SlideShare une entreprise Scribd logo
1  sur  16
Télécharger pour lire hors ligne
Hewlett Packard Company
Deskjet Printer Supply Chain
Prepared by :
Ali Yudhi
Azhar Harris
Irawati Cipto
Dame Reiny Manalu
About HP
Hewlett Packard Company was founded
in 1939 by William Hewlett and David
Packard.
Headquarters in Palo Alto, California.
In 1990, HP had over 50 operations
worldwide, with revenues of $13.2 billion
and net income $739 million.
DeskJet Printer
• Hewlett-Packard introduced the
DeskJet Printer in 1988 and it had
become one of HP’s most successful
products.
DeskJet Printer Supply Chain
Bill of Material for Deskjet Printer
Manufacturing process
Printed Circuit Assembly and Test (PCAT)
* ASIC’s (Application Spesific Integrated
Circuits).
* ROM (Read Only Memory)
FAT (Final Assembly and Test)
The total factory cycle time through the PCAT
and FAT stages was about a week.
Manufacturing of the deskjet printer operated
in a pull mode.
The distribution process
Products from FAT sorted into three
groups destined : US DC, Europe DC,
and Asia DC.
The transportation time from Vancouver
to the US DC in California => 1 day.
Long shipment time about 4-5 weeks to
ship the printers to Europe and Asia =>
due to ocean transit and the time to clear
customs and duties at port of entry.
Distribution process
Line item fill rate (LIFR) calculated as the
total number of customer order line items
filled on time divided by the total number
of customer line items attempted.
Order fill rate (OFR) based on orders
completed, where an order contains
multiple line items.
Four process steps in DC
Design Options for a distribution
network
Manufacturer Storage with Direct Shipping
•Manufacturer Storage with Direct Shipping and In-Transit Merge
•Distributor Storage with Carrier Delivery
•Distributor Storage with Last Mile Delivery
•Manufacturer or Distributor Storage with Consumer Pickup
•Retail Storage with Consumer Pickup
•Selecting a Distribution Network Design
Problem Identification
Uncertainty about how to set the correct inventory
level.
Different localization options make inventory difficult to
manage.
Long lead times due to transport using shipsand this in
turn adds difficulty to the forecasting process.
Shipment by ocean not by air takes four to five weeks
to ship the printers to Europe and Asia, the long lead
time means cannot faster reaction time to unexpected
changes in product mix.
High demand fluctuations in European markets leading
to higher levels of safety stocks.
Uncertainty in many local markets makes forecasting
difficult.
Uncertainty
Uncertainties in manufacturing process
The uncertainties in manufacturing process included
the delivery variability of incoming materials, process
yields and downtimes at the plant. The uncertainties
may increase the lead time and cause the shortage
of inventory at Distribution Center. Also,
manufacturing process don’t take into account in the
product design process, so the process not efficient
enough.
Uncertainty
Demand Uncertainties
Demand uncertainties could lead to inventory buildup or
back order at the Distribution Centers, especially at
European and Asian Distribution Centers. It is because
the transportation time from Vancouver to there requires
four to five weeks. Thus, the European and Asian
Distribution Centers’ ability to respond to fluctuations in
the demand for the different versions of the product is
limited. In order to assure high availability to customers,
high levels of safety stocks were set up. Therefore, it will
increase the inventory holding cost.
Recommendations
Improve forecasting system
Reduce lead time :
* Shipment by air freight
* Make a new plant between Asia and Europe to reduce
leadtime from FAT into DC.
ERP system implemented in DC to support
manufacturing.
Empowering e-Commerce
Using multiple facility location
Conclusion
Optimum inventory level can be obtained
by estimate the forecast more
accurately.
Safety stock is important for each DC to
ensure the availability stock in each DC
depends on the leadtime to each DC.
Hewlett packard company Hewlett Packard Company Deskjet Printer Supply Chain

Contenu connexe

Tendances

Sport Obermeyer
Sport Obermeyer Sport Obermeyer
Sport Obermeyer
glenferry
 
American Connector Company
American Connector CompanyAmerican Connector Company
American Connector Company
Subhradeep Mitra
 
Karnataka Engineering Case Analysis
Karnataka Engineering Case Analysis Karnataka Engineering Case Analysis
Karnataka Engineering Case Analysis
Sanjay Sharma
 
Sport Obermeyer Case Study
Sport Obermeyer Case StudySport Obermeyer Case Study
Sport Obermeyer Case Study
Gourav Anvekar
 

Tendances (20)

Sport Obermeyer
Sport Obermeyer Sport Obermeyer
Sport Obermeyer
 
HP channel analysis
HP channel analysis HP channel analysis
HP channel analysis
 
Ncc case study
Ncc case studyNcc case study
Ncc case study
 
Manzana insurance case study analysis.
Manzana insurance case study analysis.Manzana insurance case study analysis.
Manzana insurance case study analysis.
 
Sport obermeyer
Sport obermeyerSport obermeyer
Sport obermeyer
 
ford strategies of supply chain case study
ford strategies of supply chain case study  ford strategies of supply chain case study
ford strategies of supply chain case study
 
Donner case Operations Management
Donner case Operations ManagementDonner case Operations Management
Donner case Operations Management
 
Supply Chain Management of ZARA
Supply Chain Management of ZARASupply Chain Management of ZARA
Supply Chain Management of ZARA
 
Barilla Spa: A case on Supply Chain Integration
Barilla Spa: A case on Supply Chain IntegrationBarilla Spa: A case on Supply Chain Integration
Barilla Spa: A case on Supply Chain Integration
 
Sport Obermeyer case study_team8_submit
Sport Obermeyer case study_team8_submitSport Obermeyer case study_team8_submit
Sport Obermeyer case study_team8_submit
 
MediSys Corp- Case Study
MediSys Corp- Case Study MediSys Corp- Case Study
MediSys Corp- Case Study
 
Hp Network Printer Design for Universality
Hp Network Printer Design for UniversalityHp Network Printer Design for Universality
Hp Network Printer Design for Universality
 
American Connector Company
American Connector CompanyAmerican Connector Company
American Connector Company
 
Merloni elettrodomestici SPA
Merloni elettrodomestici SPAMerloni elettrodomestici SPA
Merloni elettrodomestici SPA
 
Case study on 7 eleven store
Case study on 7 eleven  storeCase study on 7 eleven  store
Case study on 7 eleven store
 
Karnataka Engineering Case Analysis
Karnataka Engineering Case Analysis Karnataka Engineering Case Analysis
Karnataka Engineering Case Analysis
 
DonnerCompany
DonnerCompanyDonnerCompany
DonnerCompany
 
Sport Obermeyer Case Study
Sport Obermeyer Case StudySport Obermeyer Case Study
Sport Obermeyer Case Study
 
Amazon's European Distribution Strategy Case Study
Amazon's European Distribution Strategy Case StudyAmazon's European Distribution Strategy Case Study
Amazon's European Distribution Strategy Case Study
 
Kristen's cookie company
Kristen's cookie companyKristen's cookie company
Kristen's cookie company
 

Similaire à Hewlett packard company Hewlett Packard Company Deskjet Printer Supply Chain

Warehouse Restructuring10
Warehouse Restructuring10Warehouse Restructuring10
Warehouse Restructuring10
John White
 
Aitc Business Presentation
Aitc Business PresentationAitc Business Presentation
Aitc Business Presentation
vinaybhartia
 
Jeffrey Spencer Resume_REV1
Jeffrey Spencer Resume_REV1Jeffrey Spencer Resume_REV1
Jeffrey Spencer Resume_REV1
Jeffrey Spencer
 
Overall Project Review - Paper Furnish Optimization3
Overall Project Review - Paper Furnish Optimization3Overall Project Review - Paper Furnish Optimization3
Overall Project Review - Paper Furnish Optimization3
Paul Bullock
 
Project Tardis (5)
Project Tardis (5)Project Tardis (5)
Project Tardis (5)
Dave Grayson
 
Phase 4 – Individual Project The rough draft must be a compl.docx
Phase 4 – Individual Project The rough draft must be a compl.docxPhase 4 – Individual Project The rough draft must be a compl.docx
Phase 4 – Individual Project The rough draft must be a compl.docx
randymartin91030
 
Wf gfs and enterprise efficiency
Wf gfs and enterprise efficiencyWf gfs and enterprise efficiency
Wf gfs and enterprise efficiency
Holly Fields
 

Similaire à Hewlett packard company Hewlett Packard Company Deskjet Printer Supply Chain (20)

Coordinated product and supply chain design
Coordinated product and supply chain design Coordinated product and supply chain design
Coordinated product and supply chain design
 
Projects
ProjectsProjects
Projects
 
PPT on performance collaboration
PPT on performance collaboration PPT on performance collaboration
PPT on performance collaboration
 
Strategic Lead Time Management
Strategic Lead Time ManagementStrategic Lead Time Management
Strategic Lead Time Management
 
Distribution Powerpoint
Distribution PowerpointDistribution Powerpoint
Distribution Powerpoint
 
Ppt of challenge leadershipv3
Ppt of challenge leadershipv3Ppt of challenge leadershipv3
Ppt of challenge leadershipv3
 
Plant location and layout
Plant location and layoutPlant location and layout
Plant location and layout
 
Airport Luggage Tracking System.ppt
Airport Luggage Tracking System.pptAirport Luggage Tracking System.ppt
Airport Luggage Tracking System.ppt
 
Warehouse Restructuring10
Warehouse Restructuring10Warehouse Restructuring10
Warehouse Restructuring10
 
Mba ii pmom_unit-4.4 supply chain management a
Mba ii pmom_unit-4.4 supply chain management aMba ii pmom_unit-4.4 supply chain management a
Mba ii pmom_unit-4.4 supply chain management a
 
Aitc Business Presentation
Aitc Business PresentationAitc Business Presentation
Aitc Business Presentation
 
Jeffrey Spencer Resume_REV1
Jeffrey Spencer Resume_REV1Jeffrey Spencer Resume_REV1
Jeffrey Spencer Resume_REV1
 
Overall Project Review - Paper Furnish Optimization3
Overall Project Review - Paper Furnish Optimization3Overall Project Review - Paper Furnish Optimization3
Overall Project Review - Paper Furnish Optimization3
 
Designing the supply chain network
Designing the supply chain networkDesigning the supply chain network
Designing the supply chain network
 
Project Tardis (5)
Project Tardis (5)Project Tardis (5)
Project Tardis (5)
 
inventory management and case studies
inventory management and case studies inventory management and case studies
inventory management and case studies
 
strategic value of a first project to digitise analogue collections
strategic value of a first project to digitise analogue collectionsstrategic value of a first project to digitise analogue collections
strategic value of a first project to digitise analogue collections
 
Phase 4 – Individual Project The rough draft must be a compl.docx
Phase 4 – Individual Project The rough draft must be a compl.docxPhase 4 – Individual Project The rough draft must be a compl.docx
Phase 4 – Individual Project The rough draft must be a compl.docx
 
Wf gfs and enterprise efficiency
Wf gfs and enterprise efficiencyWf gfs and enterprise efficiency
Wf gfs and enterprise efficiency
 
Invest NI Lean Conference 2016 | Case Study: AES | Our lean journey
Invest NI Lean Conference 2016 | Case Study: AES | Our lean journeyInvest NI Lean Conference 2016 | Case Study: AES | Our lean journey
Invest NI Lean Conference 2016 | Case Study: AES | Our lean journey
 

Plus de aliyudhi_h

Plus de aliyudhi_h (20)

Presentasi CRGP 124 - Ali Yudhi
Presentasi CRGP 124 - Ali YudhiPresentasi CRGP 124 - Ali Yudhi
Presentasi CRGP 124 - Ali Yudhi
 
Makalah CRGP 124 Star BPKP - Ali Yudhi BPOM.pdf
Makalah CRGP 124 Star BPKP - Ali Yudhi BPOM.pdfMakalah CRGP 124 Star BPKP - Ali Yudhi BPOM.pdf
Makalah CRGP 124 Star BPKP - Ali Yudhi BPOM.pdf
 
Diklat Sertifikasi CSEP BPKP
Diklat Sertifikasi CSEP BPKPDiklat Sertifikasi CSEP BPKP
Diklat Sertifikasi CSEP BPKP
 
Presentasi Seminar Proyek Perubahan Diklat PIM III
Presentasi Seminar Proyek Perubahan Diklat PIM IIIPresentasi Seminar Proyek Perubahan Diklat PIM III
Presentasi Seminar Proyek Perubahan Diklat PIM III
 
Presentasi Rancangan Proyek Perubahan Diklat PIM III
Presentasi Rancangan Proyek Perubahan Diklat PIM IIIPresentasi Rancangan Proyek Perubahan Diklat PIM III
Presentasi Rancangan Proyek Perubahan Diklat PIM III
 
Rancangan Proyek Perubahan Diklat PIM III
Rancangan Proyek Perubahan Diklat PIM IIIRancangan Proyek Perubahan Diklat PIM III
Rancangan Proyek Perubahan Diklat PIM III
 
Laporan Proyek Perubahan Diklat Pim III Kementerian Sekretariat Negara
Laporan Proyek Perubahan Diklat Pim III Kementerian Sekretariat NegaraLaporan Proyek Perubahan Diklat Pim III Kementerian Sekretariat Negara
Laporan Proyek Perubahan Diklat Pim III Kementerian Sekretariat Negara
 
Diklat crmp
Diklat crmp Diklat crmp
Diklat crmp
 
Sosialisasi Perka Badan POM tentang pengendalian gratifikasi
Sosialisasi Perka Badan POM tentang pengendalian gratifikasiSosialisasi Perka Badan POM tentang pengendalian gratifikasi
Sosialisasi Perka Badan POM tentang pengendalian gratifikasi
 
FAKTOR-FAKTOR PENGHAMBAT PENERAPAN TOTAL QUALITY MANAGEMENT PADA INSTANSI PE...
FAKTOR-FAKTOR PENGHAMBAT PENERAPAN  TOTAL QUALITY MANAGEMENT PADA INSTANSI PE...FAKTOR-FAKTOR PENGHAMBAT PENERAPAN  TOTAL QUALITY MANAGEMENT PADA INSTANSI PE...
FAKTOR-FAKTOR PENGHAMBAT PENERAPAN TOTAL QUALITY MANAGEMENT PADA INSTANSI PE...
 
Presentation tesis
Presentation tesisPresentation tesis
Presentation tesis
 
Presentasi ka badan pom spip
Presentasi ka badan pom spipPresentasi ka badan pom spip
Presentasi ka badan pom spip
 
Presentasi seminar proposal diklat pim IV
Presentasi seminar proposal diklat pim IVPresentasi seminar proposal diklat pim IV
Presentasi seminar proposal diklat pim IV
 
Presentasi laporan akhir proyek perubahan diklat pim IV di PMPSDPM
Presentasi laporan akhir proyek perubahan diklat pim IV di PMPSDPMPresentasi laporan akhir proyek perubahan diklat pim IV di PMPSDPM
Presentasi laporan akhir proyek perubahan diklat pim IV di PMPSDPM
 
The Impact of Strategic Human Resources Management on the Performance of Firm...
The Impact of Strategic Human Resources Management on the Performance of Firm...The Impact of Strategic Human Resources Management on the Performance of Firm...
The Impact of Strategic Human Resources Management on the Performance of Firm...
 
Presentasi leadership v4
Presentasi leadership v4Presentasi leadership v4
Presentasi leadership v4
 
Program Pengendalian Gratifikasi (PPG)
Program Pengendalian Gratifikasi (PPG)Program Pengendalian Gratifikasi (PPG)
Program Pengendalian Gratifikasi (PPG)
 
Presentasi telkom way LEADERSHIP ARCHITECTURE AND CORPORATE CULTURE TELKOM GROUP
Presentasi telkom way LEADERSHIP ARCHITECTURE AND CORPORATE CULTURE TELKOM GROUPPresentasi telkom way LEADERSHIP ARCHITECTURE AND CORPORATE CULTURE TELKOM GROUP
Presentasi telkom way LEADERSHIP ARCHITECTURE AND CORPORATE CULTURE TELKOM GROUP
 
ForldRite Furniture Co : PLANNING TO MEET A SURGE IN DEMAND
ForldRite Furniture Co :  PLANNING TO MEET A SURGE IN DEMANDForldRite Furniture Co :  PLANNING TO MEET A SURGE IN DEMAND
ForldRite Furniture Co : PLANNING TO MEET A SURGE IN DEMAND
 
Rosewood Branding to Increase Customer Profitability and Lifetime Value l the...
Rosewood Branding to Increase Customer Profitability and Lifetime Value l the...Rosewood Branding to Increase Customer Profitability and Lifetime Value l the...
Rosewood Branding to Increase Customer Profitability and Lifetime Value l the...
 

Dernier

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
MateoGardella
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Dernier (20)

Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 

Hewlett packard company Hewlett Packard Company Deskjet Printer Supply Chain

  • 1. Hewlett Packard Company Deskjet Printer Supply Chain Prepared by : Ali Yudhi Azhar Harris Irawati Cipto Dame Reiny Manalu
  • 2. About HP Hewlett Packard Company was founded in 1939 by William Hewlett and David Packard. Headquarters in Palo Alto, California. In 1990, HP had over 50 operations worldwide, with revenues of $13.2 billion and net income $739 million.
  • 3. DeskJet Printer • Hewlett-Packard introduced the DeskJet Printer in 1988 and it had become one of HP’s most successful products.
  • 5. Bill of Material for Deskjet Printer
  • 6. Manufacturing process Printed Circuit Assembly and Test (PCAT) * ASIC’s (Application Spesific Integrated Circuits). * ROM (Read Only Memory) FAT (Final Assembly and Test) The total factory cycle time through the PCAT and FAT stages was about a week. Manufacturing of the deskjet printer operated in a pull mode.
  • 7. The distribution process Products from FAT sorted into three groups destined : US DC, Europe DC, and Asia DC. The transportation time from Vancouver to the US DC in California => 1 day. Long shipment time about 4-5 weeks to ship the printers to Europe and Asia => due to ocean transit and the time to clear customs and duties at port of entry.
  • 8. Distribution process Line item fill rate (LIFR) calculated as the total number of customer order line items filled on time divided by the total number of customer line items attempted. Order fill rate (OFR) based on orders completed, where an order contains multiple line items.
  • 10. Design Options for a distribution network Manufacturer Storage with Direct Shipping •Manufacturer Storage with Direct Shipping and In-Transit Merge •Distributor Storage with Carrier Delivery •Distributor Storage with Last Mile Delivery •Manufacturer or Distributor Storage with Consumer Pickup •Retail Storage with Consumer Pickup •Selecting a Distribution Network Design
  • 11. Problem Identification Uncertainty about how to set the correct inventory level. Different localization options make inventory difficult to manage. Long lead times due to transport using shipsand this in turn adds difficulty to the forecasting process. Shipment by ocean not by air takes four to five weeks to ship the printers to Europe and Asia, the long lead time means cannot faster reaction time to unexpected changes in product mix. High demand fluctuations in European markets leading to higher levels of safety stocks. Uncertainty in many local markets makes forecasting difficult.
  • 12. Uncertainty Uncertainties in manufacturing process The uncertainties in manufacturing process included the delivery variability of incoming materials, process yields and downtimes at the plant. The uncertainties may increase the lead time and cause the shortage of inventory at Distribution Center. Also, manufacturing process don’t take into account in the product design process, so the process not efficient enough.
  • 13. Uncertainty Demand Uncertainties Demand uncertainties could lead to inventory buildup or back order at the Distribution Centers, especially at European and Asian Distribution Centers. It is because the transportation time from Vancouver to there requires four to five weeks. Thus, the European and Asian Distribution Centers’ ability to respond to fluctuations in the demand for the different versions of the product is limited. In order to assure high availability to customers, high levels of safety stocks were set up. Therefore, it will increase the inventory holding cost.
  • 14. Recommendations Improve forecasting system Reduce lead time : * Shipment by air freight * Make a new plant between Asia and Europe to reduce leadtime from FAT into DC. ERP system implemented in DC to support manufacturing. Empowering e-Commerce Using multiple facility location
  • 15. Conclusion Optimum inventory level can be obtained by estimate the forecast more accurately. Safety stock is important for each DC to ensure the availability stock in each DC depends on the leadtime to each DC.