2016 Projects
Review of major maintenance work and
status update on JCCBI’s structures
TECHNICAL MEDIA BRIEFING
November 29, 2016
#OurProjects
CHAMPLAIN BRIDGE
2016 Inspection and Structural Reinforcement
3
STRUCTURAL REINFORCEMENT AND REPAIRS
Major work on the Champlain Bridge
Installation of 48 trusses
Replacement of 11 joints
Repairs to 6 piers+
270,000+ hours worked
at Champlain Bridge work sites
4
Highly complex work
Modular trusses
+ 4 m high and 78 m long
+ 56,000 kg!
5
Constant structural monitoring
6
A STRUCTURE AT THE END OF ITS SERVICE LIFE THAT HAS
BENEFITED FROM MAJOR CORRECTIVE MEASURES
Findings from the 2016 inspection
+ Structural integrity maintained
+ Condition of edge girders generally deficient
+ Repair work to improve components (e.g., foundation units, expansion joints)
+ New Integrated Grading System (IGS) to assess the impact of the
reinforcement systems
7
Integrated Grading System (IGS) now applied to inspections of the Champlain Bridge
SECTIONAL DRAWING OF AN EDGE GIRDER
Integrated Grading System (IGS)
EDGE GIRDER
Condition rating 1:
DEFICIENT
MODULAR TRUSS
Condition rating 4:
GOOD
IGS 10:
EXCELLENT
8
Proven reinforcement method
90 edge girders are now reinforced with
modular trusses or post systems
CRITICAL INFRASTRUCTURE
Large-scale work
10
END OF DECK REPLACEMENT PROGRAM
Honoré Mercier Bridge
#OurProjects
+ Work blitzes completed a week ahead of schedule
+ Bridge’s lifespan extended by 75 years
11
Jacques Cartier Bridge
REINFORCEMENT OF THE STEEL STRUCTURE
#OurProjects
+ Replacement and reinforcement of steel members
and reinforcing plates
+ Existing rivets keeping the assemblies in place are
removed and replaced with bolts
+ 80 workers at our sites 7 days a week
+ Major program to extend the service life
UPGRADES
Major project to reinforce the metal structure,
which dates back to the 1920s
12
Jacques Cartier Bridge
#OurProjects
REPAIRS TO THE ÎLE SAINTE-HÉLÈNE PAVILION
Work on all parts of this
structural building
+
13
Illumination of the Jacques Cartier Bridge
#OurProjects
FIRST PROJECTOR INSTALLED
May 17 is the big date!
14
Solution Bonaventure
#OurProjects
ENVIRONMENTAL PROJECT TO PROTECT THE RIVER
+ 95% of work complete in the west sector
+ 32 pumping wells installed along the shoreline to create a hydraulic barrier
+ Run-in of the contaminated water processing system in December
15
Champlain Bridge Ice
Control Structure
#OurProjects
NEW BICYCLE PATH
AND DEVELOPMENT OF APPROACHES
950 trees and shrubs planted to revitalize the approaches
+
16
Melocheville Tunnel
#OurProjects
TUNNEL REHABILITATION
+ New structural reinforcements
+ Heated cables added to keep ice
from forming on the pavement
+ Waterproofing of concrete
surfaces
+ New intelligent transportation
system (ITS) to keep overheight
vehicles out of the tunnel and to
detect incidents with video
analysis
COMPLEX CHALLENGES
Proactive and responsible management
18
Management of major work
#OurProjects
DAILY MONITORING AND COORDINATION
+ Closures optimized by combining work
+ Proactive use of traffic lights on the Champlain
Bridge to redirect heavy vehicles and limit
required closures and restrictions
+ 30% fewer traffic closures and restrictions on
our network in 2016
WORK BLITZES REALLY WORK!
Work blitzes saved 7,300 hours of closure time on the
Champlain Bridge.
19
+ Ongoing communication with traffic reporters and the media,
interviews and on-site tours
+ Text message alerts for major closures or significant incidents
on our network
+ Integrated dashboard at www.JacquesCartierChamplain.ca:
live traffic conditions, planned work, traffic cameras,
major work alerts
+ Tweets about closures and information about each structure:
@pontJCBridge @pontChampBridge @pontHMBridge
+ Over 25,900 subscribers on social networks
TRANSPARENT COMMUNICATION AND MOBILE TOOLS
Ongoing updates
#OurProjects
20
Social and urban contributor
21
Bicycle path network
#OurProjects
WINTER BICYCLE PATH ON THE JACQUES CARTIER BRIDGE
+ Goal: Make the path safe for cyclists of all skill levels
+ CIMA + hired to conduct a feasibility study
+ Findings:
- Complex slopes, curves, geometry and isolated areas
- Difficult weather conditions above the river (black ice common)
- No pavement surfacing on which to spread de-icing salts
- Environmental restrictions related to snow removal
- Risk of falling ice from the steel superstructure
+ Recommendation: Optimized period in the spring once
the weather allows
22
Improvements to the existing network
#OurProjects
SEPARATE PEDESTRIAN / CYCLIST AREAS
+ Pedestrians and cyclists have to share the path,
which can be difficult for both types of user
+ Pedestrians and cyclists go at very different
speeds
+ The multipurpose path is very narrow compared
to the standard
+ Developments to improve pedestrian access
starting in spring 2017
+ New safety measures deployed on the entire
network
23
Planning for 2017
#OurProjects
FEWER MAJOR CLOSURES OR RESTRICTIONS NEXT YEAR
+ Optimized work from the river or the
shore
+ Coordination with other project
authorities to limit the impact on the
network
+ Blitz required on the Champlain
Bridge for the expansion joints
+ Continuation of the steel program on
the Jacques Cartier Bridge
+ Ongoing major maintenance program
#OurProjects

Contenu connexe

Tendances

Meeting minutes brossard good neighbourly relations commitee - may 17 2017
Meeting minutes   brossard good neighbourly relations commitee - may 17 2017Meeting minutes   brossard good neighbourly relations commitee - may 17 2017
Meeting minutes brossard good neighbourly relations commitee - may 17 2017Pont Samuel-De Champlain Bridge
 
Crosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown TO
 
Cv c d'urbal-technical supervisor(°°)
Cv c d'urbal-technical supervisor(°°)Cv c d'urbal-technical supervisor(°°)
Cv c d'urbal-technical supervisor(°°)Durbal
 
Forest Hill station open house
Forest Hill station open houseForest Hill station open house
Forest Hill station open houseCrosstown TO
 
Avenue station open house presentation
Avenue station open house presentation Avenue station open house presentation
Avenue station open house presentation Crosstown TO
 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house Crosstown TO
 
Caledonia station open house
Caledonia station open houseCaledonia station open house
Caledonia station open houseCrosstown TO
 
Keelesdale station open house
Keelesdale station open houseKeelesdale station open house
Keelesdale station open houseCrosstown TO
 
Good Neighbourly Relations Committee Meeting - Brossard - November 15, 2017
Good Neighbourly Relations Committee Meeting - Brossard - November 15, 2017Good Neighbourly Relations Committee Meeting - Brossard - November 15, 2017
Good Neighbourly Relations Committee Meeting - Brossard - November 15, 2017Pont Samuel-De Champlain Bridge
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Crosstown TO
 
Soutenance de-stage-groupe-cayon-sebastien-valette
Soutenance de-stage-groupe-cayon-sebastien-valetteSoutenance de-stage-groupe-cayon-sebastien-valette
Soutenance de-stage-groupe-cayon-sebastien-valetteSbastienValette1
 
Avenue station open house
Avenue station open house Avenue station open house
Avenue station open house Crosstown TO
 
Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Crosstown TO
 
Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open HouseCrosstown TO
 
Chaplin slide deck final
Chaplin slide deck finalChaplin slide deck final
Chaplin slide deck finalCrosstown TO
 
Mount pleasant station open house
Mount pleasant station open house  Mount pleasant station open house
Mount pleasant station open house Crosstown TO
 

Tendances (20)

Queen street station tunnel or throat development rodger querns
Queen street station tunnel or throat development  rodger quernsQueen street station tunnel or throat development  rodger querns
Queen street station tunnel or throat development rodger querns
 
Meeting minutes brossard good neighbourly relations commitee - may 17 2017
Meeting minutes   brossard good neighbourly relations commitee - may 17 2017Meeting minutes   brossard good neighbourly relations commitee - may 17 2017
Meeting minutes brossard good neighbourly relations commitee - may 17 2017
 
Crosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentation
 
Cv c d'urbal-technical supervisor(°°)
Cv c d'urbal-technical supervisor(°°)Cv c d'urbal-technical supervisor(°°)
Cv c d'urbal-technical supervisor(°°)
 
Eglinton Park
Eglinton ParkEglinton Park
Eglinton Park
 
Illumination of the Jacques Cartier Bridge
Illumination of the Jacques Cartier BridgeIllumination of the Jacques Cartier Bridge
Illumination of the Jacques Cartier Bridge
 
Forest Hill station open house
Forest Hill station open houseForest Hill station open house
Forest Hill station open house
 
Avenue station open house presentation
Avenue station open house presentation Avenue station open house presentation
Avenue station open house presentation
 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house
 
Caledonia station open house
Caledonia station open houseCaledonia station open house
Caledonia station open house
 
Keelesdale station open house
Keelesdale station open houseKeelesdale station open house
Keelesdale station open house
 
Good Neighbourly Relations Committee Meeting - Brossard - November 15, 2017
Good Neighbourly Relations Committee Meeting - Brossard - November 15, 2017Good Neighbourly Relations Committee Meeting - Brossard - November 15, 2017
Good Neighbourly Relations Committee Meeting - Brossard - November 15, 2017
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017
 
Soutenance de-stage-groupe-cayon-sebastien-valette
Soutenance de-stage-groupe-cayon-sebastien-valetteSoutenance de-stage-groupe-cayon-sebastien-valette
Soutenance de-stage-groupe-cayon-sebastien-valette
 
Avenue station open house
Avenue station open house Avenue station open house
Avenue station open house
 
Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015
 
Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open House
 
2018-06-19 - Jacques Cartier Bicycle Path Network - Advisory Committee
2018-06-19 - Jacques Cartier Bicycle Path Network - Advisory Committee 2018-06-19 - Jacques Cartier Bicycle Path Network - Advisory Committee
2018-06-19 - Jacques Cartier Bicycle Path Network - Advisory Committee
 
Chaplin slide deck final
Chaplin slide deck finalChaplin slide deck final
Chaplin slide deck final
 
Mount pleasant station open house
Mount pleasant station open house  Mount pleasant station open house
Mount pleasant station open house
 

En vedette (10)

Bilan des travaux 2016 de PJCCI
Bilan des travaux 2016 de PJCCIBilan des travaux 2016 de PJCCI
Bilan des travaux 2016 de PJCCI
 
Réseau cyclable et piétonnier 2016
Réseau cyclable et piétonnier  2016Réseau cyclable et piétonnier  2016
Réseau cyclable et piétonnier 2016
 
Assemblée publique annuelle 2016
Assemblée publique annuelle 2016Assemblée publique annuelle 2016
Assemblée publique annuelle 2016
 
Plan d'action Champlain - Opération poutre de support
Plan d'action Champlain  - Opération poutre de supportPlan d'action Champlain  - Opération poutre de support
Plan d'action Champlain - Opération poutre de support
 
Présentation travaux de réfection A-bonaventure (section fédérale)
Présentation travaux de réfection A-bonaventure (section fédérale)Présentation travaux de réfection A-bonaventure (section fédérale)
Présentation travaux de réfection A-bonaventure (section fédérale)
 
Blitz champlain automne 2014 - Week-end 2
Blitz champlain automne 2014 - Week-end 2Blitz champlain automne 2014 - Week-end 2
Blitz champlain automne 2014 - Week-end 2
 
Bilan des travaux pjcci 2014 briefing technique aux médias 9 décembre-slide...
Bilan des travaux pjcci 2014 briefing technique aux médias   9 décembre-slide...Bilan des travaux pjcci 2014 briefing technique aux médias   9 décembre-slide...
Bilan des travaux pjcci 2014 briefing technique aux médias 9 décembre-slide...
 
Assemblée publique annuelle 27 février 2015
Assemblée publique annuelle 27 février 2015 Assemblée publique annuelle 27 février 2015
Assemblée publique annuelle 27 février 2015
 
PJCCI planification des travaux 2015
PJCCI planification des travaux 2015 PJCCI planification des travaux 2015
PJCCI planification des travaux 2015
 
HALIMBAWA NG MAIKLING KWENTO
HALIMBAWA NG MAIKLING KWENTOHALIMBAWA NG MAIKLING KWENTO
HALIMBAWA NG MAIKLING KWENTO
 

Similaire à Review of work in 2016

Meeting of the brossard good neighbourly relations committee september 21 2016
Meeting of the brossard good neighbourly relations committee   september 21 2016Meeting of the brossard good neighbourly relations committee   september 21 2016
Meeting of the brossard good neighbourly relations committee september 21 2016Pont Samuel-De Champlain Bridge
 
Brossard Good Neighbourly Relations Committee - May 17, 2017
Brossard Good Neighbourly Relations Committee - May 17, 2017Brossard Good Neighbourly Relations Committee - May 17, 2017
Brossard Good Neighbourly Relations Committee - May 17, 2017Pont Samuel-De Champlain Bridge
 
Good neighbourly relations committee meeting - Brossard - January 25, 2017
Good neighbourly relations committee meeting - Brossard - January 25, 2017Good neighbourly relations committee meeting - Brossard - January 25, 2017
Good neighbourly relations committee meeting - Brossard - January 25, 2017Pont Samuel-De Champlain Bridge
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Crosstown TO
 
Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...
Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...
Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...Pont Samuel-De Champlain Bridge
 
Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...
Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...
Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...Pont Samuel-De Champlain Bridge
 
Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020Crosstown TO
 
Good neighbourly relations committee City of Brossard - May 4, 2016
Good neighbourly relations committee City of Brossard - May 4, 2016Good neighbourly relations committee City of Brossard - May 4, 2016
Good neighbourly relations committee City of Brossard - May 4, 2016Pont Samuel-De Champlain Bridge
 
Virtual Open House: Eastern Works
Virtual Open House: Eastern WorksVirtual Open House: Eastern Works
Virtual Open House: Eastern WorksCrosstown TO
 
Meeting of the verdun le sud ouest good neighbourly relations committee - Jun...
Meeting of the verdun le sud ouest good neighbourly relations committee - Jun...Meeting of the verdun le sud ouest good neighbourly relations committee - Jun...
Meeting of the verdun le sud ouest good neighbourly relations committee - Jun...Pont Samuel-De Champlain Bridge
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCrosstown TO
 
Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Crosstown TO
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Crosstown TO
 
Sea to Ski Higway Improvements Project
Sea to Ski Higway Improvements ProjectSea to Ski Higway Improvements Project
Sea to Ski Higway Improvements ProjectUrbanSystemsCanada
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)Pablo Miguel Jurado
 

Similaire à Review of work in 2016 (20)

JCCBI 2015 Project Report
JCCBI 2015 Project ReportJCCBI 2015 Project Report
JCCBI 2015 Project Report
 
Meeting of the brossard good neighbourly relations committee september 21 2016
Meeting of the brossard good neighbourly relations committee   september 21 2016Meeting of the brossard good neighbourly relations committee   september 21 2016
Meeting of the brossard good neighbourly relations committee september 21 2016
 
Brossard Good Neighbourly Relations Committee - May 17, 2017
Brossard Good Neighbourly Relations Committee - May 17, 2017Brossard Good Neighbourly Relations Committee - May 17, 2017
Brossard Good Neighbourly Relations Committee - May 17, 2017
 
Good neighbourly relations committee meeting - Brossard - January 25, 2017
Good neighbourly relations committee meeting - Brossard - January 25, 2017Good neighbourly relations committee meeting - Brossard - January 25, 2017
Good neighbourly relations committee meeting - Brossard - January 25, 2017
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017
 
Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...
Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...
Meeting of the verdun le sud ouest good neighbourly relations committee - Apr...
 
Public Information Meeting - Verdu - May 25, 2016
Public Information Meeting - Verdu - May 25, 2016Public Information Meeting - Verdu - May 25, 2016
Public Information Meeting - Verdu - May 25, 2016
 
Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...
Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...
Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...
 
Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020
 
Good neighbourly relations committee City of Brossard - May 4, 2016
Good neighbourly relations committee City of Brossard - May 4, 2016Good neighbourly relations committee City of Brossard - May 4, 2016
Good neighbourly relations committee City of Brossard - May 4, 2016
 
Virtual Open House: Eastern Works
Virtual Open House: Eastern WorksVirtual Open House: Eastern Works
Virtual Open House: Eastern Works
 
Scarborough Subway TPAP PIC
Scarborough Subway TPAP PICScarborough Subway TPAP PIC
Scarborough Subway TPAP PIC
 
Meeting of the verdun le sud ouest good neighbourly relations committee - Jun...
Meeting of the verdun le sud ouest good neighbourly relations committee - Jun...Meeting of the verdun le sud ouest good neighbourly relations committee - Jun...
Meeting of the verdun le sud ouest good neighbourly relations committee - Jun...
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open House
 
Puente izable
Puente izablePuente izable
Puente izable
 
Firas Abbawy CV - Atkins
Firas Abbawy CV - AtkinsFiras Abbawy CV - Atkins
Firas Abbawy CV - Atkins
 
Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
 
Sea to Ski Higway Improvements Project
Sea to Ski Higway Improvements ProjectSea to Ski Higway Improvements Project
Sea to Ski Higway Improvements Project
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)
 

Plus de Ponts Jacques Cartier + Champlain Bridges

Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018
Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018
Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018Ponts Jacques Cartier + Champlain Bridges
 
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...Ponts Jacques Cartier + Champlain Bridges
 
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...Ponts Jacques Cartier + Champlain Bridges
 
Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018
Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018
Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018Ponts Jacques Cartier + Champlain Bridges
 
Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...
Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...
Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...Ponts Jacques Cartier + Champlain Bridges
 
Planification des travaux de réfection et d'entretien majeur des structures P...
Planification des travaux de réfection et d'entretien majeur des structures P...Planification des travaux de réfection et d'entretien majeur des structures P...
Planification des travaux de réfection et d'entretien majeur des structures P...Ponts Jacques Cartier + Champlain Bridges
 

Plus de Ponts Jacques Cartier + Champlain Bridges (18)

2018-06-19 - Réseau cyclable du pont Jacques-Cartier - Comité consultatif
2018-06-19 - Réseau cyclable du pont Jacques-Cartier - Comité consultatif2018-06-19 - Réseau cyclable du pont Jacques-Cartier - Comité consultatif
2018-06-19 - Réseau cyclable du pont Jacques-Cartier - Comité consultatif
 
Jacques Cartier Bridge Good Neighbourly Relations Committee - May 8, 2018
Jacques Cartier Bridge Good Neighbourly Relations Committee - May 8, 2018Jacques Cartier Bridge Good Neighbourly Relations Committee - May 8, 2018
Jacques Cartier Bridge Good Neighbourly Relations Committee - May 8, 2018
 
Jacques Cartier Bicycle Path Network - Advisory Committee - April 30, 2018
Jacques Cartier Bicycle Path Network - Advisory Committee - April 30, 2018Jacques Cartier Bicycle Path Network - Advisory Committee - April 30, 2018
Jacques Cartier Bicycle Path Network - Advisory Committee - April 30, 2018
 
Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018
Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018
Comité consultatif - Réseau cyclable du pont Jacques-Cartier - 30 avril 2018
 
Comité de bon voisinage du pont Jacques-Cartier - 8 mai 2018
Comité de bon voisinage du pont Jacques-Cartier - 8 mai 2018Comité de bon voisinage du pont Jacques-Cartier - 8 mai 2018
Comité de bon voisinage du pont Jacques-Cartier - 8 mai 2018
 
Jacques Cartier Bicycle Path Network - Advisory Committee - June 22, 2017
Jacques Cartier Bicycle Path Network - Advisory Committee - June 22, 2017Jacques Cartier Bicycle Path Network - Advisory Committee - June 22, 2017
Jacques Cartier Bicycle Path Network - Advisory Committee - June 22, 2017
 
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 2...
 
Jacques Cartier Bicycle Path Network - Advisory Committee - October 4, 2017
Jacques Cartier Bicycle Path Network - Advisory Committee - October 4, 2017Jacques Cartier Bicycle Path Network - Advisory Committee - October 4, 2017
Jacques Cartier Bicycle Path Network - Advisory Committee - October 4, 2017
 
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...
Réseau cyclable du pont Jacques-Cartier - Comité consultatif - Rencontre du 4...
 
Planification 2018
Planification 2018Planification 2018
Planification 2018
 
Comité de bon voisinage - pont Jacques-Cartier - 6 février 2018
Comité de bon voisinage - pont Jacques-Cartier - 6 février 2018Comité de bon voisinage - pont Jacques-Cartier - 6 février 2018
Comité de bon voisinage - pont Jacques-Cartier - 6 février 2018
 
Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018
Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018
Good Neighbourly Relations Committee - Jacques Cartier Bridge - February 6, 2018
 
Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...
Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...
Solution Bonaventure - Projet environnemental visant à protéger le fleuve Sai...
 
Réseau cyclable du pont Jacques-Cartier - Comité consultatif
Réseau cyclable du pont Jacques-Cartier - Comité consultatifRéseau cyclable du pont Jacques-Cartier - Comité consultatif
Réseau cyclable du pont Jacques-Cartier - Comité consultatif
 
Assemblée publique annuelle 2017 / Annual Public Meeting 2017
Assemblée publique annuelle 2017 / Annual Public Meeting 2017Assemblée publique annuelle 2017 / Annual Public Meeting 2017
Assemblée publique annuelle 2017 / Annual Public Meeting 2017
 
Planification 2017 : Présentation des chantiers majeurs
Planification 2017 : Présentation des chantiers majeursPlanification 2017 : Présentation des chantiers majeurs
Planification 2017 : Présentation des chantiers majeurs
 
Solution Bonaventure
Solution BonaventureSolution Bonaventure
Solution Bonaventure
 
Planification des travaux de réfection et d'entretien majeur des structures P...
Planification des travaux de réfection et d'entretien majeur des structures P...Planification des travaux de réfection et d'entretien majeur des structures P...
Planification des travaux de réfection et d'entretien majeur des structures P...
 

Dernier

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSrknatarajan
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 

Dernier (20)

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 

Review of work in 2016

  • 1. 2016 Projects Review of major maintenance work and status update on JCCBI’s structures TECHNICAL MEDIA BRIEFING November 29, 2016 #OurProjects
  • 2. CHAMPLAIN BRIDGE 2016 Inspection and Structural Reinforcement
  • 3. 3 STRUCTURAL REINFORCEMENT AND REPAIRS Major work on the Champlain Bridge Installation of 48 trusses Replacement of 11 joints Repairs to 6 piers+ 270,000+ hours worked at Champlain Bridge work sites
  • 4. 4 Highly complex work Modular trusses + 4 m high and 78 m long + 56,000 kg!
  • 6. 6 A STRUCTURE AT THE END OF ITS SERVICE LIFE THAT HAS BENEFITED FROM MAJOR CORRECTIVE MEASURES Findings from the 2016 inspection + Structural integrity maintained + Condition of edge girders generally deficient + Repair work to improve components (e.g., foundation units, expansion joints) + New Integrated Grading System (IGS) to assess the impact of the reinforcement systems
  • 7. 7 Integrated Grading System (IGS) now applied to inspections of the Champlain Bridge SECTIONAL DRAWING OF AN EDGE GIRDER Integrated Grading System (IGS) EDGE GIRDER Condition rating 1: DEFICIENT MODULAR TRUSS Condition rating 4: GOOD IGS 10: EXCELLENT
  • 8. 8 Proven reinforcement method 90 edge girders are now reinforced with modular trusses or post systems
  • 10. 10 END OF DECK REPLACEMENT PROGRAM Honoré Mercier Bridge #OurProjects + Work blitzes completed a week ahead of schedule + Bridge’s lifespan extended by 75 years
  • 11. 11 Jacques Cartier Bridge REINFORCEMENT OF THE STEEL STRUCTURE #OurProjects + Replacement and reinforcement of steel members and reinforcing plates + Existing rivets keeping the assemblies in place are removed and replaced with bolts + 80 workers at our sites 7 days a week + Major program to extend the service life UPGRADES Major project to reinforce the metal structure, which dates back to the 1920s
  • 12. 12 Jacques Cartier Bridge #OurProjects REPAIRS TO THE ÎLE SAINTE-HÉLÈNE PAVILION Work on all parts of this structural building +
  • 13. 13 Illumination of the Jacques Cartier Bridge #OurProjects FIRST PROJECTOR INSTALLED May 17 is the big date!
  • 14. 14 Solution Bonaventure #OurProjects ENVIRONMENTAL PROJECT TO PROTECT THE RIVER + 95% of work complete in the west sector + 32 pumping wells installed along the shoreline to create a hydraulic barrier + Run-in of the contaminated water processing system in December
  • 15. 15 Champlain Bridge Ice Control Structure #OurProjects NEW BICYCLE PATH AND DEVELOPMENT OF APPROACHES 950 trees and shrubs planted to revitalize the approaches +
  • 16. 16 Melocheville Tunnel #OurProjects TUNNEL REHABILITATION + New structural reinforcements + Heated cables added to keep ice from forming on the pavement + Waterproofing of concrete surfaces + New intelligent transportation system (ITS) to keep overheight vehicles out of the tunnel and to detect incidents with video analysis
  • 17. COMPLEX CHALLENGES Proactive and responsible management
  • 18. 18 Management of major work #OurProjects DAILY MONITORING AND COORDINATION + Closures optimized by combining work + Proactive use of traffic lights on the Champlain Bridge to redirect heavy vehicles and limit required closures and restrictions + 30% fewer traffic closures and restrictions on our network in 2016 WORK BLITZES REALLY WORK! Work blitzes saved 7,300 hours of closure time on the Champlain Bridge.
  • 19. 19 + Ongoing communication with traffic reporters and the media, interviews and on-site tours + Text message alerts for major closures or significant incidents on our network + Integrated dashboard at www.JacquesCartierChamplain.ca: live traffic conditions, planned work, traffic cameras, major work alerts + Tweets about closures and information about each structure: @pontJCBridge @pontChampBridge @pontHMBridge + Over 25,900 subscribers on social networks TRANSPARENT COMMUNICATION AND MOBILE TOOLS Ongoing updates #OurProjects
  • 20. 20 Social and urban contributor
  • 21. 21 Bicycle path network #OurProjects WINTER BICYCLE PATH ON THE JACQUES CARTIER BRIDGE + Goal: Make the path safe for cyclists of all skill levels + CIMA + hired to conduct a feasibility study + Findings: - Complex slopes, curves, geometry and isolated areas - Difficult weather conditions above the river (black ice common) - No pavement surfacing on which to spread de-icing salts - Environmental restrictions related to snow removal - Risk of falling ice from the steel superstructure + Recommendation: Optimized period in the spring once the weather allows
  • 22. 22 Improvements to the existing network #OurProjects SEPARATE PEDESTRIAN / CYCLIST AREAS + Pedestrians and cyclists have to share the path, which can be difficult for both types of user + Pedestrians and cyclists go at very different speeds + The multipurpose path is very narrow compared to the standard + Developments to improve pedestrian access starting in spring 2017 + New safety measures deployed on the entire network
  • 23. 23 Planning for 2017 #OurProjects FEWER MAJOR CLOSURES OR RESTRICTIONS NEXT YEAR + Optimized work from the river or the shore + Coordination with other project authorities to limit the impact on the network + Blitz required on the Champlain Bridge for the expansion joints + Continuation of the steel program on the Jacques Cartier Bridge + Ongoing major maintenance program