SlideShare une entreprise Scribd logo
1  sur  23
CENG 490Group # 6 El Kanater Water Treatment Plant Abdel Warith, Mohamed El Aroussi, Ahmed El Beheiry, Ahmed Ezzo, Ahmed Osman, Tarek
Outline Introduction Project Location Calculations Proposed Sanitary System Schematic Design Tasks
Introduction Project Description:  Water Treatment Plant in Mansheyet el Kanater Owner:  Ministry of Housing, Utilities and Urban Development Location:  Between two water streams; Rasheed and Al rayyah al beherybranch The WTP will serve Mansheit El Kanater & the Nabouring Villages
Project Location
Project Location
Calculations Population in the previous 3 decades
Calculations Cont’d Population forecast 1) Arithmetic method     k = ∆P/∆t     Pt = Po + k . ∆t Where   Po : initial population Pt : population after time t k : population growth factor population growth factor (k) is 4543.7
Calculations Cont’d Population forecast 2) Geometric method k = ln(P2/P1) / ∆t Pt = Po . ek . ∆t Where   Po : initial population   Pt : population after time t k : population growth factor population growth factor (k) is 0.02736
Calculations Cont’d Population forecast 3) Population Growth method Pn = Po (1+r)n Where Po : initial population Pn : population after n years r  :  population growth rate (%) From collected data, r= 2.66
Calculations Cont’d
Calculations Cont’d Since our WTP service area consists mainly of villages with populations less than 50,000 capita, we will use a water consumption of 135 l/c/d. The rate of increase of consumption rates can be calculated as 1/10 of the rate of increase of the population. Water Demand
Proposed Sanitary System
Fresh Water Pumping Station Backwash collecting tanks R.W Pumping Station Fresh Water Tanks Coagulant added Back Wash Process Fresh Water Pumping Station Ground Tanks R.W Pumping Station Source/ Intake Screening Sand Filters Distribution Chamber Flash Mixing Tanks Sedimentation Tanks Chlorine Added Sludge collection To MansheyatKanater Village Sludge Pumping Station Recycled Water Gravity Thickeners Sedimentation Tanks Sludge Sludge Disposal Sludge Lagoon
Proposed Sanitary System Comes from surface water (Rayah El Beheiry) Water is allowed to flow through a screening process before entering the Raw Water Pumping Station  The first step in purifying surface water is to remove large debris such as sticks, leaves, trash and other large particles, which may interfere with subsequent purification steps  The water will be pumped to higher water head using Centrifugal Pumps   Intake Source
Proposed Sanitary System Cont’d Allocates the water to the Clariflocculator As the water is distributed along the tanks, Primary Disinfectant (Pre-Chlorination) is added to the raw water  Water is chlorinated to minimize the growth of fouling organisms (e.g. Algae) on the pipe-work and tanks  Moreover, the Distribution Chamber receives Recycled Backwash Water (RBW)  Main Distribution Chamber
Proposed Sanitary System Cont’d Are Sedimentation Tanks, were the coagulation, flocculation, mixing and sedimentation process all take place Coagulant is Added to the Raw Water IT enables Small Particles to form big flocs faster Flocs Precipitate at the bottom forming sludge Sludge is collected in the Sludge Collecting Tanks Clariflocculators contain circular channels that allow the overflowed water to move to the next treatment process (Rapid Sand Filters)    Clariflocculator
Proposed Sanitary System Cont’d Water moves vertically through sand that often has a layer of activated carbon or anthracite coal above the sand  The top layer removes organic compounds such as Algae  Most particles pass through surface layers but are trapped in pore spaces or adhere to sand particles  Filters must be backwashed using water, in order to prevent pores between sand from becoming blocked  Rapid Sand Filters
Proposed Sanitary System Cont’d Final disinfectant (Chlorine) must be added to get rid of all the harmful microorganisms that make it through the RSF Treated Water enters into the Ground Reservoirs and are afterwards pumped using Treated Water Pumping Station  Water is pumped to Elevated Tanks and various Water Networks that the plant feeds Some of the water stored in the Ground Tanks, is used in the backwash process    Ground Reservoirs/Tanks
Proposed Sanitary System Cont’d The treatment water process is cut off for a distinct period, to allow the backwash process to take place  Water is pumped backwards from the ground tanks to the filters, removing particles stuck in the RSF Water is pumped backwards to the Main Distribution Chamber that allocates it back to the Clariflocculators Some particles precipitate in the Backwash Water Settlers, which are the removed to the Sludge Collecting Tanks  Backwash Process
Proposed Sanitary System Cont’d Gravity thickeners are heavy-duty circular collectors that are custom designed to handle concentrated municipal and industrial sludge Allows Sludge to concentrate (Thickening) After the Sludge concentrates at the bottom, it is pumped to the Sludge Lagoons Collected water is pumped back to the Main Distribution Chamber, which then distributes it to the Clariflocculators Gravity Thickener Tanks
Schematic design
Tasks Design the general layout of the water treatment plant Study the water treatment process and the necessary components of a WTP The structural design of the water tanks and the different buildings of the project Design the required sanitary system needed to transport the water throughout the treatment cycle, beginning from the intake until the exit
Thank You!!!

Contenu connexe

Tendances

What is the difference between sewage and drainage
What is the difference between sewage and drainageWhat is the difference between sewage and drainage
What is the difference between sewage and drainage
Naresh Kuruba
 
Intelligent Drip Irrigation System By MD RAHEL SK
Intelligent Drip Irrigation System By MD RAHEL SKIntelligent Drip Irrigation System By MD RAHEL SK
Intelligent Drip Irrigation System By MD RAHEL SK
MD RAHEL SK
 

Tendances (18)

Drip Irrigation System 03
Drip Irrigation System 03Drip Irrigation System 03
Drip Irrigation System 03
 
DRIP IRRIGATION
DRIP IRRIGATIONDRIP IRRIGATION
DRIP IRRIGATION
 
water carriage system
water carriage systemwater carriage system
water carriage system
 
water carriage and sewage system
water carriage and sewage system water carriage and sewage system
water carriage and sewage system
 
Rwh Goal Maidan by G.S.Golani
Rwh Goal Maidan by G.S.GolaniRwh Goal Maidan by G.S.Golani
Rwh Goal Maidan by G.S.Golani
 
Drip irrigation system
Drip irrigation systemDrip irrigation system
Drip irrigation system
 
Water carriage system
Water carriage systemWater carriage system
Water carriage system
 
Chapter 1 & 2 ss (1)
Chapter 1 & 2 ss (1)Chapter 1 & 2 ss (1)
Chapter 1 & 2 ss (1)
 
What is the difference between sewage and drainage
What is the difference between sewage and drainageWhat is the difference between sewage and drainage
What is the difference between sewage and drainage
 
Sanitaion methods & technologies
Sanitaion methods & technologiesSanitaion methods & technologies
Sanitaion methods & technologies
 
Patten of collection systems of sanitation
Patten of collection systems of sanitationPatten of collection systems of sanitation
Patten of collection systems of sanitation
 
L 44 leakge management
L 44 leakge managementL 44 leakge management
L 44 leakge management
 
Concrete Reclaimer & Mixer Truck Washout
Concrete Reclaimer & Mixer Truck Washout Concrete Reclaimer & Mixer Truck Washout
Concrete Reclaimer & Mixer Truck Washout
 
Rain water harvesting in buildings
Rain water harvesting in buildings Rain water harvesting in buildings
Rain water harvesting in buildings
 
Chapter 2 trickle irrigation
Chapter 2 trickle irrigationChapter 2 trickle irrigation
Chapter 2 trickle irrigation
 
Drip irrigation system
Drip irrigation systemDrip irrigation system
Drip irrigation system
 
Irrigation
IrrigationIrrigation
Irrigation
 
Intelligent Drip Irrigation System By MD RAHEL SK
Intelligent Drip Irrigation System By MD RAHEL SKIntelligent Drip Irrigation System By MD RAHEL SK
Intelligent Drip Irrigation System By MD RAHEL SK
 

En vedette

Topik 3 sanitary pipework
Topik 3 sanitary pipeworkTopik 3 sanitary pipework
Topik 3 sanitary pipework
Inazarina Ady
 
Sem 2 bs1 drainage, sewerage disposal and treatment
Sem 2 bs1 drainage, sewerage disposal and treatmentSem 2 bs1 drainage, sewerage disposal and treatment
Sem 2 bs1 drainage, sewerage disposal and treatment
Est
 
Site selection, site planning, site divelepment
Site selection, site planning, site divelepmentSite selection, site planning, site divelepment
Site selection, site planning, site divelepment
Sidharth Ravva
 
Waste Water Treatment Process Presentation
Waste Water Treatment Process PresentationWaste Water Treatment Process Presentation
Waste Water Treatment Process Presentation
Ashish Kakadia
 
Plant site selection and layout
Plant site selection and layoutPlant site selection and layout
Plant site selection and layout
Robin Gulati
 
Presentation plumbing
Presentation plumbingPresentation plumbing
Presentation plumbing
Liguidliguid
 

En vedette (20)

Water treatment plant design
Water treatment plant designWater treatment plant design
Water treatment plant design
 
kishan dwivedi
kishan dwivedikishan dwivedi
kishan dwivedi
 
Traps and manhole aditya kumar barn1 ar14002
Traps and manhole aditya kumar barn1 ar14002Traps and manhole aditya kumar barn1 ar14002
Traps and manhole aditya kumar barn1 ar14002
 
TU Delft Water Treatment Plant Design
TU Delft Water Treatment Plant DesignTU Delft Water Treatment Plant Design
TU Delft Water Treatment Plant Design
 
07 wtp design 2
07 wtp design 207 wtp design 2
07 wtp design 2
 
Topik 3 sanitary pipework
Topik 3 sanitary pipeworkTopik 3 sanitary pipework
Topik 3 sanitary pipework
 
Sem 2 bs1 drainage, sewerage disposal and treatment
Sem 2 bs1 drainage, sewerage disposal and treatmentSem 2 bs1 drainage, sewerage disposal and treatment
Sem 2 bs1 drainage, sewerage disposal and treatment
 
S3 End Of Chapter - Loss of a Trap Seal
S3 End Of Chapter - Loss of a Trap SealS3 End Of Chapter - Loss of a Trap Seal
S3 End Of Chapter - Loss of a Trap Seal
 
Drainage system one pipe
Drainage system   one pipeDrainage system   one pipe
Drainage system one pipe
 
Selection Criteria of a Plant
Selection Criteria of a PlantSelection Criteria of a Plant
Selection Criteria of a Plant
 
Site selection, site planning, site divelepment
Site selection, site planning, site divelepmentSite selection, site planning, site divelepment
Site selection, site planning, site divelepment
 
Merancang tanda tapak, asas bangunan dan binaan
Merancang tanda tapak, asas bangunan dan binaanMerancang tanda tapak, asas bangunan dan binaan
Merancang tanda tapak, asas bangunan dan binaan
 
PIPE SYSTEMS1
PIPE SYSTEMS1PIPE SYSTEMS1
PIPE SYSTEMS1
 
Plant location
Plant locationPlant location
Plant location
 
Design criteria for waste water treatment
Design criteria for waste water treatmentDesign criteria for waste water treatment
Design criteria for waste water treatment
 
Waste Water Treatment Process Presentation
Waste Water Treatment Process PresentationWaste Water Treatment Process Presentation
Waste Water Treatment Process Presentation
 
Site Selection Criteria
Site Selection CriteriaSite Selection Criteria
Site Selection Criteria
 
Water Treatment Plant Design project
Water Treatment Plant Design projectWater Treatment Plant Design project
Water Treatment Plant Design project
 
Plant site selection and layout
Plant site selection and layoutPlant site selection and layout
Plant site selection and layout
 
Presentation plumbing
Presentation plumbingPresentation plumbing
Presentation plumbing
 

Similaire à WTP

water harvesting syatem
water harvesting syatemwater harvesting syatem
water harvesting syatem
Manish Singh
 
Wastewater%20automation
Wastewater%20automationWastewater%20automation
Wastewater%20automation
josehuesca
 

Similaire à WTP (20)

Sewage treatment plant (LINK IN DESCRIPTION FOR DOWNLOAD)
Sewage treatment plant (LINK IN DESCRIPTION FOR DOWNLOAD)Sewage treatment plant (LINK IN DESCRIPTION FOR DOWNLOAD)
Sewage treatment plant (LINK IN DESCRIPTION FOR DOWNLOAD)
 
Sewage treatment
Sewage treatmentSewage treatment
Sewage treatment
 
Stp presentation
Stp presentationStp presentation
Stp presentation
 
MBR.pptx
MBR.pptxMBR.pptx
MBR.pptx
 
Municipal wastewater treatment
Municipal wastewater treatmentMunicipal wastewater treatment
Municipal wastewater treatment
 
water harvesting syatem
water harvesting syatemwater harvesting syatem
water harvesting syatem
 
Domestic Waste water treatment
 Domestic Waste water treatment   Domestic Waste water treatment
Domestic Waste water treatment
 
Designed For Combined Common Effluent Treatment Plant Of Tarapur Midc
Designed For Combined Common Effluent Treatment Plant Of Tarapur MidcDesigned For Combined Common Effluent Treatment Plant Of Tarapur Midc
Designed For Combined Common Effluent Treatment Plant Of Tarapur Midc
 
Wastewater%20automation
Wastewater%20automationWastewater%20automation
Wastewater%20automation
 
Collection Of Sewage PPT.pptx
Collection Of Sewage PPT.pptxCollection Of Sewage PPT.pptx
Collection Of Sewage PPT.pptx
 
Osst-Alternative-Waste-SystemGroup-5.pptx
Osst-Alternative-Waste-SystemGroup-5.pptxOsst-Alternative-Waste-SystemGroup-5.pptx
Osst-Alternative-Waste-SystemGroup-5.pptx
 
Industrial waste water
Industrial waste waterIndustrial waste water
Industrial waste water
 
Carl m kuttler jr collection and estimation of sewage
Carl m kuttler jr collection and estimation of sewageCarl m kuttler jr collection and estimation of sewage
Carl m kuttler jr collection and estimation of sewage
 
Etp presentation
Etp presentationEtp presentation
Etp presentation
 
Hatchery Facilities Presentation
Hatchery Facilities PresentationHatchery Facilities Presentation
Hatchery Facilities Presentation
 
SERVICES
SERVICESSERVICES
SERVICES
 
Wastewater engineering info
Wastewater engineering infoWastewater engineering info
Wastewater engineering info
 
Collection and estimation of sewage
Collection and estimation of sewageCollection and estimation of sewage
Collection and estimation of sewage
 
project systems
project systemsproject systems
project systems
 
Design of 210 Mld Sewage Treatment Plant
Design of 210 Mld Sewage Treatment PlantDesign of 210 Mld Sewage Treatment Plant
Design of 210 Mld Sewage Treatment Plant
 

Dernier

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 

Dernier (20)

Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 

WTP

  • 1. CENG 490Group # 6 El Kanater Water Treatment Plant Abdel Warith, Mohamed El Aroussi, Ahmed El Beheiry, Ahmed Ezzo, Ahmed Osman, Tarek
  • 2. Outline Introduction Project Location Calculations Proposed Sanitary System Schematic Design Tasks
  • 3. Introduction Project Description: Water Treatment Plant in Mansheyet el Kanater Owner: Ministry of Housing, Utilities and Urban Development Location: Between two water streams; Rasheed and Al rayyah al beherybranch The WTP will serve Mansheit El Kanater & the Nabouring Villages
  • 6. Calculations Population in the previous 3 decades
  • 7. Calculations Cont’d Population forecast 1) Arithmetic method k = ∆P/∆t Pt = Po + k . ∆t Where Po : initial population Pt : population after time t k : population growth factor population growth factor (k) is 4543.7
  • 8. Calculations Cont’d Population forecast 2) Geometric method k = ln(P2/P1) / ∆t Pt = Po . ek . ∆t Where Po : initial population Pt : population after time t k : population growth factor population growth factor (k) is 0.02736
  • 9. Calculations Cont’d Population forecast 3) Population Growth method Pn = Po (1+r)n Where Po : initial population Pn : population after n years r : population growth rate (%) From collected data, r= 2.66
  • 11. Calculations Cont’d Since our WTP service area consists mainly of villages with populations less than 50,000 capita, we will use a water consumption of 135 l/c/d. The rate of increase of consumption rates can be calculated as 1/10 of the rate of increase of the population. Water Demand
  • 13. Fresh Water Pumping Station Backwash collecting tanks R.W Pumping Station Fresh Water Tanks Coagulant added Back Wash Process Fresh Water Pumping Station Ground Tanks R.W Pumping Station Source/ Intake Screening Sand Filters Distribution Chamber Flash Mixing Tanks Sedimentation Tanks Chlorine Added Sludge collection To MansheyatKanater Village Sludge Pumping Station Recycled Water Gravity Thickeners Sedimentation Tanks Sludge Sludge Disposal Sludge Lagoon
  • 14. Proposed Sanitary System Comes from surface water (Rayah El Beheiry) Water is allowed to flow through a screening process before entering the Raw Water Pumping Station The first step in purifying surface water is to remove large debris such as sticks, leaves, trash and other large particles, which may interfere with subsequent purification steps The water will be pumped to higher water head using Centrifugal Pumps Intake Source
  • 15. Proposed Sanitary System Cont’d Allocates the water to the Clariflocculator As the water is distributed along the tanks, Primary Disinfectant (Pre-Chlorination) is added to the raw water Water is chlorinated to minimize the growth of fouling organisms (e.g. Algae) on the pipe-work and tanks Moreover, the Distribution Chamber receives Recycled Backwash Water (RBW) Main Distribution Chamber
  • 16. Proposed Sanitary System Cont’d Are Sedimentation Tanks, were the coagulation, flocculation, mixing and sedimentation process all take place Coagulant is Added to the Raw Water IT enables Small Particles to form big flocs faster Flocs Precipitate at the bottom forming sludge Sludge is collected in the Sludge Collecting Tanks Clariflocculators contain circular channels that allow the overflowed water to move to the next treatment process (Rapid Sand Filters) Clariflocculator
  • 17. Proposed Sanitary System Cont’d Water moves vertically through sand that often has a layer of activated carbon or anthracite coal above the sand The top layer removes organic compounds such as Algae Most particles pass through surface layers but are trapped in pore spaces or adhere to sand particles Filters must be backwashed using water, in order to prevent pores between sand from becoming blocked Rapid Sand Filters
  • 18. Proposed Sanitary System Cont’d Final disinfectant (Chlorine) must be added to get rid of all the harmful microorganisms that make it through the RSF Treated Water enters into the Ground Reservoirs and are afterwards pumped using Treated Water Pumping Station Water is pumped to Elevated Tanks and various Water Networks that the plant feeds Some of the water stored in the Ground Tanks, is used in the backwash process Ground Reservoirs/Tanks
  • 19. Proposed Sanitary System Cont’d The treatment water process is cut off for a distinct period, to allow the backwash process to take place Water is pumped backwards from the ground tanks to the filters, removing particles stuck in the RSF Water is pumped backwards to the Main Distribution Chamber that allocates it back to the Clariflocculators Some particles precipitate in the Backwash Water Settlers, which are the removed to the Sludge Collecting Tanks Backwash Process
  • 20. Proposed Sanitary System Cont’d Gravity thickeners are heavy-duty circular collectors that are custom designed to handle concentrated municipal and industrial sludge Allows Sludge to concentrate (Thickening) After the Sludge concentrates at the bottom, it is pumped to the Sludge Lagoons Collected water is pumped back to the Main Distribution Chamber, which then distributes it to the Clariflocculators Gravity Thickener Tanks
  • 22. Tasks Design the general layout of the water treatment plant Study the water treatment process and the necessary components of a WTP The structural design of the water tanks and the different buildings of the project Design the required sanitary system needed to transport the water throughout the treatment cycle, beginning from the intake until the exit