2. About HP
Hewlett Packard Company was founded
in 1939 by William Hewlett and David
Packard.
Headquarters in Palo Alto, California.
In 1990, HP had over 50 operations
worldwide, with revenues of $13.2 billion
and net income $739 million.
6. Manufacturing process
Printed Circuit Assembly and Test (PCAT)
* ASIC’s (Application Spesific Integrated
Circuits).
* ROM (Read Only Memory)
FAT (Final Assembly and Test)
The total factory cycle time through the PCAT
and FAT stages was about a week.
Manufacturing of the deskjet printer operated
in a pull mode.
7. The distribution process
Products from FAT sorted into three
groups destined : US DC, Europe DC,
and Asia DC.
The transportation time from Vancouver
to the US DC in California => 1 day.
Long shipment time about 4-5 weeks to
ship the printers to Europe and Asia =>
due to ocean transit and the time to clear
customs and duties at port of entry.
8. Distribution process
Line item fill rate (LIFR) calculated as the
total number of customer order line items
filled on time divided by the total number
of customer line items attempted.
Order fill rate (OFR) based on orders
completed, where an order contains
multiple line items.
10. Design Options for a distribution
network
Manufacturer Storage with Direct Shipping
•Manufacturer Storage with Direct Shipping and In-Transit Merge
•Distributor Storage with Carrier Delivery
•Distributor Storage with Last Mile Delivery
•Manufacturer or Distributor Storage with Consumer Pickup
•Retail Storage with Consumer Pickup
•Selecting a Distribution Network Design
11. Problem Identification
Uncertainty about how to set the correct inventory
level.
Different localization options make inventory difficult to
manage.
Long lead times due to transport using shipsand this in
turn adds difficulty to the forecasting process.
Shipment by ocean not by air takes four to five weeks
to ship the printers to Europe and Asia, the long lead
time means cannot faster reaction time to unexpected
changes in product mix.
High demand fluctuations in European markets leading
to higher levels of safety stocks.
Uncertainty in many local markets makes forecasting
difficult.
12. Uncertainty
Uncertainties in manufacturing process
The uncertainties in manufacturing process included
the delivery variability of incoming materials, process
yields and downtimes at the plant. The uncertainties
may increase the lead time and cause the shortage
of inventory at Distribution Center. Also,
manufacturing process don’t take into account in the
product design process, so the process not efficient
enough.
13. Uncertainty
Demand Uncertainties
Demand uncertainties could lead to inventory buildup or
back order at the Distribution Centers, especially at
European and Asian Distribution Centers. It is because
the transportation time from Vancouver to there requires
four to five weeks. Thus, the European and Asian
Distribution Centers’ ability to respond to fluctuations in
the demand for the different versions of the product is
limited. In order to assure high availability to customers,
high levels of safety stocks were set up. Therefore, it will
increase the inventory holding cost.
14. Recommendations
Improve forecasting system
Reduce lead time :
* Shipment by air freight
* Make a new plant between Asia and Europe to reduce
leadtime from FAT into DC.
ERP system implemented in DC to support
manufacturing.
Empowering e-Commerce
Using multiple facility location
15. Conclusion
Optimum inventory level can be obtained
by estimate the forecast more
accurately.
Safety stock is important for each DC to
ensure the availability stock in each DC
depends on the leadtime to each DC.