LEVELLING
According to science
• Leveling is a branch of surveying which deals with the measurement
of relative heights of different points on, above or below the
surface of the earth. Thus in leveling, the measurements
(elevations) are taken in the vertical plane.
Simple Definition
• Leveling is the process used to determine a difference in elevation
between two points.
2
Definitions
• Station:- A point where the levelling staff is kept.
• Height of instrument:- It is the elevation of the plane of sight with
respect to assumed datum. It is also known as plane of collimation.
• Datum line ( M.S.L. ) :- Is the level (line) which are attributed to it
points levels on the surface of the Earth. Which is the average sea
level.
• Reduced level ( R.L) :- Is the high point from datum line.
• Benchmark (B .M ) :- Are fixed points information site and
attributed placed in different places until you start racing them
when conducting settlement .
• Back sight ( B.S.) :- Is the first reading taken after placing the device
in any position so that we see the greatest possible number of
points required to find the elevation .
3
• BENCHMARKS
4
• Fore sight (F.S) :- Is the last reading taken before the transfer device.
• Change point(CP) or turning point(TP): The point at which both BS
and FS are taken.
• Intermediate sight ( I.S.) :- Is reading taken between the back sight
and fore sight reading .
• Elevation of line of sight ( H.I) :- Is the imaginary vertical level
determined by the line of sight to the amount of increase or
decrease for sea level .
5
• Tripod stand :- is a portable three-legged frame, used as a platform
for supporting the weight and maintaining the stability of some
other object.
PLUMB BOBTRIPOD STAND TRIPOD STAND
6
7
• Leveling Staff :-Is a wooden or metal ruler one side runway to meters
and centimeters. And is a ruler of solid wood 2 , 3 , 4 , 5 meters in
length and usually 4 meters .
8
• Leveling of the instrument is done to make the vertical axis of the
instrument truly vertical. It is achieved by carrying out the
following steps:
• Step 1: The level tube is brought parallel to any two of the foot
screws, by rotating the upper part of the instrument.
• Step 2: The bubble is brought to the centre of the level tube by
rotating both the foot screws either inward or outward. (The bubble
moves in the same direction as the left thumb.)
• Step 3: The level tube is then brought over the third foot screw again
by rotating the upper part of the instrument.
• Step 4: The bubble is then again brought to the centre of the level
tube by rotating the third foot screw either inward or outward.
9
• Step 5: By rotating the upper part of the instrument through 180 ° ,
the level tube is brought parallel to first two foot screws in reverse
order. The bubble will remain in the centre if the instrument is in
permanent adjustment.
10
TYPES OF LEVELLING
1] Simple levelling
2] Differential levelling
3] Fly levelling
4] Profile levelling
5] Cross sectional levelling
6] Reciprocal levelling
There are two methods for obtaining the elevations at different points:
1] Height of instrument (or plane of collimation) method
2] Rise and fall method
11
Simple levelling:-
• When the difference in the elevation of two nearby points is
required then simple levelling is performed.
12
Differential levelling:-
• Performed when the final point is very far from the final point.
13
Fly levelling
• Performed when the work site is very far away from the bench
mark.
• The surveyor starts by taking BS at BM and proceed towards
worksite till he finds a suitable place for temporary BM. All works
are done with respect to temporary BM.
• At the end of the day the surveyor comes back to original BM.
• This is called fly levelling.
14
Profile levelling:-
•Profile levelling, which yields elevations at definite points along a
reference line, provides the needed data for designing facilities such as
highways, railroads, transmission lines.
•Reduced levels at various points at regular interval along the line is
calculated.
•After getting the RL of various points the profile is drawn. Normally
vertical scale is much larger than horizontal scale for the clear view of
the profile.
15
Reciprocal levelling:-
When levelling across river is required then this method is
applied to get rid of various errors.
16
METHODS
1] Height of Instrument method
• The basic equations are
• Height of instrument for the first setting= RL of BM + BS(at BM)
• Subtract the IS and FS from HI to get RL of intermediate stations
and change points.
• Checking: ΣBS -ΣFS = Last RL –First RL. This is –ve for FALL and +ve
for RISE.
17
18
METHODS
2] Rise and Fall method
• In this method the difference of the present staff reading is
subtracted from the previous staff reading.
• Previous reading –present staff reading = +ve, denotes RISE
• Previous reading –present staff reading = -ve, denotes FALL
• Checking: ΣBS -ΣFS = Last RL –First RL= ΣRise -ΣFall
19
20
BENCH MARK ELEVATED
e.g. 100m
?
TOP OF SLOPE
FIND THE DIFFERENT BETWEEN BENCH
MARK AND TOP OF SLOPE
Divide hill into 3 spots to make easier
Otherwise too far to see or level staff not
long enough
Back sight
9 m
Rotate dumpy round
Move level staff to new spot
Fore sight
2 m
Move dumpy level to new spot
Back sight
6 m
Fore sight
1 m
Rotate dumpy round
Move level staff to new spot
21
Ground
level
Back sight
[from dumpy
level]
Height of instrument
[ground level+ back sight
from dumpy level]
Fore sight
[from dumpy
level]
Height of new
point [height of
instrument fore
sight]
Bench
mark
100 9 109 2 107
107 6 113 1 112
Back sight
9 m
Fore sight
2 m
Back sight
6 m
Fore sight
1 m
Level of dumpy=109m
Level of dumpy=113m
9m
100m+
9m
6m
6m+107m
1m
2m
BENCH MARK ELEVATED
e.g. 100m
SO THE DIFFERENCE
IN HEIGHT IS
112-100=12M
22
CONTOURING
23
• Contours are those lines you can
see on OS maps.
• A contour line is an imaginary
line that joins points of equal
height above sea level.
• They can be used to learn about
the shape of the land (the relief).
• A map with only a few contour
lines will be flat (and often low
lying)
• If a map has lots of contours it is
a mountainous or hilly area.
• The actual pattern of the lines
will tell you more detail about
the area too.
Steep slopes
Area that is
flatter with only
a gentle slope
24
CONTOURS
• Contour An imaginary line on the ground surface joining the points
of equal elevation is known as contour.
• In other words, contour is a line in which the ground surface is
intersected by a level surface obtained by joining points of equal
elevation. This line on the map represents a contour and is called
contour line.
• Contour Map :-A map showing contour lines is known as Contour
map.
• A contour map gives an idea of the altitudes of the surface features
as well as their relative positions in plan serves the purpose of both,
a plan and a section.
25
Contouring
• The process of tracing contour lines on the surface of the earth is called
Contouring.
• PURPOSE OF CONTOURING
• Contour survey is carried out at the starting of any engineering
project such as a road, a railway, a canal, a dam, a building etc.
i) For preparing contour maps in order to select the most economical
or suitable site.
ii) To locate the alignment of a canal so that it should follow a ridge
line.
iii) To mark the alignment of roads and railways so that the quantity of
earthwork both in cutting and filling should be minimum.
26
iv) For getting information about the ground whether it is flat,
undulating or mountainous.
v) To find the capacity of a reservoir and volume of earthwork
especially in a mountainous region.
vi) To trace out the given grade of a particular route.
vii)To locate the physical features of the ground such as a pond
depression, hill, steep or small slopes.
27
METHODS OF CONTOURING
• There are mainly two methods of
locating contours:-
(1)Direct Method and
(2) Indirect Method.
28
1] Direct Method:
• In this method, the contours to be
located are directly traced out in the
field by locating and marking a
number of points on each contour.
• These points are then surveyed and
plotted on plan and the contours
drawn through them.
• This method is most accurate but
very slow and tedious as a lot of time
is wasted in searching points of the
same elevation for a contour.
• This is suitable for small area and
where great accuracy is required
29
DIRECT METHOD OF
CONTOURING
50
48
B.M.
46
Procedure:
• To start with, a temporary B.M is established near the area to be
surveyed with reference to a permanent B.M by fly levelling.
• The level is then set up in such a position so that the maximum
number of points can be commanded from the instrument station.
• The height of instrument is determined by taking a back sight on the
B.M. and adding it to the R.L. of bench mark.
• The staff reading required to fix points on the various contours is
determined by subtracting the R.L. of each of the contours from the
height of instrument.
30
2. INDIRECT METHOD
• In this method the points located and surveyed are not necessarily
on the contour lines but the spot levels are taken along the series of
lines laid out over the area .
• The spot levels of the several representative points representing
hills, depressions, ridge and valley lines and the changes in the
slope all over the area to be contoured are also observed.
• Their positions are then plotted on the plan and the contours drawn
by interpolation.
• This method of contouring is also known as contouring by spot
levels.
31
• This method is commonly employed in all kinds of surveys as this is
cheaper, quicker and less tedious as compared to direct method.
There are mainly three method of contouring in indirect method:
• (I) BY SQUARES [SQUARE METHOD]:-
• In this method, the whole area is divided into number of squares,
the side of which may vary from 5m to 30m depending upon the
nature of the ground and the contour interval. The square need not
be of the same size throughout.
• The corners of the squares are pegged out and the reduced levels
of these points are determined with a level.
32
SQUARE METHOD
33
34
BY:- ANAND JIBHKATE
CIVIL ENGINEER

Contenu connexe

Tendances

Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in Survey
Lord1911
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversing
Dolat Ram
 
Contouring pdf
Contouring pdfContouring pdf
Contouring pdf
Gokul Saud
 

Tendances (20)

Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - Report
 
traversing of survey
traversing of surveytraversing of survey
traversing of survey
 
Plane Table Surveying PPt
Plane Table Surveying PPtPlane Table Surveying PPt
Plane Table Surveying PPt
 
12.1. Horizontal and vertical control (1).pptx
12.1.  Horizontal and vertical control (1).pptx12.1.  Horizontal and vertical control (1).pptx
12.1. Horizontal and vertical control (1).pptx
 
surveying contouring
surveying contouring surveying contouring
surveying contouring
 
Introduction to surveying, ranging and chaining
Introduction to surveying, ranging and chainingIntroduction to surveying, ranging and chaining
Introduction to surveying, ranging and chaining
 
Levelling
LevellingLevelling
Levelling
 
Levelling
LevellingLevelling
Levelling
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in Survey
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversing
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
Total station
Total stationTotal station
Total station
 
Triangulation survey
Triangulation surveyTriangulation survey
Triangulation survey
 
Contouring pdf
Contouring pdfContouring pdf
Contouring pdf
 
Triangulation and Trilateration
Triangulation and TrilaterationTriangulation and Trilateration
Triangulation and Trilateration
 
Lecture 05 distance measurement
Lecture 05 distance measurementLecture 05 distance measurement
Lecture 05 distance measurement
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
levelling survey
levelling surveylevelling survey
levelling survey
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 

En vedette

Leveling surveying
Leveling surveyingLeveling surveying
Leveling surveying
Mohammed_82
 
Basics Of Surveying
Basics Of SurveyingBasics Of Surveying
Basics Of Surveying
stooty s
 
Booking sheets, 2011 v1
Booking sheets, 2011 v1Booking sheets, 2011 v1
Booking sheets, 2011 v1
jbusse
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
XinYee Khoo
 

En vedette (20)

Leveling surveying
Leveling surveyingLeveling surveying
Leveling surveying
 
Contouring
ContouringContouring
Contouring
 
leveling and aligning in orthodontics
leveling and aligning in orthodonticsleveling and aligning in orthodontics
leveling and aligning in orthodontics
 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)
 
Types of level
Types of levelTypes of level
Types of level
 
Basics Of Surveying
Basics Of SurveyingBasics Of Surveying
Basics Of Surveying
 
Booking sheets, 2011 v1
Booking sheets, 2011 v1Booking sheets, 2011 v1
Booking sheets, 2011 v1
 
Contouring Report
Contouring ReportContouring Report
Contouring Report
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
 
Contouring - Surveying...for civil Engineering and Architecture..
Contouring - Surveying...for civil Engineering and Architecture..Contouring - Surveying...for civil Engineering and Architecture..
Contouring - Surveying...for civil Engineering and Architecture..
 
Lecture 1 precise levelling
Lecture 1 precise levellingLecture 1 precise levelling
Lecture 1 precise levelling
 
Surveying
Surveying Surveying
Surveying
 
I Download (1)
I Download (1)I Download (1)
I Download (1)
 
Design of R.C.C Beam
Design of R.C.C BeamDesign of R.C.C Beam
Design of R.C.C Beam
 
Segreeduc2011
Segreeduc2011Segreeduc2011
Segreeduc2011
 
Equity Research Report 06 february 2017 Ways2Capital
Equity Research Report 06 february 2017 Ways2CapitalEquity Research Report 06 february 2017 Ways2Capital
Equity Research Report 06 february 2017 Ways2Capital
 
nivelación compuesta
nivelación compuestanivelación compuesta
nivelación compuesta
 
Manual de topografia
Manual de topografiaManual de topografia
Manual de topografia
 
Ge 122 lecture 2 (PROJECT CONTROL SURVEY) by: Broddett Bello Abatayo
Ge 122 lecture 2 (PROJECT CONTROL SURVEY) by: Broddett Bello AbatayoGe 122 lecture 2 (PROJECT CONTROL SURVEY) by: Broddett Bello Abatayo
Ge 122 lecture 2 (PROJECT CONTROL SURVEY) by: Broddett Bello Abatayo
 
Q4 2016 Austin Office Research & Forecast Report
Q4 2016 Austin Office Research & Forecast ReportQ4 2016 Austin Office Research & Forecast Report
Q4 2016 Austin Office Research & Forecast Report
 

Similaire à LEVELING AND CONTOURING

FALLSEM2017-18_CLE1003_ETH_TT334_VL2017181007250_Reference Material II_CLE100...
FALLSEM2017-18_CLE1003_ETH_TT334_VL2017181007250_Reference Material II_CLE100...FALLSEM2017-18_CLE1003_ETH_TT334_VL2017181007250_Reference Material II_CLE100...
FALLSEM2017-18_CLE1003_ETH_TT334_VL2017181007250_Reference Material II_CLE100...
divyapriya balasubramani
 
contouring-180417110533.pdf
contouring-180417110533.pdfcontouring-180417110533.pdf
contouring-180417110533.pdf
shucaybcabdi
 
Introduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESIntroduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURES
Bahzad5
 
CET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdfCET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdf
KumkumaIp
 

Similaire à LEVELING AND CONTOURING (20)

FALLSEM2017-18_CLE1003_ETH_TT334_VL2017181007250_Reference Material II_CLE100...
FALLSEM2017-18_CLE1003_ETH_TT334_VL2017181007250_Reference Material II_CLE100...FALLSEM2017-18_CLE1003_ETH_TT334_VL2017181007250_Reference Material II_CLE100...
FALLSEM2017-18_CLE1003_ETH_TT334_VL2017181007250_Reference Material II_CLE100...
 
contouring-180417110533.pdf
contouring-180417110533.pdfcontouring-180417110533.pdf
contouring-180417110533.pdf
 
Contouring
ContouringContouring
Contouring
 
Levelling
LevellingLevelling
Levelling
 
Levelling
LevellingLevelling
Levelling
 
Module-IV SURVEYING-I [BTCVC304]
Module-IV SURVEYING-I [BTCVC304]Module-IV SURVEYING-I [BTCVC304]
Module-IV SURVEYING-I [BTCVC304]
 
Ch 5 levelling
Ch 5 levellingCh 5 levelling
Ch 5 levelling
 
Levelling
LevellingLevelling
Levelling
 
3_ORDINARY SPIRIT LEVELLING.pptx
3_ORDINARY SPIRIT LEVELLING.pptx3_ORDINARY SPIRIT LEVELLING.pptx
3_ORDINARY SPIRIT LEVELLING.pptx
 
Elevation measurement_Surveying, Civil Engineering
Elevation measurement_Surveying, Civil EngineeringElevation measurement_Surveying, Civil Engineering
Elevation measurement_Surveying, Civil Engineering
 
Introduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESIntroduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURES
 
surveying-as.pptx
surveying-as.pptxsurveying-as.pptx
surveying-as.pptx
 
Introduction to Surveying .pptx
Introduction to Surveying .pptxIntroduction to Surveying .pptx
Introduction to Surveying .pptx
 
CET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdfCET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdf
 
UNIT FOUR.pptx
UNIT FOUR.pptxUNIT FOUR.pptx
UNIT FOUR.pptx
 
B.sc. agri i foswce unit 2 leveling
B.sc. agri i foswce unit 2 levelingB.sc. agri i foswce unit 2 leveling
B.sc. agri i foswce unit 2 leveling
 
B.sc. agri i foswce unit 2 leveling
B.sc. agri i foswce unit 2 levelingB.sc. agri i foswce unit 2 leveling
B.sc. agri i foswce unit 2 leveling
 
Levelling
LevellingLevelling
Levelling
 
Site Surveying Leveling
Site Surveying LevelingSite Surveying Leveling
Site Surveying Leveling
 
Mohammed kareem
Mohammed kareemMohammed kareem
Mohammed kareem
 

Dernier

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 

Dernier (20)

Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 

LEVELING AND CONTOURING

  • 1. 1 BY :- ANAND JIBHKATE CIVIL ENGINEER
  • 2. LEVELLING According to science • Leveling is a branch of surveying which deals with the measurement of relative heights of different points on, above or below the surface of the earth. Thus in leveling, the measurements (elevations) are taken in the vertical plane. Simple Definition • Leveling is the process used to determine a difference in elevation between two points. 2
  • 3. Definitions • Station:- A point where the levelling staff is kept. • Height of instrument:- It is the elevation of the plane of sight with respect to assumed datum. It is also known as plane of collimation. • Datum line ( M.S.L. ) :- Is the level (line) which are attributed to it points levels on the surface of the Earth. Which is the average sea level. • Reduced level ( R.L) :- Is the high point from datum line. • Benchmark (B .M ) :- Are fixed points information site and attributed placed in different places until you start racing them when conducting settlement . • Back sight ( B.S.) :- Is the first reading taken after placing the device in any position so that we see the greatest possible number of points required to find the elevation . 3
  • 5. • Fore sight (F.S) :- Is the last reading taken before the transfer device. • Change point(CP) or turning point(TP): The point at which both BS and FS are taken. • Intermediate sight ( I.S.) :- Is reading taken between the back sight and fore sight reading . • Elevation of line of sight ( H.I) :- Is the imaginary vertical level determined by the line of sight to the amount of increase or decrease for sea level . 5
  • 6. • Tripod stand :- is a portable three-legged frame, used as a platform for supporting the weight and maintaining the stability of some other object. PLUMB BOBTRIPOD STAND TRIPOD STAND 6
  • 7. 7
  • 8. • Leveling Staff :-Is a wooden or metal ruler one side runway to meters and centimeters. And is a ruler of solid wood 2 , 3 , 4 , 5 meters in length and usually 4 meters . 8
  • 9. • Leveling of the instrument is done to make the vertical axis of the instrument truly vertical. It is achieved by carrying out the following steps: • Step 1: The level tube is brought parallel to any two of the foot screws, by rotating the upper part of the instrument. • Step 2: The bubble is brought to the centre of the level tube by rotating both the foot screws either inward or outward. (The bubble moves in the same direction as the left thumb.) • Step 3: The level tube is then brought over the third foot screw again by rotating the upper part of the instrument. • Step 4: The bubble is then again brought to the centre of the level tube by rotating the third foot screw either inward or outward. 9
  • 10. • Step 5: By rotating the upper part of the instrument through 180 ° , the level tube is brought parallel to first two foot screws in reverse order. The bubble will remain in the centre if the instrument is in permanent adjustment. 10
  • 11. TYPES OF LEVELLING 1] Simple levelling 2] Differential levelling 3] Fly levelling 4] Profile levelling 5] Cross sectional levelling 6] Reciprocal levelling There are two methods for obtaining the elevations at different points: 1] Height of instrument (or plane of collimation) method 2] Rise and fall method 11
  • 12. Simple levelling:- • When the difference in the elevation of two nearby points is required then simple levelling is performed. 12
  • 13. Differential levelling:- • Performed when the final point is very far from the final point. 13
  • 14. Fly levelling • Performed when the work site is very far away from the bench mark. • The surveyor starts by taking BS at BM and proceed towards worksite till he finds a suitable place for temporary BM. All works are done with respect to temporary BM. • At the end of the day the surveyor comes back to original BM. • This is called fly levelling. 14
  • 15. Profile levelling:- •Profile levelling, which yields elevations at definite points along a reference line, provides the needed data for designing facilities such as highways, railroads, transmission lines. •Reduced levels at various points at regular interval along the line is calculated. •After getting the RL of various points the profile is drawn. Normally vertical scale is much larger than horizontal scale for the clear view of the profile. 15
  • 16. Reciprocal levelling:- When levelling across river is required then this method is applied to get rid of various errors. 16
  • 17. METHODS 1] Height of Instrument method • The basic equations are • Height of instrument for the first setting= RL of BM + BS(at BM) • Subtract the IS and FS from HI to get RL of intermediate stations and change points. • Checking: ΣBS -ΣFS = Last RL –First RL. This is –ve for FALL and +ve for RISE. 17
  • 18. 18
  • 19. METHODS 2] Rise and Fall method • In this method the difference of the present staff reading is subtracted from the previous staff reading. • Previous reading –present staff reading = +ve, denotes RISE • Previous reading –present staff reading = -ve, denotes FALL • Checking: ΣBS -ΣFS = Last RL –First RL= ΣRise -ΣFall 19
  • 20. 20
  • 21. BENCH MARK ELEVATED e.g. 100m ? TOP OF SLOPE FIND THE DIFFERENT BETWEEN BENCH MARK AND TOP OF SLOPE Divide hill into 3 spots to make easier Otherwise too far to see or level staff not long enough Back sight 9 m Rotate dumpy round Move level staff to new spot Fore sight 2 m Move dumpy level to new spot Back sight 6 m Fore sight 1 m Rotate dumpy round Move level staff to new spot 21
  • 22. Ground level Back sight [from dumpy level] Height of instrument [ground level+ back sight from dumpy level] Fore sight [from dumpy level] Height of new point [height of instrument fore sight] Bench mark 100 9 109 2 107 107 6 113 1 112 Back sight 9 m Fore sight 2 m Back sight 6 m Fore sight 1 m Level of dumpy=109m Level of dumpy=113m 9m 100m+ 9m 6m 6m+107m 1m 2m BENCH MARK ELEVATED e.g. 100m SO THE DIFFERENCE IN HEIGHT IS 112-100=12M 22
  • 24. • Contours are those lines you can see on OS maps. • A contour line is an imaginary line that joins points of equal height above sea level. • They can be used to learn about the shape of the land (the relief). • A map with only a few contour lines will be flat (and often low lying) • If a map has lots of contours it is a mountainous or hilly area. • The actual pattern of the lines will tell you more detail about the area too. Steep slopes Area that is flatter with only a gentle slope 24
  • 25. CONTOURS • Contour An imaginary line on the ground surface joining the points of equal elevation is known as contour. • In other words, contour is a line in which the ground surface is intersected by a level surface obtained by joining points of equal elevation. This line on the map represents a contour and is called contour line. • Contour Map :-A map showing contour lines is known as Contour map. • A contour map gives an idea of the altitudes of the surface features as well as their relative positions in plan serves the purpose of both, a plan and a section. 25
  • 26. Contouring • The process of tracing contour lines on the surface of the earth is called Contouring. • PURPOSE OF CONTOURING • Contour survey is carried out at the starting of any engineering project such as a road, a railway, a canal, a dam, a building etc. i) For preparing contour maps in order to select the most economical or suitable site. ii) To locate the alignment of a canal so that it should follow a ridge line. iii) To mark the alignment of roads and railways so that the quantity of earthwork both in cutting and filling should be minimum. 26
  • 27. iv) For getting information about the ground whether it is flat, undulating or mountainous. v) To find the capacity of a reservoir and volume of earthwork especially in a mountainous region. vi) To trace out the given grade of a particular route. vii)To locate the physical features of the ground such as a pond depression, hill, steep or small slopes. 27
  • 28. METHODS OF CONTOURING • There are mainly two methods of locating contours:- (1)Direct Method and (2) Indirect Method. 28
  • 29. 1] Direct Method: • In this method, the contours to be located are directly traced out in the field by locating and marking a number of points on each contour. • These points are then surveyed and plotted on plan and the contours drawn through them. • This method is most accurate but very slow and tedious as a lot of time is wasted in searching points of the same elevation for a contour. • This is suitable for small area and where great accuracy is required 29 DIRECT METHOD OF CONTOURING 50 48 B.M. 46
  • 30. Procedure: • To start with, a temporary B.M is established near the area to be surveyed with reference to a permanent B.M by fly levelling. • The level is then set up in such a position so that the maximum number of points can be commanded from the instrument station. • The height of instrument is determined by taking a back sight on the B.M. and adding it to the R.L. of bench mark. • The staff reading required to fix points on the various contours is determined by subtracting the R.L. of each of the contours from the height of instrument. 30
  • 31. 2. INDIRECT METHOD • In this method the points located and surveyed are not necessarily on the contour lines but the spot levels are taken along the series of lines laid out over the area . • The spot levels of the several representative points representing hills, depressions, ridge and valley lines and the changes in the slope all over the area to be contoured are also observed. • Their positions are then plotted on the plan and the contours drawn by interpolation. • This method of contouring is also known as contouring by spot levels. 31
  • 32. • This method is commonly employed in all kinds of surveys as this is cheaper, quicker and less tedious as compared to direct method. There are mainly three method of contouring in indirect method: • (I) BY SQUARES [SQUARE METHOD]:- • In this method, the whole area is divided into number of squares, the side of which may vary from 5m to 30m depending upon the nature of the ground and the contour interval. The square need not be of the same size throughout. • The corners of the squares are pegged out and the reduced levels of these points are determined with a level. 32