Yasin Abazid is a mechanical engineer from Damascus University with over 10 years of experience in HVAC design and project management. He has worked on numerous large-scale commercial and residential projects in Dubai and Abu Dhabi, including REEM townhouses, The Ritz Carlton Abu Dhabi, and Abu Dhabi Future School. Currently he oversees mechanical works and ensures compliance with standards for BH.NS Engineering Consultants.
1. Mechanical Engineer
YASIN ABAZID
0564402226 / Dubai, United Arab Emirates
yasinabazid@gmail.com
QUALIFICATION
Bachelor of Science in Mechanical Engineering / Damascus University, Syria
Total Work experience:
1. Senior Mechanical Engineer for BH.NS ENGINEERING CONSULTANTS
Period: August 2014 till date (working currently).
Work summary:
REEM Development, Mira Community - 1, 2, 3, 4&5 Construction of 1898 nos. Town
Houses (Approved from EMAAR Engineers).
(Project Cost: 1,218,000,000 AED – Project Period: 711 Days).
Business Tower Investment LLC (MAJESTINE) Twin tower Ground+3 Podiums+16
typical floor +Roof, (Approved from DAMAC engineers).
(Project Cost: 178,000,000 AED – Project Period: 2 Years)
MADINAT JUMEIRAH FORT ISLAND, Basement (server & meeting rooms) + GF
(public toilets & kitchen) +1F (male &female ablution and prayer rooms) + Roof
(Terrace & equipment’s) / Partial time.
Profile Residence LTD (Sport City) -Tower: Basement + Ground+12 typical floor +Roof / Partial time.
2. HVAC & Mechanical engineer for ETA. M&E Division –Abu Dhabi
Period: May 2008 to August 2014
Work summary:
HVAC Site engineer at THE RITZ CARELTON HOTEL ABU DHABI Project,
(features 447 luxurious guestrooms and suites, as well as 85 private 1- and 2-
bedroom villas + 10 hotel restaurants, including 3 signature restaurants – Lebanese,
Asian and Steak house + 2,182 square meters of flexible meeting space, including a
magnificent 1,550-square meter ballroom).
(Project Cost: 1,600,000,000 AED – Project Period: 4 Years)
Mechanical project engineer at Abu Dhabi Future School Projects,
(SHAWAMEKH SCHOOL).
(Project Cost: 110,000,000 AED – Project Period: 18 Months)
HVAC Estimation and Tendering quantities (JCA and BOQ).
3. Mechanical Project Engineer for YORK Agency
Period: August 2007 to April 2008
Work summary:
2. Page 2 of 3
Cinema Dummer in Damascus.
Military building, Damascus.
Duties & responsibilities
1- BH-NS / August 2014 Till date
REEM Development, Mira Community - 1, 2, 3, 4&5.
Business Tower Investment LLC (MAJESTINE).
MADINAT JUMEIRAH FORT ISLAND.
Profile Residence LTD.
Review contractor’s submittals, drawings, calculations.
Reviewing Contractor's interim monthly payments.
Coordinating with Client / Contractor’s representatives.
Attending technical & regular progress meetings with Project managers, contractors & sub-
contractors
Supervising the execution of the mechanical works in the projects and ensure that it is
executed as per contract condition.
Leading site inspectors for all kinds of mechanical work inspections & material inspections.
Raising Non Conformance Reports (NCR) for identified findings.
Ensuring compliance of all activities at site with QA/QC procedure, specification & standards.
Addressing any progress & quality related issues in meetings.
Ensuring all construction activities are being carried out as per approved shop drawings,
Method statements, contract specification & to the related code of the practice.
2- ETA / May 2008 to August 2014
ESTIMATING PROJECTS / Sep 2013 - July 2014 :
Studying the specifications and drawings for the projects, take off the quantities for HVAC items and
send the enquiries to suppliers as specified vender list ,studying any value engineering can be made
to reduce the coast of projects and rise the queries to consultant.
List of some of estimated projects:
SAADIYAT ISLAND - INFRASTRUCTURE.
AL AIN HOSPITAL.
M TOWER.
AL MEENA RESIDENTIAL AND COMMERCIAL TOWER.
GUGGENHEIM Abu Dhabi MUSEUM.
ALAIN GRAND MOSQUE.
Abu Dhabi Future School project -Shawamekh School / April 2012 - August 2013 :
Technical calculation for AC & Plumping system (pump head calculations for water supply
pumps & chilled water pumps - ESP calculation for fans).
3. Nationality : Syrian
Marital status : Married
Supervise the work of Installation for
03 chillers 372 TR (each), 03 secondary pumps, 04 primary pumps, 23 AHUs, 08
FAHUs and 46 FCUs.
300 No’s of VAVs and CAVs.
135 solar panels and 02 boilers and 04 calorifiers.
Sun light (220 units).
Chilled water system flushing.
Commissioning work (air and water balancing with devices installation for BMS work to get
final graphic monitoring) for AC system VAVs, AHUs, FAHUs, FCUs, FANs, CHW pumps and
chillers.
Maintenance work for all mechanical system AC & Plumping.
The Ritz Carlton Hotel project / May 2008 till March 2012 :
Plant room : 24” Dia header pipes - chilled water pumps (2duty & 1 standby each with 253
L/S , 50M Head capacity ) with Inertia bases and spring isolators - Heat exchanger 4 No’s
with 1140TR (each) - Pressurization unit - Chemical dosing pot - Pipes accessories: BFV ,
STR , Check valve , DRV , GV , Palo meter , flexible pipe connector & Expansion
compensators.
Installation of 18” Dia CHW pipes 250 meter length Supply/Return with fiber glass tube
insulation and aluminum cladding in parking area.
Underground CHW Pipes 10” Dia , between ETS room to Marina BLDG 600 meter length
S/R pre insulated M.S PIPE SCH-40 with 75mm thickness foam insulation and HDPE sleeve
- leak detection cable ( Joint insulation & continuity test for leak detection cable) - Ultra sonic
test for all pipes joints.
CHW pipe and ducting Work at Marina BLDG including all equipment installation (121 No’s of
Fan Coil Units & 5 No’s Fresh Air Handling Units & 11 No’s Toilet extract fans (Twin fan).
2 Floor care parking ventilation system ducting with 8 fans 13760 L/S each. Feeding 65000
Sq.Ft fire rated ducting.
40. No’s 1- and 2-bedroom villas DX system.
Testing and Commissioning work for AC system.
Supervise the AC work at villa reception.
Supervise the AC work at building no.8 in the main hotel BL +PL +ML (Kitchen) +1F(meeting
rooms)+2F(bridle suite)+4 typical Floor +Roof.
Personal Profile:
Date of Birth : 28 May 1982