 “Lean strategy” in manufacturing involves a
series of activities to minimize waste and
Non value added (NVA) operations from
production, customer relations, product
design, supplier networks and factory
management and improve the value added
(VA) process.
2
Lean approach was first introduced by Toyota
Production Systems, wherein the wastes highlighted
are
3
 Applying lean strategies
incorrectly, increases the inefficiencies of an
organization's resources and reduced
employee confidence in lean strategies.
(Marvel and Standridge 2009).
 Therefore, applying the appropriate lean
strategy for the specified industry is of
paramount importance.
4
 Behrouzi and Wong (2011) reported that the
principal reasons behind the failure of the
lean practices are
1. the lack of an effective implementation
methodology.
2. inadequate understanding of lean
performance measurements needed to
evaluate the improvement in effectiveness
and efficiency .
5
 The three core principles of lean strategy are
identified as:
1 Identification of value
2 Elimination of waste
3 The generation of smooth flow
(Womack et al., 1990)
6
1. Identifying customer defined value
2. Optimizing the value stream
3. Converting the value flow smoothly by
controlling and eliminating wastes
4. Activating the demand pull by synchronizing
customer demand and information flow
5. Perfection of all products processes and
services
( Womack and Jones, 2003)
7
 new.docx
8
 The proposed approach was implemented in
EXCEL Limited, Australia.
 The company specializes in low and medium
voltage switchgear products.
 This research mainly focused on electrical
control and communication cubicle assembly
RC-01 ES.
9
Define and assess the system
A lean implementation team is formed
Define the manufacturing performance indicators
Sketch the existing process status and map
Measure the current state of the process using CPM method
Implementation of lean tools based on the identified waste
Evaluation of effectiveness and efficiency of the proposed
approach
Continuous improvement techniques and culture10
 Based on the perspective of customer driven
value, authors assessed the current status of
lean strategy in the assembly unit.
11
Project
Manager
Mechanical
Engineer
Master
Student
Lean
Manufacturing
Expert
Skilled
Operators
Production
Manager
12
 The commonly used Performance indicators
are time ,cost ,quality and flexibility.
 In this study the authors focused on the
“Time” associated with the assembly
process.
 Continuous Performance Measurement(CPM)
method is used in this research to assess the
current state of performance.
13
 Sketch the existing process status and map
using VSM, visual control and time study
method.
 This map represents all the existing wastes, NVA
activities in a process that transforms raw
materials into a finished good.
 Major steps in the production process are:
1 receipt of raw material
2 assembly of the cubicles at different stages
3 testing
4 inspection
5 packaging
14
15
16
 The the existing process layout for RC cubicle
assembly process was responsible for major part
of time wastes and therefore redesigned the
layout. The work station had been separated
with specific task allocations for each operator
which ultimately balanced the workloads.
 Handling problems were identified as the
second most crucial waste in the process
 Third was the shortage of working parts and
tools in work stations, overcomed by providing
different trolleys in each work station with
necessary tools and parts.
17
18
 A major part of the proposed methodology is
to continuously assess performance before
and after lean implementation.
 In this process, the first step is to measure
the current state of the process in terms of
efficiency, effectiveness, VA/NVA time ratio
using process map and CPM.
19
Before Lean After Lean Improvement
Value Added Time (minutes) 27.15 27.15
Non-value added time
1.Adjusting parts 2.65 2.65 0
2.Walk to hold parts 6.03 1.93 -4.1
3.Walk to get tools 2.45 0.27 -2.18
4.Get parts 5.8 3.15 -2.65
5.Unpack and disassembly 5.15 5.15 0
6.Inspection/paper works 2.5 2.5 0
7.Handling parts and tools 7.46 5.91 -1.55
8.Cleaning 1.03 1.03 0
9.Rework 1.39 1.39 0
Total (Non Value added time) 34.46 24.34 -10
Total (VA+NVA) 61.61 51.49 -10
VA/NVA ratio .79 1.12 42%
20
 The overall performance of the
manufacturing process is measured by
considering both effectiveness and efficiency
of the production process.
 Efficiency = (output value ) × 100%
(input resource )
= no of output × average pitch time × 100%
no of workers × total allocated time
21
 Effectiveness compares actual output to
targeted output from a production line
(Bayou and de Korvin, 2008).
 Effectiveness
= Actual number of output × 100%
Targeted output value
22
Before Lean After Lean Improvement
Daily Production Target 20 26
Achieved Production Target 12 19
Average pitch time 61 51 -10
EFFICIENCY (%) 61 72 +18
EFFECTIVENESS 60 73 +22
23
 Monthly meeting and discussions among the
operators.
 And they discussed about new innovations or
new techniques to be implemented in their
production floor to reduce NVA operations
and effective use of available resources.
 5S
 Kaizen
24
 Many companies may not have expert lean
team and lean corporate culture .
 Identification of key performance indicators
is also crucial for leanness evaluation.
Sometimes, it is not possible to identify and
measure all the performance indicators in a
specific company.
 Finally, implementation of this method may
be costly and time consuming .
25
 The overall achievement in reducing NVA
time , average processing time and
improvement in process efficiency and
effectiveness were found satisfactory for the
company.
 The proposed lean implementation
methodology can be applied in
manufacturing organizations (especially in
assembly productions) to improve
operational performance.
26
 Azharul Karim and Kazi Arif-Uz-Zaman, A methodology for
effective implementation of lean strategies and its
performance evaluation in manufacturing organizations, J.
Business Process Management, Vol. 19 No. 1, (2013 ), PP
169-195.
 Manimay Ghosh, Lean manufacturing performance in Indian
manufacturing plants, Journal of Manufacturing Technology
Management, Vol. 24 No. 1, (2013) , PP 113-122.
27
28
29
30
31
 The lean team found that the existing process layout for
RC cubicle assembly process was responsible for major
part of time wastes and therefore redesigned the layout.
 In the new layout, the working stations and the machines
are located in optimum distance for operators which
actually reduced walking distances among them.
 Handling problems were identified as the second most
crucial waste in the process. The work station had been
separated with specific task allocations for each operator
which ultimately balanced the workloads. Eventually the
handling waste was minimized by the separation of the
tasks.
 In order to overcome the problem related to shortage of
parts and tools in work stations, different trolleys in each
work station was allocated with necessary tools and
working parts
32
Asses the status of Lean Strategy in the company
A lean implementation team is formed
The team further defines the manufacturing performance
indicators based on production quantity, processing time and cost.
Sketch the existing process status and map using VSM, visual control
and time study method to identify existing process wastes
Measure the current state of the process using CPM method
Different lean tools are implemented considering existing
production scopes and wastes into the process.
Again the effectiveness and efficiency of the proposed process
is evaluated in the next phase using CPM
The culture for continuous improvement techniques is
developed within the process environment 33
34
Before Lean After Lean Change
Value Added Time (minutes) 27.15 27.15
Non-value added time
Adjust 2.65 2.65 0
Walk to parts 6.03 1.93 -4.1
Walk to get tools 2.45 0.27 -2.18
Get parts 5.8 3.15 -2.65
Unpack and disassembly 5.15 5.15 0
Inspection/paper works 2.5 2.5 0
Handling 7.46 5.91 -1.55
Cleaning 1.03 1.03 0
Rework 1.39 1.39 0
Total (Non Value added time) 34.46 24.34 +10
Total (VA+NVA) 61.61 51.49 +10
VA/NVA ratio .79 1.12
Daily Target 20 26
Achieved Target 12 19
Average pitch time 61 51 +10
Efficiency 61 72 +11
Effectiveness 60 73 +1335
 The method suggests that at early stage of lean
implementation, a lean team needs to be formed
with skilled personnel from different department of
the company. The team members should have
sufficient expertise in lean strategies and
implementation methodology. Many companies may
not have people with this expertise.
 A team member without necessary knowledge and
skills adversely affect the overall success of the
project and can measure unrealistic performance of
production system.
 Identification of key performance indicators is also
crucial for leanness evaluation. Sometimes, it is not
possible to identify and measure all the measures of
performance indicators in a specific company.
 Finally, implementation of this method may be costly
and time consuming but new methods and techniques
need to be applied within company‟s budget and
resources.
36
 Lean techniques provided better results
depending on the firm size; practices such as
setup time reduction, multifunction employees
and Kanban system provide better organizational
performance regardless of firm size.
 Wan and Chen (2009) identified 12 groups of lean
tools (Autonomation, concurrent engineering,
line balancing, manufacturing cell, productivity,
pull, quality, single minute exchange of die
(SMED), standard work, visual control, VSM, and
worker flexibility) to implement in two type of
systems
(quantitative and repetitiveness of product).
37
 VSM technique developed by Rother and
Shook (1999) becomes one of the most
commonly used lean tools.
 Melton (2005) also suggested five key lean
tools especially for process industries
namely,
( kanban, 5S, visual control, Poke Yoke and
SMEDs.)
38
 set up monthly meeting and discussions
among the operators. In these meetings,
they discussed about new innovations or new
techniques to be implemented in their
production floor.
 The overall achievement in reducing NVA
time and average processing time and
increment in process efficiency and
effectiveness were satisfactory
39
40
To meet such expectations, the
manufacturing industry is focusing on
advanced manufacturing strategies in
particular the
„manufacturing-task strategy‟ and
„manufacturing-choice strategy‟
(Miller and Roth 1994, Swink and Way 1995).
41
 The manufacturing-task strategy represents
the competitive capability the manufacturing
firm must accomplish in order to compete
successfully in its business or marketing
environment
(Davies and Kochhar2002, Leung 2002)
42
 The manufacturing-choice strategy
represents the appropriate selections of
technologies and management strategies to
improve the manufacturing system.
43
44
 The RC control and communications cubicle
is a microprocessor-based controller that
provides a directional over current, earth
fault and sensitive earth fault relay, auto
reclosing relay, instantaneous metering,
event log, demand logger and remote
terminal unit (RTU) for remote control in a
single package.
45
46
47
48

Contenu connexe

Tendances

Lean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training ModuleLean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training ModuleFrank-G. Adler
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturingskchawla4
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream MappingTKMG, Inc.
 
Global 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training ModuleGlobal 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training ModuleFrank-G. Adler
 
Lean Implementation Overview
Lean Implementation OverviewLean Implementation Overview
Lean Implementation Overviewbroper
 
Value stream mapping- lean manufacturing tool
Value stream mapping- lean manufacturing toolValue stream mapping- lean manufacturing tool
Value stream mapping- lean manufacturing toolbhanutomar
 
A Kaizen - Continues Improvement
A Kaizen - Continues ImprovementA Kaizen - Continues Improvement
A Kaizen - Continues ImprovementShravan Bhumkar
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing Marico Ltd.
 
Kaizen Training
Kaizen Training Kaizen Training
Kaizen Training jah10632
 

Tendances (20)

Lean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training ModuleLean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training Module
 
Fundamentals of Lean
Fundamentals of LeanFundamentals of Lean
Fundamentals of Lean
 
Lean Thinking by Operational Excellence Consulting
Lean Thinking by Operational Excellence ConsultingLean Thinking by Operational Excellence Consulting
Lean Thinking by Operational Excellence Consulting
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Dmaic
DmaicDmaic
Dmaic
 
Kaizen
KaizenKaizen
Kaizen
 
Lean basics
Lean basicsLean basics
Lean basics
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Global 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training ModuleGlobal 8D Problem Solving Process Training Module
Global 8D Problem Solving Process Training Module
 
Lean Implementation Overview
Lean Implementation OverviewLean Implementation Overview
Lean Implementation Overview
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 
Value stream mapping- lean manufacturing tool
Value stream mapping- lean manufacturing toolValue stream mapping- lean manufacturing tool
Value stream mapping- lean manufacturing tool
 
A Kaizen - Continues Improvement
A Kaizen - Continues ImprovementA Kaizen - Continues Improvement
A Kaizen - Continues Improvement
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
 
13. value stream mapping
13. value stream mapping13. value stream mapping
13. value stream mapping
 
Kaizen Training
Kaizen Training Kaizen Training
Kaizen Training
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 

Similaire à Lean Strategy Implementation Methodology.

IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...IRJET Journal
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...Karina Islam
 
Improvement of Productivity Using Value Stream Mapping
Improvement of Productivity Using Value Stream MappingImprovement of Productivity Using Value Stream Mapping
Improvement of Productivity Using Value Stream Mappingijsrd.com
 
A036501014
A036501014A036501014
A036501014theijes
 
Productivity improvement through lean deployment &
Productivity improvement through lean deployment &Productivity improvement through lean deployment &
Productivity improvement through lean deployment &eSAT Publishing House
 
IRJET- Implementing Lean Manufacturing Principle in Fabrication Process- A...
IRJET- 	  Implementing Lean Manufacturing Principle in Fabrication Process- A...IRJET- 	  Implementing Lean Manufacturing Principle in Fabrication Process- A...
IRJET- Implementing Lean Manufacturing Principle in Fabrication Process- A...IRJET Journal
 
Malabar cements
Malabar cementsMalabar cements
Malabar cementssarathpkd
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining TimeIRJET Journal
 
Productivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodsProductivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodseSAT Journals
 
Project Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringProject Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringAmanuzzaman Aman
 
bba full notes.pdf
bba full notes.pdfbba full notes.pdf
bba full notes.pdfssuser30da23
 
BBA PRODUCTION MANAGEMENT
BBA PRODUCTION MANAGEMENT BBA PRODUCTION MANAGEMENT
BBA PRODUCTION MANAGEMENT Vandan Kashyap
 
Manufacturing planning and self inspection in pharmaceutical industries
Manufacturing planning and self inspection in pharmaceutical industriesManufacturing planning and self inspection in pharmaceutical industries
Manufacturing planning and self inspection in pharmaceutical industriesSumita Sahoo
 
Presentation by sathish nataraj sundararajan
Presentation by sathish nataraj sundararajanPresentation by sathish nataraj sundararajan
Presentation by sathish nataraj sundararajanPMI_IREP_TP
 

Similaire à Lean Strategy Implementation Methodology. (20)

IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
Improvement of Productivity Using Value Stream Mapping
Improvement of Productivity Using Value Stream MappingImprovement of Productivity Using Value Stream Mapping
Improvement of Productivity Using Value Stream Mapping
 
synopsis
synopsissynopsis
synopsis
 
Lean Construction Management
Lean Construction Management Lean Construction Management
Lean Construction Management
 
A036501014
A036501014A036501014
A036501014
 
I04402058062
I04402058062I04402058062
I04402058062
 
Productivity improvement through lean deployment &
Productivity improvement through lean deployment &Productivity improvement through lean deployment &
Productivity improvement through lean deployment &
 
I012536474
I012536474I012536474
I012536474
 
IRJET- Implementing Lean Manufacturing Principle in Fabrication Process- A...
IRJET- 	  Implementing Lean Manufacturing Principle in Fabrication Process- A...IRJET- 	  Implementing Lean Manufacturing Principle in Fabrication Process- A...
IRJET- Implementing Lean Manufacturing Principle in Fabrication Process- A...
 
Malabar cements
Malabar cementsMalabar cements
Malabar cements
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
 
Lean construction
Lean constructionLean construction
Lean construction
 
Productivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodsProductivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methods
 
Zero Tolerancev
Zero TolerancevZero Tolerancev
Zero Tolerancev
 
Project Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringProject Report on Textile Industrial Engineering
Project Report on Textile Industrial Engineering
 
bba full notes.pdf
bba full notes.pdfbba full notes.pdf
bba full notes.pdf
 
BBA PRODUCTION MANAGEMENT
BBA PRODUCTION MANAGEMENT BBA PRODUCTION MANAGEMENT
BBA PRODUCTION MANAGEMENT
 
Manufacturing planning and self inspection in pharmaceutical industries
Manufacturing planning and self inspection in pharmaceutical industriesManufacturing planning and self inspection in pharmaceutical industries
Manufacturing planning and self inspection in pharmaceutical industries
 
Presentation by sathish nataraj sundararajan
Presentation by sathish nataraj sundararajanPresentation by sathish nataraj sundararajan
Presentation by sathish nataraj sundararajan
 

Dernier

Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...KokoStevan
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 

Dernier (20)

Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 

Lean Strategy Implementation Methodology.

  • 2.  “Lean strategy” in manufacturing involves a series of activities to minimize waste and Non value added (NVA) operations from production, customer relations, product design, supplier networks and factory management and improve the value added (VA) process. 2
  • 3. Lean approach was first introduced by Toyota Production Systems, wherein the wastes highlighted are 3
  • 4.  Applying lean strategies incorrectly, increases the inefficiencies of an organization's resources and reduced employee confidence in lean strategies. (Marvel and Standridge 2009).  Therefore, applying the appropriate lean strategy for the specified industry is of paramount importance. 4
  • 5.  Behrouzi and Wong (2011) reported that the principal reasons behind the failure of the lean practices are 1. the lack of an effective implementation methodology. 2. inadequate understanding of lean performance measurements needed to evaluate the improvement in effectiveness and efficiency . 5
  • 6.  The three core principles of lean strategy are identified as: 1 Identification of value 2 Elimination of waste 3 The generation of smooth flow (Womack et al., 1990) 6
  • 7. 1. Identifying customer defined value 2. Optimizing the value stream 3. Converting the value flow smoothly by controlling and eliminating wastes 4. Activating the demand pull by synchronizing customer demand and information flow 5. Perfection of all products processes and services ( Womack and Jones, 2003) 7
  • 9.  The proposed approach was implemented in EXCEL Limited, Australia.  The company specializes in low and medium voltage switchgear products.  This research mainly focused on electrical control and communication cubicle assembly RC-01 ES. 9
  • 10. Define and assess the system A lean implementation team is formed Define the manufacturing performance indicators Sketch the existing process status and map Measure the current state of the process using CPM method Implementation of lean tools based on the identified waste Evaluation of effectiveness and efficiency of the proposed approach Continuous improvement techniques and culture10
  • 11.  Based on the perspective of customer driven value, authors assessed the current status of lean strategy in the assembly unit. 11
  • 13.  The commonly used Performance indicators are time ,cost ,quality and flexibility.  In this study the authors focused on the “Time” associated with the assembly process.  Continuous Performance Measurement(CPM) method is used in this research to assess the current state of performance. 13
  • 14.  Sketch the existing process status and map using VSM, visual control and time study method.  This map represents all the existing wastes, NVA activities in a process that transforms raw materials into a finished good.  Major steps in the production process are: 1 receipt of raw material 2 assembly of the cubicles at different stages 3 testing 4 inspection 5 packaging 14
  • 15. 15
  • 16. 16
  • 17.  The the existing process layout for RC cubicle assembly process was responsible for major part of time wastes and therefore redesigned the layout. The work station had been separated with specific task allocations for each operator which ultimately balanced the workloads.  Handling problems were identified as the second most crucial waste in the process  Third was the shortage of working parts and tools in work stations, overcomed by providing different trolleys in each work station with necessary tools and parts. 17
  • 18. 18
  • 19.  A major part of the proposed methodology is to continuously assess performance before and after lean implementation.  In this process, the first step is to measure the current state of the process in terms of efficiency, effectiveness, VA/NVA time ratio using process map and CPM. 19
  • 20. Before Lean After Lean Improvement Value Added Time (minutes) 27.15 27.15 Non-value added time 1.Adjusting parts 2.65 2.65 0 2.Walk to hold parts 6.03 1.93 -4.1 3.Walk to get tools 2.45 0.27 -2.18 4.Get parts 5.8 3.15 -2.65 5.Unpack and disassembly 5.15 5.15 0 6.Inspection/paper works 2.5 2.5 0 7.Handling parts and tools 7.46 5.91 -1.55 8.Cleaning 1.03 1.03 0 9.Rework 1.39 1.39 0 Total (Non Value added time) 34.46 24.34 -10 Total (VA+NVA) 61.61 51.49 -10 VA/NVA ratio .79 1.12 42% 20
  • 21.  The overall performance of the manufacturing process is measured by considering both effectiveness and efficiency of the production process.  Efficiency = (output value ) × 100% (input resource ) = no of output × average pitch time × 100% no of workers × total allocated time 21
  • 22.  Effectiveness compares actual output to targeted output from a production line (Bayou and de Korvin, 2008).  Effectiveness = Actual number of output × 100% Targeted output value 22
  • 23. Before Lean After Lean Improvement Daily Production Target 20 26 Achieved Production Target 12 19 Average pitch time 61 51 -10 EFFICIENCY (%) 61 72 +18 EFFECTIVENESS 60 73 +22 23
  • 24.  Monthly meeting and discussions among the operators.  And they discussed about new innovations or new techniques to be implemented in their production floor to reduce NVA operations and effective use of available resources.  5S  Kaizen 24
  • 25.  Many companies may not have expert lean team and lean corporate culture .  Identification of key performance indicators is also crucial for leanness evaluation. Sometimes, it is not possible to identify and measure all the performance indicators in a specific company.  Finally, implementation of this method may be costly and time consuming . 25
  • 26.  The overall achievement in reducing NVA time , average processing time and improvement in process efficiency and effectiveness were found satisfactory for the company.  The proposed lean implementation methodology can be applied in manufacturing organizations (especially in assembly productions) to improve operational performance. 26
  • 27.  Azharul Karim and Kazi Arif-Uz-Zaman, A methodology for effective implementation of lean strategies and its performance evaluation in manufacturing organizations, J. Business Process Management, Vol. 19 No. 1, (2013 ), PP 169-195.  Manimay Ghosh, Lean manufacturing performance in Indian manufacturing plants, Journal of Manufacturing Technology Management, Vol. 24 No. 1, (2013) , PP 113-122. 27
  • 28. 28
  • 29. 29
  • 30. 30
  • 31. 31
  • 32.  The lean team found that the existing process layout for RC cubicle assembly process was responsible for major part of time wastes and therefore redesigned the layout.  In the new layout, the working stations and the machines are located in optimum distance for operators which actually reduced walking distances among them.  Handling problems were identified as the second most crucial waste in the process. The work station had been separated with specific task allocations for each operator which ultimately balanced the workloads. Eventually the handling waste was minimized by the separation of the tasks.  In order to overcome the problem related to shortage of parts and tools in work stations, different trolleys in each work station was allocated with necessary tools and working parts 32
  • 33. Asses the status of Lean Strategy in the company A lean implementation team is formed The team further defines the manufacturing performance indicators based on production quantity, processing time and cost. Sketch the existing process status and map using VSM, visual control and time study method to identify existing process wastes Measure the current state of the process using CPM method Different lean tools are implemented considering existing production scopes and wastes into the process. Again the effectiveness and efficiency of the proposed process is evaluated in the next phase using CPM The culture for continuous improvement techniques is developed within the process environment 33
  • 34. 34
  • 35. Before Lean After Lean Change Value Added Time (minutes) 27.15 27.15 Non-value added time Adjust 2.65 2.65 0 Walk to parts 6.03 1.93 -4.1 Walk to get tools 2.45 0.27 -2.18 Get parts 5.8 3.15 -2.65 Unpack and disassembly 5.15 5.15 0 Inspection/paper works 2.5 2.5 0 Handling 7.46 5.91 -1.55 Cleaning 1.03 1.03 0 Rework 1.39 1.39 0 Total (Non Value added time) 34.46 24.34 +10 Total (VA+NVA) 61.61 51.49 +10 VA/NVA ratio .79 1.12 Daily Target 20 26 Achieved Target 12 19 Average pitch time 61 51 +10 Efficiency 61 72 +11 Effectiveness 60 73 +1335
  • 36.  The method suggests that at early stage of lean implementation, a lean team needs to be formed with skilled personnel from different department of the company. The team members should have sufficient expertise in lean strategies and implementation methodology. Many companies may not have people with this expertise.  A team member without necessary knowledge and skills adversely affect the overall success of the project and can measure unrealistic performance of production system.  Identification of key performance indicators is also crucial for leanness evaluation. Sometimes, it is not possible to identify and measure all the measures of performance indicators in a specific company.  Finally, implementation of this method may be costly and time consuming but new methods and techniques need to be applied within company‟s budget and resources. 36
  • 37.  Lean techniques provided better results depending on the firm size; practices such as setup time reduction, multifunction employees and Kanban system provide better organizational performance regardless of firm size.  Wan and Chen (2009) identified 12 groups of lean tools (Autonomation, concurrent engineering, line balancing, manufacturing cell, productivity, pull, quality, single minute exchange of die (SMED), standard work, visual control, VSM, and worker flexibility) to implement in two type of systems (quantitative and repetitiveness of product). 37
  • 38.  VSM technique developed by Rother and Shook (1999) becomes one of the most commonly used lean tools.  Melton (2005) also suggested five key lean tools especially for process industries namely, ( kanban, 5S, visual control, Poke Yoke and SMEDs.) 38
  • 39.  set up monthly meeting and discussions among the operators. In these meetings, they discussed about new innovations or new techniques to be implemented in their production floor.  The overall achievement in reducing NVA time and average processing time and increment in process efficiency and effectiveness were satisfactory 39
  • 40. 40
  • 41. To meet such expectations, the manufacturing industry is focusing on advanced manufacturing strategies in particular the „manufacturing-task strategy‟ and „manufacturing-choice strategy‟ (Miller and Roth 1994, Swink and Way 1995). 41
  • 42.  The manufacturing-task strategy represents the competitive capability the manufacturing firm must accomplish in order to compete successfully in its business or marketing environment (Davies and Kochhar2002, Leung 2002) 42
  • 43.  The manufacturing-choice strategy represents the appropriate selections of technologies and management strategies to improve the manufacturing system. 43
  • 44. 44
  • 45.  The RC control and communications cubicle is a microprocessor-based controller that provides a directional over current, earth fault and sensitive earth fault relay, auto reclosing relay, instantaneous metering, event log, demand logger and remote terminal unit (RTU) for remote control in a single package. 45
  • 46. 46
  • 47. 47
  • 48. 48