IFMIS Implementations a history of success and failures World Bank study
http://blog-pfm.imf.org/
Context: What we Know and What we Don’t Know  2003 FMIS report disappointing results 2010 Report World Bank projects 1984-2010 55 closed, 32 active primarily from World Bank documents & analysis
http://maps.google.com/maps/ms?ie=UTF&msa=0&msid=101777630030704959267.000491cccf1c14ff54bda 55 closed, 32 active FMIS projects
FMIS Profiles Client/Server through web-based Small countries to large Very low to high capacity Across all World Bank regions (& regional variances) COTS and LDSW Narrow focused Treasury to large integrated systems Some with multiple World Bank loans
Document Structure Descriptive Data Analysis Project Performance 5 Case Studies Conclusions Appendixes
FMIS Benefits Predictability Participation Transparency Accountability
1. How many project completed on budget? Under 1/3 Between 1/3 and 2/3 Above 2/3
3. 82%
What factor most influences FMIS project failure? Complex project design/large # of procurement packages Inadequate capacity/training of project teams Inadequate ICT infrastructure Inappropriate technology Ineffective project coordination Lack of leadership commitment Lack of proper skills in project team Organizational structure poorly suited for integration Weak project preparation and planning
3. Inadequate capacity/training of project teams
What is the most important FMIS success factor? Adequate preparation and clarity of design Close World Bank supervision External environment (uncontrollable) Flexible project management Focus on capacity building and training Good project management and coordination Pre-existing enabling environment (ICT, HR, accounting) Suitable political environment & committed leadership
5. Focus on capacity building and training
Trend Lines COTS & LDSW Cautions about making conclusions
Case Studies Outcome, sustainability, development impact, bank performance, borrower performance Implementation Completion Report Independent Evaluation Group
Blending the evaluation criteria, which country FMIS project was highest rate? Albania Guatemala Mongolia Pakistan Turkey
2. Guatemala
Checklist
What is the largest barrier to making FMIS software sustainable? Civil servant capacity building Civil servant retention Costs of maintaining technical infrastructure: computers, networks, data centres, database software, virus protection etc. Costs to adapt software for reform Costs to maintain and upgrade FMIS software
What is the most important pre-requisite for FMIS success? Budget classification unified chart of accounts, integrated with budget classification commitment control and monitoring mechanisms cash management functions secure countrywide communication network system/data centers core team of ICT specialists within PFM organizations Treasury single account operations
What recommendation do you think has the biggest impact on reliability + cost effectiveness of an FMIS? Using electronic payment systems Using digital/electronic signatures for all transactions Electronic document management Publishing budget execution and performance monthly Interoperability and reusability of the information system FMIS development and project management based on international standards Using Free/Open Source Software (FLOSS) in PFM applications
Which Success Factor do you think is most important? proper attention to capacity building and training plans, close World Bank supervision of the projects, strong leadership and a conducive political environment, and Flexibility in the way the project was designed and managed.
What transparency initiative is or would be the most beneficial for your country? Aid transparency Budget execution + financial reports Budget preparation + budget books Civil service transparency in hiring and salaries Revenue transparency – taxes, extractive industries
How many projects were completed on budget? Under 1/3 Between 1/3 and 2/3 Above 2/3
What factor most influences FMIS project failures? Complex project design/large # of procurement packages Inadequate capacity/training of project teams Inadequate ICT infrastructure Inappropriate technology Ineffective project coordination Lack of leadership commitment Lack of proper skills in project team Organizational structure poorly suited for integration Weak project preparation and planning
What is the most important FMIS success factor? Adequate preparation and clarity of design Close World Bank supervision External environment (uncontrollable) Flexible project management Focus on capacity building and training Good project management and coordination Pre-existing enabling environment (ICT, HR, accounting) Suitable political environment & committed leadership
What country listed in the case studies do you think had the best blended score (outcomes, sustainability, bank performance, borrower performance)?   Albania   Guatemala   Mongolia   Pakistan   Turkey
What is the most important pre-requisite for FMIS success? Budget classification Development of a unified chart of accounts, integrated with budget classification Development of commitment control and monitoring mechanisms Establishment of cash management functions Establishment of secure countrywide communication network Preparation of system/data centers Presence of a core team of ICT specialists within PFM organizations Treasury single account operations
What is the largest barrier to making FMIS software sustainable? Civil servant capacity building Civil servant retention Costs of maintaining technical infrastructure: computers, networks, data centres, database software, virus protection etc. Costs to adapt software for reform Costs to maintain and upgrade FMIS software
Which recommendation do you think has the biggest impact on reliability + cost effectiveness of a FMIS? Using electronic payment systems Using digital/electronic signatures for all transactions Electronic document management Publishing budget execution and performance monthly Interoperability and reusability of the information system FMIS development and project management based on international standards Using Free/Open Source Software (FLOSS) in PFM applications
Which of the following options is the most critical success factor for a successful FMIS? Proper attention to capacity building and training plans Close World Bank supervision of the projects Strong leadership and a conducive political environment Flexibility in the way the project was designed and managed

Contenu connexe

Similaire à Worldbank FMIS & results - Hadden

Free Balance surveys at ICGFM ANNUAL CONFERENCE
Free Balance surveys  at ICGFM ANNUAL CONFERENCEFree Balance surveys  at ICGFM ANNUAL CONFERENCE
Free Balance surveys at ICGFM ANNUAL CONFERENCEicgfmconference
 
Medullus Treasury & Finance Solutions
Medullus Treasury & Finance SolutionsMedullus Treasury & Finance Solutions
Medullus Treasury & Finance SolutionsRoni Banerjee
 
100531 it management dpa upload
100531 it management dpa upload100531 it management dpa upload
100531 it management dpa uploadplpictimatec
 
31 ijaprr vol1-4-29-35harmeet
31 ijaprr vol1-4-29-35harmeet31 ijaprr vol1-4-29-35harmeet
31 ijaprr vol1-4-29-35harmeetijaprr_editor
 
The challenges of modern financial reporting
The challenges of modern financial reportingThe challenges of modern financial reporting
The challenges of modern financial reportingKaizenlogcom
 
online reporting
online reportingonline reporting
online reportingsoniakundra
 
Overview of mis mr. ramachandran
Overview of mis mr. ramachandranOverview of mis mr. ramachandran
Overview of mis mr. ramachandransnb9899
 
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...Cognizant
 
6 Steps to Transition Govt ICT effectiveness
6 Steps to Transition Govt ICT effectiveness6 Steps to Transition Govt ICT effectiveness
6 Steps to Transition Govt ICT effectivenessRavi Tirumalai
 
MIS Guidelines 20.11.2009
MIS Guidelines 20.11.2009MIS Guidelines 20.11.2009
MIS Guidelines 20.11.2009Heinz Ropertz
 
[2011] SPACE - A Computer Aided Environment for e Government and eBusiness ag...
[2011] SPACE - A Computer Aided Environment for e Government and eBusiness ag...[2011] SPACE - A Computer Aided Environment for e Government and eBusiness ag...
[2011] SPACE - A Computer Aided Environment for e Government and eBusiness ag...e-Democracy Conference
 
GRP & IT Vendor Governance in Government
GRP & IT Vendor Governance in GovernmentGRP & IT Vendor Governance in Government
GRP & IT Vendor Governance in GovernmentFreeBalance
 
The ITFM Tool Journey
The ITFM Tool JourneyThe ITFM Tool Journey
The ITFM Tool JourneyPete Hidalgo
 
2010 CIO Panel_ December 9, 2010
2010 CIO Panel_ December 9, 20102010 CIO Panel_ December 9, 2010
2010 CIO Panel_ December 9, 2010kbmarsh
 
2010 CIO Panel
2010 CIO Panel2010 CIO Panel
2010 CIO PanelMHTAevents
 
The Application of Information Technology in the Preparation and Presentation...
The Application of Information Technology in the Preparation and Presentation...The Application of Information Technology in the Preparation and Presentation...
The Application of Information Technology in the Preparation and Presentation...IOSRJBM
 

Similaire à Worldbank FMIS & results - Hadden (20)

Worldbank fmis
Worldbank fmisWorldbank fmis
Worldbank fmis
 
Free Balance surveys at ICGFM ANNUAL CONFERENCE
Free Balance surveys  at ICGFM ANNUAL CONFERENCEFree Balance surveys  at ICGFM ANNUAL CONFERENCE
Free Balance surveys at ICGFM ANNUAL CONFERENCE
 
Medullus Treasury & Finance Solutions
Medullus Treasury & Finance SolutionsMedullus Treasury & Finance Solutions
Medullus Treasury & Finance Solutions
 
100531 it management dpa upload
100531 it management dpa upload100531 it management dpa upload
100531 it management dpa upload
 
Acc 310
Acc 310Acc 310
Acc 310
 
31 ijaprr vol1-4-29-35harmeet
31 ijaprr vol1-4-29-35harmeet31 ijaprr vol1-4-29-35harmeet
31 ijaprr vol1-4-29-35harmeet
 
The challenges of modern financial reporting
The challenges of modern financial reportingThe challenges of modern financial reporting
The challenges of modern financial reporting
 
online reporting
online reportingonline reporting
online reporting
 
Overview of mis mr. ramachandran
Overview of mis mr. ramachandranOverview of mis mr. ramachandran
Overview of mis mr. ramachandran
 
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...
 
6 Steps to Transition Govt ICT effectiveness
6 Steps to Transition Govt ICT effectiveness6 Steps to Transition Govt ICT effectiveness
6 Steps to Transition Govt ICT effectiveness
 
MIS Guidelines 20.11.2009
MIS Guidelines 20.11.2009MIS Guidelines 20.11.2009
MIS Guidelines 20.11.2009
 
[2011] SPACE - A Computer Aided Environment for e Government and eBusiness ag...
[2011] SPACE - A Computer Aided Environment for e Government and eBusiness ag...[2011] SPACE - A Computer Aided Environment for e Government and eBusiness ag...
[2011] SPACE - A Computer Aided Environment for e Government and eBusiness ag...
 
GRP & IT Vendor Governance in Government
GRP & IT Vendor Governance in GovernmentGRP & IT Vendor Governance in Government
GRP & IT Vendor Governance in Government
 
The ITFM Tool Journey
The ITFM Tool JourneyThe ITFM Tool Journey
The ITFM Tool Journey
 
Ict maturity2009
Ict maturity2009Ict maturity2009
Ict maturity2009
 
1_ICT.pptx
1_ICT.pptx1_ICT.pptx
1_ICT.pptx
 
2010 CIO Panel_ December 9, 2010
2010 CIO Panel_ December 9, 20102010 CIO Panel_ December 9, 2010
2010 CIO Panel_ December 9, 2010
 
2010 CIO Panel
2010 CIO Panel2010 CIO Panel
2010 CIO Panel
 
The Application of Information Technology in the Preparation and Presentation...
The Application of Information Technology in the Preparation and Presentation...The Application of Information Technology in the Preparation and Presentation...
The Application of Information Technology in the Preparation and Presentation...
 

Plus de icgfmconference

2015 closing remarks_winter_conference_icgfm_maykoski_fr
2015 closing remarks_winter_conference_icgfm_maykoski_fr2015 closing remarks_winter_conference_icgfm_maykoski_fr
2015 closing remarks_winter_conference_icgfm_maykoski_fricgfmconference
 
2015 closing remarks_winter_conference_icgfm_maykoski_sp
2015 closing remarks_winter_conference_icgfm_maykoski_sp2015 closing remarks_winter_conference_icgfm_maykoski_sp
2015 closing remarks_winter_conference_icgfm_maykoski_spicgfmconference
 
2015 closing remarks winter_conference_icgfm_maykoski_en
2015 closing remarks winter_conference_icgfm_maykoski_en2015 closing remarks winter_conference_icgfm_maykoski_en
2015 closing remarks winter_conference_icgfm_maykoski_enicgfmconference
 
Day3 sp4 chemonics-icgfm_dec2015_fr
Day3 sp4 chemonics-icgfm_dec2015_frDay3 sp4 chemonics-icgfm_dec2015_fr
Day3 sp4 chemonics-icgfm_dec2015_fricgfmconference
 
Day3 sp4 chemonics-icgfm_dec2015_sp
Day3 sp4 chemonics-icgfm_dec2015_spDay3 sp4 chemonics-icgfm_dec2015_sp
Day3 sp4 chemonics-icgfm_dec2015_spicgfmconference
 
Day3 sp4 chemonics-icgfm_dec2015_en
Day3 sp4 chemonics-icgfm_dec2015_enDay3 sp4 chemonics-icgfm_dec2015_en
Day3 sp4 chemonics-icgfm_dec2015_enicgfmconference
 
Day3 sp3-3 georgetown-panelandreamurta_en
Day3 sp3-3 georgetown-panelandreamurta_enDay3 sp3-3 georgetown-panelandreamurta_en
Day3 sp3-3 georgetown-panelandreamurta_enicgfmconference
 
Day3 sp3-4 georgetown-panelyonatonmorse_en
Day3 sp3-4 georgetown-panelyonatonmorse_enDay3 sp3-4 georgetown-panelyonatonmorse_en
Day3 sp3-4 georgetown-panelyonatonmorse_enicgfmconference
 
Day3 sp3-2 georgetown-paneltomcardamone_en
Day3 sp3-2 georgetown-paneltomcardamone_enDay3 sp3-2 georgetown-paneltomcardamone_en
Day3 sp3-2 georgetown-paneltomcardamone_enicgfmconference
 
Day3 sp3-1 georgetown-paneljodivittori_en
Day3 sp3-1 georgetown-paneljodivittori_enDay3 sp3-1 georgetown-paneljodivittori_en
Day3 sp3-1 georgetown-paneljodivittori_enicgfmconference
 
Day3 sp2 nov 6 draft icgfm-wuertz_fr
Day3 sp2 nov 6 draft icgfm-wuertz_frDay3 sp2 nov 6 draft icgfm-wuertz_fr
Day3 sp2 nov 6 draft icgfm-wuertz_fricgfmconference
 
Day3 sp2 nov 6 draft icgfm-wuertz_sp
Day3 sp2 nov 6 draft icgfm-wuertz_spDay3 sp2 nov 6 draft icgfm-wuertz_sp
Day3 sp2 nov 6 draft icgfm-wuertz_spicgfmconference
 
Day3 sp2 nov 6 draft icgfm-wuertz_en
Day3 sp2 nov 6 draft icgfm-wuertz_enDay3 sp2 nov 6 draft icgfm-wuertz_en
Day3 sp2 nov 6 draft icgfm-wuertz_enicgfmconference
 
Day3 sp1 wright-membership_benefits_dec2015_fr
Day3 sp1 wright-membership_benefits_dec2015_frDay3 sp1 wright-membership_benefits_dec2015_fr
Day3 sp1 wright-membership_benefits_dec2015_fricgfmconference
 
Day3 sp1 wright-membership_benefits_dec2015_sp
Day3 sp1 wright-membership_benefits_dec2015_spDay3 sp1 wright-membership_benefits_dec2015_sp
Day3 sp1 wright-membership_benefits_dec2015_spicgfmconference
 
Day3 sp1 wright-membership_benefits_dec2015_en
Day3 sp1 wright-membership_benefits_dec2015_enDay3 sp1 wright-membership_benefits_dec2015_en
Day3 sp1 wright-membership_benefits_dec2015_enicgfmconference
 
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...icgfmconference
 
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...icgfmconference
 
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...icgfmconference
 
Day2 sp4 pres-washington_elettore_en
Day2 sp4 pres-washington_elettore_enDay2 sp4 pres-washington_elettore_en
Day2 sp4 pres-washington_elettore_enicgfmconference
 

Plus de icgfmconference (20)

2015 closing remarks_winter_conference_icgfm_maykoski_fr
2015 closing remarks_winter_conference_icgfm_maykoski_fr2015 closing remarks_winter_conference_icgfm_maykoski_fr
2015 closing remarks_winter_conference_icgfm_maykoski_fr
 
2015 closing remarks_winter_conference_icgfm_maykoski_sp
2015 closing remarks_winter_conference_icgfm_maykoski_sp2015 closing remarks_winter_conference_icgfm_maykoski_sp
2015 closing remarks_winter_conference_icgfm_maykoski_sp
 
2015 closing remarks winter_conference_icgfm_maykoski_en
2015 closing remarks winter_conference_icgfm_maykoski_en2015 closing remarks winter_conference_icgfm_maykoski_en
2015 closing remarks winter_conference_icgfm_maykoski_en
 
Day3 sp4 chemonics-icgfm_dec2015_fr
Day3 sp4 chemonics-icgfm_dec2015_frDay3 sp4 chemonics-icgfm_dec2015_fr
Day3 sp4 chemonics-icgfm_dec2015_fr
 
Day3 sp4 chemonics-icgfm_dec2015_sp
Day3 sp4 chemonics-icgfm_dec2015_spDay3 sp4 chemonics-icgfm_dec2015_sp
Day3 sp4 chemonics-icgfm_dec2015_sp
 
Day3 sp4 chemonics-icgfm_dec2015_en
Day3 sp4 chemonics-icgfm_dec2015_enDay3 sp4 chemonics-icgfm_dec2015_en
Day3 sp4 chemonics-icgfm_dec2015_en
 
Day3 sp3-3 georgetown-panelandreamurta_en
Day3 sp3-3 georgetown-panelandreamurta_enDay3 sp3-3 georgetown-panelandreamurta_en
Day3 sp3-3 georgetown-panelandreamurta_en
 
Day3 sp3-4 georgetown-panelyonatonmorse_en
Day3 sp3-4 georgetown-panelyonatonmorse_enDay3 sp3-4 georgetown-panelyonatonmorse_en
Day3 sp3-4 georgetown-panelyonatonmorse_en
 
Day3 sp3-2 georgetown-paneltomcardamone_en
Day3 sp3-2 georgetown-paneltomcardamone_enDay3 sp3-2 georgetown-paneltomcardamone_en
Day3 sp3-2 georgetown-paneltomcardamone_en
 
Day3 sp3-1 georgetown-paneljodivittori_en
Day3 sp3-1 georgetown-paneljodivittori_enDay3 sp3-1 georgetown-paneljodivittori_en
Day3 sp3-1 georgetown-paneljodivittori_en
 
Day3 sp2 nov 6 draft icgfm-wuertz_fr
Day3 sp2 nov 6 draft icgfm-wuertz_frDay3 sp2 nov 6 draft icgfm-wuertz_fr
Day3 sp2 nov 6 draft icgfm-wuertz_fr
 
Day3 sp2 nov 6 draft icgfm-wuertz_sp
Day3 sp2 nov 6 draft icgfm-wuertz_spDay3 sp2 nov 6 draft icgfm-wuertz_sp
Day3 sp2 nov 6 draft icgfm-wuertz_sp
 
Day3 sp2 nov 6 draft icgfm-wuertz_en
Day3 sp2 nov 6 draft icgfm-wuertz_enDay3 sp2 nov 6 draft icgfm-wuertz_en
Day3 sp2 nov 6 draft icgfm-wuertz_en
 
Day3 sp1 wright-membership_benefits_dec2015_fr
Day3 sp1 wright-membership_benefits_dec2015_frDay3 sp1 wright-membership_benefits_dec2015_fr
Day3 sp1 wright-membership_benefits_dec2015_fr
 
Day3 sp1 wright-membership_benefits_dec2015_sp
Day3 sp1 wright-membership_benefits_dec2015_spDay3 sp1 wright-membership_benefits_dec2015_sp
Day3 sp1 wright-membership_benefits_dec2015_sp
 
Day3 sp1 wright-membership_benefits_dec2015_en
Day3 sp1 wright-membership_benefits_dec2015_enDay3 sp1 wright-membership_benefits_dec2015_en
Day3 sp1 wright-membership_benefits_dec2015_en
 
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
 
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
 
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
Day2 sp5 23.10.2015-presentation-stateaid_taxationanddevelopmentinukraine_ief...
 
Day2 sp4 pres-washington_elettore_en
Day2 sp4 pres-washington_elettore_enDay2 sp4 pres-washington_elettore_en
Day2 sp4 pres-washington_elettore_en
 

Worldbank FMIS & results - Hadden

  • 1. IFMIS Implementations a history of success and failures World Bank study
  • 3. Context: What we Know and What we Don’t Know 2003 FMIS report disappointing results 2010 Report World Bank projects 1984-2010 55 closed, 32 active primarily from World Bank documents & analysis
  • 5. FMIS Profiles Client/Server through web-based Small countries to large Very low to high capacity Across all World Bank regions (& regional variances) COTS and LDSW Narrow focused Treasury to large integrated systems Some with multiple World Bank loans
  • 6.
  • 7. Document Structure Descriptive Data Analysis Project Performance 5 Case Studies Conclusions Appendixes
  • 8. FMIS Benefits Predictability Participation Transparency Accountability
  • 9. 1. How many project completed on budget? Under 1/3 Between 1/3 and 2/3 Above 2/3
  • 11. What factor most influences FMIS project failure? Complex project design/large # of procurement packages Inadequate capacity/training of project teams Inadequate ICT infrastructure Inappropriate technology Ineffective project coordination Lack of leadership commitment Lack of proper skills in project team Organizational structure poorly suited for integration Weak project preparation and planning
  • 13. What is the most important FMIS success factor? Adequate preparation and clarity of design Close World Bank supervision External environment (uncontrollable) Flexible project management Focus on capacity building and training Good project management and coordination Pre-existing enabling environment (ICT, HR, accounting) Suitable political environment & committed leadership
  • 14. 5. Focus on capacity building and training
  • 15. Trend Lines COTS & LDSW Cautions about making conclusions
  • 16. Case Studies Outcome, sustainability, development impact, bank performance, borrower performance Implementation Completion Report Independent Evaluation Group
  • 17. Blending the evaluation criteria, which country FMIS project was highest rate? Albania Guatemala Mongolia Pakistan Turkey
  • 19.
  • 21. What is the largest barrier to making FMIS software sustainable? Civil servant capacity building Civil servant retention Costs of maintaining technical infrastructure: computers, networks, data centres, database software, virus protection etc. Costs to adapt software for reform Costs to maintain and upgrade FMIS software
  • 22. What is the most important pre-requisite for FMIS success? Budget classification unified chart of accounts, integrated with budget classification commitment control and monitoring mechanisms cash management functions secure countrywide communication network system/data centers core team of ICT specialists within PFM organizations Treasury single account operations
  • 23. What recommendation do you think has the biggest impact on reliability + cost effectiveness of an FMIS? Using electronic payment systems Using digital/electronic signatures for all transactions Electronic document management Publishing budget execution and performance monthly Interoperability and reusability of the information system FMIS development and project management based on international standards Using Free/Open Source Software (FLOSS) in PFM applications
  • 24. Which Success Factor do you think is most important? proper attention to capacity building and training plans, close World Bank supervision of the projects, strong leadership and a conducive political environment, and Flexibility in the way the project was designed and managed.
  • 25. What transparency initiative is or would be the most beneficial for your country? Aid transparency Budget execution + financial reports Budget preparation + budget books Civil service transparency in hiring and salaries Revenue transparency – taxes, extractive industries
  • 26. How many projects were completed on budget? Under 1/3 Between 1/3 and 2/3 Above 2/3
  • 27. What factor most influences FMIS project failures? Complex project design/large # of procurement packages Inadequate capacity/training of project teams Inadequate ICT infrastructure Inappropriate technology Ineffective project coordination Lack of leadership commitment Lack of proper skills in project team Organizational structure poorly suited for integration Weak project preparation and planning
  • 28. What is the most important FMIS success factor? Adequate preparation and clarity of design Close World Bank supervision External environment (uncontrollable) Flexible project management Focus on capacity building and training Good project management and coordination Pre-existing enabling environment (ICT, HR, accounting) Suitable political environment & committed leadership
  • 29. What country listed in the case studies do you think had the best blended score (outcomes, sustainability, bank performance, borrower performance)? Albania Guatemala Mongolia Pakistan Turkey
  • 30. What is the most important pre-requisite for FMIS success? Budget classification Development of a unified chart of accounts, integrated with budget classification Development of commitment control and monitoring mechanisms Establishment of cash management functions Establishment of secure countrywide communication network Preparation of system/data centers Presence of a core team of ICT specialists within PFM organizations Treasury single account operations
  • 31. What is the largest barrier to making FMIS software sustainable? Civil servant capacity building Civil servant retention Costs of maintaining technical infrastructure: computers, networks, data centres, database software, virus protection etc. Costs to adapt software for reform Costs to maintain and upgrade FMIS software
  • 32. Which recommendation do you think has the biggest impact on reliability + cost effectiveness of a FMIS? Using electronic payment systems Using digital/electronic signatures for all transactions Electronic document management Publishing budget execution and performance monthly Interoperability and reusability of the information system FMIS development and project management based on international standards Using Free/Open Source Software (FLOSS) in PFM applications
  • 33. Which of the following options is the most critical success factor for a successful FMIS? Proper attention to capacity building and training plans Close World Bank supervision of the projects Strong leadership and a conducive political environment Flexibility in the way the project was designed and managed

Notes de l'éditeur

  1. Prior to FMIS Presentation at 3:45 – repeat slide
  2. FMIS – Slide 9
  3. FMIS – Slide 11
  4. FMIS – Slide 13
  5. FMIS – Slide 17
  6. FMIS – Slide 21
  7. FMIS – Slide 22
  8. FMIS – Slide 23
  9. FMIS – Slide 24