PROJECT MANAGEMENT
KNOWLEDGE MANAGEMENT AND
ORGANIZATIONAL PERFORMANCE
Presented by:
Yara Eissa Summer Shoukry
Bassam Shouman Amir Mokhtar
Ahmed Ehab Maryam Mohamed
Olta Mamaj Hala Medhat
PRESENTED TO: DR. AYMAN OTHMAN
TABLE OF CONTENTS
 Introduction on K.M. ,types and organizational
Performance.
 Organizational performance measurement and
improvement criteria.
 How does K.M. improve organizational performance.
 Knowledge Transfer in an Organization.
 K.M. impact on architecture.
 K.M. and the four Phases of Construction
 Case Studies
 Business benefits of knowledge management.
 Challenges facing K.M.
 Barriers to knowledge management.
 Conclusion.
 References.
INTRODUCTION ON K.M. ,TYPES AND
ORGANIZATIONAL PERFORMANCE.
 Knowledge management is the explicit and
systematic management of vital knowledge and its
associated processes of
creating, gathering, organizing, diffusion, use and
exploitation.
 It requires turning personal knowledge into corporate
knowledge that can be widely shared throughout an
organization and appropriately applied.
 Organizational performance is an analysis of a
company`s performance as compared to goals and
objectives
INTRODUCTION ON K.M. ,TYPES AND
ORGANIZATIONAL PERFORMANCE.
Types of Knowledge:
 Explicit knowledge (Know-What): which is the formal,
easily identified and general knowledge that could be
expressed in mathematical expressions or specifications
and manuals.
 Tacit Knowledge (Know-How): which is intuitive, personal
hidden knowledge that is embedded in an individual’s
experience and coloured by their personal beliefs and
values.
Nick Willard, a British
consultant in knowledge
INTRODUCTION ON K.M. ,TYPES AND
ORGANIZATIONAL PERFORMANCE.(CONT.)
 Embedded Knowledge: Which is
knowledge that is locked up in
processes, routines and products rather than
personality or a database.
ORGANIZATIONAL PERFORMANCE
MEASUREMENT AND IMPROVEMENT CRITERIA.
 Measures of organizational performance:
 Profit
 Productivity
 Sales and market share
 Customer service
 Subjective estimates of financial performance
 Achievement of goals
 Measures specific to the industry
ORGANIZATIONAL PERFORMANCE
MEASUREMENT AND IMPROVEMENT CRITERIA.
 Criteria for improving organizational
performance:-
 Customers’ Satisfaction Survey.
 Employee Satisfaction Survey.
 Supplier Satisfaction Survey.
 Supplier Performance Rating.
 Employee Performance Rating.
 Issues Management.
 No of Raised/ Open/ Closed Issues.
 Average Issue Resolution time.
 Number of complaints & commendations.
 Planned V.S. Actual
HOW K.M. DOES IMPROVE ORGANIZATIONAL
PERFORMANCE.
 The benefits of KM on organizational
performance:
 Faster access to knowledge.
 Higher business process efficiency.
 More improvements via higher staff motivation.
 Cost savings.
 Increased profitability.
 Shorter time-to–market new business
opportunities.
 Better knowledge sharing.
 By applying knowledge management
HOW K.M. DOES IMPROVE ORGANIZATIONAL
PERFORMANCE.
 Practical improvements from real companies:-
 Improved corporate ability to adapt to organizational and
environmental change. and effectively leverage critical
workforce and leadership knowledge to deliver sustained
performance to stakeholders and clients.
 Corporate knowledge strategy that led to record year over
year growth–13% organic revenue growth in 2008 over
2007 and a three-year combined annual growth rate of
over 20%.
KNOWLEDGE TRANSFER IN AN ORGANIZATION.
 Knowledge transfer occurs when an organizational
unit is affected by the experience of another.
 The goal of knowledge transfer is to enable new,
less experienced and/or less effective personnel to
understand and use another person’s knowledge in
ways that significantly improve productivity.
KNOWLEDGE TRANSFER IN AN ORGANIZATION.
 The three conditions of effective knowledge transfer:
1. The knowledge available for transfer must be
sufficiently better than the existing personal
knowledge.
2. The availability of a means of transfer from the
source to many receivers not just one.
3. The receivers must have both the will and the ability
to use the better knowledge both instantly and over
the long-term.
KNOWLEDGE TRANSFER SYSTEMS
KNOWLEDGE TRANSFER SYSTEMS
K.M. IMPACT ON ARCHITECTURE.
 More precise and accurate framework.
 Knowledge Utilization of Resources
 Reduce wastage of time.
 Reduce expenses and wastage in construction.
 Increase productivity.
 Well-organized information process and transfer.
 Satisfied customers, and stakeholders.
 Employee growth and learning.
 Core organization growth and improvement.
 Improves project management.
K.M. AND THE FOUR PHASES OF
CONSTRUCTION
1-THE PRECONSTRUCTION PHASE:
Through the services of KM in pre-construction, the owner
makes sure to provide all the conditions that must be reached
to make the construction phase run smooth and in accordance
with a clear defined up program.
 Advisory services are also provided in this stage of the process in
order to meet all the needs mentioned from the client– starting from
the terms of reference and to items such as safety in the working field
and good civil engineering practice.
 The developer helps the client on tenders and all necessary formal
documentation, and on selection, availability and prices of
materials, work methods, construction systems and equipment.
K.M. AND THE FOUR PHASES OF
CONSTRUCTION
1-THE PRECONSTRUCTION PHASE:
 Knowledge Management services in pre-construction phase
include:
1-Terms of reference
2- Tender for the designer
3- Design management
4- Cost planning
5- Tender packages
6- Project approvals and permits
7- Strategic planning
8- Smart procurement
9- Logistics of construction site
K.M. AND THE FOUR PHASES OF
CONSTRUCTION
1-THE PRECONSTRUCTION PHASE:
 The importance of the pre-construction phase
 The Preconstruction phase is where the ground work for the
relationships, negotiations, models, and risk register that will make
the project successful is performed.
 The Preconstruction phase is where the partnering and
communication is critical to the success of the project.
 The contractor gets to fully understand the site constraints.
 The contractor gets several months of project exposure.
 There is an opportunity to shorten the project critical path.
 Managing scope, schedule, and budget is enhanced.
K.M. AND THE FOUR PHASES OF
CONSTRUCTION
2- THE PROCUREMENT PHASE:
 Tendering Phase in the most important phase in Construction
Industry
 The tendering process cannot initiate until the tender documents
such as the form of tender, architectural drawings, bills of
quantities are complete.
 Information within the organization is usually not
organized, therefore the knowledge management is introduced.
 All the important information is gathered, organized, analyzed and
inserted systematically into a database called the Knowledge
Base
 Knowledge Base can be accessed by other departments
 Knowledge Management improves Decision making, decrease
risk, better preparation and anticipation for the future.
 Enhance team collaboration and communication
 Improve the flow of Knowledge
 Decrease operational costs
K.M. AND THE FOUR PHASES OF
CONSTRUCTION
3- THE CONSTRUCTION PHASE:
 Construction process as
a knowledge based
industry:
 Knowledge production in
construction.
 Knowledge creation.
 Knowledge mapping.
 Skills and competencies in a
knowledge based economy.
 Communicating knowledge.
 Employees and their role in
knowledge management.
 Strategies to accomplish
strong KM:
 What does the knowledge
management mean to the
construction.
 Assuring the effectiveness of
the KM on the site.
 What knowledge management
strategy should be adopted.
 Over coming KM
obstacles:
 Organisational knowledge
sharing practices .
 Taking external knowledge into
K.M. AND THE FOUR PHASES OF
CONSTRUCTION
4- THE CLOSE-OUT PHASE:
 The Closeout Phase is the last phase in the project lifecycle.
Closeout begins when the user accepts the project & the
project has meet the goals established.
 Project closeout includes:
 Turn over of project deliverables to operations
 Redistributing resources—staff, facilities, equipment, and
automated systems
 Closing out financial accounts
 Completing, collecting, and archiving project records
K.M. AND THE FOUR PHASES OF
CONSTRUCTION
4- THE CLOSE-OUT PHASE:
 Impact of knowledge management on closeout phase:
 Actual activity cost and duration should be recorded and
compared with that was planned this will serve basis for
estimating future projects.
 Assessment of project team performance in this stage for
avoiding mistakes in the future.
CASE STUDIES
 Two case studies were investigated, the first
one is Keppie Design Architectural Practice
and the second one is Pochin PLC
construction company.
CASE STUDIES - KEPPIE DESIGN
ARCHITECTURAL PRACTICE
Company Background:
Keppie Design is a Scottish leading independent architectural
practice. The company has an international reputation in health-care
design and education.
Issues leading to the investment of Knowledge Management
(Background to the KM Initiative):
1.Rapid Expansion:
2.The constant influx of trainees and programmes of training and
practical guiding
3.The gap of technical experience of architectural fresh trainees
entering the field from university
 Objectives
Knowledge Management was needed by the company
for:
1. To facilitate internal communication of the
knowledge of the project.
2. The professional development of staff members
(especially, fresh trainees).
3. The spread of the work to different local offices and
maintaining the documents' quality.s
 Problems Faced KM Implementation and
Their Objectives
1.Knowing about KM but not its benefits
2.The IT system aided in serving local offices in their work
but couldn't supply a way for circulating information.
3.Forming a repository of experience and skills, "a
directory of standard drawing details" , "a library of
technical and design information" , and a directory of
standard firm information for bid documents.
4. Repeatedly raised issues.
5. Staff training.
 Implementation Of KM
1.Active collaboration.
2.Various skills were required.
3.A simple intranet model was made.
4. A group of observers guided the procedure.
5.IT members started opting an appropriate web-
based system, that is flexible to expand and to editing.
6. Establishment of the "experience and skills
database" based on interviews with staff members
 Challenges
 1.The contribution of senior experts:
Solution
 2.Securing enough project documents
Solution
 Key Results of KM
1.Productivity
2.Technical Information
3.Trainees
 Key Results of KM
4.Intranet
a)Social communication
b)Events, photographs,chitchats and local projects were easily
communicated.
c)People from distant offices could reach each other's news and C.Vs.
d)Technicians could aid each other distantly.
e)Group discussions could be raised for sudden technical problems.
f)Design issues and low-carbon design materials could be debated
among
colleagues.
h)Leaders could share their achievements.
i)Specialists could raise awareness about several issues.
j) Several people were personally recognized
k)Identification of knowledge areas to be developed
 Lessons Learned
1.Time Commitment is required.
2.Deliver clear advantages when introducing the system.
3.The success of the KM implementation depended greatly on
people's collaboration.
4. Each contributor to the KM process gains benefits.
POCHIN PLC CONSTRUCTION COMPANY
 Company background
 Discussion of the problem: Due to the
leakage in transforming information between
the two workshops, this knowledge was kept
unsupported and unfortunately operators
kept doing the same job.
 As a result, where knowledge could be well
organized and exchanged, the efficiency and
performance of technicians will vary
accordingly. (Koskela, 2007)
POCHIN PLC CONSTRUCTION COMPANY
 Development of solution
Identifying requirements
Discover potential
solutions
Implementation
Results
ORACLE’S KNOWLEDGE MANAGEMENT OVERVIEW
Oracle’s Knowledge Management is internet information
management system that utilizes Oracle-developed
knowledge capture, storage, and distribution tools. Oracle’s
Knowledge Management provides the features of solution
search, creation, organization, and immediate access to
new solutions.
ORACLE’S KNOWLEDGE MANAGEMENT FEATURES/BENEFITS
 Multiple Search Methods
 Multiple search methods are available for searching in Oracle’s Knowledge
 Management. The search methods include intermedia text, or keyword
searches.
 Finding Matching Statements/Solutions
 While creating a statement, you can find matching statements or solutions in the
 database to prevent duplication.
 Creating and Searching by Multiple Solution Types
 Information in Oracle’s Knowledge Management is organized into solutions,
 segmented into solution types.
 Adding Attachments, External Links, and/or Comments to Solutions
 This feature allows knowledge workers, customer service representatives, and
 Knowledge Management administrators to add supporting and related
 information, links to other objects
BUSINESS BENEFITS OF KNOWLEDGE
MANAGEMENT.
 The identification of new markets through knowledge pooling
and high-level intelligence gathering by experts.
 Higher awareness of market needs through gathering
external knowledge.
 Employing the client’s knowledge into creating new products
and improving existing ones.
 Producing products of higher quality.
 Faster time to market.
 Benefiting from the knowledge gained in different parts of the
world to satisfy other customers with similar problems.
CHALLENGES FACING K.M
 The main argument is ― if knowledge is
power, why should I diminish my power base
by sharing it? ―. This argument is one of
many challenges that management faces in
introducing knowledge management
BARRIERS TO KNOWLEDGE MANAGEMENT.
 There are no previous processes or systems that focus of the
process of knowledge management as they were not part of
the original system specification.
 There is not a system that could be used to monitor the
creation and distribution of knowledge
 There are no means of measuring the performance of the
knowledge management plan that is being carried out.
 Some people may respond negatively to knowledge as they
view it as a threat to their self-image.
 New ideas must be made explicit in a language that all
individuals inside the organization understand.
CONCLUSION
 To sum up, knowledge management is a
critical process for an efficient organizational
performance. It requires a proper plan,
sufficient resources and personnel who are
willing to both transfer knowledge and use it
on the long-term.
ANY QUESTIONS ?
REFERENCES
 Argote, L., & Ingram, P. (2000, 5 1). http://www.columbia.edu/~pi17/2893a.pdf. Retrieved 11 20, 2012, from
Columbia.edu: http://www.columbia.edu/~pi17/2893a.pdf
 Bagorogoza, J. (2012, 11). Improving organisational performance through knowledge management:. Retrieved
12 2, 2012, from hpocentre:
http://www.hpocenter.com/uploads/Improving%20organisational%20performance%20through%20knowledge%
20management%20-%20The%20case%20of%20financial%20institutions%20in%20Uganda.pdf
 Businessdictionary. (n.d.). organizational-performance. Retrieved 12 2, 2012, from Businessdictionary:
http://www.businessdictionary.com/definition/organizational-performance.html
 chong, I. (n.d.). Study on Knowledgemanagement in architectural practice. Retrieved 12 2, 2012, from c-
sand.org.uk: http://www.c-sand.org.uk/documents/chong.pdf
 Elsevier Linarce House. (2009). Management Extra: Information and Knowledge Management. Hungary:
Elsevier Butterworth-Heinemann.
 Frost, A. (2010). Types of Knowledge. Retrieved 20 11, 2012, from http://www.knowledge-management-
tools.net/different-types-of-knowledge.html
 Kaplan, B. (2010, 8 10). Does Knowledge Management Improve Performance? Retrieved 12 2, 2012, from
organizationsandmarkets: http://organizationsandmarkets.com/2010/08/09/does-knowledge-management-
improve-performance/
 Moss, D. S. (2009, 5 19). Measures of organizational performance. Retrieved 12 2, 2012, from psych-it:
http://www.psych-it.com.au/Psychlopedia/article.asp?id=295
 samanta, B. k. (2006, 6 3). Retrieved 12 2, 2012, from secc:
http://www.secc.org.eg/sepg%202006/ingredients/PDF_files/218.pdf
 Seidman, W., & McCauley, M. (2005). Optimizing Knowledge Transfer and Use. Retrieved 2012, from
Cerebyte: http://www.cerebyte.com/articles/Optimizing%20Knowledge%20Transfer.pdf
 Seidmann, W. (2002, 3). Humanistic Knowledge Technology. Retrieved 11 2012, from Cerebyte:
http://www.cerebyte.com/articles/Humanistic%20Knowledge%20Transfer%20Cutter.pdf
 shahrukhalid. (2011, 4). Definitions-Of-Organizational-Performance. Retrieved 12 2, 2012, from studymode:
http://www.studymode.com/essays/Definitions-Of-Organizational-Performance-663067.html

Contenu connexe

Tendances

Understaning the evaluation contextmon
Understaning the evaluation contextmonUnderstaning the evaluation contextmon
Understaning the evaluation contextmon
altaamecs
 
Б.Наранцацрал -БАЙГУУЛЛАГЫН ЗАН ТӨЛӨВ, ХАРИЛЦААНЫ ХЭВ ШИНЖИЙН ЗАГВАРУУДЫГ АШИ...
Б.Наранцацрал -БАЙГУУЛЛАГЫН ЗАН ТӨЛӨВ, ХАРИЛЦААНЫ ХЭВ ШИНЖИЙН ЗАГВАРУУДЫГ АШИ...Б.Наранцацрал -БАЙГУУЛЛАГЫН ЗАН ТӨЛӨВ, ХАРИЛЦААНЫ ХЭВ ШИНЖИЙН ЗАГВАРУУДЫГ АШИ...
Б.Наранцацрал -БАЙГУУЛЛАГЫН ЗАН ТӨЛӨВ, ХАРИЛЦААНЫ ХЭВ ШИНЖИЙН ЗАГВАРУУДЫГ АШИ...
batnasanb
 
Түвшинтөгс, Өлзийбуян - Менежерийн ур чадвар
Түвшинтөгс, Өлзийбуян - Менежерийн ур чадварТүвшинтөгс, Өлзийбуян - Менежерийн ур чадвар
Түвшинтөгс, Өлзийбуян - Менежерийн ур чадвар
batnasanb
 
хиагтын гурван улсын гэрээ.Docx
хиагтын гурван улсын гэрээ.Docxхиагтын гурван улсын гэрээ.Docx
хиагтын гурван улсын гэрээ.Docx
Otgon-Erdene Bazarkhand
 
лекц №12
лекц №12лекц №12
лекц №12
azora14
 
Investimet e Huaja Direkte IHD
Investimet e Huaja Direkte IHDInvestimet e Huaja Direkte IHD
Investimet e Huaja Direkte IHD
Anita Dogani
 

Tendances (20)

Management7 8
Management7 8Management7 8
Management7 8
 
"Санхүүгийн үндэс" Хичээл - 1
"Санхүүгийн үндэс" Хичээл - 1"Санхүүгийн үндэс" Хичээл - 1
"Санхүүгийн үндэс" Хичээл - 1
 
Sbeul12.2019 2020 on
Sbeul12.2019 2020 onSbeul12.2019 2020 on
Sbeul12.2019 2020 on
 
Understaning the evaluation contextmon
Understaning the evaluation contextmonUnderstaning the evaluation contextmon
Understaning the evaluation contextmon
 
Б.Наранцацрал -БАЙГУУЛЛАГЫН ЗАН ТӨЛӨВ, ХАРИЛЦААНЫ ХЭВ ШИНЖИЙН ЗАГВАРУУДЫГ АШИ...
Б.Наранцацрал -БАЙГУУЛЛАГЫН ЗАН ТӨЛӨВ, ХАРИЛЦААНЫ ХЭВ ШИНЖИЙН ЗАГВАРУУДЫГ АШИ...Б.Наранцацрал -БАЙГУУЛЛАГЫН ЗАН ТӨЛӨВ, ХАРИЛЦААНЫ ХЭВ ШИНЖИЙН ЗАГВАРУУДЫГ АШИ...
Б.Наранцацрал -БАЙГУУЛЛАГЫН ЗАН ТӨЛӨВ, ХАРИЛЦААНЫ ХЭВ ШИНЖИЙН ЗАГВАРУУДЫГ АШИ...
 
Түвшинтөгс, Өлзийбуян - Менежерийн ур чадвар
Түвшинтөгс, Өлзийбуян - Менежерийн ур чадварТүвшинтөгс, Өлзийбуян - Менежерийн ур чадвар
Түвшинтөгс, Өлзийбуян - Менежерийн ур чадвар
 
Bagts tsag tootsoh juram
Bagts tsag tootsoh juramBagts tsag tootsoh juram
Bagts tsag tootsoh juram
 
Ch 2 Management History
Ch 2 Management HistoryCh 2 Management History
Ch 2 Management History
 
Writing a business case
Writing a business caseWriting a business case
Writing a business case
 
хиагтын гурван улсын гэрээ.Docx
хиагтын гурван улсын гэрээ.Docxхиагтын гурван улсын гэрээ.Docx
хиагтын гурван улсын гэрээ.Docx
 
Менежерийн ур чадвар гэдэг бол хүний нөөцийг үр ашигтай удирдаж байгаагаар ил...
Менежерийн ур чадвар гэдэг бол хүний нөөцийг үр ашигтай удирдаж байгаагаар ил...Менежерийн ур чадвар гэдэг бол хүний нөөцийг үр ашигтай удирдаж байгаагаар ил...
Менежерийн ур чадвар гэдэг бол хүний нөөцийг үр ашигтай удирдаж байгаагаар ил...
 
лекц №12
лекц №12лекц №12
лекц №12
 
Seminar 9 - 12
Seminar 9 - 12Seminar 9 - 12
Seminar 9 - 12
 
Mie.s5.2020 2021
Mie.s5.2020  2021Mie.s5.2020  2021
Mie.s5.2020 2021
 
татварын гарын авлага EBarimt
татварын гарын авлага EBarimt татварын гарын авлага EBarimt
татварын гарын авлага EBarimt
 
ТВ үзэлтийн судалгаа 2019
ТВ үзэлтийн судалгаа 2019 ТВ үзэлтийн судалгаа 2019
ТВ үзэлтийн судалгаа 2019
 
Franchising 20161027
Franchising 20161027Franchising 20161027
Franchising 20161027
 
Management1
Management1Management1
Management1
 
Investimet e Huaja Direkte IHD
Investimet e Huaja Direkte IHDInvestimet e Huaja Direkte IHD
Investimet e Huaja Direkte IHD
 
Management (Complete Book)
Management (Complete Book)Management (Complete Book)
Management (Complete Book)
 

Similaire à Project management final

Mike_Marco_eCG_02.2016_Short
Mike_Marco_eCG_02.2016_ShortMike_Marco_eCG_02.2016_Short
Mike_Marco_eCG_02.2016_Short
Mike Marco
 
Mike_Marco_eCG_02.2016_Short
Mike_Marco_eCG_02.2016_ShortMike_Marco_eCG_02.2016_Short
Mike_Marco_eCG_02.2016_Short
Mike Marco
 
The Knowledge Strategy Process
The Knowledge Strategy ProcessThe Knowledge Strategy Process
The Knowledge Strategy Process
guest6d101a
 
Evolution of shared services
Evolution of shared servicesEvolution of shared services
Evolution of shared services
Nidhi Kansal
 

Similaire à Project management final (20)

Mike_Marco_eCG_02.2016_Short
Mike_Marco_eCG_02.2016_ShortMike_Marco_eCG_02.2016_Short
Mike_Marco_eCG_02.2016_Short
 
Mike_Marco_eCG_02.2016_Short
Mike_Marco_eCG_02.2016_ShortMike_Marco_eCG_02.2016_Short
Mike_Marco_eCG_02.2016_Short
 
1 ch1
1 ch11 ch1
1 ch1
 
Resume of Eric McCaw
Resume of Eric McCawResume of Eric McCaw
Resume of Eric McCaw
 
ARJUN
ARJUNARJUN
ARJUN
 
Nicola Winpenny - CV
Nicola Winpenny - CVNicola Winpenny - CV
Nicola Winpenny - CV
 
Project Management: Importance in Detail
Project Management: Importance in DetailProject Management: Importance in Detail
Project Management: Importance in Detail
 
The Knowledge Strategy Process
The Knowledge Strategy ProcessThe Knowledge Strategy Process
The Knowledge Strategy Process
 
CCP_SEC5_ Project Management
CCP_SEC5_ Project ManagementCCP_SEC5_ Project Management
CCP_SEC5_ Project Management
 
Project Management U 1.pptx
Project Management U 1.pptxProject Management U 1.pptx
Project Management U 1.pptx
 
Kettering university brochure-
Kettering university  brochure-Kettering university  brochure-
Kettering university brochure-
 
Process improvement for General Counsel and Law Firms
Process improvement for General Counsel and Law FirmsProcess improvement for General Counsel and Law Firms
Process improvement for General Counsel and Law Firms
 
Evolution of shared services
Evolution of shared servicesEvolution of shared services
Evolution of shared services
 
Evolution of shared services
Evolution of shared servicesEvolution of shared services
Evolution of shared services
 
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
IRJET- A Study on Quantification of Factors Affecting the Quality of Construc...
 
Energy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational AssessmentEnergy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational Assessment
 
Energy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational AssessmentEnergy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational Assessment
 
Energy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational AssessmentEnergy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational Assessment
 
Value Management Tutorial - VM Application in Cost Planning
Value Management Tutorial - VM Application in Cost PlanningValue Management Tutorial - VM Application in Cost Planning
Value Management Tutorial - VM Application in Cost Planning
 
fkiQuality overview 2014 09
fkiQuality overview 2014 09fkiQuality overview 2014 09
fkiQuality overview 2014 09
 

Dernier

Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 

Dernier (20)

2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 

Project management final

  • 1. PROJECT MANAGEMENT KNOWLEDGE MANAGEMENT AND ORGANIZATIONAL PERFORMANCE Presented by: Yara Eissa Summer Shoukry Bassam Shouman Amir Mokhtar Ahmed Ehab Maryam Mohamed Olta Mamaj Hala Medhat PRESENTED TO: DR. AYMAN OTHMAN
  • 2. TABLE OF CONTENTS  Introduction on K.M. ,types and organizational Performance.  Organizational performance measurement and improvement criteria.  How does K.M. improve organizational performance.  Knowledge Transfer in an Organization.  K.M. impact on architecture.  K.M. and the four Phases of Construction  Case Studies  Business benefits of knowledge management.  Challenges facing K.M.  Barriers to knowledge management.  Conclusion.  References.
  • 3. INTRODUCTION ON K.M. ,TYPES AND ORGANIZATIONAL PERFORMANCE.  Knowledge management is the explicit and systematic management of vital knowledge and its associated processes of creating, gathering, organizing, diffusion, use and exploitation.  It requires turning personal knowledge into corporate knowledge that can be widely shared throughout an organization and appropriately applied.  Organizational performance is an analysis of a company`s performance as compared to goals and objectives
  • 4. INTRODUCTION ON K.M. ,TYPES AND ORGANIZATIONAL PERFORMANCE. Types of Knowledge:  Explicit knowledge (Know-What): which is the formal, easily identified and general knowledge that could be expressed in mathematical expressions or specifications and manuals.  Tacit Knowledge (Know-How): which is intuitive, personal hidden knowledge that is embedded in an individual’s experience and coloured by their personal beliefs and values. Nick Willard, a British consultant in knowledge
  • 5. INTRODUCTION ON K.M. ,TYPES AND ORGANIZATIONAL PERFORMANCE.(CONT.)  Embedded Knowledge: Which is knowledge that is locked up in processes, routines and products rather than personality or a database.
  • 6. ORGANIZATIONAL PERFORMANCE MEASUREMENT AND IMPROVEMENT CRITERIA.  Measures of organizational performance:  Profit  Productivity  Sales and market share  Customer service  Subjective estimates of financial performance  Achievement of goals  Measures specific to the industry
  • 7. ORGANIZATIONAL PERFORMANCE MEASUREMENT AND IMPROVEMENT CRITERIA.  Criteria for improving organizational performance:-  Customers’ Satisfaction Survey.  Employee Satisfaction Survey.  Supplier Satisfaction Survey.  Supplier Performance Rating.  Employee Performance Rating.  Issues Management.  No of Raised/ Open/ Closed Issues.  Average Issue Resolution time.  Number of complaints & commendations.  Planned V.S. Actual
  • 8. HOW K.M. DOES IMPROVE ORGANIZATIONAL PERFORMANCE.  The benefits of KM on organizational performance:  Faster access to knowledge.  Higher business process efficiency.  More improvements via higher staff motivation.  Cost savings.  Increased profitability.  Shorter time-to–market new business opportunities.  Better knowledge sharing.  By applying knowledge management
  • 9. HOW K.M. DOES IMPROVE ORGANIZATIONAL PERFORMANCE.  Practical improvements from real companies:-  Improved corporate ability to adapt to organizational and environmental change. and effectively leverage critical workforce and leadership knowledge to deliver sustained performance to stakeholders and clients.  Corporate knowledge strategy that led to record year over year growth–13% organic revenue growth in 2008 over 2007 and a three-year combined annual growth rate of over 20%.
  • 10. KNOWLEDGE TRANSFER IN AN ORGANIZATION.  Knowledge transfer occurs when an organizational unit is affected by the experience of another.  The goal of knowledge transfer is to enable new, less experienced and/or less effective personnel to understand and use another person’s knowledge in ways that significantly improve productivity.
  • 11. KNOWLEDGE TRANSFER IN AN ORGANIZATION.  The three conditions of effective knowledge transfer: 1. The knowledge available for transfer must be sufficiently better than the existing personal knowledge. 2. The availability of a means of transfer from the source to many receivers not just one. 3. The receivers must have both the will and the ability to use the better knowledge both instantly and over the long-term.
  • 14. K.M. IMPACT ON ARCHITECTURE.  More precise and accurate framework.  Knowledge Utilization of Resources  Reduce wastage of time.  Reduce expenses and wastage in construction.  Increase productivity.  Well-organized information process and transfer.  Satisfied customers, and stakeholders.  Employee growth and learning.  Core organization growth and improvement.  Improves project management.
  • 15. K.M. AND THE FOUR PHASES OF CONSTRUCTION 1-THE PRECONSTRUCTION PHASE: Through the services of KM in pre-construction, the owner makes sure to provide all the conditions that must be reached to make the construction phase run smooth and in accordance with a clear defined up program.  Advisory services are also provided in this stage of the process in order to meet all the needs mentioned from the client– starting from the terms of reference and to items such as safety in the working field and good civil engineering practice.  The developer helps the client on tenders and all necessary formal documentation, and on selection, availability and prices of materials, work methods, construction systems and equipment.
  • 16. K.M. AND THE FOUR PHASES OF CONSTRUCTION 1-THE PRECONSTRUCTION PHASE:  Knowledge Management services in pre-construction phase include: 1-Terms of reference 2- Tender for the designer 3- Design management 4- Cost planning 5- Tender packages 6- Project approvals and permits 7- Strategic planning 8- Smart procurement 9- Logistics of construction site
  • 17. K.M. AND THE FOUR PHASES OF CONSTRUCTION 1-THE PRECONSTRUCTION PHASE:  The importance of the pre-construction phase  The Preconstruction phase is where the ground work for the relationships, negotiations, models, and risk register that will make the project successful is performed.  The Preconstruction phase is where the partnering and communication is critical to the success of the project.  The contractor gets to fully understand the site constraints.  The contractor gets several months of project exposure.  There is an opportunity to shorten the project critical path.  Managing scope, schedule, and budget is enhanced.
  • 18. K.M. AND THE FOUR PHASES OF CONSTRUCTION 2- THE PROCUREMENT PHASE:  Tendering Phase in the most important phase in Construction Industry  The tendering process cannot initiate until the tender documents such as the form of tender, architectural drawings, bills of quantities are complete.  Information within the organization is usually not organized, therefore the knowledge management is introduced.  All the important information is gathered, organized, analyzed and inserted systematically into a database called the Knowledge Base  Knowledge Base can be accessed by other departments  Knowledge Management improves Decision making, decrease risk, better preparation and anticipation for the future.  Enhance team collaboration and communication  Improve the flow of Knowledge  Decrease operational costs
  • 19. K.M. AND THE FOUR PHASES OF CONSTRUCTION 3- THE CONSTRUCTION PHASE:  Construction process as a knowledge based industry:  Knowledge production in construction.  Knowledge creation.  Knowledge mapping.  Skills and competencies in a knowledge based economy.  Communicating knowledge.  Employees and their role in knowledge management.  Strategies to accomplish strong KM:  What does the knowledge management mean to the construction.  Assuring the effectiveness of the KM on the site.  What knowledge management strategy should be adopted.  Over coming KM obstacles:  Organisational knowledge sharing practices .  Taking external knowledge into
  • 20. K.M. AND THE FOUR PHASES OF CONSTRUCTION 4- THE CLOSE-OUT PHASE:  The Closeout Phase is the last phase in the project lifecycle. Closeout begins when the user accepts the project & the project has meet the goals established.  Project closeout includes:  Turn over of project deliverables to operations  Redistributing resources—staff, facilities, equipment, and automated systems  Closing out financial accounts  Completing, collecting, and archiving project records
  • 21. K.M. AND THE FOUR PHASES OF CONSTRUCTION 4- THE CLOSE-OUT PHASE:  Impact of knowledge management on closeout phase:  Actual activity cost and duration should be recorded and compared with that was planned this will serve basis for estimating future projects.  Assessment of project team performance in this stage for avoiding mistakes in the future.
  • 22. CASE STUDIES  Two case studies were investigated, the first one is Keppie Design Architectural Practice and the second one is Pochin PLC construction company.
  • 23. CASE STUDIES - KEPPIE DESIGN ARCHITECTURAL PRACTICE Company Background: Keppie Design is a Scottish leading independent architectural practice. The company has an international reputation in health-care design and education. Issues leading to the investment of Knowledge Management (Background to the KM Initiative): 1.Rapid Expansion: 2.The constant influx of trainees and programmes of training and practical guiding 3.The gap of technical experience of architectural fresh trainees entering the field from university
  • 24.  Objectives Knowledge Management was needed by the company for: 1. To facilitate internal communication of the knowledge of the project. 2. The professional development of staff members (especially, fresh trainees). 3. The spread of the work to different local offices and maintaining the documents' quality.s
  • 25.  Problems Faced KM Implementation and Their Objectives 1.Knowing about KM but not its benefits 2.The IT system aided in serving local offices in their work but couldn't supply a way for circulating information. 3.Forming a repository of experience and skills, "a directory of standard drawing details" , "a library of technical and design information" , and a directory of standard firm information for bid documents. 4. Repeatedly raised issues. 5. Staff training.
  • 26.  Implementation Of KM 1.Active collaboration. 2.Various skills were required. 3.A simple intranet model was made. 4. A group of observers guided the procedure. 5.IT members started opting an appropriate web- based system, that is flexible to expand and to editing. 6. Establishment of the "experience and skills database" based on interviews with staff members
  • 27.  Challenges  1.The contribution of senior experts: Solution  2.Securing enough project documents Solution  Key Results of KM 1.Productivity 2.Technical Information 3.Trainees
  • 28.  Key Results of KM 4.Intranet a)Social communication b)Events, photographs,chitchats and local projects were easily communicated. c)People from distant offices could reach each other's news and C.Vs. d)Technicians could aid each other distantly. e)Group discussions could be raised for sudden technical problems. f)Design issues and low-carbon design materials could be debated among colleagues. h)Leaders could share their achievements. i)Specialists could raise awareness about several issues. j) Several people were personally recognized k)Identification of knowledge areas to be developed
  • 29.  Lessons Learned 1.Time Commitment is required. 2.Deliver clear advantages when introducing the system. 3.The success of the KM implementation depended greatly on people's collaboration. 4. Each contributor to the KM process gains benefits.
  • 30. POCHIN PLC CONSTRUCTION COMPANY  Company background  Discussion of the problem: Due to the leakage in transforming information between the two workshops, this knowledge was kept unsupported and unfortunately operators kept doing the same job.  As a result, where knowledge could be well organized and exchanged, the efficiency and performance of technicians will vary accordingly. (Koskela, 2007)
  • 31. POCHIN PLC CONSTRUCTION COMPANY  Development of solution Identifying requirements Discover potential solutions Implementation Results
  • 32. ORACLE’S KNOWLEDGE MANAGEMENT OVERVIEW Oracle’s Knowledge Management is internet information management system that utilizes Oracle-developed knowledge capture, storage, and distribution tools. Oracle’s Knowledge Management provides the features of solution search, creation, organization, and immediate access to new solutions.
  • 33. ORACLE’S KNOWLEDGE MANAGEMENT FEATURES/BENEFITS  Multiple Search Methods  Multiple search methods are available for searching in Oracle’s Knowledge  Management. The search methods include intermedia text, or keyword searches.  Finding Matching Statements/Solutions  While creating a statement, you can find matching statements or solutions in the  database to prevent duplication.  Creating and Searching by Multiple Solution Types  Information in Oracle’s Knowledge Management is organized into solutions,  segmented into solution types.  Adding Attachments, External Links, and/or Comments to Solutions  This feature allows knowledge workers, customer service representatives, and  Knowledge Management administrators to add supporting and related  information, links to other objects
  • 34. BUSINESS BENEFITS OF KNOWLEDGE MANAGEMENT.  The identification of new markets through knowledge pooling and high-level intelligence gathering by experts.  Higher awareness of market needs through gathering external knowledge.  Employing the client’s knowledge into creating new products and improving existing ones.  Producing products of higher quality.  Faster time to market.  Benefiting from the knowledge gained in different parts of the world to satisfy other customers with similar problems.
  • 35. CHALLENGES FACING K.M  The main argument is ― if knowledge is power, why should I diminish my power base by sharing it? ―. This argument is one of many challenges that management faces in introducing knowledge management
  • 36. BARRIERS TO KNOWLEDGE MANAGEMENT.  There are no previous processes or systems that focus of the process of knowledge management as they were not part of the original system specification.  There is not a system that could be used to monitor the creation and distribution of knowledge  There are no means of measuring the performance of the knowledge management plan that is being carried out.  Some people may respond negatively to knowledge as they view it as a threat to their self-image.  New ideas must be made explicit in a language that all individuals inside the organization understand.
  • 37. CONCLUSION  To sum up, knowledge management is a critical process for an efficient organizational performance. It requires a proper plan, sufficient resources and personnel who are willing to both transfer knowledge and use it on the long-term.
  • 39. REFERENCES  Argote, L., & Ingram, P. (2000, 5 1). http://www.columbia.edu/~pi17/2893a.pdf. Retrieved 11 20, 2012, from Columbia.edu: http://www.columbia.edu/~pi17/2893a.pdf  Bagorogoza, J. (2012, 11). Improving organisational performance through knowledge management:. Retrieved 12 2, 2012, from hpocentre: http://www.hpocenter.com/uploads/Improving%20organisational%20performance%20through%20knowledge% 20management%20-%20The%20case%20of%20financial%20institutions%20in%20Uganda.pdf  Businessdictionary. (n.d.). organizational-performance. Retrieved 12 2, 2012, from Businessdictionary: http://www.businessdictionary.com/definition/organizational-performance.html  chong, I. (n.d.). Study on Knowledgemanagement in architectural practice. Retrieved 12 2, 2012, from c- sand.org.uk: http://www.c-sand.org.uk/documents/chong.pdf  Elsevier Linarce House. (2009). Management Extra: Information and Knowledge Management. Hungary: Elsevier Butterworth-Heinemann.  Frost, A. (2010). Types of Knowledge. Retrieved 20 11, 2012, from http://www.knowledge-management- tools.net/different-types-of-knowledge.html  Kaplan, B. (2010, 8 10). Does Knowledge Management Improve Performance? Retrieved 12 2, 2012, from organizationsandmarkets: http://organizationsandmarkets.com/2010/08/09/does-knowledge-management- improve-performance/  Moss, D. S. (2009, 5 19). Measures of organizational performance. Retrieved 12 2, 2012, from psych-it: http://www.psych-it.com.au/Psychlopedia/article.asp?id=295  samanta, B. k. (2006, 6 3). Retrieved 12 2, 2012, from secc: http://www.secc.org.eg/sepg%202006/ingredients/PDF_files/218.pdf  Seidman, W., & McCauley, M. (2005). Optimizing Knowledge Transfer and Use. Retrieved 2012, from Cerebyte: http://www.cerebyte.com/articles/Optimizing%20Knowledge%20Transfer.pdf  Seidmann, W. (2002, 3). Humanistic Knowledge Technology. Retrieved 11 2012, from Cerebyte: http://www.cerebyte.com/articles/Humanistic%20Knowledge%20Transfer%20Cutter.pdf  shahrukhalid. (2011, 4). Definitions-Of-Organizational-Performance. Retrieved 12 2, 2012, from studymode: http://www.studymode.com/essays/Definitions-Of-Organizational-Performance-663067.html