This document summarizes key points from a presentation on achieving low carbon buildings through design and procurement processes. It discusses definitions of procurement and low carbon concepts. Case studies are presented on projects that achieved energy efficiency through measures like high insulation, air tightness, and renewable energy integration. Passivhaus standards are examined as an approach to near-zero carbon buildings. The importance of accurate specifications, quality control, and training in achieving performance targets is emphasized.
Measures of Central Tendency: Mean, Median and Mode
Low Carbon Housing and Supply Chain Development - Dr Andrew Platten
1. Achieving Low Carbon Buildings - Design and Procurement Processes Dr Andrew Platten Associate Dean, Leeds Metropolitan University Chair Centre for Urban and Built Environment
2. What is procurement ? About finding a service for the client At the right quality Right time Right price ….and making the client feel good
3. What is low carbon ? Energy efficiency Renewable energy sources Low environmental impact Zero waste Sustainable materials Reuse ? Adaptability for the future ?
4. Introduction The need for affordable and energy efficient homes A commitment for zero carbon new build by 2016 now 2019 Home design led by the Code for Sustainable Homes (CSH), complementing the introduction of Energy Performance Certificates in 2007 Part L of the Building regulations which is leading to ongoing changes in thermal performance and the adoption of low carbon design Best practice in procurement and process for 16 years Effect linking all parties in the design and production process, clients and contractors to achieve efficiency and improvement in the industry Public sector has acted as the exemplar for change BSF / NHS LIFT / HMR legacy
6. International Green Standards BREEAM with 12 different guides for buildings PassivHaus Leadership in Energy and Environmental Design China Three Star Green Star – Australia Estidama Pearl Rating System
7. CSH Design Categories energy usage and CO2 emissions, pollution, water usage, standards for health and well-being, the adoption of low impact and energy reducing materials, standards for management on site, the management of surface water run-off , the protection of ecology and waste minimisation
9. Low or Zero Carbon Technologies (LZC) Not mandatory to the CSH, but credit awarded for 10% reduction in carbon emissions as a result of supply from a renewable source (1 credit), or 15% reduction in carbon emissions (2 credits) CSH controls include: accredited external renewable sources / biomass such as burning, gasification or anaerobic digestion, ESCO (an Energy Services Company), Renewables including: solar including solar thermal and photovoltaics, small scale hydro power, wind turbines, CHP or heat pump technology
10. BREEAM – Multi-residential Design Stage (DS) leading to an Interim BREEAM Certificate Post-Construction Stage (PCS) leading to a Final BREEAM Certificate post-construction review of an interim design-stage assessment post-construction assessment
12. BREEAM Environmental Weightings Management: Credits awarded for planning, design meetings, on site control and user information Energy: Credit awarded for CO2 emission reduction, sub-metering, lighting, LZC technologies, white goods, CHP, drying space. Minimum standards set for each section and additional credits awarded for innovation
14. The Supply Chain Getting it right, cost, time and quality Procurement encouraged to achieve best public benefit Education, housing and health sectors placed wider criteria in selection processes Public sector led innovation eg CSR. Low carbon, local benefit to the regions First tier companies placed with the responsibility to develop their supply chains – public sector frameworks such as Yorbuild / GM Procure / Efficiency North The reality of public sector intervention to aid development RDA support in the regional sectors to end 2011 Post 2011 regional growth with private sector support ? Private sector financers now using development as a guarantee of quality
15. Egan’s Regeneration Skills Environmental Economic Socio-cultural Governance Transportation Quality of services to the public The quality of the built environment Effectively, public sector clients need to emphasise these criteria in developer and contractor selection processes, for example employment, carbon reduction or efficiency gains
16. Partnering Process Seen as a means to achieve change and innovation Both internal and external to client organisations Transparency of process Appointing a partnering team Developing team members ready for collaboration Common aims and processes Performance measurement
17. Housing Market Actions Long term shortage of supply in the UK which has kept prices high Affordability issues Subject to huge change in the past 9 months Pre-June 2010 Sustainable Communities: Homes for All launched a huge upgrading process for existing homes (Decent Homes), HIPS investment in stock management and Pathfinder
18. Case Study: Pathfinder The East Lancashire pathfinder Elevate established four new build developments adopting the partnership model and selected developer / contractors using environmental criteria in addition to wider performance and economic indicators Key performance indicators (KPI) were developed to measure the performance of the developers KPI were used to determine a proportion of the developer return
19. Elevate KPIs Incentivised Code for Sustainable Homes Design quality Implementation of Phase Milestones Local Labour Local Suppliers Quality Good Constructor Practices Predictability of Construction Training Health and Safety Good Developer Practices Developer Satisfaction Not Incentivised Community Satisfaction Partnering Relationships Supply Chain Satisfaction Sustainable Development Land Registry Property Prices Demographic Change Local Health Statistics Crime Statistics
20. Blackburn Waterside Two year programme RSL with regional contractor £14,390,000 value 131 units Mixed tenure Brown field site Timber frame system
25. Blackburn Waterside Use of timber framed construction to achieve low U value, built by an accredited supplier Local labour maximised for other elements Training plan monitored Monthly progress recording
26. Post 2010 Government investment curtailed The low carbon agenda has changed DECC LCBP closed The Green Deal: home improvement paid for via energy bills due Spring 2012 RSLs in a tight corner District authorities with some movement for now, BREEAM Excellent is a planning requirement in some areas Efficiency / cost accuracy top priority Learning the building science Zero carbon the home of the committed client ? The Good Homes Alliance, the Green Building Store, etc
27. Case Study: STAMFORD BROOK Evaluating the Impact of an Enhanced Energy Performance Standard on Load-bearing Masonry Domestic Construction Partners in Innovation CI 39/3/663 - BD2324 Stamford Brook is a development of around 700 dwellings constructed on part of the Dunham Massey Estate near Altrincham in Cheshire.
28. Background Construction period 2004 - 2010. A partnership agreement between the land owner, the National Trust, Redrow and Bryant Homes. A “Partners in Innovation” (PII) project with the CeBE at Leeds Metropolitan University (Leeds Met) that has investigated various aspects of the design and construction processes.
29. Project Objectives The overall PII project objective was to support future reviews of Part L of the Building Regulations Evaluation of the various impacts on a large scale masonry housing development of a range of improvement measures that could be used to meet the requirements of an advanced energy performance standard The impacts and issues that the project was designed to assess included the following: Technical Impact Economic Impact Regulatory Issues Design Process Issues Site Project Management and Construction Process Issues In-use Performance
30. The EPS08 Energy Standard used at Stamford Brook The EPS08 standard was a prototype energy standard for the St Nicholas Court project with the intention that it would inform the revision of the Building Regulations that was expected at the time to occur in 2008. The EPS08 standard defines elemental target U-values for the main construction elements, a maximum limit for air permeability and a limit on the carbon intensity of the heating system. The equivalent carbon emission rate for an EPS08 compliant dwelling would be around 10% to 15% better than that required under Part L1a 2006, depending upon dwelling form and size.
32. Min Air Supply Ventilation Standards The “build tight – ventilate right” concept has been promoted since the eighties; the current Approved Document L for England and Wales sets the air permeability target for new dwellings at 10m3/hm2 at 50Pa. Reducing air permeability – in other words, uncontrolled air leakage – is a cost-effective means to improve energy efficiency. Indeed, the Passivhaus house standard requires an air permeability index of 1m3/hm2 at 50Pa.
33. Project Findings Party wall thermal by pass: Experiments undertaken at Stamford Brook have shown that heat loss via party wall cavities in masonry dwellings can be significant. The party wall thermal bypasses will be present in most new masonry dwellings with cavity party walls Measurements have shown that the party walls at Stamford Brook have an effective U-value of around 0.5 W/m2K to 0.7 W/m2K. Analysis of the experimental data has shown that the mechanism for heat loss via the party wall is driven by upwards air movement in the cavity. Heat is then lost via the loft space.
34. Airtightness The design adopted (cavity masonry construction) is perfectly capable of delivering the specified target air permeability of 5 m3/(h.m2) @ 50 Pa The airtightness work at Stamford Brook has demonstrated that the technology used, parged masonry walls linked to airtight top floor ceilings and ground floors, can deliver airtightness that is below 2 m3/(h.m2) @ 50Pa. The difficulties encountered were process related: incomplete design information insufficient attention to detailed sequencing of operations, that were not systematic in their control of quality and did not provide consistent feedback to improve design and construction practices.
36. Reducing Carbon – Passivhaus External shell - U-Value that does not exceed 0.15 W/m2/K Limiting U-values of approximately 0.25-0.35 W/m2/K Passive use of solar energy is a significant factor in PassivHaus design. Windows should have U-values not exceeding 0.80 W/m².K for both glazing and frames - this requires the window frame to incorporate insulation and the glazing to be triple.
37. Passivhaus Air leakage (n50) through unwanted gaps and cracks in the building fabric must be less than 0.6 times the house volume per hour under negative and positive pressurisation. Design air permeability of 7 to 10 m2/hr/m3@ 50 Pa. This is approximately a factor of 10 poorer than the PassivHaus standard. Pre-heating incoming air Mechanical or passive stack air ventilation Heat exchange for vented air at 80% efficiency
38. Passivhaus Energy-saving household appliances: Low energy refrigerators, stoves, freezers, lamps, washers, dryers, etc. are indispensable in a PassivHaus. Dedicated low-energy lights are provided in a number of rooms in a new dwelling. Total energy demand for space heating and cooling less than 15 kWh/m2/yr Typically 55 kWh/m2/yr 1
39. Case Study: Carnegie Village: Leeds Metropolitan University 479 study bedrooms in ‘cluster flat’ and ‘townhouse’ arrangements, 10,275m2. BREEAM Excellent, 76.1% Low energy installations High levels of insulation High levels of airtightness Mechanical heat recovery ventilation systems Low Nox, A-rated gas condensing boilers Solar water heating
40.
41. Low water use aerated taps and showers, dual flush WCs - SUDS (sustainable drainage system) wastewater attenuation system
42. Full, low energy lighting /passive infrared (PIR) to common areas
46. Use of A-rated Green Guide products FSC-certified timber
47.
48. Case Study: DenbyDale PassivHaus The Green Building Store First UK Passivhaus to be built with cavity wall construction. One of the first certified Passivhaus homes in the UK Minimal heating - using 90% less energy for space heating than the UK average £141K basic build costs 118m2 three-bed detached house
49. Windows and Openings Ecopassiv timber windows that are triple glazed and have a whole-window U-value of just under 0.8W/m2K (and glazing U-value of 0.6W/m2K). Low-emissivity coatings and argon fill Windows for Passivhaus-level projects usually have to have some insulation in the frame (in this case polyurethane).
51. MVHR Mechanical ventilation and heat recovery Air supply to dry areas and vented from wet areas Heat is extracted from outgoing air and used to heat the incoming air saving 90% of heat Economic at air tightness less than 3 air changes per hour @50 Pa
52. Air tightness Final figures Airtightness: 0.33 ach @50 Pa measured using the Euronorm and Passivhaus method Passivhausrequirements are 0.6 ach @ 50 Pa
54. What of Procurement ? The framework is here to stay Accuracy of cost estimates and savings taking priority but still targets set for CSR and sustainability will often gain planning approval and this will remain part of the picture Thus the PQQ and Performance management are the art of procurement Issues are in meeting design standards and conveying them in procurement documentation Evidence of performance on site and project performance will be the credentials for continued engagement But how we use procurement to achieve zero carbon is one of education and commitment of all parties Technical quality and on site standards will be critical to high performance dwellings in the lead up to 2019 Training standards and supervision remain important
55. Post Script What did we learn from the boom period ? What can we do in the next ten years that will make a difference Energy Public / private balance Politics Environment Efficiency Technical accuracy Excellence management