decommissioning│G.Schmidt/V.Ustohalova/A.Minhans│Brussels│17.12.2013

8
www.oeko.de

3. Recommendations
In recommendation 8 we propose a clear attribution of
responsibilities. The respective organisational structure to achieve
this can be designed as shown in the figure.

Decommissioning│G.Schmidt/V.Ustohalova/A.Minhans│Brussels│17.12.2013

9
www.oeko.de

Vielen Dank für Ihre Aufmerksamkeit!
Thank you for your attention!

Haben Sie noch Fragen?
Do you have any questions?

?
www.oeko.de

The recommendations in full text
Recommendation 1: Improving national control conditions
The introduction of EU/member state shared projects and a joint steering of the strategic decisions of the
organisation that is responsible for implementing decommissioning is recommended in order to
strengthen the role of the national controlling administrator and to increase the cost effectiveness.

Recommendation 2: Towards co-shared financing
The EU support of the decommissioning should be re-organized as co-sharing projects. Cosharing of the
costs would increase the country’s interest in con-trolling the managing organisation’s strategic decisions
towards increased cost effectiveness. In the co-financed and co-directed projects both institutions
financing the activity should equally control their effectiveness. The share should be defined with a fixed
level, but allowing to reduce the EC’s contribution in case of projects that are only in part related to
decommissioning. The fixed level should be depending from the country’s abilities, but shall not be below
certain thresholds to achieve the desired goal.

Recommendation 3: Improving responsibility of the managing organisation
A clearer attribution of responsibilities in respect to strategic decisions is recommended. In accordance
with this proposed re-organisation and under consideration of the specific conditions in this case (e.g. cofinancing, shared control) a possible advanced structure of the management organisation in accordance
with the identified best practice is recommended.

11
www.oeko.de

The recommendations in full text
Recommendation 4: Improving project and risk management
A complete and adequate project and risk management, including the respective task-tailored IT tools
(PMIS), for the decommissioning project has to be considered a state-of-the-art requirement. Improving,
completing and fully implementing project and risk management should be given the highest priority.
Management should set up respective work methods and tools, the controlling institutions should
supervise their design and timely implementation in the managing process.

Recommendation 5: Continuation of the good practice in licensing
Licensing issues should be carefully considered within the risk assessment and should not be
underestimated, because failures and delays in this field can have major consequences for the
decommissioning process. The good practice identified so far should be continued and upgraded to
match to the upcoming more sensitive work steps.

Recommendation 6: Improving cost estimates
Cost estimates are based on state-of-the-art. To further increase their reliability and usefulness, cost
escalation and risks should be included in future estimates.

Recommendation 7: Improving effectiveness of the workforce
The relevance of workforce issues, such as conversion management and training, is well recognized in all
three countries. Explicit training, e.g. in the less technical and more soft skill areas of project
management, risk communication and knowledge management is desirable.

12
www.oeko.de

The recommendations in full text
Recommendation 8: Achieving clear responsibility attributions
In any future setting clear, unambiguous and transparent responsibilities have to be defined and
implemented to avoid any dilution and dispersion of responsibilities over several institutions and to avoid
unclear and uncommunicated attributions.

The national supervising institution and the EC should be jointly attributed the full responsibility for
controlling the national managing organisation’s strategic decisions. They should have the right and as
well the obligation to completely oversee the whole performance of the decommissioning project and to
steer and control the management.
The managing organisation has to be attributed the sole, undivided and unambiguous responsibility to a)
prepare the proposals and the complete background for the strategic decisions and b) for any operational
decisions. This includes all overseeing, steering and supervision over organisation-internal as well as any
external processes, including procurement, cost and time control.
To control the due diligence of all financial transactions, the managing organisation should define, set up,
implement and regularly audit an adequate internal control system. The national controlling institution or
an equivalent (e.g. the Ministry for Finance) as well as the EC should have the right and the obligation to
oversee and exemplarily check the adequacy of the management’s measures to keep control over its
financial transactions.
If, in the case of Bulgaria and Slovakia, the interferences of the constitution of the managing
organisation’s with its non-decommissioning obligations is too complicated and may reduce the
effectiveness of the management level’s ability to act, an institutional separation of the decommissioning
project part should be considered.

13

Contenu connexe

Similaire à Nuclear decommissioning - costs and risks

Outcome-focused Management and Budgeting
Outcome-focused Management and BudgetingOutcome-focused Management and Budgeting
Outcome-focused Management and Budgeting
Jens Kromann Kristensen
 
Wp062011 risk management for energy efficiency projects in developing countries
Wp062011 risk management for energy efficiency projects in developing countriesWp062011 risk management for energy efficiency projects in developing countries
Wp062011 risk management for energy efficiency projects in developing countries
Agus Witono
 
New thinking on technical assistance to solve knowledge and capacity gaps
New thinking on technical assistance to solve knowledge and capacity gapsNew thinking on technical assistance to solve knowledge and capacity gaps
New thinking on technical assistance to solve knowledge and capacity gaps
Dr Lendy Spires
 
New thinking on technical assistance to solve knowledge and capacity gaps
New thinking on technical assistance to solve knowledge and capacity gapsNew thinking on technical assistance to solve knowledge and capacity gaps
New thinking on technical assistance to solve knowledge and capacity gaps
Dr Lendy Spires
 
Monitoring and Evaluation Framework
Monitoring and Evaluation FrameworkMonitoring and Evaluation Framework
Monitoring and Evaluation Framework
Michelle Joja
 

Similaire à Nuclear decommissioning - costs and risks (20)

Project starting report iktimed 2 nov
Project starting report iktimed 2  novProject starting report iktimed 2  nov
Project starting report iktimed 2 nov
 
ResearchProject
ResearchProjectResearchProject
ResearchProject
 
Report FP9
Report FP9Report FP9
Report FP9
 
APMP_Strategic Definition
APMP_Strategic DefinitionAPMP_Strategic Definition
APMP_Strategic Definition
 
Renovation roadmaps for buildings by The Policy Partners
Renovation roadmaps for buildings by The Policy PartnersRenovation roadmaps for buildings by The Policy Partners
Renovation roadmaps for buildings by The Policy Partners
 
Outcome-focused Management and Budgeting
Outcome-focused Management and BudgetingOutcome-focused Management and Budgeting
Outcome-focused Management and Budgeting
 
Wp062011 risk management for energy efficiency projects in developing countries
Wp062011 risk management for energy efficiency projects in developing countriesWp062011 risk management for energy efficiency projects in developing countries
Wp062011 risk management for energy efficiency projects in developing countries
 
Formato Teoria de cambio para convocatoria UKPACT
Formato Teoria de cambio para convocatoria UKPACTFormato Teoria de cambio para convocatoria UKPACT
Formato Teoria de cambio para convocatoria UKPACT
 
ipa_routemap_asset_management_module.pdf
ipa_routemap_asset_management_module.pdfipa_routemap_asset_management_module.pdf
ipa_routemap_asset_management_module.pdf
 
GEF's Support and Experience on Capacity Building for Transparency GEF''s, Du...
GEF's Support and Experience on Capacity Building for Transparency GEF''s, Du...GEF's Support and Experience on Capacity Building for Transparency GEF''s, Du...
GEF's Support and Experience on Capacity Building for Transparency GEF''s, Du...
 
Curb it balance it emission management &cc using sap (2)
Curb it   balance it emission management &cc using sap (2)Curb it   balance it emission management &cc using sap (2)
Curb it balance it emission management &cc using sap (2)
 
Are you a sustainable PM? - RICS Article
Are you a sustainable PM? - RICS ArticleAre you a sustainable PM? - RICS Article
Are you a sustainable PM? - RICS Article
 
New thinking on technical assistance to solve knowledge and capacity gaps
New thinking on technical assistance to solve knowledge and capacity gapsNew thinking on technical assistance to solve knowledge and capacity gaps
New thinking on technical assistance to solve knowledge and capacity gaps
 
New thinking on technical assistance to solve knowledge and capacity gaps
New thinking on technical assistance to solve knowledge and capacity gapsNew thinking on technical assistance to solve knowledge and capacity gaps
New thinking on technical assistance to solve knowledge and capacity gaps
 
OECD Best Practices for Performance budgeting - Ivor Beazley, OECD
OECD Best Practices for Performance budgeting - Ivor Beazley, OECDOECD Best Practices for Performance budgeting - Ivor Beazley, OECD
OECD Best Practices for Performance budgeting - Ivor Beazley, OECD
 
Discussion paper, 4th Regional PIFC Conference for EU Enlargement Countries, ...
Discussion paper, 4th Regional PIFC Conference for EU Enlargement Countries, ...Discussion paper, 4th Regional PIFC Conference for EU Enlargement Countries, ...
Discussion paper, 4th Regional PIFC Conference for EU Enlargement Countries, ...
 
UK PACT Applicant Handbook Aug 2023 v4.pdf
UK PACT Applicant Handbook Aug 2023 v4.pdfUK PACT Applicant Handbook Aug 2023 v4.pdf
UK PACT Applicant Handbook Aug 2023 v4.pdf
 
EFFICIENCY PROBLEMS IN PUBLIC SECTOR PROJECTS PLANNING AND IMPLEMENTATION STAGE
EFFICIENCY PROBLEMS IN PUBLIC SECTOR PROJECTS PLANNING AND IMPLEMENTATION STAGEEFFICIENCY PROBLEMS IN PUBLIC SECTOR PROJECTS PLANNING AND IMPLEMENTATION STAGE
EFFICIENCY PROBLEMS IN PUBLIC SECTOR PROJECTS PLANNING AND IMPLEMENTATION STAGE
 
Project Server in the Oil and Gas Industry - Enabling Technologies Best Pract...
Project Server in the Oil and Gas Industry - Enabling Technologies Best Pract...Project Server in the Oil and Gas Industry - Enabling Technologies Best Pract...
Project Server in the Oil and Gas Industry - Enabling Technologies Best Pract...
 
Monitoring and Evaluation Framework
Monitoring and Evaluation FrameworkMonitoring and Evaluation Framework
Monitoring and Evaluation Framework
 

Plus de Oeko-Institut

Plus de Oeko-Institut (20)

Holz, Klima und Nachhaltigkeit: Was sagt die Wissenschaft? Was bedeutet das f...
Holz, Klima und Nachhaltigkeit: Was sagt die Wissenschaft? Was bedeutet das f...Holz, Klima und Nachhaltigkeit: Was sagt die Wissenschaft? Was bedeutet das f...
Holz, Klima und Nachhaltigkeit: Was sagt die Wissenschaft? Was bedeutet das f...
 
Co-Transformation durch kontextsensitive Partizipation in der Planung: ein Pl...
Co-Transformation durch kontextsensitive Partizipation in der Planung: ein Pl...Co-Transformation durch kontextsensitive Partizipation in der Planung: ein Pl...
Co-Transformation durch kontextsensitive Partizipation in der Planung: ein Pl...
 
Perceptions of surface facilities of a potential disposal site and the role o...
Perceptions of surface facilities of a potential disposal site and the role o...Perceptions of surface facilities of a potential disposal site and the role o...
Perceptions of surface facilities of a potential disposal site and the role o...
 
The role of Nuclear Cultural Heritage in long-term nuclear waste governance
The role of Nuclear Cultural Heritage in long-term nuclear waste governanceThe role of Nuclear Cultural Heritage in long-term nuclear waste governance
The role of Nuclear Cultural Heritage in long-term nuclear waste governance
 
Technische Probleme in den französischen AKW und ihre Auswirkungen
Technische Probleme in den französischen AKW und ihre AuswirkungenTechnische Probleme in den französischen AKW und ihre Auswirkungen
Technische Probleme in den französischen AKW und ihre Auswirkungen
 
Die aktuelle energiepolitische Situation - mit einem Ausflug in die Klimapoli...
Die aktuelle energiepolitische Situation - mit einem Ausflug in die Klimapoli...Die aktuelle energiepolitische Situation - mit einem Ausflug in die Klimapoli...
Die aktuelle energiepolitische Situation - mit einem Ausflug in die Klimapoli...
 
Der Klimasozialfonds: Grüner Wandel in Europas Gebäuden –wie sozial und fair ...
Der Klimasozialfonds: Grüner Wandel in Europas Gebäuden –wie sozial und fair ...Der Klimasozialfonds: Grüner Wandel in Europas Gebäuden –wie sozial und fair ...
Der Klimasozialfonds: Grüner Wandel in Europas Gebäuden –wie sozial und fair ...
 
Potentials and challenges of applying Artificial Intelligence (AI) in geoscie...
Potentials and challenges of applying Artificial Intelligence (AI) in geoscie...Potentials and challenges of applying Artificial Intelligence (AI) in geoscie...
Potentials and challenges of applying Artificial Intelligence (AI) in geoscie...
 
Research needs around politically influenceable factors of climate policy acc...
Research needs around politically influenceable factors of climate policy acc...Research needs around politically influenceable factors of climate policy acc...
Research needs around politically influenceable factors of climate policy acc...
 
Facilitating Socially Just Carbon Pricing in the EU - Identification of vulne...
Facilitating Socially Just Carbon Pricing in the EU - Identification of vulne...Facilitating Socially Just Carbon Pricing in the EU - Identification of vulne...
Facilitating Socially Just Carbon Pricing in the EU - Identification of vulne...
 
Klimaschutz sozial gerecht gestalten
Klimaschutz sozial gerecht gestaltenKlimaschutz sozial gerecht gestalten
Klimaschutz sozial gerecht gestalten
 
Gesundes Essen fürs Klima - Auswirkungen der Planetary Health Diet auf die L...
 Gesundes Essen fürs Klima - Auswirkungen der Planetary Health Diet auf die L... Gesundes Essen fürs Klima - Auswirkungen der Planetary Health Diet auf die L...
Gesundes Essen fürs Klima - Auswirkungen der Planetary Health Diet auf die L...
 
Endlagerung in Deutschland - Warum brauchen wir das? Wie geht das? Und wer en...
Endlagerung in Deutschland - Warum brauchen wir das? Wie geht das? Und wer en...Endlagerung in Deutschland - Warum brauchen wir das? Wie geht das? Und wer en...
Endlagerung in Deutschland - Warum brauchen wir das? Wie geht das? Und wer en...
 
compan-e: Befragungsergebnisse Themenfeld Dienstwagen
compan-e: Befragungsergebnisse Themenfeld Dienstwagencompan-e: Befragungsergebnisse Themenfeld Dienstwagen
compan-e: Befragungsergebnisse Themenfeld Dienstwagen
 
compan-e: Befragungsergebnisse Themenfeld Ladeinfrastruktur am Wohnort
compan-e: Befragungsergebnisse Themenfeld Ladeinfrastruktur am Wohnortcompan-e: Befragungsergebnisse Themenfeld Ladeinfrastruktur am Wohnort
compan-e: Befragungsergebnisse Themenfeld Ladeinfrastruktur am Wohnort
 
compan-e: Befragungsergebnisse Themenfeld Mobilitätsbudget
compan-e: Befragungsergebnisse Themenfeld Mobilitätsbudgetcompan-e: Befragungsergebnisse Themenfeld Mobilitätsbudget
compan-e: Befragungsergebnisse Themenfeld Mobilitätsbudget
 
compan-e: Befragungsergebnisse Themenfeld Car Policy
compan-e: Befragungsergebnisse Themenfeld Car Policycompan-e: Befragungsergebnisse Themenfeld Car Policy
compan-e: Befragungsergebnisse Themenfeld Car Policy
 
An ETS-2 for buildings and road transport: Impacts, vulnerabilities and the r...
An ETS-2 for buildings and road transport: Impacts, vulnerabilities and the r...An ETS-2 for buildings and road transport: Impacts, vulnerabilities and the r...
An ETS-2 for buildings and road transport: Impacts, vulnerabilities and the r...
 
Was ist umweltpolitisch „gerecht“? Überblick über die Vielfalt sozialer Aspek...
Was ist umweltpolitisch „gerecht“? Überblick über die Vielfalt sozialer Aspek...Was ist umweltpolitisch „gerecht“? Überblick über die Vielfalt sozialer Aspek...
Was ist umweltpolitisch „gerecht“? Überblick über die Vielfalt sozialer Aspek...
 
Soziale Aspekte von Klimakrise und Klimapolitik
Soziale Aspekte von Klimakrise und KlimapolitikSoziale Aspekte von Klimakrise und Klimapolitik
Soziale Aspekte von Klimakrise und Klimapolitik
 

Dernier

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Dernier (20)

Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 

Nuclear decommissioning - costs and risks

  • 1. www.oeko.de Nuclear Decommissioning – Costs and risks Presentation of the applied methodology and the results Gerhard Schmidt, Veronika Ustohalova, Anne Minhans Presentation to the EP Budgetary Commission Brussels, 17.12.2013
  • 2. www.oeko.de Task of the study 1. To identify, describe and characterise best practice examples for decommissioning in Europe 2. To understand, describe and compare the decommissioning projects in Bulgaria, Lithuania and Slovakia with these best practice examples, and 3. To derive recommendations for improvements in these decommissioning projects. Decommissioning│G.Schmidt/V.Ustohalova/A.Minhans│Brussels│17.12.2013 2
  • 3. www.oeko.de 1. Best practices in decommissioning Analysis showed that • Most of the 88 decommissioning projects in Europe are located in France, Germany and the UK. • A large variety of reactor types, power categories, operational ages are under decommissioning. • Of the 88 projects only 8 have already finalised decommissioning (most of them located in Germany). Identification of three examples: • Electricité de France (EDF): stock company, but majorly state owned, nine reactors under decommissioning • Energiewerke Nord (EWN): federally owned company, six reactors under decommissioning • Sellafield Ltd.: set up under control of a national agency (NDA), large complex with a variety of installations to decommission Decommissioning│G.Schmidt/V.Ustohalova/A.Minhans│Brussels│17.12.2013 3
  • 4. www.oeko.de 1. Best practices in decommissioning Best practices that were identified: 1. To completely re-structure and build-up designated organisations which are optimised for decommissioning, have undivided responsibility assigned and clear management structures (EDF, EWN). 2. To closely control strategic management decisions by a strong institution, leaving operational decisions with the management but providing a continuous and well-informed assessment counterpart for the management (e.g. EWN: Federal Ministry of Finance). 3. To create, install and continuously work with a comprehensive project management tool that provides all necessary information for work planning, as knowledge base, for estimates, etc. Decommissioning│G.Schmidt/V.Ustohalova/A.Minhans│Brussels│17.12.2013 4
  • 5. www.oeko.de 1. Best practices in decommissioning 4. To preserve and use internal workforce‘s knowledge and experience with the facility, but also to re-qualify the workforce for the new task of decommissioning. Decommissioning│G.Schmidt/V.Ustohalova/A.Minhans│Brussels│17.12.2013 5
  • 6. www.oeko.de 2. Results of the comparison Quantitative representation of the comparison results National framework 5 4 Workforce 3 2 Management organization BG 1 LT 0 SK Ideal Project and risk management Cost estimates Regulatory approach Decommissioning│G.Schmidt/V.Ustohalova/A.Minhans│Brussels│17.12.2013 6
  • 7. www.oeko.de 2. Results of the comparison We identified • that the national framework which should be able to set up, organise and control the responsible decommissioning organisation is not highly developed in Bulgaria, Lithuania and Slovakia and could be better understood as a national task, • that the national organisations, which should be held fully responsible for decommissioning, are not optimally organised to fulfil their task in the necessary manner, • that project management can be largely improved in most of the decommissioning projects. Decommissioning│G.Schmidt/V.Ustohalova/A.Minhans│Brussels│17.12.2013 7
  • 8. www.oeko.de 3. Derived recommendations Eight recommendations were derived from the findings. These concern: 1. Improving national control conditions 2. Towards co-shared financing 3. Improving responsibility of the managing organisation 4. Improving project and risk management 5. Continuation of the good practice in licensing 6. Improving cost estimates 7. Improving effectiveness of the workforce 8. Achieving clear responsibility attributions Decommissioning│G.Schmidt/V.Ustohalova/A.Minhans│Brussels│17.12.2013 8
  • 9. www.oeko.de 3. Recommendations In recommendation 8 we propose a clear attribution of responsibilities. The respective organisational structure to achieve this can be designed as shown in the figure. Decommissioning│G.Schmidt/V.Ustohalova/A.Minhans│Brussels│17.12.2013 9
  • 10. www.oeko.de Vielen Dank für Ihre Aufmerksamkeit! Thank you for your attention! Haben Sie noch Fragen? Do you have any questions? ?
  • 11. www.oeko.de The recommendations in full text Recommendation 1: Improving national control conditions The introduction of EU/member state shared projects and a joint steering of the strategic decisions of the organisation that is responsible for implementing decommissioning is recommended in order to strengthen the role of the national controlling administrator and to increase the cost effectiveness. Recommendation 2: Towards co-shared financing The EU support of the decommissioning should be re-organized as co-sharing projects. Cosharing of the costs would increase the country’s interest in con-trolling the managing organisation’s strategic decisions towards increased cost effectiveness. In the co-financed and co-directed projects both institutions financing the activity should equally control their effectiveness. The share should be defined with a fixed level, but allowing to reduce the EC’s contribution in case of projects that are only in part related to decommissioning. The fixed level should be depending from the country’s abilities, but shall not be below certain thresholds to achieve the desired goal. Recommendation 3: Improving responsibility of the managing organisation A clearer attribution of responsibilities in respect to strategic decisions is recommended. In accordance with this proposed re-organisation and under consideration of the specific conditions in this case (e.g. cofinancing, shared control) a possible advanced structure of the management organisation in accordance with the identified best practice is recommended. 11
  • 12. www.oeko.de The recommendations in full text Recommendation 4: Improving project and risk management A complete and adequate project and risk management, including the respective task-tailored IT tools (PMIS), for the decommissioning project has to be considered a state-of-the-art requirement. Improving, completing and fully implementing project and risk management should be given the highest priority. Management should set up respective work methods and tools, the controlling institutions should supervise their design and timely implementation in the managing process. Recommendation 5: Continuation of the good practice in licensing Licensing issues should be carefully considered within the risk assessment and should not be underestimated, because failures and delays in this field can have major consequences for the decommissioning process. The good practice identified so far should be continued and upgraded to match to the upcoming more sensitive work steps. Recommendation 6: Improving cost estimates Cost estimates are based on state-of-the-art. To further increase their reliability and usefulness, cost escalation and risks should be included in future estimates. Recommendation 7: Improving effectiveness of the workforce The relevance of workforce issues, such as conversion management and training, is well recognized in all three countries. Explicit training, e.g. in the less technical and more soft skill areas of project management, risk communication and knowledge management is desirable. 12
  • 13. www.oeko.de The recommendations in full text Recommendation 8: Achieving clear responsibility attributions In any future setting clear, unambiguous and transparent responsibilities have to be defined and implemented to avoid any dilution and dispersion of responsibilities over several institutions and to avoid unclear and uncommunicated attributions. The national supervising institution and the EC should be jointly attributed the full responsibility for controlling the national managing organisation’s strategic decisions. They should have the right and as well the obligation to completely oversee the whole performance of the decommissioning project and to steer and control the management. The managing organisation has to be attributed the sole, undivided and unambiguous responsibility to a) prepare the proposals and the complete background for the strategic decisions and b) for any operational decisions. This includes all overseeing, steering and supervision over organisation-internal as well as any external processes, including procurement, cost and time control. To control the due diligence of all financial transactions, the managing organisation should define, set up, implement and regularly audit an adequate internal control system. The national controlling institution or an equivalent (e.g. the Ministry for Finance) as well as the EC should have the right and the obligation to oversee and exemplarily check the adequacy of the management’s measures to keep control over its financial transactions. If, in the case of Bulgaria and Slovakia, the interferences of the constitution of the managing organisation’s with its non-decommissioning obligations is too complicated and may reduce the effectiveness of the management level’s ability to act, an institutional separation of the decommissioning project part should be considered. 13