Management, Sixth Edition 2
The three-sphere model of systems management deals with the
business, organizational and technological aspects and/or issues
related to the project that should be defined and considered in
order to select and manage projects effectively and successfully
Business:
A project should supplement or serve as an answer to the business
goals
Business Issue:
 What will the project cost the company:
 What would be the impact of the website to the sales of the
magazine?
 What would be the cost of maintaining the whole system for the
website?
Copyright 2009
Information Technology Project
Management, Sixth Edition 3
Technology:
The technological sphere should state the proper hardware and
software issues to be resolved
Technological Issues:
 What operating system, server platform, scripting language and
database should be used?
 Does our current network setup allow employees to develop this
project, or do we need an upgrade?
 What will be the server and desktop specifications?
Copyright 2009
Information Technology Project
Management, Sixth Edition 4
Organization:
As for the organizational aspect, matters involving the stakeholders
should be taken into full consideration
Organizational Issues:
 Do we have the existing manpower to develop the project?
 What is the higher management support required?
 Do we have infrastructure to complete the project?
 If the project manager would be able to point out as early as
possible the aforementioned issues and integrate it to the project
it would definitely aid in determining if an organization should
invest and produce the project.
Copyright 2009
Information Technology Project
Management, Sixth Edition 5
Copyright 2009
 People in top management positions are key
stakeholders in projects
 A very important factor in helping project managers
successfully lead projects is the level of commitment
and support they receive from top management
 Without top management commitment, many projects
will fail
Information Technology Project
Management, Sixth Edition 6
Copyright 2009
 Providing adequate resources
 Approving unique project needs in a timely
manner
 Getting cooperation from other parts of the
organization
 Mentoring and coaching
Information Technology Project
Management, Sixth Edition 7
Copyright 2009
 A project life cycle is a collection of project
phases that defines:
◦ What work will be performed in each phase
◦ What deliverables will be produced and when
◦ Who is involved in each phase
◦ How management will control and approve work
produced in each phase
 A deliverable is a product or service produced or
provided as part of a project
Information Technology Project
Management, Sixth Edition 8
Copyright 2009
 In early phases of a project life cycle:
◦ Resource needs are usually lowest
◦ The level of uncertainty (risk) is highest
◦ Project stakeholders have the greatest opportunity to
influence the project
 In middle phases of a project life cycle:
◦ The certainty of completing a project improves
◦ More resources are needed
 The final phase of a project life cycle focuses on:
◦ Ensuring that project requirements were met
◦ The sponsor approves completion of the project
Information Technology Project
Management, Sixth Edition 9
Copyright 2009
Information Technology Project
Management, Sixth Edition 10
Copyright 2009
 Products also have life cycles
 The Systems Development Life Cycle (SDLC) is
a framework for describing the phases involved in
developing and maintaining information systems
 Systems development projects can follow
◦ Predictive life cycle: the scope of the project can be
clearly articulated and the schedule and cost can be
predicted
◦ Adaptive Software Development (ASD) life cycle:
requirements cannot be clearly expressed, projects are
mission driven and component based, using time-based
cycles to meet target dates
Information Technology Project
Management, Sixth Edition 11
Copyright 2009
 Waterfall model: has well-defined, linear stages of
systems development and support
 Spiral model: shows that software is developed
using an iterative or spiral approach rather than a
linear approach
 Incremental build model: provides for progressive
development of operational software
 Prototyping model: used for developing prototypes
to clarify user requirements
 Rapid Application Development (RAD) model:
used to produce systems quickly without
sacrificing quality
Information Technology Project
Management, Sixth Edition 12
Copyright 2009
Agile software development is a group of
software development methods in which requirements
and solutions evolve through collaboration between self-
organizing, cross-functional teams. It promotes adaptive
planning, evolutionary development, early delivery,
continuous improvement and encourages rapid and
flexible response to change. It is a conceptual framework
that focuses on frequently delivering small increments of
working software.
Information Technology Project
Management, Sixth Edition 13
Copyright 2009
 A project should successfully pass through each
of the project phases in order to continue on to the
next
 Management reviews, also called phase exits or
kill points, should occur after each phase to
evaluate the project’s progress, likely success,
and continued compatibility with organizational
goals
Information Technology Project
Management, Sixth Edition 14
Copyright 2009
 IT projects can be very diverse in terms of size,
complexity, products produced, application area,
and resource requirements
 IT project team members often have diverse
backgrounds and skill sets
 IT projects use diverse technologies that change
rapidly; even within one technology area, people
must be highly specialized
Information Technology Project
Management, Sixth Edition 15
Copyright 2009
 Globalization: lower trade and political barriers
and the digital revolution have made it possible to
interact almost instantaneously with billions of
other people across the planet
 Outsourcing: outsourcing is when an
organization acquires goods and/or sources from
an outside source; offshoring is sometimes used
to describe outsourcing from another country
 Virtual teams: a virtual team is a group of
individuals who work across time and space using
communication technologies
Information Technology Project
Management, Sixth Edition 16
Copyright 2009
 Issues
◦ Communications
◦ Trust
◦ Common work practices
◦ Tools
 Suggestions
◦ Employ greater project discipline
◦ Keep project momentum going
◦ Use newer tools and technology
Information Technology Project
Management, Sixth Edition 17
Copyright 2009
 Organizations remain competitive by using
outsourcing to their advantage, such as finding
ways to reduce costs
 Their next challenge is to make strategic IT
investments with outsourcing by improving their
enterprise architecture to ensure that IT
infrastructure and business processes are
integrated and standardized (see Suggested
Readings)
 Project managers should become more familiar with
negotiating contracts and other outsourcing issues
Information Technology Project
Management, Sixth Edition 18
Copyright 2009
 Increasing competiveness and responsiveness
by having a team of workers available 24/7
 Lowering costs because many virtual workers do
not require office space or support beyond their
home offices
 Providing more expertise and flexibility by
having team members from across the globe
working any time of day or night
 Increasing the work/life balance for team
members by eliminating fixed office hours and
the need to travel to work
Information Technology Project
Management, Sixth Edition 19
Copyright 2009
 Isolating team members
 Increasing the potential for communications
problems
 Reducing the ability for team members to network
and transfer information informally
 Increasing the dependence on technology to
accomplish work
Information Technology Project
Management, Sixth Edition 20

Contenu connexe

Tendances

Spm software effort estimation
Spm software effort estimationSpm software effort estimation
Spm software effort estimationKanchana Devi
 
SOFTWARE PROJECT MANAGEMENT TOOL PPT
SOFTWARE PROJECT MANAGEMENT TOOL PPTSOFTWARE PROJECT MANAGEMENT TOOL PPT
SOFTWARE PROJECT MANAGEMENT TOOL PPTSai Charan
 
06. Project Management Process Groups
06. Project Management Process Groups06. Project Management Process Groups
06. Project Management Process GroupsBhuWan Khadka
 
Selection of an appropriate project approach
Selection of an appropriate project approachSelection of an appropriate project approach
Selection of an appropriate project approachtumetr1
 
Organization and team structures
Organization and team structuresOrganization and team structures
Organization and team structuresNur Islam
 
Software Configuration Management (SCM)
Software Configuration Management (SCM)Software Configuration Management (SCM)
Software Configuration Management (SCM)Er. Shiva K. Shrestha
 
Information Technology Project Management - part 10
Information Technology Project Management - part 10Information Technology Project Management - part 10
Information Technology Project Management - part 10Rizwan Khurram
 
Software estimation
Software estimationSoftware estimation
Software estimationMd Shakir
 
Need for Software Engineering
Need for Software EngineeringNeed for Software Engineering
Need for Software EngineeringUpekha Vandebona
 
Information Technology Project Management - part 11
Information Technology Project Management - part 11Information Technology Project Management - part 11
Information Technology Project Management - part 11Rizwan Khurram
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTKathirvel Ayyaswamy
 
Information Technology Project Management - part 05
Information Technology Project Management - part 05Information Technology Project Management - part 05
Information Technology Project Management - part 05Rizwan Khurram
 
Software Cost Estimation in Software Engineering SE23
Software Cost Estimation in Software Engineering SE23Software Cost Estimation in Software Engineering SE23
Software Cost Estimation in Software Engineering SE23koolkampus
 
Project Planning in Software Engineering
Project Planning in Software EngineeringProject Planning in Software Engineering
Project Planning in Software EngineeringFáber D. Giraldo
 
Comparison of Software Engineering Models
Comparison of Software Engineering  ModelsComparison of Software Engineering  Models
Comparison of Software Engineering Modelstahir iqbal
 
Dynamic Systems Development Method (DSDM) - Agile
Dynamic Systems Development Method (DSDM) - AgileDynamic Systems Development Method (DSDM) - Agile
Dynamic Systems Development Method (DSDM) - AgileMaruf Abdullah (Rion)
 
Software Project Management chapter-1
Software Project Management chapter-1Software Project Management chapter-1
Software Project Management chapter-1Computing Cage
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTKathirvel Ayyaswamy
 

Tendances (20)

Spm software effort estimation
Spm software effort estimationSpm software effort estimation
Spm software effort estimation
 
SOFTWARE PROJECT MANAGEMENT TOOL PPT
SOFTWARE PROJECT MANAGEMENT TOOL PPTSOFTWARE PROJECT MANAGEMENT TOOL PPT
SOFTWARE PROJECT MANAGEMENT TOOL PPT
 
06. Project Management Process Groups
06. Project Management Process Groups06. Project Management Process Groups
06. Project Management Process Groups
 
Selection of an appropriate project approach
Selection of an appropriate project approachSelection of an appropriate project approach
Selection of an appropriate project approach
 
Organization and team structures
Organization and team structuresOrganization and team structures
Organization and team structures
 
Software Configuration Management (SCM)
Software Configuration Management (SCM)Software Configuration Management (SCM)
Software Configuration Management (SCM)
 
Information Technology Project Management - part 10
Information Technology Project Management - part 10Information Technology Project Management - part 10
Information Technology Project Management - part 10
 
Project Management Tools
Project Management ToolsProject Management Tools
Project Management Tools
 
Software estimation
Software estimationSoftware estimation
Software estimation
 
Need for Software Engineering
Need for Software EngineeringNeed for Software Engineering
Need for Software Engineering
 
Information Technology Project Management - part 11
Information Technology Project Management - part 11Information Technology Project Management - part 11
Information Technology Project Management - part 11
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
 
Information Technology Project Management - part 05
Information Technology Project Management - part 05Information Technology Project Management - part 05
Information Technology Project Management - part 05
 
Software Cost Estimation in Software Engineering SE23
Software Cost Estimation in Software Engineering SE23Software Cost Estimation in Software Engineering SE23
Software Cost Estimation in Software Engineering SE23
 
Project Planning in Software Engineering
Project Planning in Software EngineeringProject Planning in Software Engineering
Project Planning in Software Engineering
 
Comparison of Software Engineering Models
Comparison of Software Engineering  ModelsComparison of Software Engineering  Models
Comparison of Software Engineering Models
 
Dynamic Systems Development Method (DSDM) - Agile
Dynamic Systems Development Method (DSDM) - AgileDynamic Systems Development Method (DSDM) - Agile
Dynamic Systems Development Method (DSDM) - Agile
 
Software Project Management chapter-1
Software Project Management chapter-1Software Project Management chapter-1
Software Project Management chapter-1
 
MG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENTMG6088 SOFTWARE PROJECT MANAGEMENT
MG6088 SOFTWARE PROJECT MANAGEMENT
 
CMMI
CMMICMMI
CMMI
 

En vedette

Four-Frame Model - Reframing Organisations
Four-Frame Model - Reframing OrganisationsFour-Frame Model - Reframing Organisations
Four-Frame Model - Reframing OrganisationsPhil Vincent
 
Chap03 the project management process groups
Chap03 the project management process groupsChap03 the project management process groups
Chap03 the project management process groupsDhani Ahmad
 
The Symbolic Frame
The Symbolic FrameThe Symbolic Frame
The Symbolic Frameguest19e59c
 
มาตรฐานสีเขียวเพื่อองค์กร
มาตรฐานสีเขียวเพื่อองค์กรมาตรฐานสีเขียวเพื่อองค์กร
มาตรฐานสีเขียวเพื่อองค์กรNECTEC, NSTDA
 
2017 | E-Brochure | Project Manager Skills - Set 1 | Project Management Train...
2017 | E-Brochure | Project Manager Skills - Set 1 | Project Management Train...2017 | E-Brochure | Project Manager Skills - Set 1 | Project Management Train...
2017 | E-Brochure | Project Manager Skills - Set 1 | Project Management Train...Dcolearning
 
Digital Marketing Plan Template
Digital Marketing Plan TemplateDigital Marketing Plan Template
Digital Marketing Plan TemplateC.Y Wong
 
Practical Project Management - full course
Practical Project Management - full coursePractical Project Management - full course
Practical Project Management - full courseMarten Schoonman
 
case study on ERP success(cadbury) and failure(hershey's)
case study on ERP success(cadbury) and failure(hershey's)case study on ERP success(cadbury) and failure(hershey's)
case study on ERP success(cadbury) and failure(hershey's)Chitrangada Roy
 

En vedette (9)

Four-Frame Model - Reframing Organisations
Four-Frame Model - Reframing OrganisationsFour-Frame Model - Reframing Organisations
Four-Frame Model - Reframing Organisations
 
Chap03 the project management process groups
Chap03 the project management process groupsChap03 the project management process groups
Chap03 the project management process groups
 
The Symbolic Frame
The Symbolic FrameThe Symbolic Frame
The Symbolic Frame
 
มาตรฐานสีเขียวเพื่อองค์กร
มาตรฐานสีเขียวเพื่อองค์กรมาตรฐานสีเขียวเพื่อองค์กร
มาตรฐานสีเขียวเพื่อองค์กร
 
2017 | E-Brochure | Project Manager Skills - Set 1 | Project Management Train...
2017 | E-Brochure | Project Manager Skills - Set 1 | Project Management Train...2017 | E-Brochure | Project Manager Skills - Set 1 | Project Management Train...
2017 | E-Brochure | Project Manager Skills - Set 1 | Project Management Train...
 
Digital Marketing Plan Template
Digital Marketing Plan TemplateDigital Marketing Plan Template
Digital Marketing Plan Template
 
Practical Project Management - full course
Practical Project Management - full coursePractical Project Management - full course
Practical Project Management - full course
 
case study on ERP success(cadbury) and failure(hershey's)
case study on ERP success(cadbury) and failure(hershey's)case study on ERP success(cadbury) and failure(hershey's)
case study on ERP success(cadbury) and failure(hershey's)
 
Project management
Project managementProject management
Project management
 

Similaire à Lecture 2

1.2 Schwalbe Ch2.pptx
1.2 Schwalbe Ch2.pptx1.2 Schwalbe Ch2.pptx
1.2 Schwalbe Ch2.pptxAddayKhan
 
Chapter 2 The Project Management and Information Technology Context.ppt
Chapter 2 The Project Management and Information Technology Context.pptChapter 2 The Project Management and Information Technology Context.ppt
Chapter 2 The Project Management and Information Technology Context.pptAhmadTawfigAlRadaide
 
چپتر اول مدیریت پروژه
چپتر اول مدیریت پروژه چپتر اول مدیریت پروژه
چپتر اول مدیریت پروژه m.saboor nesar
 
Project management by hamidun
Project management by hamidunProject management by hamidun
Project management by hamidunDr Hamidun Jaafar
 
Chapter 4 Project Integration Management.ppt
Chapter 4 Project Integration Management.pptChapter 4 Project Integration Management.ppt
Chapter 4 Project Integration Management.pptAhmadTawfigAlRadaide
 
5 - Project Scope Management.pptx
5 - Project Scope Management.pptx5 - Project Scope Management.pptx
5 - Project Scope Management.pptxMuhammadNazim63
 
Chapter 3 The Project Management Process Groups A Case Study.ppt
Chapter 3 The Project Management Process Groups A Case Study.pptChapter 3 The Project Management Process Groups A Case Study.ppt
Chapter 3 The Project Management Process Groups A Case Study.pptAhmadTawfigAlRadaide
 
Project integration management
Project integration managementProject integration management
Project integration managementDhani Ahmad
 
pm_chapter1_n_1_111111111111111111111.pptx
pm_chapter1_n_1_111111111111111111111.pptxpm_chapter1_n_1_111111111111111111111.pptx
pm_chapter1_n_1_111111111111111111111.pptxlinatalole2118
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project managementBarun_agnihotri
 
Chapter 1 (1).pptx
Chapter 1 (1).pptxChapter 1 (1).pptx
Chapter 1 (1).pptxAlHasanAmeer
 
L01 introduction to pm
L01 introduction to pmL01 introduction to pm
L01 introduction to pmAsa Chan
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementNathanielAddoQuaye1
 
Chapter 1 Introduction to Project Management.ppt
Chapter 1 Introduction to Project Management.pptChapter 1 Introduction to Project Management.ppt
Chapter 1 Introduction to Project Management.pptAhmadTawfigAlRadaide
 
project management process groups
project management process groupsproject management process groups
project management process groupserick chuwa
 

Similaire à Lecture 2 (20)

1.2 Schwalbe Ch2.pptx
1.2 Schwalbe Ch2.pptx1.2 Schwalbe Ch2.pptx
1.2 Schwalbe Ch2.pptx
 
Chapter 2 The Project Management and Information Technology Context.ppt
Chapter 2 The Project Management and Information Technology Context.pptChapter 2 The Project Management and Information Technology Context.ppt
Chapter 2 The Project Management and Information Technology Context.ppt
 
چپتر اول مدیریت پروژه
چپتر اول مدیریت پروژه چپتر اول مدیریت پروژه
چپتر اول مدیریت پروژه
 
Project management by hamidun
Project management by hamidunProject management by hamidun
Project management by hamidun
 
Chapter 4 Project Integration Management.ppt
Chapter 4 Project Integration Management.pptChapter 4 Project Integration Management.ppt
Chapter 4 Project Integration Management.ppt
 
5 - Project Scope Management.pptx
5 - Project Scope Management.pptx5 - Project Scope Management.pptx
5 - Project Scope Management.pptx
 
Chapter 3 The Project Management Process Groups A Case Study.ppt
Chapter 3 The Project Management Process Groups A Case Study.pptChapter 3 The Project Management Process Groups A Case Study.ppt
Chapter 3 The Project Management Process Groups A Case Study.ppt
 
Project integration management
Project integration managementProject integration management
Project integration management
 
pm_chapter1_n_1_111111111111111111111.pptx
pm_chapter1_n_1_111111111111111111111.pptxpm_chapter1_n_1_111111111111111111111.pptx
pm_chapter1_n_1_111111111111111111111.pptx
 
01 itpm6
01 itpm601 itpm6
01 itpm6
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
ch04.ppt
ch04.pptch04.ppt
ch04.ppt
 
1. introduction
1. introduction1. introduction
1. introduction
 
Chapter 1 (1).pptx
Chapter 1 (1).pptxChapter 1 (1).pptx
Chapter 1 (1).pptx
 
L01 introduction to pm
L01 introduction to pmL01 introduction to pm
L01 introduction to pm
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
PM&IT_Ch02.pptx
PM&IT_Ch02.pptxPM&IT_Ch02.pptx
PM&IT_Ch02.pptx
 
Chapter 1 Introduction to Project Management.ppt
Chapter 1 Introduction to Project Management.pptChapter 1 Introduction to Project Management.ppt
Chapter 1 Introduction to Project Management.ppt
 
project management process groups
project management process groupsproject management process groups
project management process groups
 
02_Ch2a.pptx
02_Ch2a.pptx02_Ch2a.pptx
02_Ch2a.pptx
 

Plus de Yasir Khan (20)

Lecture 6
Lecture 6Lecture 6
Lecture 6
 
Lecture 4
Lecture 4Lecture 4
Lecture 4
 
Lecture 3
Lecture 3Lecture 3
Lecture 3
 
Lec#1
Lec#1Lec#1
Lec#1
 
Ch10 (1)
Ch10 (1)Ch10 (1)
Ch10 (1)
 
Ch09
Ch09Ch09
Ch09
 
Ch05
Ch05Ch05
Ch05
 
Snooping protocols 3
Snooping protocols 3Snooping protocols 3
Snooping protocols 3
 
Snooping 2
Snooping 2Snooping 2
Snooping 2
 
Introduction 1
Introduction 1Introduction 1
Introduction 1
 
Hpc sys
Hpc sysHpc sys
Hpc sys
 
Hpc 6 7
Hpc 6 7Hpc 6 7
Hpc 6 7
 
Hpc 4 5
Hpc 4 5Hpc 4 5
Hpc 4 5
 
Hpc 3
Hpc 3Hpc 3
Hpc 3
 
Hpc 2
Hpc 2Hpc 2
Hpc 2
 
Hpc 1
Hpc 1Hpc 1
Hpc 1
 
Flynns classification
Flynns classificationFlynns classification
Flynns classification
 
Dir based imp_5
Dir based imp_5Dir based imp_5
Dir based imp_5
 
Natural Language Processing
Natural Language ProcessingNatural Language Processing
Natural Language Processing
 
Uncertainity
Uncertainity Uncertainity
Uncertainity
 

Dernier

Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdfssuserdda66b
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxcallscotland1987
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 

Dernier (20)

Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdfVishram Singh - Textbook of Anatomy  Upper Limb and Thorax.. Volume 1 (1).pdf
Vishram Singh - Textbook of Anatomy Upper Limb and Thorax.. Volume 1 (1).pdf
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 

Lecture 2

  • 1. Information TechnologyInformation Technology Project Management, SixthProject Management, Sixth EditionEdition Note: See the text itself for full citations.
  • 2. Copyright 2009 Information Technology Project Management, Sixth Edition 2 The three-sphere model of systems management deals with the business, organizational and technological aspects and/or issues related to the project that should be defined and considered in order to select and manage projects effectively and successfully Business: A project should supplement or serve as an answer to the business goals Business Issue:  What will the project cost the company:  What would be the impact of the website to the sales of the magazine?  What would be the cost of maintaining the whole system for the website?
  • 3. Copyright 2009 Information Technology Project Management, Sixth Edition 3 Technology: The technological sphere should state the proper hardware and software issues to be resolved Technological Issues:  What operating system, server platform, scripting language and database should be used?  Does our current network setup allow employees to develop this project, or do we need an upgrade?  What will be the server and desktop specifications?
  • 4. Copyright 2009 Information Technology Project Management, Sixth Edition 4 Organization: As for the organizational aspect, matters involving the stakeholders should be taken into full consideration Organizational Issues:  Do we have the existing manpower to develop the project?  What is the higher management support required?  Do we have infrastructure to complete the project?  If the project manager would be able to point out as early as possible the aforementioned issues and integrate it to the project it would definitely aid in determining if an organization should invest and produce the project.
  • 5. Copyright 2009 Information Technology Project Management, Sixth Edition 5
  • 6. Copyright 2009  People in top management positions are key stakeholders in projects  A very important factor in helping project managers successfully lead projects is the level of commitment and support they receive from top management  Without top management commitment, many projects will fail Information Technology Project Management, Sixth Edition 6
  • 7. Copyright 2009  Providing adequate resources  Approving unique project needs in a timely manner  Getting cooperation from other parts of the organization  Mentoring and coaching Information Technology Project Management, Sixth Edition 7
  • 8. Copyright 2009  A project life cycle is a collection of project phases that defines: ◦ What work will be performed in each phase ◦ What deliverables will be produced and when ◦ Who is involved in each phase ◦ How management will control and approve work produced in each phase  A deliverable is a product or service produced or provided as part of a project Information Technology Project Management, Sixth Edition 8
  • 9. Copyright 2009  In early phases of a project life cycle: ◦ Resource needs are usually lowest ◦ The level of uncertainty (risk) is highest ◦ Project stakeholders have the greatest opportunity to influence the project  In middle phases of a project life cycle: ◦ The certainty of completing a project improves ◦ More resources are needed  The final phase of a project life cycle focuses on: ◦ Ensuring that project requirements were met ◦ The sponsor approves completion of the project Information Technology Project Management, Sixth Edition 9
  • 10. Copyright 2009 Information Technology Project Management, Sixth Edition 10
  • 11. Copyright 2009  Products also have life cycles  The Systems Development Life Cycle (SDLC) is a framework for describing the phases involved in developing and maintaining information systems  Systems development projects can follow ◦ Predictive life cycle: the scope of the project can be clearly articulated and the schedule and cost can be predicted ◦ Adaptive Software Development (ASD) life cycle: requirements cannot be clearly expressed, projects are mission driven and component based, using time-based cycles to meet target dates Information Technology Project Management, Sixth Edition 11
  • 12. Copyright 2009  Waterfall model: has well-defined, linear stages of systems development and support  Spiral model: shows that software is developed using an iterative or spiral approach rather than a linear approach  Incremental build model: provides for progressive development of operational software  Prototyping model: used for developing prototypes to clarify user requirements  Rapid Application Development (RAD) model: used to produce systems quickly without sacrificing quality Information Technology Project Management, Sixth Edition 12
  • 13. Copyright 2009 Agile software development is a group of software development methods in which requirements and solutions evolve through collaboration between self- organizing, cross-functional teams. It promotes adaptive planning, evolutionary development, early delivery, continuous improvement and encourages rapid and flexible response to change. It is a conceptual framework that focuses on frequently delivering small increments of working software. Information Technology Project Management, Sixth Edition 13
  • 14. Copyright 2009  A project should successfully pass through each of the project phases in order to continue on to the next  Management reviews, also called phase exits or kill points, should occur after each phase to evaluate the project’s progress, likely success, and continued compatibility with organizational goals Information Technology Project Management, Sixth Edition 14
  • 15. Copyright 2009  IT projects can be very diverse in terms of size, complexity, products produced, application area, and resource requirements  IT project team members often have diverse backgrounds and skill sets  IT projects use diverse technologies that change rapidly; even within one technology area, people must be highly specialized Information Technology Project Management, Sixth Edition 15
  • 16. Copyright 2009  Globalization: lower trade and political barriers and the digital revolution have made it possible to interact almost instantaneously with billions of other people across the planet  Outsourcing: outsourcing is when an organization acquires goods and/or sources from an outside source; offshoring is sometimes used to describe outsourcing from another country  Virtual teams: a virtual team is a group of individuals who work across time and space using communication technologies Information Technology Project Management, Sixth Edition 16
  • 17. Copyright 2009  Issues ◦ Communications ◦ Trust ◦ Common work practices ◦ Tools  Suggestions ◦ Employ greater project discipline ◦ Keep project momentum going ◦ Use newer tools and technology Information Technology Project Management, Sixth Edition 17
  • 18. Copyright 2009  Organizations remain competitive by using outsourcing to their advantage, such as finding ways to reduce costs  Their next challenge is to make strategic IT investments with outsourcing by improving their enterprise architecture to ensure that IT infrastructure and business processes are integrated and standardized (see Suggested Readings)  Project managers should become more familiar with negotiating contracts and other outsourcing issues Information Technology Project Management, Sixth Edition 18
  • 19. Copyright 2009  Increasing competiveness and responsiveness by having a team of workers available 24/7  Lowering costs because many virtual workers do not require office space or support beyond their home offices  Providing more expertise and flexibility by having team members from across the globe working any time of day or night  Increasing the work/life balance for team members by eliminating fixed office hours and the need to travel to work Information Technology Project Management, Sixth Edition 19
  • 20. Copyright 2009  Isolating team members  Increasing the potential for communications problems  Reducing the ability for team members to network and transfer information informally  Increasing the dependence on technology to accomplish work Information Technology Project Management, Sixth Edition 20