SlideShare une entreprise Scribd logo
1  sur  9
Télécharger pour lire hors ligne
Énergivie Summit 
04 novembre 2014 
Strasbourg, France 
Quel rôle de la recherche et innovation 
dans le déploiement européen du BIM ? 
Sylvain Kubicki 
Architecte, Docteur en Sciences de l’Architecture. 
Public Research Centre Henri Tudor. 
This work is licensed under the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License. 
To view a copy of this license, visit http://creativecommons.org/licenses/by-nc-sa/4.0/.
La recherche (francophone) et le BIM 2 
10/22/11 
8 
S. Kubicki - CRP Henri Tudor - 2014 ⓒ 
SCAN’14, Luxembourg
Recherche et innovation 3 
10/22/11 
8 
S. Kubicki - CRP Henri Tudor - 2014 ⓒ 
“BIM Research” 
Mohamad Kassem, Nahim Iqbal, Graham Kelly, Stephen Lockley, Nashwan Dawood (2014). Building information modelling: protocols for 
collaborative design processes. Journal of Information Technology in Construction (ITcon), Vol. 19, pg. 126-149, http://www.itcon.org/2014/7
Recherche et innovation 3 
10/22/11 
8 
S. Kubicki - CRP Henri Tudor - 2014 ⓒ 
“BIM Research” 
Prescriptif 
- Modèle de charte BIM, projet 
pilote 
vs. Descriptif 
- Analyse rétro-active ou 
immersive 
Processus 
- Evaluation de la valeur 
ajoutée 
- Modélisation des échanges 
Technologie 
- Formats et modélisation des 
données 
Pratiques et support aux 
réglementations publiques 
- Ex. COBie trial en G-B 
Mohamad Kassem, Nahim Iqbal, Graham Kelly, Stephen Lockley, Nashwan Dawood (2014). Building information modelling: protocols for 
collaborative design processes. Journal of Information Technology in Construction (ITcon), Vol. 19, pg. 126-149, http://www.itcon.org/2014/7
Évaluer la diffusion des pratiques BIM 4 
À l’échelle de l’organisation 
Areas of Interest and their Respective Credits 
Information Accuracy 
Graphical Information 
10/22/11 
8 
S. Kubicki - CRP Henri Tudor - 2014 ⓒ 
Évaluation de la maturité des organisations 
• Interactive BIM 
Capability Maturity Model, 
NIBS 
• Organizational BIM 
Assessment, Penn state 
University 
Insérer la référence biblio ici 
Data Richness 
04 05 
01 
06 
04 
03 
05 
08 
02 
06 
08 
09 
08 
07 
06 
05 
04 
03 
02 
01 
00 
Life-cycle Views 
Change Management 
Roles or Disciplines 
Business Process 
Timeliness/ Delivery Method Response 
Spatial Capability 
Interoperability/ IFC 
Support 
Strategy 
the Mission, Vision, Goals, and Objectives, along 
with management support, BIM Champions, and 
BIM Planning Committee. 
0 
Non-Existent 
1 
Initial 
2 
Managed 
3 
Defined 
4 
Quantitatively Managed 
5 
Optimizing 11 19 25 
Organizational Mission 
and Goals 
A mission is the fundamental purpose for 
existence of an organization. 
Goals are specific aims which the organization 
wishes to accomplish. 
No organizational mission 
or goals 
Basic organizational 
mission established 
Established basic 
organizational goals 
Organization mission which 
addressed purpose, 
services, values (at a 
minimum) 
Goals are specific, 
measurable, attainable, 
relevant, and timely 
Mission and goals are 
regularly revisited, 
maintained and updated 
(as necessary) 
3 5 5 
BIM Vision and 
Objectives 
A vision is a picture of what an organization is 
striving to become 
Objectives are specific tasks or steps that when 
accomplished move the organization toward their 
goals 
No BIM vision or objectives 
defined 
Basic BIM vision is 
establish 
Established Basic BIM 
Objectives 
BIM Vision address 
mission, strategy, and 
culture 
BIM objectives are specific, 
measurable, attainable, 
relevant, and timely 
Vision and objectives are 
regularly revisited, 
maintained and updated 
(as necessary) 
1 3 5 
Management Support To what level does management support the BIM 
Planning Process 
No management support Limited support for 
feasibility study 
Full Support for BIM 
Implementation with some 
resource commitment 
Full support for BIM 
Implementation with 
appropriate resource 
commitment 
Limited support for 
continuing efforts with a 
limited budget 
Full support of continuing 
efforts 4 5 5 
BIM Champion 
A BIM Champion is a person who is technically 
skilled and motivated to guide an organization to 
improve their processes by pushing adoption, 
managing resistance to change and ensuring 
implementation of BIM 
No BIM Champion 
BIM Champion identified 
but limited time committed 
to BIM initiative 
BIM Champion with 
adequate time commitment 
Multiple BIM Champions 
with each working Group 
Executive Level BIM 
Support Champion with 
limit time commitment 
Executive-level BIM 
Champion working closely 
with working group 
champion 
3 4 5 
BIM Planning 
Committee 
The BIM Planning Committee is responsible for 
developing the BIM strategy of the organization No BIM Planning 
Committee established 
Small Ad-hoc Committee 
with only those interested 
in BIM 
BIM Committee is 
formalized but not inclusive 
of all operating units 
Multi-disciplinary BIM 
Planning Committee 
established with members 
from all operative units 
Planning Committee 
includes members for all 
level of the organization 
including executives 
BIM Planning decisions are 
integrated with 
organizational Strategic 
Planning 
0 2 5 
BIM Uses The specific methods of implementing BIM 0 
Non-Existent 
1 
Initial 
2 
Managed 
3 
Defined 
4 
Quantitatively Managed 
5 
Optimizing 2 7 10 
Project Uses The specific methods of implementing BIM on 
projects 
No BIM Uses for Projects 
identified 
Minimal owner 
requirements for BIM Minimal BIM Uses required 
Extensive use of BIM with 
limited sharing between 
parties 
Extensive use of BIM with 
sharing between parties 
within project phase 
Open sharing of BIM data 
across all parties and 
project phases 
1 3 5 
Operational Uses The specific methods of implementing BIM within 
the organization 
No BIM Uses for 
Operations identified 
Record (As-Built) BIM 
model received by 
operations 
Record BIM data imported 
or referenced for 
operational uses 
BIM data manually 
maintained for operational 
uses 
BIM data is directly 
integrated with operational 
systems 
BIM data maintained with 
operational systems in 
Real-time 
1 4 5 
Process The means by which the BIM Uses are 
accomplished 
0 
Non-Existent 
1 
Initial 
2 
Managed 
3 
Defined 
4 
Quantitatively Managed 
5 
Optimizing 0 5 10 
Project Processes The documentation of External Project BIM 
Processes 
No external project BIM 
processes documented 
High-level BIM process 
documented for each party 
Integrated high-level BIM 
process pocumented 
Detailed BIM process 
documented for primary 
BIM Uses 
Detailed BIM process 
documented for all BIM 
Uses 
Detailed BIM process 
documented and regularly 
maintained and updated 
0 3 5 
Organizational 
Processes 
The documentation of Internal Organizational BIM 
Processes 
No internal organizational 
BIM processes 
documented 
High-Level BIM process 
documented for each 
operating unit 
Integrated high-level 
organizational process 
documented 
Detailed BIM process 
documented for primary 
organizational Uses 
Detailed BIM process 
documented for all BIM 
Uses 
Detailed BIM Process 
documented and regularly 
maintained and updated 
0 2 5 
Planning Element Description Current 
Level 
Target 
Level 
Total 
Possible 
Information Information Needs refer to Model Level of 
Development and Facility Data requirements 
0 
Non-Existent 
1 
Initial 
2 
Managed 
3 
Defined 
4 
Quantitatively Managed 
5 
Optimizing 1 6 15 
Model Element 
Breakdown (MEB) 
Model Element Breakdown Structure are 
identifiers assigned to each physical or functional 
element in the breakdown of the facility model. 
No consistent 
Organizational Model 
Element Breakdown 
Organizational Model 
Element Breakdown 
defined but not uniform 
within entire organization 
Level of Maturity 
Organizational Model 
Element Breakdown is 
uniform within the 
organization 
Organizational Model 
Element Breakdown 
aligned with industry 
standards 
Organizational Model 
Element Breakdown 
updated along with industry 
standards 
Organizational 
modifications to industry 
standard model element 
breakdown are balloted for 
inclusion in industry 
standards 
0 1 5 
Level of Development 
(LOD) 
The Level of Development (LOD) describes the 
level of completeness to which a Model Element 
developed 
No consistent Level of 
Development 
LOD defined but not 
standardized witin the 
entire organization 
LOD standardized within 
the organization 
Organizational LOD 
standards aligned with 
industry standards 
Model View Definitions & 
Information Delivery 
Manuals are used to define 
LOD 
Organizational modification 
to MVDs and IDMs are 
balloted for inclusion in 
industry standards 
0 2 5 
Facility Data 
Facility Data is non-graphical information that can 
be attached to objects within the Model that 
defines various characteristics of the object 
No consistent facility data 
requirement 
Facility data defined but 
not internally standardized 
Facility data defined and 
standardized within the 
organization 
Organizational facility data 
attributes aligned with 
industry standards 
Facility data attributes 
aligned with open 
standards 
Facility data attributes 
updated with open 
standards 
1 3 5 
Infrastructure Technological and physical systems needed for 
the operation of BIM with the organization. 
0 
Non-Existent 
1 
Initial 
2 
Managed 
3 
Defined 
4 
Quantitatively Managed 
5 
Optimizing 7 11 15 
Software the programs and other operating information 
used by a computer to implement BIM No BIM Software Software capable of 
accepting BIM data 
Basic BIM Software 
Systems 
Advanced BIM software 
systems 
All software systems 
available to all personnel 
Program established for 
continous updating of BIM 
software systems 
3 4 5 
Hardware physical interconnections and devices required to 
store and execute (or run) BIM software 
No Hardware capable of 
running BIM software 
Some hardware capable of 
running basic BIM software 
All Hardware Capable of 
Running Basic BIM 
Software 
Some advanced hardware 
systems with the 
organzation 
All organization hardware 
is capable of running 
advanced BIM Software 
Program established for 
continous updating of BIM 
hardware systems 
3 4 5 
Physical Spaces Functional areas within a facility used to properly 
implement BIM within the organization No dedicated BIM space Single workstation for 
viewing BIM data 
Small Workspace for 
Collaborating with a screen 
large enough for multiple 
viewers 
BIM room for collaborating 
with large screen viewing 
capability 
Multiple collaborative 
workspaces within regular 
workspace 
Program established for 
continous updating of BIM 
spaces 
1 3 5 
Personnel Human resources of an organization 0 
Non-Existent 
1 
Initial 
2 
Managed 
3 
Defined 
4 
Quantitatively Managed 
5 
Optimizing 8 15 25 
Roles and 
Responsibilities 
Roles are the primary function assumed by a 
person within the organization and Responsiblities 
are the tasks or obligations that one is required to 
do as part of that role. 
No roles and 
responsibilities 
documented 
BIM is the responsibility of 
the BIM Champion 
BIM is the responsibility of 
the interdisciplinary BIM 
Group 
BIM responsibility lies with 
each operating unit 
BIM responsibility lies with 
each person 
BIM Responsiblities are 
regularly reviewed to 
ensure they are properly 
distributed 
1 3 5 
Organizational 
Hierarchy 
An arrangement of personnel and group into 
functional groups within the organization 
Organizational Hierarchy 
does not address BIM 
BIM Champion outside of 
typical organizational 
hierarchy 
Small BIM Implementation 
Team outside the typical 
organization hierarchy 
Large interdisciplinary BIM 
Group created 
BIM Champion defined 
within each operating unit 
BIM Implemenation Team 
supports BIM Use within 
operating units 
3 4 5 
Education Education is to formally instruct about a subject No Education Program Ad hoc education as 
needed 
Formal Presentations 
on what is BIM and the 
Benefits is has for the 
organization 
Regularly conducted 
employee education 
sessions 
On-Demand education 
program established for the 
organization 
Education is seemlessly 
improved through lessons 
learned within the 
organizartion 
1 2 5 
Training Train is to teach so as to make fit, qualified, or 
proficient in a specific task or process No Training Program 
Training program run by 
vendors - only for 
necessary personnel 
Internal Training program 
for all personnel that may 
interact with BIM 
Regularly conducted and 
routine training programs 
On-Demand training 
program established for the 
organization 
Training is seemlessly 
improved through lessons 
learned within the 
organization 
1 2 5 
Change Readiness The willingness and state preparedness of an 
organization to integrate BIM 
No Change Readiness 
Awareness Established need for BIM Upper management buy-in Operating unit buy-in All individuals buy-in 
Willingness to change is 
part of the culture of the 
organization 
2 4 5 
This is the total for all the categories. Note this does reflect maturity in all sections. While the organization could score high, there could be some key areas not implemented that could hinder the organizations BIM 
Implementation. 
Totals 29 58 90
Évaluer la diffusion des pratiques BIM 5 
À l’échelle du projet 
10/22/11 
8 
S. Kubicki - CRP Henri Tudor - 2014 ⓒ 
Processus d’échanges d’information basés sur des 
maquettes numériques 
4D 
5D 
FM 
Enjeux : 
- Valeur ajoutée du BIM ? 
- ROI ? 
- Comment organiser la 
collaboration ? 
Catalogues et produits
Évaluer la diffusion des pratiques BIM 6 
À l’échelle sectorielle 
10/22/11 
8 
S. Kubicki - CRP Henri Tudor - 2014 ⓒ 
Enquêtes IT Barometer 
Evaluer le niveau 
d’informatisation du secteur 
de la construction 
Denmark, Finland and Sweden 1998 
Canada 2000 
Singapore 2005 
Sweden and Finland 2008 
New Zealand 2010 
Sweden 2012 
Luxembourg 2014 
Enquêtes BIM 
Ex. NBS, UK 
Kubicki, S. and Boton, C. (2014) IT Barometer Survey in Luxembourg: First results to 
understand IT innovation in Construction sector. International Conference on 
Applications of IT in the AEC Industry. Orlando, Florida. June 23rd-25th. pp. 179-186. 
National BIM Report 2014, from NBS
Évaluer la diffusion des pratiques BIM 7 
10/22/11 
8 
S. Kubicki - CRP Henri Tudor - 2014 ⓒ 
Niveau de maturité 1 Niveau de maturité 2 Niveau de maturité 3 
Modélisation 
Collaboration 
Intégration 
orientée-objet 
orientée-modèle 
orientée-réseau 
Pre-BIM 
- Modèles mono-disciplinaires 
- Automatisation de la 
génération des documents 2D 
ou 3D 
- Echanges ad-hoc de modèles 
- Export de données pour import 
“uni-directionnel” 
- Logiciels “BIM” CAO, 
Structure, MEP 
- Logiciels “non-BIM” : ex. PF de 
gestion de projet 
- Modélisation “avancée” : 
contrôle des paramètres, 
données non géométriques 
- Référencement de modèles 
disciplinaires 
- Simulations 4D, 5D, envir. 
- Processus d’échange 
formalisé : objectifs, disciplines, 
exigences informationnelles 
- Mono-phase / cross-phases, 
multi-directionnalité 
- Format d’échange standardisé/ 
propriétaire 
- Livrable standard (ex. COBie) 
- Logiciels “non-BIM” : 
persistance des données 
- Co-modélisation, entièrement 
multi-disciplinaire 
- Modèles nD 
- Echanges de données 
synchrone 
- Fluidité du processus, 
recouvrement et gommage des 
phases 
- Serveurs de modèles 
interopérables 
- Données BIM+PM+FM 
centralisées ou réparties 
- Cloud storage et cloud 
computing 
- Plans, métrés, cahiers 
de charges développés 
séparément 
- Incohérences 
fréquentes 
- Collaboration ad-hoc 
- Difficulté à rationaliser 
et standardiser les 
échanges 
- Investissements IT 
faibles 
- DAO 
- PF de gestion de 
projets multiples 
Modélisation 
n Dimensions 
Collaboration 
“projet” 
Technologie 
Format d’échange 
À l’échelle sectorielle 
Boton, C. & Kubicki, S. 2014. Maturité des pratiques BIM. Dimensions de modélisation, pratiques collaboratives et technologies. 
Actes du Séminaire de Conception Architecturale Numérique. Luxembourg. 18-20 juin 2014. 
Inspiré de Succar, 2009. Building information modelling framework: A research and delivery foundation for industry stakeholders . Automation in Construction. 18. 357 - 375.
Merci pour votre attention 
sylvain.kubicki@tudor.lu 
@SKubicki 
lu.linkedin.com/in/sylvainkubicki/

Contenu connexe

Tendances

BIM Uses In Design
BIM Uses In DesignBIM Uses In Design
BIM Uses In Designnevena_psu
 
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...Dalbir Dugal
 
BIM protocols: What are they? Do we need them? What should they contain?
BIM protocols: What are they? Do we need them? What should they contain?BIM protocols: What are they? Do we need them? What should they contain?
BIM protocols: What are they? Do we need them? What should they contain?Applecore Designs Limited
 
Omar selim portfolio
Omar selim portfolioOmar selim portfolio
Omar selim portfolioOmar Selim
 
Implementing BIM for Owners
Implementing BIM for OwnersImplementing BIM for Owners
Implementing BIM for OwnersDLT Solutions
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionReshma Philip
 
BIM project execution
BIM project executionBIM project execution
BIM project executionStephen Au
 
Bim and project controls
Bim and project controlsBim and project controls
Bim and project controlsOmar Selim
 
Open bim and collaboration practice
Open bim and collaboration practiceOpen bim and collaboration practice
Open bim and collaboration practiceOmar Selim
 
BIM for Construction
BIM for Construction BIM for Construction
BIM for Construction Marc Goldman
 
Building Information Modelling (BIM) in India
Building Information Modelling (BIM) in IndiaBuilding Information Modelling (BIM) in India
Building Information Modelling (BIM) in IndiaBe2camp Admin
 
Barie Hasib BIMREC-Ralph Montague ArcDox-EIR
Barie Hasib BIMREC-Ralph Montague ArcDox-EIRBarie Hasib BIMREC-Ralph Montague ArcDox-EIR
Barie Hasib BIMREC-Ralph Montague ArcDox-EIRManaging Director
 
Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building Information Modelling (BIM) Lessons at University of Hull's Student ...Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building Information Modelling (BIM) Lessons at University of Hull's Student ...Sewell Construction
 

Tendances (20)

BIM Uses In Design
BIM Uses In DesignBIM Uses In Design
BIM Uses In Design
 
5 peter trebilcock, balfour beattie
5   peter trebilcock, balfour beattie5   peter trebilcock, balfour beattie
5 peter trebilcock, balfour beattie
 
2 ross reid, pentagon
2   ross reid, pentagon2   ross reid, pentagon
2 ross reid, pentagon
 
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
 
BIM protocols: What are they? Do we need them? What should they contain?
BIM protocols: What are they? Do we need them? What should they contain?BIM protocols: What are they? Do we need them? What should they contain?
BIM protocols: What are they? Do we need them? What should they contain?
 
Global_BIM_Management_catalog
Global_BIM_Management_catalogGlobal_BIM_Management_catalog
Global_BIM_Management_catalog
 
1 andrew thomas, room 4
1   andrew thomas, room 41   andrew thomas, room 4
1 andrew thomas, room 4
 
How BIM Enhances the Design Process
How BIM Enhances the Design ProcessHow BIM Enhances the Design Process
How BIM Enhances the Design Process
 
Omar selim portfolio
Omar selim portfolioOmar selim portfolio
Omar selim portfolio
 
Implementing BIM for Owners
Implementing BIM for OwnersImplementing BIM for Owners
Implementing BIM for Owners
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuction
 
BIM project execution
BIM project executionBIM project execution
BIM project execution
 
Bim and project controls
Bim and project controlsBim and project controls
Bim and project controls
 
Introduction of nr bim consultant
Introduction of nr bim consultantIntroduction of nr bim consultant
Introduction of nr bim consultant
 
Open bim and collaboration practice
Open bim and collaboration practiceOpen bim and collaboration practice
Open bim and collaboration practice
 
BIM for Construction
BIM for Construction BIM for Construction
BIM for Construction
 
3 ralph montague, arcdox
3   ralph montague, arcdox3   ralph montague, arcdox
3 ralph montague, arcdox
 
Building Information Modelling (BIM) in India
Building Information Modelling (BIM) in IndiaBuilding Information Modelling (BIM) in India
Building Information Modelling (BIM) in India
 
Barie Hasib BIMREC-Ralph Montague ArcDox-EIR
Barie Hasib BIMREC-Ralph Montague ArcDox-EIRBarie Hasib BIMREC-Ralph Montague ArcDox-EIR
Barie Hasib BIMREC-Ralph Montague ArcDox-EIR
 
Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building Information Modelling (BIM) Lessons at University of Hull's Student ...Building Information Modelling (BIM) Lessons at University of Hull's Student ...
Building Information Modelling (BIM) Lessons at University of Hull's Student ...
 

Similaire à Quel rôle de la recherche et innovation dans le déploiement européen du BIM ?

International BIM Implementation for The Saudi Big 5
International BIM Implementation for The Saudi Big 5International BIM Implementation for The Saudi Big 5
International BIM Implementation for The Saudi Big 5Saad Al Jabri
 
FOUR PHASES OF BIM IMPLEMENTATION
FOUR PHASES OF BIM IMPLEMENTATIONFOUR PHASES OF BIM IMPLEMENTATION
FOUR PHASES OF BIM IMPLEMENTATIONsuccessdsp
 
An Overview of buildingSMART
An Overview of buildingSMARTAn Overview of buildingSMART
An Overview of buildingSMARTMariela Daskalova
 
The relation in between ITIL, Cobit, Togaf and CMMI.
The relation in between ITIL, Cobit, Togaf and CMMI.The relation in between ITIL, Cobit, Togaf and CMMI.
The relation in between ITIL, Cobit, Togaf and CMMI.Mücahit Sidimi
 
Comparison of it governance framework-COBIT, ITIL, BS7799
Comparison of it governance framework-COBIT, ITIL, BS7799Comparison of it governance framework-COBIT, ITIL, BS7799
Comparison of it governance framework-COBIT, ITIL, BS7799Meghna Verma
 
Cobit 4.1 ivooktavianti
Cobit 4.1 ivooktaviantiCobit 4.1 ivooktavianti
Cobit 4.1 ivooktaviantiIvo Oktavianti
 
Integrating ISO 27001, ISO 20000, and Project Management – From Theory to Pra...
Integrating ISO 27001, ISO 20000, and Project Management – From Theory to Pra...Integrating ISO 27001, ISO 20000, and Project Management – From Theory to Pra...
Integrating ISO 27001, ISO 20000, and Project Management – From Theory to Pra...PECB
 
SixSigma 【Continuous Study】
SixSigma 【Continuous Study】SixSigma 【Continuous Study】
SixSigma 【Continuous Study】Jerimi Soma
 
little-book-of-bim-global-2023-final-web-.pdf
little-book-of-bim-global-2023-final-web-.pdflittle-book-of-bim-global-2023-final-web-.pdf
little-book-of-bim-global-2023-final-web-.pdfRajaSrinivas14
 

Similaire à Quel rôle de la recherche et innovation dans le déploiement européen du BIM ? (20)

International BIM Implementation for The Saudi Big 5
International BIM Implementation for The Saudi Big 5International BIM Implementation for The Saudi Big 5
International BIM Implementation for The Saudi Big 5
 
FOUR PHASES OF BIM IMPLEMENTATION
FOUR PHASES OF BIM IMPLEMENTATIONFOUR PHASES OF BIM IMPLEMENTATION
FOUR PHASES OF BIM IMPLEMENTATION
 
Introduction to BIM Execution Planning (BEP) (Episode 02)
Introduction to BIM Execution Planning (BEP) (Episode 02)Introduction to BIM Execution Planning (BEP) (Episode 02)
Introduction to BIM Execution Planning (BEP) (Episode 02)
 
Ricci Piper
Ricci PiperRicci Piper
Ricci Piper
 
An Overview of buildingSMART
An Overview of buildingSMARTAn Overview of buildingSMART
An Overview of buildingSMART
 
The relation in between ITIL, Cobit, Togaf and CMMI.
The relation in between ITIL, Cobit, Togaf and CMMI.The relation in between ITIL, Cobit, Togaf and CMMI.
The relation in between ITIL, Cobit, Togaf and CMMI.
 
SIMPLE ISO 19650 TEMPLATES (BILT VIRTUAL PRESENTATION)
SIMPLE ISO 19650 TEMPLATES (BILT VIRTUAL PRESENTATION)SIMPLE ISO 19650 TEMPLATES (BILT VIRTUAL PRESENTATION)
SIMPLE ISO 19650 TEMPLATES (BILT VIRTUAL PRESENTATION)
 
Cobit 4.1 indri
Cobit 4.1 indriCobit 4.1 indri
Cobit 4.1 indri
 
Comparison of it governance framework-COBIT, ITIL, BS7799
Comparison of it governance framework-COBIT, ITIL, BS7799Comparison of it governance framework-COBIT, ITIL, BS7799
Comparison of it governance framework-COBIT, ITIL, BS7799
 
Cobit 4.1 ivo oktavianti
Cobit 4.1 ivo oktaviantiCobit 4.1 ivo oktavianti
Cobit 4.1 ivo oktavianti
 
Cobit 4.1 ivooktavianti
Cobit 4.1 ivooktaviantiCobit 4.1 ivooktavianti
Cobit 4.1 ivooktavianti
 
Cobit 4.1 ivo oktavianti
Cobit 4.1 ivo oktaviantiCobit 4.1 ivo oktavianti
Cobit 4.1 ivo oktavianti
 
Integrating ISO 27001, ISO 20000, and Project Management – From Theory to Pra...
Integrating ISO 27001, ISO 20000, and Project Management – From Theory to Pra...Integrating ISO 27001, ISO 20000, and Project Management – From Theory to Pra...
Integrating ISO 27001, ISO 20000, and Project Management – From Theory to Pra...
 
Donna Febriani
Donna FebrianiDonna Febriani
Donna Febriani
 
SixSigma 【Continuous Study】
SixSigma 【Continuous Study】SixSigma 【Continuous Study】
SixSigma 【Continuous Study】
 
John adams viewpoint
John adams viewpointJohn adams viewpoint
John adams viewpoint
 
Co5bit
Co5bitCo5bit
Co5bit
 
little-book-of-bim-global-2023-final-web-.pdf
little-book-of-bim-global-2023-final-web-.pdflittle-book-of-bim-global-2023-final-web-.pdf
little-book-of-bim-global-2023-final-web-.pdf
 
Implementing BIM to Realise Benefits (Peter Scuderi, Arup)
Implementing BIM to Realise Benefits (Peter Scuderi, Arup)Implementing BIM to Realise Benefits (Peter Scuderi, Arup)
Implementing BIM to Realise Benefits (Peter Scuderi, Arup)
 
Continuous improvement a road map
Continuous improvement   a road mapContinuous improvement   a road map
Continuous improvement a road map
 

Plus de Sylvain Kubicki

Digital Built Environment Management
Digital Built Environment ManagementDigital Built Environment Management
Digital Built Environment ManagementSylvain Kubicki
 
Workshop SDC - Cours Outils supports à la coordination 2016
Workshop SDC - Cours Outils supports à la coordination 2016Workshop SDC - Cours Outils supports à la coordination 2016
Workshop SDC - Cours Outils supports à la coordination 2016Sylvain Kubicki
 
BIM management, un savant mélange
BIM management, un savant mélangeBIM management, un savant mélange
BIM management, un savant mélangeSylvain Kubicki
 
Niveaux de maturité BIM - 2015
Niveaux de maturité BIM - 2015Niveaux de maturité BIM - 2015
Niveaux de maturité BIM - 2015Sylvain Kubicki
 
Workshop SDC - Cours Outils supports à la coordination
Workshop SDC - Cours Outils supports à la coordinationWorkshop SDC - Cours Outils supports à la coordination
Workshop SDC - Cours Outils supports à la coordinationSylvain Kubicki
 
BIM Strategy in practice
BIM Strategy in practiceBIM Strategy in practice
BIM Strategy in practiceSylvain Kubicki
 
PLM, BIM serveur : qui fait quoi, quand et comment ? Pratiques et technologie...
PLM, BIM serveur : qui fait quoi, quand et comment ? Pratiques et technologie...PLM, BIM serveur : qui fait quoi, quand et comment ? Pratiques et technologie...
PLM, BIM serveur : qui fait quoi, quand et comment ? Pratiques et technologie...Sylvain Kubicki
 
Maquette numérique BIM pour la collaboration en conception/construction. Prat...
Maquette numérique BIM pour la collaboration en conception/construction. Prat...Maquette numérique BIM pour la collaboration en conception/construction. Prat...
Maquette numérique BIM pour la collaboration en conception/construction. Prat...Sylvain Kubicki
 
Technologies mobiles et modélisation 4D pour la gestion de l’avancement de l...
Technologies mobiles et modélisation 4D pour la gestion de l’avancement de l...Technologies mobiles et modélisation 4D pour la gestion de l’avancement de l...
Technologies mobiles et modélisation 4D pour la gestion de l’avancement de l...Sylvain Kubicki
 
Introduction to the BIM Conference Luxembourg
Introduction to the BIM Conference LuxembourgIntroduction to the BIM Conference Luxembourg
Introduction to the BIM Conference LuxembourgSylvain Kubicki
 
An approach to collect building sensors data based on Building Information Mo...
An approach to collect building sensors data based on Building Information Mo...An approach to collect building sensors data based on Building Information Mo...
An approach to collect building sensors data based on Building Information Mo...Sylvain Kubicki
 
4D-based Teaching of High-rise Structural Principles
4D-based Teaching of High-rise Structural Principles4D-based Teaching of High-rise Structural Principles
4D-based Teaching of High-rise Structural PrinciplesSylvain Kubicki
 
Évaluation de la performance environnementale en co-conception architecturale
Évaluation de la performance environnementale en co-conception architecturaleÉvaluation de la performance environnementale en co-conception architecturale
Évaluation de la performance environnementale en co-conception architecturaleSylvain Kubicki
 

Plus de Sylvain Kubicki (13)

Digital Built Environment Management
Digital Built Environment ManagementDigital Built Environment Management
Digital Built Environment Management
 
Workshop SDC - Cours Outils supports à la coordination 2016
Workshop SDC - Cours Outils supports à la coordination 2016Workshop SDC - Cours Outils supports à la coordination 2016
Workshop SDC - Cours Outils supports à la coordination 2016
 
BIM management, un savant mélange
BIM management, un savant mélangeBIM management, un savant mélange
BIM management, un savant mélange
 
Niveaux de maturité BIM - 2015
Niveaux de maturité BIM - 2015Niveaux de maturité BIM - 2015
Niveaux de maturité BIM - 2015
 
Workshop SDC - Cours Outils supports à la coordination
Workshop SDC - Cours Outils supports à la coordinationWorkshop SDC - Cours Outils supports à la coordination
Workshop SDC - Cours Outils supports à la coordination
 
BIM Strategy in practice
BIM Strategy in practiceBIM Strategy in practice
BIM Strategy in practice
 
PLM, BIM serveur : qui fait quoi, quand et comment ? Pratiques et technologie...
PLM, BIM serveur : qui fait quoi, quand et comment ? Pratiques et technologie...PLM, BIM serveur : qui fait quoi, quand et comment ? Pratiques et technologie...
PLM, BIM serveur : qui fait quoi, quand et comment ? Pratiques et technologie...
 
Maquette numérique BIM pour la collaboration en conception/construction. Prat...
Maquette numérique BIM pour la collaboration en conception/construction. Prat...Maquette numérique BIM pour la collaboration en conception/construction. Prat...
Maquette numérique BIM pour la collaboration en conception/construction. Prat...
 
Technologies mobiles et modélisation 4D pour la gestion de l’avancement de l...
Technologies mobiles et modélisation 4D pour la gestion de l’avancement de l...Technologies mobiles et modélisation 4D pour la gestion de l’avancement de l...
Technologies mobiles et modélisation 4D pour la gestion de l’avancement de l...
 
Introduction to the BIM Conference Luxembourg
Introduction to the BIM Conference LuxembourgIntroduction to the BIM Conference Luxembourg
Introduction to the BIM Conference Luxembourg
 
An approach to collect building sensors data based on Building Information Mo...
An approach to collect building sensors data based on Building Information Mo...An approach to collect building sensors data based on Building Information Mo...
An approach to collect building sensors data based on Building Information Mo...
 
4D-based Teaching of High-rise Structural Principles
4D-based Teaching of High-rise Structural Principles4D-based Teaching of High-rise Structural Principles
4D-based Teaching of High-rise Structural Principles
 
Évaluation de la performance environnementale en co-conception architecturale
Évaluation de la performance environnementale en co-conception architecturaleÉvaluation de la performance environnementale en co-conception architecturale
Évaluation de la performance environnementale en co-conception architecturale
 

Dernier

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 

Dernier (20)

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 

Quel rôle de la recherche et innovation dans le déploiement européen du BIM ?

  • 1. Énergivie Summit 04 novembre 2014 Strasbourg, France Quel rôle de la recherche et innovation dans le déploiement européen du BIM ? Sylvain Kubicki Architecte, Docteur en Sciences de l’Architecture. Public Research Centre Henri Tudor. This work is licensed under the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License. To view a copy of this license, visit http://creativecommons.org/licenses/by-nc-sa/4.0/.
  • 2. La recherche (francophone) et le BIM 2 10/22/11 8 S. Kubicki - CRP Henri Tudor - 2014 ⓒ SCAN’14, Luxembourg
  • 3. Recherche et innovation 3 10/22/11 8 S. Kubicki - CRP Henri Tudor - 2014 ⓒ “BIM Research” Mohamad Kassem, Nahim Iqbal, Graham Kelly, Stephen Lockley, Nashwan Dawood (2014). Building information modelling: protocols for collaborative design processes. Journal of Information Technology in Construction (ITcon), Vol. 19, pg. 126-149, http://www.itcon.org/2014/7
  • 4. Recherche et innovation 3 10/22/11 8 S. Kubicki - CRP Henri Tudor - 2014 ⓒ “BIM Research” Prescriptif - Modèle de charte BIM, projet pilote vs. Descriptif - Analyse rétro-active ou immersive Processus - Evaluation de la valeur ajoutée - Modélisation des échanges Technologie - Formats et modélisation des données Pratiques et support aux réglementations publiques - Ex. COBie trial en G-B Mohamad Kassem, Nahim Iqbal, Graham Kelly, Stephen Lockley, Nashwan Dawood (2014). Building information modelling: protocols for collaborative design processes. Journal of Information Technology in Construction (ITcon), Vol. 19, pg. 126-149, http://www.itcon.org/2014/7
  • 5. Évaluer la diffusion des pratiques BIM 4 À l’échelle de l’organisation Areas of Interest and their Respective Credits Information Accuracy Graphical Information 10/22/11 8 S. Kubicki - CRP Henri Tudor - 2014 ⓒ Évaluation de la maturité des organisations • Interactive BIM Capability Maturity Model, NIBS • Organizational BIM Assessment, Penn state University Insérer la référence biblio ici Data Richness 04 05 01 06 04 03 05 08 02 06 08 09 08 07 06 05 04 03 02 01 00 Life-cycle Views Change Management Roles or Disciplines Business Process Timeliness/ Delivery Method Response Spatial Capability Interoperability/ IFC Support Strategy the Mission, Vision, Goals, and Objectives, along with management support, BIM Champions, and BIM Planning Committee. 0 Non-Existent 1 Initial 2 Managed 3 Defined 4 Quantitatively Managed 5 Optimizing 11 19 25 Organizational Mission and Goals A mission is the fundamental purpose for existence of an organization. Goals are specific aims which the organization wishes to accomplish. No organizational mission or goals Basic organizational mission established Established basic organizational goals Organization mission which addressed purpose, services, values (at a minimum) Goals are specific, measurable, attainable, relevant, and timely Mission and goals are regularly revisited, maintained and updated (as necessary) 3 5 5 BIM Vision and Objectives A vision is a picture of what an organization is striving to become Objectives are specific tasks or steps that when accomplished move the organization toward their goals No BIM vision or objectives defined Basic BIM vision is establish Established Basic BIM Objectives BIM Vision address mission, strategy, and culture BIM objectives are specific, measurable, attainable, relevant, and timely Vision and objectives are regularly revisited, maintained and updated (as necessary) 1 3 5 Management Support To what level does management support the BIM Planning Process No management support Limited support for feasibility study Full Support for BIM Implementation with some resource commitment Full support for BIM Implementation with appropriate resource commitment Limited support for continuing efforts with a limited budget Full support of continuing efforts 4 5 5 BIM Champion A BIM Champion is a person who is technically skilled and motivated to guide an organization to improve their processes by pushing adoption, managing resistance to change and ensuring implementation of BIM No BIM Champion BIM Champion identified but limited time committed to BIM initiative BIM Champion with adequate time commitment Multiple BIM Champions with each working Group Executive Level BIM Support Champion with limit time commitment Executive-level BIM Champion working closely with working group champion 3 4 5 BIM Planning Committee The BIM Planning Committee is responsible for developing the BIM strategy of the organization No BIM Planning Committee established Small Ad-hoc Committee with only those interested in BIM BIM Committee is formalized but not inclusive of all operating units Multi-disciplinary BIM Planning Committee established with members from all operative units Planning Committee includes members for all level of the organization including executives BIM Planning decisions are integrated with organizational Strategic Planning 0 2 5 BIM Uses The specific methods of implementing BIM 0 Non-Existent 1 Initial 2 Managed 3 Defined 4 Quantitatively Managed 5 Optimizing 2 7 10 Project Uses The specific methods of implementing BIM on projects No BIM Uses for Projects identified Minimal owner requirements for BIM Minimal BIM Uses required Extensive use of BIM with limited sharing between parties Extensive use of BIM with sharing between parties within project phase Open sharing of BIM data across all parties and project phases 1 3 5 Operational Uses The specific methods of implementing BIM within the organization No BIM Uses for Operations identified Record (As-Built) BIM model received by operations Record BIM data imported or referenced for operational uses BIM data manually maintained for operational uses BIM data is directly integrated with operational systems BIM data maintained with operational systems in Real-time 1 4 5 Process The means by which the BIM Uses are accomplished 0 Non-Existent 1 Initial 2 Managed 3 Defined 4 Quantitatively Managed 5 Optimizing 0 5 10 Project Processes The documentation of External Project BIM Processes No external project BIM processes documented High-level BIM process documented for each party Integrated high-level BIM process pocumented Detailed BIM process documented for primary BIM Uses Detailed BIM process documented for all BIM Uses Detailed BIM process documented and regularly maintained and updated 0 3 5 Organizational Processes The documentation of Internal Organizational BIM Processes No internal organizational BIM processes documented High-Level BIM process documented for each operating unit Integrated high-level organizational process documented Detailed BIM process documented for primary organizational Uses Detailed BIM process documented for all BIM Uses Detailed BIM Process documented and regularly maintained and updated 0 2 5 Planning Element Description Current Level Target Level Total Possible Information Information Needs refer to Model Level of Development and Facility Data requirements 0 Non-Existent 1 Initial 2 Managed 3 Defined 4 Quantitatively Managed 5 Optimizing 1 6 15 Model Element Breakdown (MEB) Model Element Breakdown Structure are identifiers assigned to each physical or functional element in the breakdown of the facility model. No consistent Organizational Model Element Breakdown Organizational Model Element Breakdown defined but not uniform within entire organization Level of Maturity Organizational Model Element Breakdown is uniform within the organization Organizational Model Element Breakdown aligned with industry standards Organizational Model Element Breakdown updated along with industry standards Organizational modifications to industry standard model element breakdown are balloted for inclusion in industry standards 0 1 5 Level of Development (LOD) The Level of Development (LOD) describes the level of completeness to which a Model Element developed No consistent Level of Development LOD defined but not standardized witin the entire organization LOD standardized within the organization Organizational LOD standards aligned with industry standards Model View Definitions & Information Delivery Manuals are used to define LOD Organizational modification to MVDs and IDMs are balloted for inclusion in industry standards 0 2 5 Facility Data Facility Data is non-graphical information that can be attached to objects within the Model that defines various characteristics of the object No consistent facility data requirement Facility data defined but not internally standardized Facility data defined and standardized within the organization Organizational facility data attributes aligned with industry standards Facility data attributes aligned with open standards Facility data attributes updated with open standards 1 3 5 Infrastructure Technological and physical systems needed for the operation of BIM with the organization. 0 Non-Existent 1 Initial 2 Managed 3 Defined 4 Quantitatively Managed 5 Optimizing 7 11 15 Software the programs and other operating information used by a computer to implement BIM No BIM Software Software capable of accepting BIM data Basic BIM Software Systems Advanced BIM software systems All software systems available to all personnel Program established for continous updating of BIM software systems 3 4 5 Hardware physical interconnections and devices required to store and execute (or run) BIM software No Hardware capable of running BIM software Some hardware capable of running basic BIM software All Hardware Capable of Running Basic BIM Software Some advanced hardware systems with the organzation All organization hardware is capable of running advanced BIM Software Program established for continous updating of BIM hardware systems 3 4 5 Physical Spaces Functional areas within a facility used to properly implement BIM within the organization No dedicated BIM space Single workstation for viewing BIM data Small Workspace for Collaborating with a screen large enough for multiple viewers BIM room for collaborating with large screen viewing capability Multiple collaborative workspaces within regular workspace Program established for continous updating of BIM spaces 1 3 5 Personnel Human resources of an organization 0 Non-Existent 1 Initial 2 Managed 3 Defined 4 Quantitatively Managed 5 Optimizing 8 15 25 Roles and Responsibilities Roles are the primary function assumed by a person within the organization and Responsiblities are the tasks or obligations that one is required to do as part of that role. No roles and responsibilities documented BIM is the responsibility of the BIM Champion BIM is the responsibility of the interdisciplinary BIM Group BIM responsibility lies with each operating unit BIM responsibility lies with each person BIM Responsiblities are regularly reviewed to ensure they are properly distributed 1 3 5 Organizational Hierarchy An arrangement of personnel and group into functional groups within the organization Organizational Hierarchy does not address BIM BIM Champion outside of typical organizational hierarchy Small BIM Implementation Team outside the typical organization hierarchy Large interdisciplinary BIM Group created BIM Champion defined within each operating unit BIM Implemenation Team supports BIM Use within operating units 3 4 5 Education Education is to formally instruct about a subject No Education Program Ad hoc education as needed Formal Presentations on what is BIM and the Benefits is has for the organization Regularly conducted employee education sessions On-Demand education program established for the organization Education is seemlessly improved through lessons learned within the organizartion 1 2 5 Training Train is to teach so as to make fit, qualified, or proficient in a specific task or process No Training Program Training program run by vendors - only for necessary personnel Internal Training program for all personnel that may interact with BIM Regularly conducted and routine training programs On-Demand training program established for the organization Training is seemlessly improved through lessons learned within the organization 1 2 5 Change Readiness The willingness and state preparedness of an organization to integrate BIM No Change Readiness Awareness Established need for BIM Upper management buy-in Operating unit buy-in All individuals buy-in Willingness to change is part of the culture of the organization 2 4 5 This is the total for all the categories. Note this does reflect maturity in all sections. While the organization could score high, there could be some key areas not implemented that could hinder the organizations BIM Implementation. Totals 29 58 90
  • 6. Évaluer la diffusion des pratiques BIM 5 À l’échelle du projet 10/22/11 8 S. Kubicki - CRP Henri Tudor - 2014 ⓒ Processus d’échanges d’information basés sur des maquettes numériques 4D 5D FM Enjeux : - Valeur ajoutée du BIM ? - ROI ? - Comment organiser la collaboration ? Catalogues et produits
  • 7. Évaluer la diffusion des pratiques BIM 6 À l’échelle sectorielle 10/22/11 8 S. Kubicki - CRP Henri Tudor - 2014 ⓒ Enquêtes IT Barometer Evaluer le niveau d’informatisation du secteur de la construction Denmark, Finland and Sweden 1998 Canada 2000 Singapore 2005 Sweden and Finland 2008 New Zealand 2010 Sweden 2012 Luxembourg 2014 Enquêtes BIM Ex. NBS, UK Kubicki, S. and Boton, C. (2014) IT Barometer Survey in Luxembourg: First results to understand IT innovation in Construction sector. International Conference on Applications of IT in the AEC Industry. Orlando, Florida. June 23rd-25th. pp. 179-186. National BIM Report 2014, from NBS
  • 8. Évaluer la diffusion des pratiques BIM 7 10/22/11 8 S. Kubicki - CRP Henri Tudor - 2014 ⓒ Niveau de maturité 1 Niveau de maturité 2 Niveau de maturité 3 Modélisation Collaboration Intégration orientée-objet orientée-modèle orientée-réseau Pre-BIM - Modèles mono-disciplinaires - Automatisation de la génération des documents 2D ou 3D - Echanges ad-hoc de modèles - Export de données pour import “uni-directionnel” - Logiciels “BIM” CAO, Structure, MEP - Logiciels “non-BIM” : ex. PF de gestion de projet - Modélisation “avancée” : contrôle des paramètres, données non géométriques - Référencement de modèles disciplinaires - Simulations 4D, 5D, envir. - Processus d’échange formalisé : objectifs, disciplines, exigences informationnelles - Mono-phase / cross-phases, multi-directionnalité - Format d’échange standardisé/ propriétaire - Livrable standard (ex. COBie) - Logiciels “non-BIM” : persistance des données - Co-modélisation, entièrement multi-disciplinaire - Modèles nD - Echanges de données synchrone - Fluidité du processus, recouvrement et gommage des phases - Serveurs de modèles interopérables - Données BIM+PM+FM centralisées ou réparties - Cloud storage et cloud computing - Plans, métrés, cahiers de charges développés séparément - Incohérences fréquentes - Collaboration ad-hoc - Difficulté à rationaliser et standardiser les échanges - Investissements IT faibles - DAO - PF de gestion de projets multiples Modélisation n Dimensions Collaboration “projet” Technologie Format d’échange À l’échelle sectorielle Boton, C. & Kubicki, S. 2014. Maturité des pratiques BIM. Dimensions de modélisation, pratiques collaboratives et technologies. Actes du Séminaire de Conception Architecturale Numérique. Luxembourg. 18-20 juin 2014. Inspiré de Succar, 2009. Building information modelling framework: A research and delivery foundation for industry stakeholders . Automation in Construction. 18. 357 - 375.
  • 9. Merci pour votre attention sylvain.kubicki@tudor.lu @SKubicki lu.linkedin.com/in/sylvainkubicki/