SlideShare une entreprise Scribd logo
1  sur  8
Télécharger pour lire hors ligne
1 | P a g e
SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
Centre for Architecture Studies in Southeast Asia (MASSA)
Bachelor of Science (Honours) (Architecture)
ARCHITECTURAL DESIGN PROJECT [ARC60108]
Sustaining Humanities
Project 1c: Detailed Design and Final Executive Report
Assessments Type Learning
outcomes
Due Presentation Assessment Weight/
Submission
Final
Assessment
Individual 4-6 Week 15
Week 16
Final Design
and Report
60% Presentation
10% Design Report
yy
`
Introduction
In addition to students ability to develop their own position in developing their individual project within
the theme of ‘sustaining humanities’- architecture for people, place and time, one key aspect of the
design project is to develop holistic and integrated aspects of technology, environment and cultural
context in architectural design.
Subsequent to Phase 2: Design Strategy and Schematic Design phase, students are required to further
develop scheme with the incorporation of environmental strategies and technological resolutions. The
intention of integrating the E&T aspect is to strengthen design on the aspect of sustainability and
buildability. Student will have additional guidance from their E&T tutor who will look into improving
Image: sectional perspective of building with all the integrated aspects
http://openbuildings.com/buildings/peoples-association-headquarters-profile-5438?_show_description=1
2 | P a g e
the green and sustainability component, suggesting on passive cooling techniques and technological
innovations. The studies will be included in a 5000 word comprehensive design report.
This phase is integrated with the module Building Technology 2. The co-requisite module will look into
how to improve the structural aspect and buildability of the project.
Objectives of Project
The objective of Phase 1c is:
 To consolidate an understanding of the holistic nature of the architectural design process, to a
given degree of detail, with emphasis on design as an integrative process, drawing as
appropriate on previous subjects of the program.
Learning Outcomes of this Project
1. Produce design development drawings for a selected portion of design with a suitable level of
Complexity.
2. Design with considerations of building performance (thermal comfort, acoustic and lighting),
regulatory frameworks, and health and safety considerations.
3. Produce drawings (both 2D and 3D), modelling, verbal presentation and a design report to
communicate and visualize architectural design and ideas.
Tasks - Methodology
1. Based on your proposed sketch design, consider and include expanded aspects of design
development in tandem with the design of spaces, e.g. regulatory requirements, fire safety,
materials, construction, sustainability, feasibility and other relevant considerations, wherever
possible, integrating their development to produce a richer, more multi-layered design.
2. Develop a selected portion of your design for technological development and resolution.
Tectonic thinking in design approach.
3. Integrate environmental strategies into your design. May look into current sustainable trends
and design features.
4. To present work in a most comprehensive, systematic, creative and comprehendible manner.
Architectural Visualization, modelling and report.
3 | P a g e
Submission Requirement
1) A Final Design Panel (6-10 A1 Panels)
Design panel will include the following:
1.1 Project Profile & Description
a. Project profile and site description
b. Design Statement and conceptual write up
c. Architectural position + design considerations
d. Design conceptual development (diagrams)
1.2 2- Drawings/Orthogonal
a. Site Plan (1:400 minimum scale)
b. Floor Plans
c. Elevations (1:200 minimum scale)
d. Sections
1.3 3-D Drawings (completely rendered)
a. Exterior View in relation to site (aerial/bird’s/elevated view)
b. Exterior view in relation to people (street/normal view)
c. Walk through the spaces (outside-inside)
d. Sectional Perspective
1.4 Architectural Detailing (1:20. 1:10 scale)
a. Full detailed wall section
b. Design features and innovations (2D/3D)
(Blow-up details)
Note: For specific requirements for item 1.4
refer to Building Technology 2 Project 2 Brief.
1.5 Scaled Model (1:200 minimum scale)
a. To show how building sits on site
b. To show overall design and building massing.
c. Scaled as per advised by studio supervisor
4 | P a g e
2) A Final Design Report
a. A3 landscape format
b. Approximately 5000 words.
Design Report Guidelines
a. Introduction (1-2 pages)
Title of your project
Abstract (200 words)
Introduction
Project Aims and Objectives
b. Site Investigation & Contextual Studies (2-4 pages)
Introduction
Historical background
Site Significant Issues
Urban Studies
Macro site analysis
c. Project Background & Design Intentions Strategies (3-5pages)
Micro site analysis
Precedent studies
Design intention
Programme and project brief
Site response
Spatial Programming
Morphological/Form studies (Adhering to the theme)
d. Environmental and Technological strategies (5-7pages)
Site planning strategies
Orientation: Wind and Solar analysis
Environmental Strategies
Sustainability concepts
Energy conservation features
Material and Resources
Acoustical Consideration
Innovations (rainwater harvesting, solar panels, others)
Structural concept (buildability, structural logic, others)
All Images:
http://www.firstinarchitecture.co.uk/archi
tecture-presentation-board-tips/
5 | P a g e
Marking criteria
There will be two (2) Assessments – Design Project and Design Report
1.0 Design Detailed Project Assessment Scheme
Marking Criteria
Marks%
FAIL
(F)
POOR
(D-,D,D+)
PASS
(C)
SATISFACTORY
(C+,B-)
GOOD
(B,B+)
VERYGOO
(A-)
EXCELLENT
(A)
Assessment
Component
Weightage
These will be assessed via the
following compliance with the
learning outcomes
100
0-39
40-49
50-54
55-64
65-74
75-79
80-100
1.0 Narrative and Project Brief
1.1 Clarity and richness of
architectural position/exploration,
project aims and objectives evident
in the design work
1.2 Relevance of architecture
programme and brief
__/10%
2.0 References and Guidelines
2.1 Use of precedent studies in the
generation of programme and
design strategies.
2.2 Adhere to relevant guidelines and
design theme (project brief, UBBL,
Bomba, ROL, others.)
__/10%
3.0 Design approach and concept
3.1 Clarity, appropriateness and rigor
of design proposition/ strategy in
response to the contextual
conditions (synthesis on programme
and context in deriving design.
3.2 Detailed design that meets
functional requirements (planning) of
the proposed programme and
contextual conditions.
__/30%
4.0 Poetics, Tectonics & Exploration
Design Development drawing for a
selected portion of design with
suitable level of complexity and
supporting the students’ design
exploration. (space and tectonics)
__/15%
6 | P a g e
5.0 Buildability and Performance
5.1 Consideration of building
performance: thermal comfort,
acoustic and lighting.
5.2 Adapting regulatory framework
that guide design and building
construction.
5.3 Adapting health and safety
guidelines in design.
__/15%
6.0 Overall presentation and design
communications
___/15%
7.0 Verbal communications ___/5%
Assessment Weight: 50% Total (Over-all) ____/100
Note: 1. Rubric Assessment is attached to the Project 1a Assessment Sheet, refer to as page
2.0 Design Project Report Assessment Sheet
Marking Criteria
Marks%
FAIL
(F)
POOR
(D-,D,D+)
PASS
(C)
SATISFACTORY
(C+,B-)
GOOD
(B,B+)
VERYGOO
(A-)
EXCELLENT
(A)
Assessment
Component
Weightage
These will be assessed via the
following compliance with the
learning outcomes
10%
0-39
40-49
50-54
55-64
65-74
75-79
80-1001.0 Project background & brief __/10%
2.0 Site Investigation &
Contextual Studies & Analysis __/10%
3.0 Design Intentions/Strategies
Exploration through design
-Design suitability
-Building Performance
-Compliance with ordinances.
-Site planning Strategies
-Spatial Programming
__/35%
4.0 Sustainable Feature and
Elements (E&T Strategies)
-structural and buildability
-services and requirements
__/20%
5.0 Final Design
-Site Plan and Floor Plans
-Elevations and Sections
-Rendered 3D Drawings
-Axon & Sectional Perspective
-Others (details, wallsection, etc.)
__/20%
7 | P a g e
6.0 Tutorial Log Sheets __/5%
Assessment Weight: 10% Total (Over-all) ____/100%
Suggested References
1. Allison, P. David Adjaya, Making Public Buildings. London: Thames & Hudson
2. Baker, G. 1989. Design Strategies In Architecture (2nd
Ed.). New York: Van Nostrand Reinhold.
3. Hertzberger, H. 1991. Lessons For Students In Architecture. Rotterdam: 010 Publishers.
4. Ligtelijn, V. 1999. Aldo Van Eyck Works. (1995 Ed.). The Netherlands: Thoth Publisher.
5. Allen, E.,1993 Architectural Detailing: Function, Constructability-Aesthetics(3rd
Ed.): Wiley
6. Bauer, M, Mosle, P. and Schwarz, M., Green Building: Guidebook for Sustainable Architecture:
Springer
7. Charleson, A., Structure in Architecture: A Sourcebook for Architects and Structural Engineers
(2nd
Ed.): Routledge
8. Yee, R, Architectural Drawing: A Visual Compendium (4th
Ed.), 2003, Wiley
9. Architect’s Data, Ernst and Neufert, P. 4th
Ed., 2012, Wiley-Blackwell
10. Abu Bakar, H., (2006), Guide to Fire Protection in Malaysia, Malaysia, The Institute of Fire
Engineers (UK) Malaysia Branch, Kuala Lumpur.
Timeline and Schedule
Week 9 : Exploration on Tectonic qualities of design, Spatial & Form articulation
Week 10 : Finalizing Schemes Spatial Planning & Form Design
Week 11 : Finalizing Design with structural details and components.
Week 12 : Finalizing Design with structural details and components.
Interim- Design Final Working on minor improvements/ additions. 70% done
Week 13 : Finalizing final detailed design and presentation
Design Final Working on minor improvements/ additions. 80-90% done
Week 14 : Printing and preparation (Optional Tutorial)
Week 15 : Final Submission and Pin-up
Final Design Review
Week 16 : ADP Comprehensive Report Submission
Note : Refer to module outline for the detailed activities, tutorials and suggested references.
8 | P a g e
Submission Date and Guidelines
Interim : Monday, 20 November 2017 (Week 12)
Final Submission
Project 1c Pin-up : Wednesday, 13 December 2017 (Week 15)
Final Design Review : Thursday, 14 December 2017 (Week 15)
Final Comprehensive : Monday, 18 December 2017 (Week 16)
Executive Report
Note:
1. Final presentation schedule and pin-up layout to be released and uploaded on the
TIMeS portal on Week 13.
2. Student should present within 20-30 minutes including Q &A from the external panellists.
3. TGC Portfolio link to be submitted to Facebook Group Page.
4. ADP Report to be submitted on 18th
December 2017, before 2:00 pm
at C5 Academic Staff Room.
Prepared by: Approved by:
Prince Favis Isip Mohd Adib Ramli
……………………………. …………………………….
Date: 24/8/2017 Date: 25/8/2017
Stream Coordinator Programme Director
(Design Studies)
Email: princefavis.isip@taylors.edu.my
Remarks:
1. The Project Brief is to be distributed to the students in the first week of the semester.
2. Any changes to the Project Brief shall be communicated (in writing) to the Programme Director and
the approved revised version must be communicated to the students

Contenu connexe

Tendances

Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016Preston Liew
 
Arch design studio 2 module outline
Arch design studio 2 module outlineArch design studio 2 module outline
Arch design studio 2 module outlineJian Leo
 
Btech module outline
Btech module outlineBtech module outline
Btech module outlinePreston Liew
 
Project brief 2 architecture studio 5 march 2016 v3
Project brief 2 architecture studio 5 march 2016  v3Project brief 2 architecture studio 5 march 2016  v3
Project brief 2 architecture studio 5 march 2016 v3Preston Liew
 
Module outline bm
Module outline bmModule outline bm
Module outline bmJian Leo
 
SEMESTER 3 : BUILDING CONSTRUCTION 2 MODULE OUTLINE
SEMESTER 3 : BUILDING CONSTRUCTION 2 MODULE OUTLINESEMESTER 3 : BUILDING CONSTRUCTION 2 MODULE OUTLINE
SEMESTER 3 : BUILDING CONSTRUCTION 2 MODULE OUTLINEDarshiini Vig
 
Arc1126 project 2b retreat house at fraser s hill (1)
Arc1126 project 2b retreat house at fraser s hill (1)Arc1126 project 2b retreat house at fraser s hill (1)
Arc1126 project 2b retreat house at fraser s hill (1)Preston Liew
 
Project brief 1 architecture studio 4 august2015
Project brief 1 architecture studio 4 august2015Project brief 1 architecture studio 4 august2015
Project brief 1 architecture studio 4 august2015Preston Liew
 
BUILDING TECHNOLOGY PROJECT 2 BRIEF
BUILDING TECHNOLOGY PROJECT 2 BRIEFBUILDING TECHNOLOGY PROJECT 2 BRIEF
BUILDING TECHNOLOGY PROJECT 2 BRIEFJoyeeLee0131
 
Project brief 2 b construction 2 march 2016 (new)
Project brief 2 b construction 2 march 2016 (new)Project brief 2 b construction 2 march 2016 (new)
Project brief 2 b construction 2 march 2016 (new)Arvindhan Balasingam
 
Design Communication Module Outline
Design Communication Module OutlineDesign Communication Module Outline
Design Communication Module OutlineNatalie Yunxian
 
Architecture, culture and history 1 precedent studies project brief - march 2016
Architecture, culture and history 1 precedent studies project brief - march 2016Architecture, culture and history 1 precedent studies project brief - march 2016
Architecture, culture and history 1 precedent studies project brief - march 2016Lau Hui Ming Belinda
 
Project 2 brief architecture studio 4 arc60206 august 2015
Project 2 brief  architecture studio 4 arc60206 august 2015Project 2 brief  architecture studio 4 arc60206 august 2015
Project 2 brief architecture studio 4 arc60206 august 2015Preston Liew
 
Arch design studio 1 module outline
Arch design studio 1 module outlineArch design studio 1 module outline
Arch design studio 1 module outlineJian Leo
 
BUILDING TECHNOLOGY PROJECT 1 BRIEF
BUILDING TECHNOLOGY PROJECT 1 BRIEFBUILDING TECHNOLOGY PROJECT 1 BRIEF
BUILDING TECHNOLOGY PROJECT 1 BRIEFJoyeeLee0131
 
SEMESTER 2.5 MODULE OUTLINE
SEMESTER 2.5 MODULE OUTLINE SEMESTER 2.5 MODULE OUTLINE
SEMESTER 2.5 MODULE OUTLINE Darshiini Vig
 
Conceptual design
Conceptual designConceptual design
Conceptual designIrfan Ullah
 

Tendances (19)

Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016Architectural design project project 1b brief august 2016
Architectural design project project 1b brief august 2016
 
Arch design studio 2 module outline
Arch design studio 2 module outlineArch design studio 2 module outline
Arch design studio 2 module outline
 
Btech module outline
Btech module outlineBtech module outline
Btech module outline
 
Project brief 2 architecture studio 5 march 2016 v3
Project brief 2 architecture studio 5 march 2016  v3Project brief 2 architecture studio 5 march 2016  v3
Project brief 2 architecture studio 5 march 2016 v3
 
Module outline bm
Module outline bmModule outline bm
Module outline bm
 
SEMESTER 3 : BUILDING CONSTRUCTION 2 MODULE OUTLINE
SEMESTER 3 : BUILDING CONSTRUCTION 2 MODULE OUTLINESEMESTER 3 : BUILDING CONSTRUCTION 2 MODULE OUTLINE
SEMESTER 3 : BUILDING CONSTRUCTION 2 MODULE OUTLINE
 
Arc1126 project 2b retreat house at fraser s hill (1)
Arc1126 project 2b retreat house at fraser s hill (1)Arc1126 project 2b retreat house at fraser s hill (1)
Arc1126 project 2b retreat house at fraser s hill (1)
 
Project brief 1 architecture studio 4 august2015
Project brief 1 architecture studio 4 august2015Project brief 1 architecture studio 4 august2015
Project brief 1 architecture studio 4 august2015
 
BUILDING TECHNOLOGY PROJECT 2 BRIEF
BUILDING TECHNOLOGY PROJECT 2 BRIEFBUILDING TECHNOLOGY PROJECT 2 BRIEF
BUILDING TECHNOLOGY PROJECT 2 BRIEF
 
Project brief 2 b construction 2 march 2016 (new)
Project brief 2 b construction 2 march 2016 (new)Project brief 2 b construction 2 march 2016 (new)
Project brief 2 b construction 2 march 2016 (new)
 
Design Communication Module Outline
Design Communication Module OutlineDesign Communication Module Outline
Design Communication Module Outline
 
Architecture, culture and history 1 precedent studies project brief - march 2016
Architecture, culture and history 1 precedent studies project brief - march 2016Architecture, culture and history 1 precedent studies project brief - march 2016
Architecture, culture and history 1 precedent studies project brief - march 2016
 
Project 2 brief architecture studio 4 arc60206 august 2015
Project 2 brief  architecture studio 4 arc60206 august 2015Project 2 brief  architecture studio 4 arc60206 august 2015
Project 2 brief architecture studio 4 arc60206 august 2015
 
Arch design studio 1 module outline
Arch design studio 1 module outlineArch design studio 1 module outline
Arch design studio 1 module outline
 
BUILDING TECHNOLOGY PROJECT 1 BRIEF
BUILDING TECHNOLOGY PROJECT 1 BRIEFBUILDING TECHNOLOGY PROJECT 1 BRIEF
BUILDING TECHNOLOGY PROJECT 1 BRIEF
 
Studio 3 proj 3
Studio 3 proj 3Studio 3 proj 3
Studio 3 proj 3
 
SEMESTER 2.5 MODULE OUTLINE
SEMESTER 2.5 MODULE OUTLINE SEMESTER 2.5 MODULE OUTLINE
SEMESTER 2.5 MODULE OUTLINE
 
Conceptual design
Conceptual designConceptual design
Conceptual design
 
Co ct1
Co ct1Co ct1
Co ct1
 

Similaire à SEM 6 : STUDIO PROJECT 1C

ADP - PROJ 1B BRIEF
ADP - PROJ 1B BRIEFADP - PROJ 1B BRIEF
ADP - PROJ 1B BRIEFYen Min Khor
 
ADP - PROJ 1A BRIEF
ADP - PROJ 1A BRIEFADP - PROJ 1A BRIEF
ADP - PROJ 1A BRIEFYen Min Khor
 
Arc60103 (arc1313) 1 april 2014 project brief final
Arc60103 (arc1313) 1 april 2014 project brief finalArc60103 (arc1313) 1 april 2014 project brief final
Arc60103 (arc1313) 1 april 2014 project brief finalAnthony Chew
 
Arc60103 (arc1313) 1 april 2014 project brief final
Arc60103 (arc1313) 1 april 2014 project brief finalArc60103 (arc1313) 1 april 2014 project brief final
Arc60103 (arc1313) 1 april 2014 project brief finalPreston Liew
 
Building con 1 (arc1523) project 2 brief august 2015
Building con 1 (arc1523) project 2 brief   august 2015Building con 1 (arc1523) project 2 brief   august 2015
Building con 1 (arc1523) project 2 brief august 2015Chow Hong Da
 
Building con 1 (arc1523) project 2 brief
Building con 1 (arc1523) project 2 brief   Building con 1 (arc1523) project 2 brief
Building con 1 (arc1523) project 2 brief Darshiini Vig
 
SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1Darshiini Vig
 
SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2Darshiini Vig
 
Project brief 1 architecture studio 4 august2015
Project brief 1 architecture studio 4 august2015Project brief 1 architecture studio 4 august2015
Project brief 1 architecture studio 4 august2015Anthony Chew
 
Building con 1 (arc 1523) project 2 brief aug 2014 (1)
Building con 1 (arc 1523) project 2 brief aug 2014 (1)Building con 1 (arc 1523) project 2 brief aug 2014 (1)
Building con 1 (arc 1523) project 2 brief aug 2014 (1)Anthony Chew
 
Building con 1 (arc 1523) project 2 brief aug 2014
Building con 1 (arc 1523) project 2 brief aug 2014Building con 1 (arc 1523) project 2 brief aug 2014
Building con 1 (arc 1523) project 2 brief aug 2014Preston Liew
 
studio 5 brief 2017
studio 5 brief 2017studio 5 brief 2017
studio 5 brief 2017Yen Min Khor
 
SEM 5 : PROJECT 2 STUDIO
SEM 5 : PROJECT 2 STUDIOSEM 5 : PROJECT 2 STUDIO
SEM 5 : PROJECT 2 STUDIODarshiini Vig
 
Arc1126 project 2 pavilion @ national botanical garden shah alam
Arc1126 project 2 pavilion @ national botanical garden shah alamArc1126 project 2 pavilion @ national botanical garden shah alam
Arc1126 project 2 pavilion @ national botanical garden shah alamLau Hui Ming Belinda
 
Arc1126 project 2 pavilion @ national botanical garden shah alam (1)
Arc1126 project 2 pavilion @ national botanical garden shah alam (1)Arc1126 project 2 pavilion @ national botanical garden shah alam (1)
Arc1126 project 2 pavilion @ national botanical garden shah alam (1)Joeylau97
 
Culture and History I Project Brief
Culture and History I Project BriefCulture and History I Project Brief
Culture and History I Project BriefBolin Loong
 
Arc60103 (arc1313) march 2015 project brief
Arc60103 (arc1313) march 2015 project briefArc60103 (arc1313) march 2015 project brief
Arc60103 (arc1313) march 2015 project briefArvindhan Balasingam
 
Arc60103 (arc1313) march 2015 project brief
Arc60103 (arc1313) march 2015 project briefArc60103 (arc1313) march 2015 project brief
Arc60103 (arc1313) march 2015 project briefChow Hong Da
 
Arc60103 (arc1313) march 2015 project brief
Arc60103 (arc1313) march 2015 project briefArc60103 (arc1313) march 2015 project brief
Arc60103 (arc1313) march 2015 project briefaswadtheman
 
Arc60103 (arc1313) march 2015 project brief
Arc60103 (arc1313) march 2015 project briefArc60103 (arc1313) march 2015 project brief
Arc60103 (arc1313) march 2015 project briefaswadtheman
 

Similaire à SEM 6 : STUDIO PROJECT 1C (20)

ADP - PROJ 1B BRIEF
ADP - PROJ 1B BRIEFADP - PROJ 1B BRIEF
ADP - PROJ 1B BRIEF
 
ADP - PROJ 1A BRIEF
ADP - PROJ 1A BRIEFADP - PROJ 1A BRIEF
ADP - PROJ 1A BRIEF
 
Arc60103 (arc1313) 1 april 2014 project brief final
Arc60103 (arc1313) 1 april 2014 project brief finalArc60103 (arc1313) 1 april 2014 project brief final
Arc60103 (arc1313) 1 april 2014 project brief final
 
Arc60103 (arc1313) 1 april 2014 project brief final
Arc60103 (arc1313) 1 april 2014 project brief finalArc60103 (arc1313) 1 april 2014 project brief final
Arc60103 (arc1313) 1 april 2014 project brief final
 
Building con 1 (arc1523) project 2 brief august 2015
Building con 1 (arc1523) project 2 brief   august 2015Building con 1 (arc1523) project 2 brief   august 2015
Building con 1 (arc1523) project 2 brief august 2015
 
Building con 1 (arc1523) project 2 brief
Building con 1 (arc1523) project 2 brief   Building con 1 (arc1523) project 2 brief
Building con 1 (arc1523) project 2 brief
 
SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1
 
SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2
 
Project brief 1 architecture studio 4 august2015
Project brief 1 architecture studio 4 august2015Project brief 1 architecture studio 4 august2015
Project brief 1 architecture studio 4 august2015
 
Building con 1 (arc 1523) project 2 brief aug 2014 (1)
Building con 1 (arc 1523) project 2 brief aug 2014 (1)Building con 1 (arc 1523) project 2 brief aug 2014 (1)
Building con 1 (arc 1523) project 2 brief aug 2014 (1)
 
Building con 1 (arc 1523) project 2 brief aug 2014
Building con 1 (arc 1523) project 2 brief aug 2014Building con 1 (arc 1523) project 2 brief aug 2014
Building con 1 (arc 1523) project 2 brief aug 2014
 
studio 5 brief 2017
studio 5 brief 2017studio 5 brief 2017
studio 5 brief 2017
 
SEM 5 : PROJECT 2 STUDIO
SEM 5 : PROJECT 2 STUDIOSEM 5 : PROJECT 2 STUDIO
SEM 5 : PROJECT 2 STUDIO
 
Arc1126 project 2 pavilion @ national botanical garden shah alam
Arc1126 project 2 pavilion @ national botanical garden shah alamArc1126 project 2 pavilion @ national botanical garden shah alam
Arc1126 project 2 pavilion @ national botanical garden shah alam
 
Arc1126 project 2 pavilion @ national botanical garden shah alam (1)
Arc1126 project 2 pavilion @ national botanical garden shah alam (1)Arc1126 project 2 pavilion @ national botanical garden shah alam (1)
Arc1126 project 2 pavilion @ national botanical garden shah alam (1)
 
Culture and History I Project Brief
Culture and History I Project BriefCulture and History I Project Brief
Culture and History I Project Brief
 
Arc60103 (arc1313) march 2015 project brief
Arc60103 (arc1313) march 2015 project briefArc60103 (arc1313) march 2015 project brief
Arc60103 (arc1313) march 2015 project brief
 
Arc60103 (arc1313) march 2015 project brief
Arc60103 (arc1313) march 2015 project briefArc60103 (arc1313) march 2015 project brief
Arc60103 (arc1313) march 2015 project brief
 
Arc60103 (arc1313) march 2015 project brief
Arc60103 (arc1313) march 2015 project briefArc60103 (arc1313) march 2015 project brief
Arc60103 (arc1313) march 2015 project brief
 
Arc60103 (arc1313) march 2015 project brief
Arc60103 (arc1313) march 2015 project briefArc60103 (arc1313) march 2015 project brief
Arc60103 (arc1313) march 2015 project brief
 

Plus de Darshiini Vig

SEM 6 : PROJECT MANAGEMENT PROJECT 2 BRIEF
SEM 6 : PROJECT MANAGEMENT  PROJECT 2 BRIEFSEM 6 : PROJECT MANAGEMENT  PROJECT 2 BRIEF
SEM 6 : PROJECT MANAGEMENT PROJECT 2 BRIEFDarshiini Vig
 
SEM 6 : PROJECT MANAGEMENT PROJECT 1 BRIEF
SEM 6 : PROJECT MANAGEMENT  PROJECT 1 BRIEFSEM 6 : PROJECT MANAGEMENT  PROJECT 1 BRIEF
SEM 6 : PROJECT MANAGEMENT PROJECT 1 BRIEFDarshiini Vig
 
SEM 6 : PROJECT MANAGEMENT MODULE OUTLINE
SEM 6 : PROJECT MANAGEMENT MODULE OUTLINESEM 6 : PROJECT MANAGEMENT MODULE OUTLINE
SEM 6 : PROJECT MANAGEMENT MODULE OUTLINEDarshiini Vig
 
SEM 6 : BTECH 2 MODULE OUTLINE
SEM 6 : BTECH 2 MODULE OUTLINESEM 6 : BTECH 2 MODULE OUTLINE
SEM 6 : BTECH 2 MODULE OUTLINEDarshiini Vig
 
BSCIENCE PROJECT 2 FINAL REPORT
BSCIENCE PROJECT 2 FINAL REPORTBSCIENCE PROJECT 2 FINAL REPORT
BSCIENCE PROJECT 2 FINAL REPORTDarshiini Vig
 
BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT Darshiini Vig
 
SEM 5 : PROJECT 2 BTECH 1
SEM 5 : PROJECT 2 BTECH 1 SEM 5 : PROJECT 2 BTECH 1
SEM 5 : PROJECT 2 BTECH 1 Darshiini Vig
 
CSI E-JOURNAL INDIVIDUAL COMPONENT
CSI E-JOURNAL INDIVIDUAL COMPONENTCSI E-JOURNAL INDIVIDUAL COMPONENT
CSI E-JOURNAL INDIVIDUAL COMPONENTDarshiini Vig
 
CSI WOODEN PALLETS BOARD
CSI WOODEN PALLETS BOARD CSI WOODEN PALLETS BOARD
CSI WOODEN PALLETS BOARD Darshiini Vig
 
CSI INITIAL PROPOSAL DOCUMENT
CSI INITIAL PROPOSAL DOCUMENT CSI INITIAL PROPOSAL DOCUMENT
CSI INITIAL PROPOSAL DOCUMENT Darshiini Vig
 
CSI INITIAL PROPOSAL SLIDES
CSI INITIAL PROPOSAL SLIDES CSI INITIAL PROPOSAL SLIDES
CSI INITIAL PROPOSAL SLIDES Darshiini Vig
 
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2Darshiini Vig
 
SEM 5 : PROJECT 2 BSCIENCE 2
SEM 5 : PROJECT 2 BSCIENCE 2SEM 5 : PROJECT 2 BSCIENCE 2
SEM 5 : PROJECT 2 BSCIENCE 2Darshiini Vig
 
SEM 5 : PROJECT 2 THEORIES URBAN
SEM 5 : PROJECT 2 THEORIES URBAN SEM 5 : PROJECT 2 THEORIES URBAN
SEM 5 : PROJECT 2 THEORIES URBAN Darshiini Vig
 
SEM 5 : PROJECT 1 THEORIES URBAN
SEM 5 : PROJECT 1 THEORIES URBAN SEM 5 : PROJECT 1 THEORIES URBAN
SEM 5 : PROJECT 1 THEORIES URBAN Darshiini Vig
 
SEM 5 : THEORIES URBAN MODULE OUTLINE
SEM 5 : THEORIES URBAN MODULE OUTLINE SEM 5 : THEORIES URBAN MODULE OUTLINE
SEM 5 : THEORIES URBAN MODULE OUTLINE Darshiini Vig
 
SEM 5 : PROJECT 1 STUDIO
SEM 5 : PROJECT 1 STUDIO SEM 5 : PROJECT 1 STUDIO
SEM 5 : PROJECT 1 STUDIO Darshiini Vig
 
SEM 5 : DESIGN STUDIO V MODULE OUTLINE
SEM 5 : DESIGN STUDIO V MODULE OUTLINESEM 5 : DESIGN STUDIO V MODULE OUTLINE
SEM 5 : DESIGN STUDIO V MODULE OUTLINEDarshiini Vig
 
SEM 5 : PROJECT 1 FOOD & CULTURE
SEM 5 : PROJECT 1 FOOD & CULTURE SEM 5 : PROJECT 1 FOOD & CULTURE
SEM 5 : PROJECT 1 FOOD & CULTURE Darshiini Vig
 
SEM 5 : MODULE OUTLINE - FOOD & CULTURE
SEM 5 : MODULE OUTLINE - FOOD & CULTURE SEM 5 : MODULE OUTLINE - FOOD & CULTURE
SEM 5 : MODULE OUTLINE - FOOD & CULTURE Darshiini Vig
 

Plus de Darshiini Vig (20)

SEM 6 : PROJECT MANAGEMENT PROJECT 2 BRIEF
SEM 6 : PROJECT MANAGEMENT  PROJECT 2 BRIEFSEM 6 : PROJECT MANAGEMENT  PROJECT 2 BRIEF
SEM 6 : PROJECT MANAGEMENT PROJECT 2 BRIEF
 
SEM 6 : PROJECT MANAGEMENT PROJECT 1 BRIEF
SEM 6 : PROJECT MANAGEMENT  PROJECT 1 BRIEFSEM 6 : PROJECT MANAGEMENT  PROJECT 1 BRIEF
SEM 6 : PROJECT MANAGEMENT PROJECT 1 BRIEF
 
SEM 6 : PROJECT MANAGEMENT MODULE OUTLINE
SEM 6 : PROJECT MANAGEMENT MODULE OUTLINESEM 6 : PROJECT MANAGEMENT MODULE OUTLINE
SEM 6 : PROJECT MANAGEMENT MODULE OUTLINE
 
SEM 6 : BTECH 2 MODULE OUTLINE
SEM 6 : BTECH 2 MODULE OUTLINESEM 6 : BTECH 2 MODULE OUTLINE
SEM 6 : BTECH 2 MODULE OUTLINE
 
BSCIENCE PROJECT 2 FINAL REPORT
BSCIENCE PROJECT 2 FINAL REPORTBSCIENCE PROJECT 2 FINAL REPORT
BSCIENCE PROJECT 2 FINAL REPORT
 
BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT
 
SEM 5 : PROJECT 2 BTECH 1
SEM 5 : PROJECT 2 BTECH 1 SEM 5 : PROJECT 2 BTECH 1
SEM 5 : PROJECT 2 BTECH 1
 
CSI E-JOURNAL INDIVIDUAL COMPONENT
CSI E-JOURNAL INDIVIDUAL COMPONENTCSI E-JOURNAL INDIVIDUAL COMPONENT
CSI E-JOURNAL INDIVIDUAL COMPONENT
 
CSI WOODEN PALLETS BOARD
CSI WOODEN PALLETS BOARD CSI WOODEN PALLETS BOARD
CSI WOODEN PALLETS BOARD
 
CSI INITIAL PROPOSAL DOCUMENT
CSI INITIAL PROPOSAL DOCUMENT CSI INITIAL PROPOSAL DOCUMENT
CSI INITIAL PROPOSAL DOCUMENT
 
CSI INITIAL PROPOSAL SLIDES
CSI INITIAL PROPOSAL SLIDES CSI INITIAL PROPOSAL SLIDES
CSI INITIAL PROPOSAL SLIDES
 
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
SEM 5 : PROJECT 1 REPORT BUILDING SCIENCE 2
 
SEM 5 : PROJECT 2 BSCIENCE 2
SEM 5 : PROJECT 2 BSCIENCE 2SEM 5 : PROJECT 2 BSCIENCE 2
SEM 5 : PROJECT 2 BSCIENCE 2
 
SEM 5 : PROJECT 2 THEORIES URBAN
SEM 5 : PROJECT 2 THEORIES URBAN SEM 5 : PROJECT 2 THEORIES URBAN
SEM 5 : PROJECT 2 THEORIES URBAN
 
SEM 5 : PROJECT 1 THEORIES URBAN
SEM 5 : PROJECT 1 THEORIES URBAN SEM 5 : PROJECT 1 THEORIES URBAN
SEM 5 : PROJECT 1 THEORIES URBAN
 
SEM 5 : THEORIES URBAN MODULE OUTLINE
SEM 5 : THEORIES URBAN MODULE OUTLINE SEM 5 : THEORIES URBAN MODULE OUTLINE
SEM 5 : THEORIES URBAN MODULE OUTLINE
 
SEM 5 : PROJECT 1 STUDIO
SEM 5 : PROJECT 1 STUDIO SEM 5 : PROJECT 1 STUDIO
SEM 5 : PROJECT 1 STUDIO
 
SEM 5 : DESIGN STUDIO V MODULE OUTLINE
SEM 5 : DESIGN STUDIO V MODULE OUTLINESEM 5 : DESIGN STUDIO V MODULE OUTLINE
SEM 5 : DESIGN STUDIO V MODULE OUTLINE
 
SEM 5 : PROJECT 1 FOOD & CULTURE
SEM 5 : PROJECT 1 FOOD & CULTURE SEM 5 : PROJECT 1 FOOD & CULTURE
SEM 5 : PROJECT 1 FOOD & CULTURE
 
SEM 5 : MODULE OUTLINE - FOOD & CULTURE
SEM 5 : MODULE OUTLINE - FOOD & CULTURE SEM 5 : MODULE OUTLINE - FOOD & CULTURE
SEM 5 : MODULE OUTLINE - FOOD & CULTURE
 

Dernier

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxNikitaBankoti2
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 

Dernier (20)

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 

SEM 6 : STUDIO PROJECT 1C

  • 1. 1 | P a g e SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN Centre for Architecture Studies in Southeast Asia (MASSA) Bachelor of Science (Honours) (Architecture) ARCHITECTURAL DESIGN PROJECT [ARC60108] Sustaining Humanities Project 1c: Detailed Design and Final Executive Report Assessments Type Learning outcomes Due Presentation Assessment Weight/ Submission Final Assessment Individual 4-6 Week 15 Week 16 Final Design and Report 60% Presentation 10% Design Report yy ` Introduction In addition to students ability to develop their own position in developing their individual project within the theme of ‘sustaining humanities’- architecture for people, place and time, one key aspect of the design project is to develop holistic and integrated aspects of technology, environment and cultural context in architectural design. Subsequent to Phase 2: Design Strategy and Schematic Design phase, students are required to further develop scheme with the incorporation of environmental strategies and technological resolutions. The intention of integrating the E&T aspect is to strengthen design on the aspect of sustainability and buildability. Student will have additional guidance from their E&T tutor who will look into improving Image: sectional perspective of building with all the integrated aspects http://openbuildings.com/buildings/peoples-association-headquarters-profile-5438?_show_description=1
  • 2. 2 | P a g e the green and sustainability component, suggesting on passive cooling techniques and technological innovations. The studies will be included in a 5000 word comprehensive design report. This phase is integrated with the module Building Technology 2. The co-requisite module will look into how to improve the structural aspect and buildability of the project. Objectives of Project The objective of Phase 1c is:  To consolidate an understanding of the holistic nature of the architectural design process, to a given degree of detail, with emphasis on design as an integrative process, drawing as appropriate on previous subjects of the program. Learning Outcomes of this Project 1. Produce design development drawings for a selected portion of design with a suitable level of Complexity. 2. Design with considerations of building performance (thermal comfort, acoustic and lighting), regulatory frameworks, and health and safety considerations. 3. Produce drawings (both 2D and 3D), modelling, verbal presentation and a design report to communicate and visualize architectural design and ideas. Tasks - Methodology 1. Based on your proposed sketch design, consider and include expanded aspects of design development in tandem with the design of spaces, e.g. regulatory requirements, fire safety, materials, construction, sustainability, feasibility and other relevant considerations, wherever possible, integrating their development to produce a richer, more multi-layered design. 2. Develop a selected portion of your design for technological development and resolution. Tectonic thinking in design approach. 3. Integrate environmental strategies into your design. May look into current sustainable trends and design features. 4. To present work in a most comprehensive, systematic, creative and comprehendible manner. Architectural Visualization, modelling and report.
  • 3. 3 | P a g e Submission Requirement 1) A Final Design Panel (6-10 A1 Panels) Design panel will include the following: 1.1 Project Profile & Description a. Project profile and site description b. Design Statement and conceptual write up c. Architectural position + design considerations d. Design conceptual development (diagrams) 1.2 2- Drawings/Orthogonal a. Site Plan (1:400 minimum scale) b. Floor Plans c. Elevations (1:200 minimum scale) d. Sections 1.3 3-D Drawings (completely rendered) a. Exterior View in relation to site (aerial/bird’s/elevated view) b. Exterior view in relation to people (street/normal view) c. Walk through the spaces (outside-inside) d. Sectional Perspective 1.4 Architectural Detailing (1:20. 1:10 scale) a. Full detailed wall section b. Design features and innovations (2D/3D) (Blow-up details) Note: For specific requirements for item 1.4 refer to Building Technology 2 Project 2 Brief. 1.5 Scaled Model (1:200 minimum scale) a. To show how building sits on site b. To show overall design and building massing. c. Scaled as per advised by studio supervisor
  • 4. 4 | P a g e 2) A Final Design Report a. A3 landscape format b. Approximately 5000 words. Design Report Guidelines a. Introduction (1-2 pages) Title of your project Abstract (200 words) Introduction Project Aims and Objectives b. Site Investigation & Contextual Studies (2-4 pages) Introduction Historical background Site Significant Issues Urban Studies Macro site analysis c. Project Background & Design Intentions Strategies (3-5pages) Micro site analysis Precedent studies Design intention Programme and project brief Site response Spatial Programming Morphological/Form studies (Adhering to the theme) d. Environmental and Technological strategies (5-7pages) Site planning strategies Orientation: Wind and Solar analysis Environmental Strategies Sustainability concepts Energy conservation features Material and Resources Acoustical Consideration Innovations (rainwater harvesting, solar panels, others) Structural concept (buildability, structural logic, others) All Images: http://www.firstinarchitecture.co.uk/archi tecture-presentation-board-tips/
  • 5. 5 | P a g e Marking criteria There will be two (2) Assessments – Design Project and Design Report 1.0 Design Detailed Project Assessment Scheme Marking Criteria Marks% FAIL (F) POOR (D-,D,D+) PASS (C) SATISFACTORY (C+,B-) GOOD (B,B+) VERYGOO (A-) EXCELLENT (A) Assessment Component Weightage These will be assessed via the following compliance with the learning outcomes 100 0-39 40-49 50-54 55-64 65-74 75-79 80-100 1.0 Narrative and Project Brief 1.1 Clarity and richness of architectural position/exploration, project aims and objectives evident in the design work 1.2 Relevance of architecture programme and brief __/10% 2.0 References and Guidelines 2.1 Use of precedent studies in the generation of programme and design strategies. 2.2 Adhere to relevant guidelines and design theme (project brief, UBBL, Bomba, ROL, others.) __/10% 3.0 Design approach and concept 3.1 Clarity, appropriateness and rigor of design proposition/ strategy in response to the contextual conditions (synthesis on programme and context in deriving design. 3.2 Detailed design that meets functional requirements (planning) of the proposed programme and contextual conditions. __/30% 4.0 Poetics, Tectonics & Exploration Design Development drawing for a selected portion of design with suitable level of complexity and supporting the students’ design exploration. (space and tectonics) __/15%
  • 6. 6 | P a g e 5.0 Buildability and Performance 5.1 Consideration of building performance: thermal comfort, acoustic and lighting. 5.2 Adapting regulatory framework that guide design and building construction. 5.3 Adapting health and safety guidelines in design. __/15% 6.0 Overall presentation and design communications ___/15% 7.0 Verbal communications ___/5% Assessment Weight: 50% Total (Over-all) ____/100 Note: 1. Rubric Assessment is attached to the Project 1a Assessment Sheet, refer to as page 2.0 Design Project Report Assessment Sheet Marking Criteria Marks% FAIL (F) POOR (D-,D,D+) PASS (C) SATISFACTORY (C+,B-) GOOD (B,B+) VERYGOO (A-) EXCELLENT (A) Assessment Component Weightage These will be assessed via the following compliance with the learning outcomes 10% 0-39 40-49 50-54 55-64 65-74 75-79 80-1001.0 Project background & brief __/10% 2.0 Site Investigation & Contextual Studies & Analysis __/10% 3.0 Design Intentions/Strategies Exploration through design -Design suitability -Building Performance -Compliance with ordinances. -Site planning Strategies -Spatial Programming __/35% 4.0 Sustainable Feature and Elements (E&T Strategies) -structural and buildability -services and requirements __/20% 5.0 Final Design -Site Plan and Floor Plans -Elevations and Sections -Rendered 3D Drawings -Axon & Sectional Perspective -Others (details, wallsection, etc.) __/20%
  • 7. 7 | P a g e 6.0 Tutorial Log Sheets __/5% Assessment Weight: 10% Total (Over-all) ____/100% Suggested References 1. Allison, P. David Adjaya, Making Public Buildings. London: Thames & Hudson 2. Baker, G. 1989. Design Strategies In Architecture (2nd Ed.). New York: Van Nostrand Reinhold. 3. Hertzberger, H. 1991. Lessons For Students In Architecture. Rotterdam: 010 Publishers. 4. Ligtelijn, V. 1999. Aldo Van Eyck Works. (1995 Ed.). The Netherlands: Thoth Publisher. 5. Allen, E.,1993 Architectural Detailing: Function, Constructability-Aesthetics(3rd Ed.): Wiley 6. Bauer, M, Mosle, P. and Schwarz, M., Green Building: Guidebook for Sustainable Architecture: Springer 7. Charleson, A., Structure in Architecture: A Sourcebook for Architects and Structural Engineers (2nd Ed.): Routledge 8. Yee, R, Architectural Drawing: A Visual Compendium (4th Ed.), 2003, Wiley 9. Architect’s Data, Ernst and Neufert, P. 4th Ed., 2012, Wiley-Blackwell 10. Abu Bakar, H., (2006), Guide to Fire Protection in Malaysia, Malaysia, The Institute of Fire Engineers (UK) Malaysia Branch, Kuala Lumpur. Timeline and Schedule Week 9 : Exploration on Tectonic qualities of design, Spatial & Form articulation Week 10 : Finalizing Schemes Spatial Planning & Form Design Week 11 : Finalizing Design with structural details and components. Week 12 : Finalizing Design with structural details and components. Interim- Design Final Working on minor improvements/ additions. 70% done Week 13 : Finalizing final detailed design and presentation Design Final Working on minor improvements/ additions. 80-90% done Week 14 : Printing and preparation (Optional Tutorial) Week 15 : Final Submission and Pin-up Final Design Review Week 16 : ADP Comprehensive Report Submission Note : Refer to module outline for the detailed activities, tutorials and suggested references.
  • 8. 8 | P a g e Submission Date and Guidelines Interim : Monday, 20 November 2017 (Week 12) Final Submission Project 1c Pin-up : Wednesday, 13 December 2017 (Week 15) Final Design Review : Thursday, 14 December 2017 (Week 15) Final Comprehensive : Monday, 18 December 2017 (Week 16) Executive Report Note: 1. Final presentation schedule and pin-up layout to be released and uploaded on the TIMeS portal on Week 13. 2. Student should present within 20-30 minutes including Q &A from the external panellists. 3. TGC Portfolio link to be submitted to Facebook Group Page. 4. ADP Report to be submitted on 18th December 2017, before 2:00 pm at C5 Academic Staff Room. Prepared by: Approved by: Prince Favis Isip Mohd Adib Ramli ……………………………. ……………………………. Date: 24/8/2017 Date: 25/8/2017 Stream Coordinator Programme Director (Design Studies) Email: princefavis.isip@taylors.edu.my Remarks: 1. The Project Brief is to be distributed to the students in the first week of the semester. 2. Any changes to the Project Brief shall be communicated (in writing) to the Programme Director and the approved revised version must be communicated to the students